AGREEMENT FOR GUARANTEE MAXIMUM PRICE CONSTRUCTION SERVICES CHANGE ORDER 12 August 2002
QuickLinks -- Click here to rapidly navigate through this document
AGREEMENT FOR GUARANTEE MAXIMUM PRICE
CONSTRUCTION SERVICES
CHANGE ORDER
12 August 2002
Project: Le Rêve | Change in Order No.: 1 | |
"Contractor": XXXXXXX XXXXXX ASSOCIATES, INC. 0000 Xxxxx Xxxxxxx Xxxxxx Xxx Xxxxx, Xxxxxx 00000 |
"Owner": XXXX LAS VEGAS, LLC 0000 Xxx Xxxxx Xxxxxxxxx Xx. Xxx Xxxxx, Xxxxxx 00000 |
That certain Agreement for Guaranteed Maximum Price Construction Services between Owner and Contractor for Le Rêve dated as of June 4, 2002 ("Contract") is hereby modified as follows:
- 1.
- SCOPE OF WORK
- A.
- Highrise Height Increase
- (i)
- Description. Increase typical guestroom floor height by one foot per floor. All Work shall be in
accordance with revised design criteria published 7/18/02 by Xxxx Design and Development, including the revised Architectural section published by Xxxxxx Xxxxxxxx on 7/15/02.
- (ii)
- Increase/Decrease to Guaranteed Maximum Price. Total increase per MCA Change Proposal No. 1 dated 8/9/02, $7,930,581.00.
- B.
- Suite Wallcovering
- (i)
- Description. Install Owner furnished wallcovering in lieu of providing finished paint surfaces at walls
specified by Owner throughout the Executive, Parlor and Salon Suites.
- (ii)
- Increase/Decrease to Guaranteed Maximum Price. Total increase per MCA Change Proposal No. 2 dated 8/9/02, $87,125.00.
- C.
- Project Bid Extension
- (i)
- Description. Increase costs due to extension of Highrise Subcontractor bids through September 2002, in
support of the revised anticipated Project start date.
- (ii)
- Increase/Decrease to Guaranteed Maximum Price. Total increase per MCA Change Proposal No. 3 dated 8/9/02, $643,798.00.
- D.
- Revised Room Mix/Salon Suite Revisions
- (i)
- Description. Provide all Work associated with the revised room mix and Salon suite modifications as
shown in the Salon model room and including Xxxx Design and Development correspondence dated 7/3/02 & 7/10/02 and revised Highrise drawings dated 6/24/02 as issued by Xxxxxx Xxxxxxxx.
- (ii)
- Increase/Decrease to Guaranteed Maximum Price. Total increase per MCA Change Proposal No. 4 dated 8/9/02, $1,592,895.00.
- E.
- Highrise Media Revisions
The Scope of Work is changed as follows:
- (i)
- Description. Revise guestroom audio/visual systems to incorporate the use of plasma televisions in lieu
of traditional CRT/armoire units as depicted by Preliminary Design Drawings issued by Xxxxxx Xxxxxxxx dated 8/8/02.
- (ii)
- Increase/Decrease to Guaranteed Maximum Price. Total allowance per revised guestroom plans issued 8/8/02, $779,000.00.
- F.
- Lanai Program Revisions
- (i)
- Description. Reduce the Lanai Corridor width from 12' wide to 8' and modify plan to create a net footage
reduction as specified by Owner. Incorporate a direct connection to VIP Pool Deck and add one guest elevator for a total of two (2).
- (ii)
- Increase/Decrease to Guaranteed Maximum Price. Total decrease per Program Area revisions and revised Master Plans, both dated 7/19/02 ($347,470.00).
- X.
- Xxxxx Program Revisions
- (i)
- Description. Modify Villa program to reflect the incorporation of dining rooms, pantries and the
addition of a residential type elevator, one (1) each, in the two four bedroom Villas as specified by Owner.
- (ii)
- Increase/Decrease to Guaranteed Maximum Price. Total increase per Program Area revisions and revised Master Plans, both dated 7/19/02 $116,287.00.
- H.
- Lowrise Building Area Revision—Casino Level
- (i)
- Description. Modify program areas to reflect square footage as provided in revised Master Plans and
Program Area revisions, both dated 7/19/02. Revise retail store lease mix and adjust Tenant fit-out allowances to reflect current lease arrangements as provided by Owner to Contractor.
- (ii)
- Increase/Decrease to Guaranteed Maximum Price. Total decrease per Program Area revisions and revised Master Plans, both dated 7/19/02 ($1,518,360.00).
- I.
- Lowrise Building Area Revision—Mezzanine Level
- (i)
- Description. Modify program areas to reflect square footage as provided in revised Master Plans and
Program Area revisions, both dated 7/19/02. Incorporate room reservations and PBX into Mezzanine level from Spa level as specified by Owner.
- (ii)
- Increase/Decrease to Guaranteed Maximum Price. Total increase per Program Area revisions and revised Master Plans, both dated 7/19/02 $1,021,426.00.
- J.
- Lowrise Building Area Revision—Sea Level
- (i)
- Description. Modify program areas to reflect square footage as provided in revised Master Plans and
Program Area revisions, both dated 7/19/02. Add property Executive Offices and increase mechanical room footage as specified by Owner. Relocate Arcade from Casino Level.
- (ii)
- Increase/Decrease to Guaranteed Maximum Price. Total increase per Program Area revisions and revised Master Plans, both dated 7/19/02 $2,853,419.00.
- K.
- Lowrise Building Area Revision—Basement
- (i)
- Description. Modify program areas to reflect square footage as provided in revised Master Plans and Program Area revisions, both dated 7/19/02. Consolidate finance and accounting functions on basement level and increase footage as specified by Owner.
2
- (ii)
- Increase/Decrease to Guaranteed Maximum Price. Total increase per Program Area revisions and revised Master Plans, both dated 7/19/02 $5,078,835.00.
- L.
- Lowrise Building Area Revision—Parking/Pool Level
- (i)
- Description. Modify program areas to reflect square footage as provided in revised Master Plans and
Program Area revisions, both dated 7/19/02.
- (ii)
- Increase/Decrease to Guaranteed Maximum Price. Total increase per Program Area revisions and revised Master Plans, both dated 7/19/02 $179,015.00.
- M.
- Exterior Feature—Lake
- (i)
- Description. Reduce open water area on Lake Feature per revised Master Plans dated 7/19/02.
New plan creates distinct venues as opposed to one large lake feature.
- (ii)
- Increase/Decrease to Guaranteed Maximum Price. Total decrease per Program Area revisions and revised Master Plans, both dated 7/19/02 ($776,336.00).
- N.
- Exterior Features—General
- (i)
- Description. Reduce north bus/shuttle plaza and entry canopy, and increase exterior exit
stairs, as specified by Owner.
- (ii)
- Increase/Decrease to Guaranteed Maximum Price. Total decrease per Program Area revisions and revised Master Plans, both dated 7/19/02 ($3,985.00).
- O.
- Exterior Features—Main Pool
- (i)
- Description. Reduce cabana count at main pool area and add pool bar as specified by Owner.
- (ii)
- Increase/Decrease to Guaranteed Maximum Price. Total decrease per Program Area revisions and Master Plans, both dated 7/19/02 ($104,566.00).
- P.
- Exterior Features—Basement Level
- (i)
- Description. Modify exterior patio footage per 7/19/02 master plan and eliminate Steakhouse moving patio allowance
of $500,000.00
- (ii)
- Increase/Decrease to Guaranteed Maximum Price. Total decrease per Program Area revisions and revised Master Plans, both dated 7/19//02 ($1,285,859.00).
- Q.
- Exterior Features—Casino Level
- (i)
- Description. Modify exterior patio footage per 7/19/02 revised Master Plans. Add lakeside
viewing balconies at retail promenade, channel and registration lobby as specified by Owner. Add 12 cabana structures at VIP pool deck.
- (ii)
- Increase/Decrease to Guaranteed Maximum Price. Total increase per Program Area revisions and revised Master Plans, both dated 7/19/02 $1,093,068.00.
- R.
- Site Improvements—Valet
- (i)
- Description. Modify valet circulation ramps and add direct access to Ferrari service area
as specified by Owner.
- (ii)
- Increase/Decrease to Guaranteed Maximum Price. Total increase per Program Area revisions and revised Master Plans, both dated 7/19/02 $119,700.00.
Provide 3,000 sq. ft. shell space for dry cleaning tenant. Revise Italian and Steak restaurant footage to reflect revised Master Plan dated 7/19/02
3
Total Scope of Work Change Order No. 1 amount $17,458,573
- 2.
- INCREASE TO GUARANTEED MAXIMUM PRICE.
The Guaranteed Maximum Price set forth in Section 3.1 of the Contract is by this Change Order hereby increased from $901,883,710.00 to $919,342,283.00, based on the Changes described in Paragraph 1 above. The detailed breakdown of the foregoing increase is contained in the Revised Contractors Work and Guaranteed Maximum Price Breakdown labeled as Revised Exhibit F and dated 12 August 2002, and attached to this Change Order. Accordingly, the original Guaranteed Maximum Price Breakdown attached as Exhibit F to the Contract is hereby deleted and substituted therefore is the Revised Contractors Work and Guaranteed Maximum Price Breakdown attached hereto. From and after the date of this Change Order, all references in the Contract Documents to the "Guaranteed Maximum Price Breakdown" attached as Exhibit F to the Contract, shall mean and refer to the Revised Contractors Work and Guaranteed Maximum Price Breakdown attached hereto as Revised Exhibit F. From and after the date of this Change Order, any and all references in the Contract Documents to the "Guaranteed Maximum Price" shall mean the amount of $919,342,283.00.
- 3.
- PROJECT SCHEDULE
The original Project Schedule attached as Exhibit B to the Contract is hereby deleted and substituted therefore is the Revised Project Schedule dated August 12, 2002 and attached to this Change Order and labeled Revised Exhibit B. From and after the date of this Change Order, all references in the Contract Documents to the term "Project Schedule," shall mean and refer to the Revised Project Schedule dated August 12, 2002 and attached hereto as Revised Exhibit B. The Contract Time of 910 calendar days from Date of Commencement, and the Guaranteed Date of Substantial Completion, as defined in Section 4.1 of the Contract, remain unchanged by this Change Order.
4
All initial capitalized terms used in this Change Order shall have the meaning ascribed to them in the Contract, unless otherwise defined herein. This Change Order is effective as of August 12, 2002.
OWNER: | CONTRACTOR: | |||||||||
XXXX LAS VEGAS, LLC a Nevada limited liability company, |
XXXXXXX XXXXXX ASSOCIATES, INC. a Nevada corporation |
|||||||||
By: |
Wynn Resorts Holdings, LLC, a Nevada limited liability company, its sole member |
By: |
/s/ Xxxxx Xxxxx Name: Xxxxx Xxxxxx Its: President |
|||||||
By: | Xxxxxxx Xxxxxx, LLC, a Nevada limited liability company, its sole member |
|||||||||
By: |
/s/ Xxxxxxx X. Xxxx Name: Xxxxxxx X. Xxxx Its: Managing Member |
|||||||||
ARCHITECT: |
||||||||||
XXXXXX XXXXXXXX ARCHITECTS, LLC |
||||||||||
By: |
/s/ Xxxx Xxxxxxxx Name: Xxxx Xxxxxxxx Its: Vice President and Secretary |
5
AGREEMENT FOR GUARANTEE MAXIMUM PRICE CONSTRUCTION SERVICES CHANGE ORDER 12 August 2002