Licence Agreement for SCD Technology
Exhibit 10.6
for SCD Technology
between
aerodyn Asia CO. LTD
Xxxxx 0000, Xxxxx0
Xxxxx Xxxxxx, 00 Xxxxxxxxx
Xxxx Xxxx
- hereinafter referred to as the Licensor -
and
Guangdong Mingyang Wind Power Technology Co. Ltd.
Jianye Rd, Torch Hi-Tech Industry Zone,
Zhongshan 528437,
Guangdong, P.R. China
- hereinafter referred to as Licensee -
(each a “party” and collectively the “parties”)
This contract-without annexes-consists of a total of 36 pages.
It is drafted in triplicate (i.e. three identical copies)
Licence Agreement of SCD (2008-07-28)
Page 1 of 36
Table of Contents
List of Annexes | 3 | |||
Definitions | 4 | |||
Preamble | ||||
A. Parties to the Contract on the Part of Licensor |
8 | |||
B. The Idea of the SCD Concept |
9 | |||
C. Demands on Licensee as Manufacturer |
10 | |||
Provisions of the Agreement | ||||
Art. 1 | Subject-matter under Licence |
11 | ||
Art. 2 | Granting of Licence |
12 | ||
Art. 3 | Contractual Territory |
13 | ||
Art. 4 | Duties of Licensor |
13 | ||
Art. 5 | Duties of Licensee |
16 | ||
Art. 6 | Suppliers |
18 | ||
Art. 7 | Further Development of the WECS under the Agreement |
19 | ||
Art. 8 | Subcontracts |
20 | ||
Art. 9 | QM Demands on Licensee |
20 | ||
Art. 10 | Communication |
21 | ||
Art. 11 | Warranties on the Part of Licensor |
22 | ||
Art. 12 | Restrictions on Liability for Licensor |
24 | ||
Art. 13 | Preservation and Defence of Industrial Property Rights |
24 | ||
Art. 14 | Basic payment |
25 | ||
Art. 15 | Royalties |
25 | ||
Art. 16 | Option for the Benefit of Licensee in the Event of Initial Public Offering (IPO) |
27 | ||
Art. 17 | Invoicing Procedure |
28 | ||
Art. 18 | Taxes |
28 | ||
Art. 19 | Confidentiality |
29 | ||
Art. 20 | Non-competition Clause |
30 | ||
Art. 21 | Duration of Agreement |
30 | ||
Art. 22 | Termination of Agreement |
31 | ||
Art. 23 | Termination of Exclusiveness and of Restriction of Distribution to Contractual Territory |
32 | ||
Art. 24 | Capacity to Enter into this Agreement |
33 | ||
Art. 25 | Force Majeure |
33 | ||
Art. 26 | Settlement of Disputes, Governing Law |
33 | ||
Art. 27 | Additional Agreements |
34 |
Licence Agreement of SCD (2008-07-28)
Page 2 of 36
List of Annexes
Annex | Source | Content | ||
1 | Preamble | Licensor’s Organisational Chart | ||
2 | Art. 1.1 | Technical Features of Onshore WECSs of 2.5 to 3 MW | ||
3 | Art. 1.1 | Technical Features of Offshore WECSs of 5 to 6 MW | ||
4 | Art. 1.2 | Status of Industrial Property Rights | ||
5 | Art. 1.3 | Responsibilities | ||
6 | Art. 2.1 | List of Documents | ||
7 | Art. 4.7 | Conditions of Location and Commissioning of Prototype | ||
8 | Art. 4.7 | Prototype Report | ||
9 | Art. 4.8 | Conditions of Clearance for Series Production | ||
10 | Art. 4.8 | Supports for Prototype/Series Production | ||
11 | Art. 6.1 | List of Suppliers | ||
12 | Art. 9.2 | Guidelines on Quality Management of Germanischer Xxxxx | ||
13 | Art. 14 | Basic Payment Schedule | ||
14 | Art. 21.3 | Time Schedule |
Licence Agreement of SCD (2008-07-28)
Page 3 of 36
Definitions
A-design assessment is a complete examination of the design analyses with the required material and component tests is required, together with witnessing of the commissioning of one of the first wind turbines. The detail information is referred to GL certification guidelines.
Basic Documents: Basic Documents are documents essential for performing the contractual, task. Among these are requirements lists, specifications, drawings, calculation documentation, descriptions, summary records, etc.
Basic Engineer: All work related to the preparation of concepts, preliminary calculations, preliminary designs, specifications, requirements lists and descriptions of the basic characteristics of components or assemblies. The results will form the basis of the Detail Engineering.
Certification Authority is the institution that examines the above documents which are subject to authorisation in order to be licensed. This procedure is completed by a type approval or a certificate. Authorities to carry out such tests are, for example, Germanischer Xxxxx, TUEV or Det Norske Veritas.
Competitors of Licensor are companies occupied with conception, development, construction, production and sales of wind energy converters as a whole or of parts thereof, no matter whether they do so for external customers or for their own products.
Contractual Equipment: The wind energy converter to be developed according to this Agreement is referred to as ‘Contractual Equipment’.
Contractual Know-how is the knowledge of design data, construction principles, detailed solutions, calculation results and other information regarding the Contractual Equipment.
Construction Drawing: A drawing that contains all information, including, but not limited to, material number and, if necessary, physical properties, tolerances and surface treatment in order to prepare a full set of manufacturing drawings for a component or assembly.
Licence Agreement of SCD (2008-07-28)
Page 4 of 36
Declaration of Release is the written confirmation issued by a Certification Authority regarding the safety of the design in accordance with the data in a given document.
Defects means any situation in which the Deliverables, the Work, the Contractual Equipment or the Project in their entirety or parts thereof, in particular, but not limited to, the design solutions and the results of the development services, are not in compliance with the requirements of this Agreement.
Deliverables shall mean any and all documentation, reports, drawings, data and information, regardless of the format, to be provided by the Licensor to the Licensee according to the Agreement.
Detail Engineering: All work related to the preparation of detail design calculations and documentation, including all documents that are necessary for approval by the Certification Authority, such as calculation documents, Construction Drawings and specifications.
Documentation for Certification: Documentation that fulfils all requirements of the Certification Authority in order to certify the component or calculation. These documents include all the input data used, boundary conditions and all necessary results. The documentation does not contain descriptions of calculation methods or calculation formulas.
Internal Documentation: Documentation that contains general information about a component or calculation showing the most important results. It is used to check the design or calculation internally within the Licensor’s company. It does not contain all the information requested by the Certification Authority.
Know-how of the Licensor: This know-how includes documented and secret technical knowledge as well as the economic and commercial knowledge of the Licensor. This complex know-how that is not in the public domain is essential in order to enable the development of wind energy converters. This particularly refers to design principles, procedures and calculation documentation.
Manufacturing Drawing: A drawing or a set of drawings containing all the information required for the manufacturing of a component or an assembly which can be used directly by the employee in the workshop.
Licence Agreement of SCD (2008-07-28)
Page 5 of 36
Mainland of China is the P.R.C., excluding the province of Taiwan.
Megawatt (MW) is the nominal output of the WECS in a certain Power Category.
Nominal Output of the WECS is the assumed maximum electrical power of a wind energy converter system (WECS) that can be achieved in continuous operation.
Power Category is the size of a WEC specified with its nominal output. Two power categories in this contract are included, i.e. 2.5/3.0 MW WECS and 5.0/6.0 MW WECS.
Purchase Price is the gross price for the complete WECS including the tower to be sold by Licensee to its customer.
Secret shall be the technical knowledge of the Licensor which is not in the public domain and which is essential for the development, production and distribution of WECSs. In particular, such knowledge shall include the EDP-based methods of calculation for the development of WECSs and components.
Specification: A document that describes the main characteristic of a component, including, but not limited to, the loads on the components, the main dimensions, environmental conditions, performance parameters, test standards, crucial quality characteristics, if necessary, as well as the scope of delivery.
Substantial Defects shall mean any defect that is of such a nature and such an extent that it affects the operating ability of the Project or Contractual Equipment.
Third party is a party which is not directly involved in this license contract but anyhow has a contract with one of this License contract parties.
Type certificate: besides A-design assessment, the implementation of the design requirements in production and erection, quality management system and prototype test of the wind turbine are also necessarily required to attain the Type Certificate.
Licence Agreement of SCD (2008-07-28)
Page 6 of 36
Regulation: The examination of documents subject to authorisation is carried out in accordance with certain technical recommendations which are applied depending on the scope of application. The usual regulations are those laid down by Germanischer Xxxxx, DNV or IEC.
Wind Energy Converter System (WECS): A wind energy converter system is a technical unit that converts wind energy into electrical energy. It includes the following components: rotor blades, machine nacelle with all aggregates, tower, as well, as electrical and electronic devices of the, converter. The interface between wind energy converter and foundation is the flange connection at the tower base.
Work shall mean any and all activities and responsibilities required under and reasonably inferred from this Agreement that are necessary in order to perform this Agreement, including, without limitation, the supply of Deliverables, remedy of defects and technical services.
Licence Agreement of SCD (2008-07-28)
Page 7 of 36
Preamble
A. Parties to the Contract on the Part of Licensor
Xx Xxxxxx Siegfriedsen is the inventor of the SCD system concept and shareholder as well as managing director of the Licensor, aerodyn ASIA Co Ltd., a accompany has its registered office in Hong Kong. The said company is the owner of the exclusive right to grant licences for the SCD Technology.
Coordinator as regards the implementation of the SCD Technology project is aerodyn development + marketing GmbH, a company having its registered office in Rendsburg. Sole shareholder and managing director of the said company is also Xx. Xxxxxx Siegfriedsen. It is the responsibility of this company to coordinate the converter system development with all development partners; among these are aerodyn Energiesysteme GmbH in Rendsburg, other qualified engineering consultancies, manufacturers of components and further partners such as the Certification Authority.
aerodyn Energiesysteme GmbH is an important development partner for the converter-structure design, for the structure and aerodynamics of rotor blades, tower, technical documentation and certification documentation.
aerodyn Energiesysteme GmbH, which was found by Xx Xxxxxx Siegfriedsen in 1983, is an engineering consultancy that has focused on business activities in the field of wind energy, since then having done business with about 30 different manufacturers of Wind Energy Converter Systems (WECSs) and having worked on about 65 different types of WECSs. Thus aerodyn Energiesysteme GmbH has many years of experience in the work on and development of complete WECSs and individual components via a comprehensive understanding of the technical and economic interconnections of different kinds of WECSs. aerodyn Energiesysteme GmbH has the ability to design complete WECSs and has performed such complete WECS design for turbines of up to 5MW rated power.
aerodyn Engineering GmbH is a company whose sole shareholder is Soenke Siegfriedsen. It is responsible for managing the industrial property rights owned by Soenke Siegfriedsen.
Licence Agreement of SCD (2008-07-28)
Page 8 of 36
Another partner will be aerodyn products + trading Ltd., a subsidiary of aerodyn ASIA Co. Ltd; having its registered office in Shanghai. The said company will be in charge of the technical support for assembly, erection and testing of the prototype WECS as well as the provision of consultancy services to the Licensee during series production.
The enterprises and persons involved in the SCD project on the part of the Licensor are described in the organisational chart enclosed herewith as Annex 1.
B. The Idea of the SCD Concept
The idea of the SCD concept was developed on the basis of the Multibrid technology. The Multibrid concept was developed by aerodyn Energiesysteme GmbH between 1998 and 2004, thereby laying the foundations of another forward-looking technology. The development know-how of aerodyn Energiesysteme also has some influence on the project in the case of the SCD Technology.
The technical concept of the SCD Technology is based on the fact that the main drive train components such as rotor bearing, gear and generator are designed as a compact unit. The two casings of gear and generator are integrated into the load flow resulting from the rotor in the tower; loads are transferred via the casings.
Further features: The tower head is built in a lightweight and compact manner, the system does not require a nacelle casing, and the Wind Energy Converter System is equipped with a two-blade rotor. All these features result in a low-cost manufacturing concept. A minor disadvantage of this concept is a slightly higher noise emission, which has an influence on the choice of location.
Since the end of 2005, aerodyn Energiesysteme has worked intensively on the innovative SCD concept in order to prove the feasibility of this concept in practice. All main components have been designed provisionally to estimate dimensions and costs. Moreover, external specialists have been called in to examine gear design, generator design and overall dynamics, i.e. the dynamic behaviour of the entire system.
Licence Agreement of SCD (2008-07-28)
Page 9 of 36
The entire Detail Engineering, including the furnishing of proof with regard to the certification as well as the preparation of all manufacturing documents, is planned for 2008/2009. It is furthermore planned to involve Germanischer Xxxxx (GL) and Allianz Zentrum fur Technik (AZT) in the design work as advisers from the beginning.
C. Demands on Licensee as Manufacturer
Due to production depth and the number of units to be achieved in production, the Licensee has to fulfil the following conditions:
a) | High capitalisation in order to pre-finance the manufacturing facilities and pre-production run; |
b) | Excellent access to the markets and operators of Wind Energy Converter-Systems in order to be able to sell the required number of units (approx. 1,000 converters per year); |
c) | Sufficiently qualified personnel at the Licensee’s disposal, with appropriate capacities in management, technology, engineering and production; |
d) | Technical equipment and operational organisation in order to comply with the quality standards according to the Licensor’s QM requirements, confirmed by a shop approval by Germanischer Xxxxx. |
Licence Agreement of SCD (2008-07-28)
Page 10 of 36
The details of the Agreement are described in the following provisions:
Provisions of the Agreement
Art. 1 Subject-matter under Licence
1.1 | Subject-matter under licence shall be the Licensor’s industrial property rights and know-how with regard to a new Wind. Energy Converter System concept relating to the SCD Technology, the technical features of which are specified in Annex 2 as far as onshore WECSs of a Power Category of 2.5 to 3 MW are concerned and the technical features, of which are specified in Annex 3 as far as offshore WECSs of a Power Category of 5 to 6 MW are concerned. Under this Agreement, the licence will be granted for both power categories jointly. The Licensor is and will remain as the holder of all rights in the construction of the WECS under the Agreement as well as owner of all documents required for manufacture, the results of calculation, and all further developments resulting from this Agreement. |
1.2 | In order to realise the SCD project, industrial property rights are required. Owner of such industrial property rights is aerodyn Engineering GmbH. Some of the said industrial property rights have been granted, some of them have been applied for and others still have to be applied for. An overview of the industrial property rights showing the status, country and term is enclosed with this Agreement as Annex 4. The Licensor hereby assures the Licensee that it is entitled to avail itself of the rights of use with regard to the industrial property rights of aerodyn Engineering GmbH without restriction. |
1.3 | The tasks and responsibilities regarding development of the WECS, purchase of components, assembly and tests, transport and erection, commissioning and measurement as well as series production are stipulated in Annex 5. |
Licence Agreement of SCD (2008-07-28)
Page 11 of 36
Art. 2 Granting of Licence
2.1 | By this Agreement, the Licensor shall grant the Licensee the exclusive right for the manufacture of the WECS under the Agreement according to Annex 2 and Annex 3 and the distribution thereof in the contractual territory, as well as a non-exclusive right to use the industrial property rights listed in Annex 4 and the Contractual Know-how and shall for this purpose deliver to the Licensee all documents, specifications, other technical papers, plans and manuals listed in Annex 6. Delivery of the documents will enable the Licensee to manufacture almost all components itself. |
2.2 | The granting of sublicenses by the Licensee is not permitted. This shall particularly apply with regard to enterprises with which the Licensee has a direct or indirect participating relationship or is in the same group of companies. |
2.3 | Changes to the Contractual Know-how and design changes to the WECS under the Agreement as well as the further development thereof by the Licensee shall not be permitted (for the details of further development see Art. 7). Under this Licence Agreement, the Licensor shall not be obligated to develop the WECS under the Agreement further unless a separate contract is concluded in this respect. |
2.4 | The Licensor shall have the absolute right to grant further licences to other licensees outside the contractual territory. |
2.5 | If the Licensee wishes to enter into joint ventures or similar partnerships for the manufacture and distribution of the WECS under the Agreement, it will require the prior written consent of the Licensor. This shall also apply if the Licensee wants to contract out the manufacture of the WECS under the Agreement to third parties or within the group of companies, in particular if this requires the delivery of technical information, documents and calculations of the Licensor or the Contractual Know-how. |
Licence Agreement of SCD (2008-07-28)
Page 12 of 36
Art. 3 Contractual Territory
3.1 | The Licensee shall be entitled to manufacture and distribute WECS under the Agreement only on the Mainland of China. |
3.2 | The Licensee undertakes not to manufacture or cause third parties to manufacture, not to offer or cause third parties to offer, not to erect or cause third parties to erect, or operate or cause third parties to operate WECSs under the Agreement outside the contractual territory. |
3.3 | An erection of WECSs under the Agreement outside the contractual territory shall only be permitted before the date specified in Art.23, always in relation to a certain project or territory, if the Licensor has given its prior consent in writing. Such consent shall generally be given at the Licensee’s request if the Licensor has not yet entered into a licence agreement with another partner as regards the project or territory concerned. A condition is that the Licensee proves that there is a pre-contractual obligation regarding the project which will result in the conclusion of a contract within three months. |
Art. 4 Duties of Licensor
4.1 | The Licensor shall be obligated to put all documents such as drawings, part lists, component specifications (without calculation documents) required for manufacture of the WECS under the Agreement for all parts of the WECS, including the tower, and standard foundation (all listed in Annex 6) at the Licensee’s disposal. For this purpose, the Licensor has commissioned aerodyn Energiesysteme GmbH and other external specialists to develop the WECS concept further and make all calculations required for the construction and operation of the SCD Wind Energy Converter Systems as well as to prepare papers, drawings and other design documents according to the list in Annex 6. |
Licence Agreement of SCD (2008-07-28)
Page 13 of 36
4.2 | The Licensee will receive all documents required for the manufacturing of the converter system, namely Construction Drawings, parts lists, specifications, subassembly drawings, mounting instructions, operating and service manuals, assembly and erection descriptions, commissioning regulations. |
4.3 | The components documentation will be delivered for all cast parts, gear parts as well as generator parts. Specifications will be made available for all parts that have to be bought in addition, namely all rolling bearings, yaw drive, yaw brakes, pitch system, hydraulic aggregates, oil lubrication systems as well as refrigerating sets and sensor technology. The foregoing list is not complete and not binding but only exemplary. |
4.4 | The scope of the project also includes the licence for the control system, including source code, description of source code, and electrical cable layout plans, circuit diagrams, parts list for frequency converters and frequency converter software. |
4.5 | The project package furthermore includes the production licence for the rotor blade system with 3D surface data, including the manufacturing documents, for the rotor blade as well as the master plug and female mould, and support in the production of these manufacturing facilities. |
4.6 | As far as the calculation results are needed for the quality control of components, the results are included in the components specifications. |
4.7 | The Licensee will receive on-the-spot support as regards the prototypes in connection with the components inspection. The Licensee shall assign responsible and qualified employees whom the Licensor will familiarise with the technical documents and train to such an extent that the Licensee will be able to manufacture the WECS under the Agreement. Furthermore, the Licensor undertakes to advise and support the Licensee. On/in the assembly, erection and commissioning of the prototype WECS by providing qualified engineers on the spot. |
Licence Agreement of SCD (2008-07-28)
Page 14 of 36
4.8 | The Licensor shall be entitled and obligated to determine the conditions of the location and commissioning of the prototype as defined in Annex 7 and to analyse measurements taken on the prototype WECS as defined in Annex 8 (Prototype Report). All costs relating to the manufacture, erection, testing and measurement of the prototype shall be borne by the Licensee. The prototype of the 5.0/6.0 MW Wind Energy Converter System will be erected approx. 12 months after the erection of the 2.5/3.0 MW Wind Energy Converter System. |
4.9 | The Licensor is responsible for clearing the WECS under the Agreement for series production. The conditions of such clearance for series production are described in Annex 9. The Licensor shall advise and support the Licensee also during series production. Details are described in Annex 10 (Support for Series Production). |
4.10 | Prior to commencement of series production, the Licensor shall prepare a QM manual for manufacture. The Licensee shall be obligated to comply with the standards determined by the Licensor during manufacture. The Licensor shall be entitled to verify compliance with its quality standards as regards the preparation of manufacture, production at the Licensee’s works, assembly, erection, commissioning as well as maintenance and servicing of the WECSs. Therefore, the Licensee shall be obligated to give the Licensor free access to all manufacturing facilities and assembly plants and to give the Licensor permission to inspect all manufacturing and QM documents at any time during the usual business hours. If the Licensor discovers any manufacturing or quality defects, the Licensor shall be entitled to demand that the Licensee remedy the quality defects before the WECS leaves the works for delivery to a customer. In so doing, however, the Licensor does not assume any warranty obligation in respect of the quality of the Licensee’s products, neither with regard to the Licensee nor with regard to the Licensee’s customer. |
4.11 | Furthermore, the Licensor shall be responsible for providing all assessment documents to the certification Authority to obtain A-design assessment issued in the Licensee’s name. The cost of A-design-assessment will be borne by Licensor. |
Licence Agreement of SCD (2008-07-28)
Page 15 of 36
4.12 | The Licensee shall also receive an assembly shop plan as a recommendation with regard to the establishment of a useful series production sequence. |
4.13 | The Licensor shall be obligated to inform the Licensee about changes and improvements resulting from further developments of the Contractual Know-how and provide the Licensee with documents which have been revised accordingly. This shall be effected in accordance with the Licensor’s document management system. |
4.14 | Before the start of series production, the Licensor will carry out training courses to ensure that WEC can be assembled, erected, commissioned, and maintained in the required way of Licensor. The concrete training courses are described in Annex.10. |
Art. 5 Duties of Licensee
5.1 | The Licensee shall be obligated to skilfully manufacture, transport, assemble and put into operation the WECS under the Agreement taking into account the care as is usual in the line of business, the standards set by the Licensor and the suppliers of materials and components as well as the obligations imposed by the authorising bodies and Certification Authorities with the help of sufficiently qualified, specialised personnel. |
5.2 | The Licensee shall be obligated not to start series production prior to clearance by the Licensor according to Art. 4.8 and Annex 9. After production, erection, commissioning and test of maximum three prototypes in the year 2009, the series production of SCO shall be only started in the year 2010 with max production of 20-30 sets of turbines. In the year 2011, the production shall be max. 200 turbines, and from the year 2012, the production shall be able to reach the goal with more than 500 sets of turbines. |
Licence Agreement of SCD (2008-07-28)
Page 16 of 36
5.3 | The Licensee shall be obligated to put a serial number on WECSs under the Agreement produced by the Licensee in a place specified by the Licensor and to document the same in such a way that a clear allocation to the state of review of the technical documents provided by the Licensor is possible. |
5.4 | The Licensee shall be solely responsible for the production of the WECS under the Agreement. This shall also apply to the correct designation of dangers as well as to the provision of appropriate operation and maintenance manuals; in this connection, the Licensor will set appropriate standards taking account of the Guidelines of Germanischer Xxxxx which will not, however, release the Licensee from its duty to carry out its own examination. All technical documents put at the disposal of the operators of WECSs have to be clearly labelled as documents of the Licensee. |
5.5 | The Licensee will introduce the WECSs under the Agreement on the market using its own product name. The Licensee can use the name of aerodyn in words and images only with prior written consent of Licensor. |
5.6 | In so far as in the course of the manufacture or operation of the WECS under this Agreement the Licensee becomes aware of any cases of damage, the Licensee undertakes to immediately inform the Licensor thereof and of the causes and consequences of the damage. |
5.7 | The Licensee undertakes to keep in safe custody the documents, drawings, descriptions and other papers provided by the Licensor and to use the same only in its own company in compliance with the principle of confidentiality and to take precautions to ensure that such documents cannot be made available to third parties. |
5.8 | To get a WEC type certificate, Licensor has to fulfil all the requirements for Certification Authority on its own expenses. The cost for the A-Design assessment as a part of the type certificate is borne by Licensor (Art.4.11). |
Licence Agreement of SCD (2008-07-28)
Page 17 of 36
Art. 6 Suppliers
6.1 | The Licensor has defined suitable and qualified suppliers of parts and components in the list in Annex 11. The Licensee shall be responsible for selecting the suppliers from this list. The Licensor shall offer the list of selected suppliers for Licensor’s prototype as soon as the suppliers are fixed. |
6.2 | If the Licensee wishes to use other suppliers than those suggested by the Licensor, it shall be obligated to consult the Licensor when examining their qualification and suitability. The Licensor may commission a qualified third party to carry out such examination. Prior to the careful auditing of a new possible supplier by the Licensor, the parties to the Agreement have to satisfy themselves that the suggested supplier is generally suitable. The auditing will only take place if both parties agree that the new supplier suggested by the Licensee is to be examined. The parties to the Agreement agree that it will suffice if not more than three suitable suppliers are available for the subsequent series production for each component (e.g. gearwheels, bearing, cast parts, generator, etc.). Each party to the Agreement shall bear its own costs resulting from the auditing. The cost of certification of suppliers should be borne by the suppliers themselves. |
6.3 | Should any problems arise during series production, the Licensor shall be entitled to express doubts about the supplier of the defect component and give reasons for them. This is to ensure that the technical documents provided have been interpreted correctly. During and in connection with the series production, the Licensor shall have the right to object to the fact that a components manufacturer is commissioned if doubts arise about the manufacturer’s qualification and reliability. |
6.4 | If the Licensee wishes to entrust another components manufacturer or supplier listed in Annex 11, the new supplier shall ensure that the respective elements or components are interchangeable at 100% with the components already cleared and that no additional changes to other components or elements become necessary. |
Licence Agreement of SCD (2008-07-28)
Page 18 of 36
Art. 7 Further Development of the WECS
under the Agreement
7.1 | Both parties to the Agreement are interested in keeping the WECS under the Agreement competitive with regard to other Wind Energy Converter Systems. Therefore, both parties agree to exchange experiences regularly in particular as regards the evaluation of basic economic and technical conditions, possibilities of improvement and development of prices, especially of suppliers. This exchange of experience will take place in the course of the regular visits during the prototype production and series production support by the Licensor. |
7.2 | The Licensor shall be under no obligation to develop the WECS under the Agreement further and modify the same. Furthermore, beyond the provisions of Art.7.4 there is no obligation on the part of the Licensee to implement design changes. |
7.3 | However, it is intended to carry out optimisations and further developments resulting in an important economic advantage for the WECS under the Agreement. The parties to the Agreement have to agree on such changes and put them down in writing. Any adjustment of any of the documents listed in Annex 6 will be documented by the Licensor in Annex 6 and by continuously updating the said documents and made available by the Licensor as well as receipted by the Licensee. |
7.4 | The Licensee undertakes to implement future changes to the WECS under the Agreement that serve the safety and working order thereof in the manufacture of the WECS under the Agreement In this connection, the parties to the Agreement intend to take the maintenance of the profitability of the WECS under the Agreement into account. The Licensor shall be entitled to modify the technical details of the onshore/offshore WECS defined in Annexes 2 and 3 to the Agreement if this is necessary or expedient for reasons relating to design or business. The Licensor shall inform the Licensee thereof. Such a modification of technical details does not represent an alteration of the Agreement and will not entitle the Licensee to object or terminate the Agreement. |
Licence Agreement of SCD (2008-07-28)
Page 19 of 36
Art. 8 Sub Contracts
Licensor is entitled to place orders with sub-contractors for design, calculation and drawing work provided that Licensor shall always remain liable for the contract obligations and liabilities, including quality and infringements. Licensor is responsible for co-ordinating the individual activities. The sub-contractors shall be bound to secrecy by contract regarding the content of the work.
Art. 9 QM Demands on Licensee
9.1 | The Licensor will stipulate the demands on the standard of quality assurance in conformity and coordination with the standards stipulated by the Certification Authority. |
9.2 | It is indispensable for the certification of the WECS under the Agreement to be produced by the Licensee to establish a quality management for the manufacture which meets the requirements of the Certification Authority. To this end, the Licensee has to satisfy the demands of the Certification Authority on the manufacturing firms and the quality management according to the Guideline of Germanischer Xxxxx concerning the certification of WECSs (Annex 12), including the demands on the personnel and technical equipment of the manufacturing firm, and have itself certified by the Certification Authority at its own expense. |
9.3 | The Licensee shall be obligated to prove to the Licensor upon request compliance with the standards of the Certification Authority by means of appropriate test certificates within the framework of quality management (DIN ISO 9001). The same goes for the QM standards imposed by the Licensor according to Art. 4.9, which will be put at the Licensee’s disposal prior to series production. The Licensor shall be under no obligation to inspect. |
Licence Agreement of SCD (2008-07-28)
Page 20 of 36
9.4 | The Licensee will examine the design and production documents for completeness and accuracy immediately after delivery and immediately inform the Licensor of any reservations. The same shall apply if suppliers of components should have similar reservations. |
Art. 10 Communication
10.1 | The official text of the Agreement and any schedules, annexes or appendices attached hereto and any notices given hereunder shall be in English. In the event of any dispute over the construction or interpretation of this Agreement, reference shall be made only to this Agreement in English and not to any translation into any other language. Language of all communications shall be English. |
10.2 | The regular technical liaison meetings for both parties to communicate during implementation of SCD project are necessarily required, the phases will be defined as follows, the concrete time for such meeting must be agreed and fixed by both parties: |
a. after Licensor delivers all documents specified in Annex 6.
b. before the order/supply of components (parts),
c. during production phase/QM when it is necessary,
d. before installation and erection
e. after commissioning & certification, i.e. before the start of series production
10.3 | Any results of meetings shall be recorded immediately after the respective meeting and the minutes shall be signed by both parties. If no objection to these minutes is raised by the parties to the Agreement within ten working days, the said minutes shall be deemed to be approved and thus form a further working basis. |
10.4 | Both parties agree to exchange experiences regularly, in particular as regards the evaluation of basic economic and technical conditions, possibilities of improvement and development of prices of the suppliers. |
Licence Agreement of SCD (2008-07-28)
Page 21 of 36
This exchange of experience will take place in the course of the regular visits during the support for production by the Licensor.
10.5 | All the documents which have been prepared using metric units will be delivered on the Licensor’s forms in English. All drawings have been prepared in accordance with the relevant ISO or DIN standards. |
10.6 | Confidential information and secret technical data may only be transmitted by e-mail in encoded form in order to ensure protection against access by unauthorised third parties. Responsibility for the loss or falsification of secret information and technical data as well as the risk of being spied out by unauthorised third parties shall be borne by that party to the Agreement which sends confidential information by e-mail. |
10.7 | At the beginning of the contractual cooperation each party to the Agreement shall appoint a qualified, English-speaking contact person in charge of the project management. The said contact person must have sufficient authority in order to be able to take the necessary decisions with regard to the progress of the project. |
Art. 11 Warranties on the Part of Licensor
11.1 | The Licensor shall skilfully develop the WECS under the Agreement in accordance with Art. 1 and Annex 2 and 3, taking into account the care as is usual in the line of business and the recognised engineering standards. The Licensor hereby warrants that the WECS under the Agreement will be certified following receipt of sufficient measurements in accordance with the version of the Guidelines of Germanischer Xxxxx applicable on the date of signing this Agreement. |
11.2 | The further obtainment of any necessary approvals from authorities and other institutions shall be the duty of the Licensee as the manufacturer of WECSs. The Licensee shall bear the commercial risk of use of the transferred Contractual Know-how. |
Licence Agreement of SCD (2008-07-28)
Page 22 of 36
11.3 | Claims to remedy of defects against the Licensor shall exclusively refer to engineering services provided by the Licensor. Should design solutions regarding the WECS under the Agreement offered by the Licensor or the documents to be delivered be faulty, the Licensor will remedy the acknowledged design defects, which have to be notified immediately in writing, or faulty documents in terms of planning within a reasonable period of time for a period of up to 24 months after the date of issue of A-Design-Assessment of the WECS under the Agreement. If the Licensor is not given the opportunity to remedy defects within a reasonable period of time, the obligation to remedy defects will be extended adequately. |
11.4 | Any claims over and above the foregoing, in particular claims for compensation for any consequential damage or expenses incurred by the Licensee in connection with the use of faulty design documents, shall be excluded unless the damage |
is based on a design defect for which the Licensor is responsible and the same was caused by the Licensor intentionally or by gross negligence,
is based on the absence of a warranted characteristic.
11.5 | Warranty claims against the Licensor shall lapse if the Licensee has deviated from the Licensor’s certified and valid Deliverables without the Licensor’s consent in writing. |
11.6 | The Licensee shall immediately pass on to the Licensor every information about any defect or damage which a third party has reported to the Licensee and enable the Licensor’s employees to get an idea of the damage. The aim is to discern design defects that may become known as early as possible and remedy the same. If such information is not given or if the same is culpably delayed, any liability on the part of the Licensor shall be excluded. |
Licence Agreement of SCD (2008-07-28)
Page 23 of 36
Art. 12 Restrictions on Liability for Licensor
12.1 | The Licensor shall not be liable for any damage suffered by third parties because of the use of the transferred Contractual Know-how or the delivered documents and papers, for whatever reason. |
12.2 | The Licensee shall indemnify the Licensor against all claims asserted by third parties against the Licensor due to warranty obligations of the Licensee with regard to its customers or due to statutory liability or product liability. |
Art. 13 Preservation and Defence of Industrial
Property Rights
13.1 | The Licensor hereby guarantees that aerodyn Engineering GmbH will pursue the current applications for industrial property rights as well as the further applications for industrial property rights described in Annex 4 and that it will preserve the industrial property rights under the Agreement during the term of the Agreement. |
13.2 | Should it come to the knowledge of one of the parties to the Agreement that there is danger of an attack on the industrial property rights or the Contractual Know-how from a third party or that claims in this respect are asserted by a third party, the parties shall inform each other thereof and xxxx off such attacks jointly. If the attack is launched outside the contractual territory, the Licensor shall bear the costs, if the attack is made within the contractual territory, the Licensee shall bear the costs. |
13.3 | In order to defend third-party claims, the Licensor shall be entitled to redesign the WECS under the Agreement in such a way that an infringement of industrial property rights does not exist any more. |
Licence Agreement of SCD (2008-07-28)
Page 24 of 36
13.4 | If a conflict of industrial property rights is inevitable and cannot be cleared up, the Licensor’s liability shall be limited to a reasonable reduction of the remuneration. |
13.5 | The Licensee hereby assures that it will not contest the Licensor’s right to the know-how to be transferred and that it will neither start an attack on the Licensor for this know-how nor support the attack of a third party. |
Art. 14 Basic Payment
As a basic contractual remuneration for the granting of the exclusive licence according to Art 2.1, the Licensee shall make a basic payment; the total amount of such payment will be EUR 7.0 million for the 2.5/3.0 MW onshore WECS and EUR 12.0 million for the 5.0/6.0 MW offshore WECS. The payment has to be paid in instalments which are stipulated in Annex 13 (Payment Schedule).
Art. 15 Royalties
15.1 | The royalties to be paid additionally by the Licensee to the Licensor are as follows (the number of units stated shall not include the prototype and shall apply to each Power Category): |
• | 2.0% of the Purchase Price, at least EUR 16,000 per MW, for each SCD Wind Energy Converter System No. 1 to 100; |
• | 1.5% of the Purchase Price, at least EUR 12,000 per MW, for each SCD Wind Energy Converter System No. 101 to 500; |
• | 1% of the Purchase Price, at least EUR 8,000 per MW, for each SCD Wind Energy Converter System No. 501 to 1000; |
• | 0.5% of the Purchase Price, at least EUR 4,000 per MW, for each SCD Wind Energy Converter System from No. 1001 up. |
Licence Agreement of SCD (2008-07-28)
Page 25 of 36
15.2 | The Licensor shall be entitled to charge the Licensee the royalties according to Art. 15.1; Such royalties will become due for payment when a WECS is delivered to the customer. |
15.3 | The Licensee shall make an advance payment on the regular royalties to be expected in the first 12 months of series production according to Art. 15.1 and 15.2; such advance payment is to be made to the Licensor within one month of the date of clearance (Art. 4.9, Annex 9) of each Power Category of the WECS (2.5/3.0 MW onshore and 5.0/6.0 MW offshore) for series production. The amount of the advance payment will be determined by the Licensor in coordination with the Licensee. The same procedure will be repeated for all subsequent twelve-month periods. This means that the Licensor will always determine the amount of the advance payment for the following twelve-month period in coordination with the Licensee by the end of the preceding twelve-month period. |
15.4 | Unless the parties to the Agreement reach agreement about another amount of the advance payment, the amount shall be as follows for one of the power categories: |
• | For the first twelve-month period for each of the two power categories EUR 0.75 million, |
• | for the second twelve-month period for each of the two power categories EUR 3.0 million, |
• | for all further twelve-month periods for each of the two power categories EUR 8.0 million. |
15.5 | If the amount of the royalties to be paid at the end of the respective twelve-month period is lower than the advance payment, the Licensee shall not be entitled to repayment or offset of the overpayment. If the sum of the royalties to be paid is higher, the difference has to be balanced by the Licensee. The Licensor shall prepare the statement of account on the basis of the information provided by the Licensee. |
Licence Agreement of SCD (2008-07-28)
Page 26 of 36
15.6 | The Licensor shall be entitled to receive all information required in order to calculate the royalties. Therefore, each month the Licensee has to report to the Licensor in writing on the number of WECSs that were subjected to indoor assembly and on the date of such assembly, stating the serial number, and to document this by means of appropriate documents. The Licensee shall be obligated to give the Licensor access to the indoor assembly at any time upon request. |
15.7 | The Licensor hereby grants the Licensee the option of settling the royalties from Wind Energy Converter System No. 1001 up by making a final payment of EUR 3.0 million per MW. This option shall apply separately to the 2.5/3.0 MW onshore WECS and to the 5.0/6.0 MW offshore WECS. |
Art. 16 Option for the Benefit of Licensee
in the Event of Initial Public Offering (IPO)
16.1 | For a period of 18 months from the signing of the Agreement, the Licensor will grant the Licensee the option with Licensor’s 50% of royalties (Art. 15.1) as shares of Licensee’s company if, on the basis of the SCD Technology, Licensee intends to transform Its company into a public limited company listed on the stock exchange and to place the shares on the stock market in whole or in part. The details of such option shall be agreed and finalized in additional contract, and separate contract with this option shall be duly signed by both parties. In case the common agreement can not be achieved by both parties, the royalties still have to be paid by the Licensee as stipulated in this License contract. |
Licence Agreement of SCD (2008-07-28)
Page 27 of 36
Art. 17 Invoicing Procedure
17.1 | The Licensor’s claims for remuneration will become due 1 month after invoicing and sending of the invoice by the Licensor, payable by transfer to the bank account specified by the Licensor. |
17.2 | A right of retention or the right to a set-off shall be excluded. If the payment to be made by the Licensee does not arrive in the Licensor’s account when due, the Licensee will have to give reasons for the delay in payment within 10 days when queried by the Licensor. The parties to the Agreement will then immediately try to reach agreement about the making of the due payment. If the delay in payment is not justified, the Licensor may have the right to terminate the Agreement for good cause without giving due notice according to Art. 22.4. |
Art. 18 Taxes
18.1 | Remunerations are agreed “free from taxes”, which means that all public levies (taxes, charges, customs duties) imposed in connection with the conclusion of this Agreement or the execution thereof shall be borne by the Licensor in so far as such levies are imposed in the country where the registered office of the Licensor is situated and by the Licensee in so far as such levies are imposed in the country where the registered office of the Licensee is situated. |
18.2 | The parties to the Agreement will support each other in the implementation of this rule and give such information as is required in order to be able to make the necessary statements with regard to authorities. However, they shall not have the right to try to find out confidential company data or inspect the books of the other party. |
Licence Agreement of SCD (2008-07-28)
Page 28 of 36
Art. 19 Confidentiality
19.1 | The parties to the Agreement are mutually bound to secrecy with regard to any information already exchanged or still to be exchanged in connection with the negotiations, conclusion and execution of the Agreement. |
19.2 | The present secrecy clause shall also apply to any other business or operational procedures, and information about internal processes and relationships, customers, technical and commercial information about the other party to the Agreement or the Licensor, irrespective of whether the said information is explicitly described as “confidential” or whether its confidentiality results from the nature of the respective Information. Both parties agree to swear to secrecy also their personnel as well as any third party involved in the contractual process if such third parties have access to information about the Contractual Know-how. |
19.3 | This secrecy clause will expire ten years after termination of this Agreement. |
19.4 | The secrecy clause shall also be binding on associated companies, their organs and staff. |
19.5 | Information shall not be considered confidential if the parties prove that the respective information |
• | is already generally known or |
• | becomes generally known without any contribution of the parties or |
• | has been lawfully obtained by a third party. |
19.6 | The secrecy clause shall not apply if and to the extent that a disclosure is necessary in order to obtain an official permit or in order to apply for a patent grant or other intellectual property rights. Any kind of publication concerning the contractual cooperation shall be subject to the prior consent of the other party. |
Licence Agreement of SCD (2008-07-28)
Page 29 of 36
Art. 20 Non-competition Clause
20.1 | The know-how transferred to the Licensee by the Licensor may not be made available to competitors of the Licensor. However, the Licensee has been informed that the Licensor will offer the same Contractual Know-how also to other companies outside the contractual territory. |
20.2 | The Licensee undertakes not to enter into competition with the Licensor. This means that the Licensee is neither allowed to offer WECSs outside the contractual territory nor to conclude contracts with customers outside the contractual territory, nor to develop, manufacture and distribute WECSs of a Power Category as defined in Art. 1 and of similar design principles. This worldwide non-competition clause shall be valid for the entire duration of the Licence Agreement as well as ten years after the termination thereof. |
Art. 21 Duration of Agreement
21.1 | This Agreement shall commence upon the signing thereof and receipt of the first part of basic payment on the Licensor’s bank account according to Annex 13. |
21.2 | The Agreement shall end if the Licensee exercises the option according to Art. 15.7. |
21.3 | The time sequence of the cooperation between the parties to the Agreement is defined in Annex 14 (Time Schedule). |
21.4 | The Licensor shall be entitled to terminate by unilateral declaration the exclusive right to use of the contractual know-how granted to the Licensee (Art. 2.1) and to grant further licences in the contractual territory (Art. 3.1) thereafter if the Licensee has not fulfilled the conditions defined in Art. 15.3, i.e. if and as soon as the minimum royalties in a twelve-month period have not been fully paid at any time. All the other provisions of this agreement shall then continue to apply unchanged. |
Licence Agreement of SCD (2008-07-28)
Page 30 of 36
Art. 22 Termination of Agreement
22.1 | Both parties shall have the right to terminate this Agreement without notice if the respective other party is declared bankrupt or insolvent, is a party to winding up or liquidation proceedings or otherwise terminates its business operations for such a period of time that the performance of its obligations under this Agreement may be affected. |
22.2 | This shall also apply if the shareholders of the Licensee sell the company and/or the line of business “wind energy” in whole or in part, however, not in the event of a partial sale of the company where more than 50% of the shares continue to be held. |
22.3 | The Licensor shall have the right to terminate the Agreement without notice and to refuse the further performance of the Agreement if the first instalment of the basic payment according to Annex 13 has not been paid into the Licensor’s account within three months of signing of this Agreement. |
22.4 | Otherwise, the Agreement may only be terminated for good cause. In the event of a breach of a material obligation under this Agreement or under any of the Annexes hereto by any party, the other party may terminate this Agreement specifying such period of notice as may be necessary from time to time in order to enable the party in breach to remedy or terminate its breach provided that upon expiry of the said notice period the breach of the relevant party continues. |
Licence Agreement of SCD (2008-07-28)
Page 31 of 36
22.5 | If the Licensor terminates the Agreement for good cause according to Art. 22.4, the Licensee shall be obligated to return to the Licensor the papers, design documents and data carriers, including all copies, according to Annex 6 put at the Licensee’s disposal if so requested by the Licensor. |
22.6 | Upon termination of the Agreement through the final payment of royalties by the Licensee (Art. 15.7) or for other reasons all obligations to perform on the part of the Licensor, including the warranty obligations according to Art. 11, shall end unless the parties to the Agreement have agreed otherwise beforehand. The Licensee will then retain the unrestricted, exclusive or non-exclusive (depending on the respective agreement) right to use the industrial property rights under the Agreement and the Contractual. Know-how of the Licensor (Art. 2.1) for the contractual territory (Art. 3.1). The provisions of Art. 2.2, 2.3, 3, 5.5, 5.7, 8, 11, 12, 18, 19, 24 and 25 shall continue to apply irrespective of the kind of termination of the Agreement. |
Art. 23 Termination of Exclusiveness and of
Restriction of Distribution to Contractual Territory
23.1 | The Licensee knows that the Licensor is conducting negotiations about the granting of a licence regarding the SCD project also with other interested parties outside the contractual territory. The Licensor will impose on other licensees the same conditions as stipulated in this Licence Agreement and bind other licensees not to deliver any WECSs under the Agreement into the contractual territory according to Art. 3. |
23.2 | The Licensor shall agree with all licensees that as regards the WECSs of a Power Category of 2.5/3.0 MW a worldwide, unrestricted distribution will be possible from 1 January 2016 and that the restriction to the contractual territory will be lifted from this point in time. The same shall apply to WECSs of a Power Category of 5.0/6.0 MW with effect from 1 January 2019. From these points in time, the Licensor will not guarantee compliance with exclusiveness any more. |
Licence Agreement of SCD (2008-07-28)
Page 32 of 36
Art. 24 Capacity to Enter into this Agreement
Each party represents and warrants to the other party that it has the full legal capacity to enter into this Agreement without involving an intermediary such as an import and export company.
Art. 25 Force Majeure
The parties to this Agreement shall not be deemed to be in breach of this Agreement or otherwise liable with regard to the other party for any delay in performance or any non-performance of any obligations under this Agreement if and to the extent that the delay or non-performance is due to an Event of Force Majeure. “Event of Force Majeure” shall mean, with regard to either party, an event or circumstance beyond the reasonable control of that party, for example, without limitation, wars or embargoes on imports.
Art. 26 Settlement of Disputes, Governing Law
26.1 | All Disputes arising out of or in connection with this Agreement, including any question regarding its existence, validity or termination, shall be put forward in writing and should then be settled by amicable agreement within 3 months. |
26.2 | If such an agreement cannot be reached, all disputes arising out of or in relation to this Agreement shall be finally settled by arbitration to the exclusion of the courts of law by the Arbitration Tribunal of the International Chamber of Commerce in Paris (ICC) in accordance with its Rules of Arbitration by one or more arbitrators appointed in accordance with such Rules. The arbitration proceedings shall be conducted in the English language. The arbitrators shall refer to the English version of the Agreement. |
Licence Agreement of SCD (2008-07-28)
Page 33 of 36
26.3 | Arbitration awards shall be final and binding upon both parties. |
26.4 | The. application of the United Nations Convention on Contracts for the International Sale of Goods shall be excluded. |
26.5 | This Agreement shall be governed and construed as to all matters, including validity, interpretation and performance, in accordance with the laws of Switzerland. |
Art. 27 Additional Agreements
27.1 | This Agreement, including all Annexes, contains the entire agreement between the parties with respect to the subject-matter hereof and supersedes any and all prior written and verbal negotiations, commitments and understandings pertaining to the subject-matter hereof. |
27.2 | Any changes to this Agreement must be made in writing. There are no supplementary verbal agreements. Any changes and supplements to as well as deletions and the notice of termination of the Agreement and changes to this clause must be made in writing in order to be effective. |
27.3 | If individual provisions of this Agreement should be invalid, this shall not affect the validity of the Agreement as a whole. Both parties shall make efforts to replace invalid provisions with valid provisions without losing sight of the economic content of the Agreement. |
Licence Agreement of SCD (2008-07-28)
Page 34 of 36
27.4 | Upon premature termination of the present Agreement for whatever reason the Licensor may freely use and dispose of development results gained up to that point. |
27.5 | Place of fulfilment of the contractual obligations of the Licensor shall be Hong Kong. |
27.6 | If additional registration or approval of this Agreement is required due to local regulations, the Licensee shall ensure that such registration and/or approval, is duly obtained and the Licensee shall bear all related costs, including, but not limited to, lawyer’s fees incurred by the Licensor for review and/or implementation of any amendments to this Agreement required by the relevant approving or registration authority. |
27.7 | All submissions and communications hereunder shall be written in the English language. |
27.8 | Neither party shall assign, transfer or subcontract this Agreement and/or any of its rights or obligations hereunder, either in whole or in part, without the prior written consent of the other party |
Licence Agreement of SCD (2008-07-28)
Page 35 of 36
aerodyn ASIA Co. Ltd. |
Guangdong Mingyang Wind Power Technology Co. Ltd. | |||||||
By | /s/ Soenke SIEGFRIEDSEN |
By | /s/ ZHANG Chuanwei | |||||
(Legally valid Signature) | (Legally valid Signature) | |||||||
Soenke SIEGFRIEDSEN |
ZHANG Chuanwei | |||||||
(Typed name of representative) | (Typed name of representative) | |||||||
Managing Director |
President | |||||||
(Title) | (Title) | |||||||
Zhongshan, Xxxxxxxx, Xxxxx 0000-00-00 |
Xxxxxxxxx, Xxxxxxxxx, Xxxxx 2008-07-28 | |||||||
(Place/Date signed) | (Place/Date signed) |
Licence Agreement of SCD (2008-07-28)
Page 36 of 36
Annex 1 Licensor’s Organization Chart
Annex 1, License Agreement SCD [Rev. A 2008-6-18]
Annex 2 Technical Features of Onshore WECSs
of 2.5 to 3 MW
1. Concept Description of onshore WECs of 2.5 to 3MW
a. Consistent Light Weight
In the development of SCD, the greatest importance is attached to the low weight of nacelle and rotor. This simplifies the transport considerably and allows a safe and fast installation, since the nacelle can be lifted as one complete unit on top of the tower. Moreover, the low nacelle weight ensures the use of highly cost effective foundation structures.
b. Durable Reliability
Reliability, the decisive factor for the operation of WEC, is an integral element of the SCD concept. The lower rotational speed-level and the small number of rotating parts and roller bearings reduce the risk of damage in the drive train to a minimum.
c. Hermetic Encapsulation
The permanent protection of the converter’s technology from atmosphere is the basic precondition for a long life time. Therefore nacelle and hub of SCD are hermetically encapsulated against the ambient air. An air treatment system filters the air throughout all weather and operational conditions and provides that the plant’s interior is not affected by corrosion through salt and humidity.
d. Efficient Compactness
The drive train of SCD involves from the combination of the advantages of conventional turbine concepts. The intelligent integration of the rotor bearing, gear system and generator allows an extraordinary compact design and a very effective utilization of the main components. At the same time this leads to short load paths from the rotor to the lower head. Accordingly the compactness is not an end in itself, but the result of a consequential implementation of the requirements on WECs. Moreover, to ensure the easy assembly, the gearbox and generator are integrated in two different casting parts.
e. Rotor
The two rotor blades are the main concept of this SCD technology. Two independent hydraulic blade pitch system guarantee a highly dynamic blade angle adjustment and maximum safety in case of failure. The aerodynamic of the rotor blades are well-designed and provide low loads. This two rotor blades can also park horizontally in case of extreme wind speed.
Annex 2, License Agreement of SCD (2008-07-28)
Page 1 of 4
f. Rotor Bearing/Gearbox
A double tapered roller bearing in TDO-configuration transfers the rotor loads from the hub into the machine housing. Bearing and gearbox are arranged in such a way that the dynamic rotor-loads can not have a harmful impact on the tooth engagements. The planetary gear is driven by the hollow wheel and the planetary shafts are fixed in a stationary cage. Hereby the shafts running on friction bearings as well as the gear meshing can be lubricated ideally.
g. Generator/Converter
The stator of the permanent magnet synchronous generator is directly installed into the generator frame which includes the cooling system. By using the permanent magnet technology highest efficiency degrees are achieved at nominal load as well as in partial load operation. The generator is connected to the grid via a 4Q converter, which allows maximum speed variability and full compliance with all grid codes.
h. fluid unit
The fluid unit consists of water cooling system of generator, the hydraulic unit for brakes, rotor lock and pitch system, lubrication and cooling for gear box. This fluid unit is fixed on the base plate inside the head carrier; the integrated heat exchanger gets the outside air through air channel. The warm air goes out through the second air channel, thus, no outside air comes into the nacelle.
2. Technical Data
General
Diameter | Hub height | Rotational speed | Nominal output | |||||
TC III |
105m | 100m | 9.6-15.6min-1 | 2.5MW | ||||
XX XX |
98m | 90m | 10.5-17.1min-1 | 2.75MW | ||||
TC I |
92m | 80m | 11.5-18.7min-1 | 3.0MW |
Common data
Cut-out wind speed |
25m/s | |
Design life time |
20 years | |
Number of rotor blades |
2 |
Annex 2, License Agreement of SCD (2008-07-28)
Page 2 of 4
Tilt angle |
4° | |
Cone angle |
0° | |
Pitch system | ||
Principle |
Hydraulic single pitch | |
Power control |
blade angle and rotor speed control | |
Tower | ||
Type |
Tubular steel tower | |
Gearbox | ||
Type |
two-stage-planetary gear | |
Ratio |
1:20.7 | |
Generator and Converter | ||
Generator type |
synchronous, permanent magnet | |
Cooling |
water cooled | |
Protection class |
IP 54 | |
Converter type |
4-quadrant-converter | |
Power factor (grid) |
0.9 inductive-0.9 capacitive | |
Masses | ||
Blades(each) |
approximately 12.6 tons | |
Tower head |
approximately 108 tons |
Note: The technical data can be changed with the final design.
Annex 2, License Agreement of SCD (2008-07-28)
Page 3 of 4
3. Technical Features
Annex 2, License Agreement of SCD (2008-07-28)
Page 4 of 4
Annex 3 Technical Features of Offshore WECSs
of 5 to 6 MW
1. Concept description of offshore 5 to 6MW
The concept description of offshore refers to Annex 2. For the offshore turbine 5.0/6.0MW, the following features are also covered:
a. Reliability
Additionally for the 5.0/6.0 MW offshore turbine, all auxiliary-aggregates and sensors that are indispensable for the operation are installed in duplicate in order to avoid that a failure of these parts will lead to a standstill of the overall system.
b. Air Treatment
An air treatment system is located at the tower bottom, which takes in ambient air and separates water and salt particles. An overpressure in lower and nacelle is built up with the treated air and secures a controlled volume flow through the turbine. With a pressure difference monitoring system it is possible to eliminate any intrusion of untreated air. In addition, the temperature in the nacelle is adjusted by variation of the air flow.
2. Technical Data
General
Diameter | Hub height | Rotational speed | Nominal output | |||||
TCI |
130m | 90m (above sea level) | 8.6-13.5 min-1 | 5.0/6.0MW |
Common data |
||
Cut-out wind speed |
25m/s | |
Design life time |
20 years | |
Number of rotor blades |
2 | |
Tilt angle |
4° | |
Cone angle |
0° | |
Pitch system | ||
Principle |
Hydraulic single pitch | |
Power control |
blade angle and rotor speed control |
Annex 3, License Agreement of SCD (2008-07-28)
Page 1 of 2
Tower | ||
Type |
Tubular steel tower | |
Gearbox | ||
Type |
two-stage-planetary gear | |
Generator and Converter | ||
Generator type |
synchronous, permanent magnet | |
Cooling |
water cooled | |
Protection class |
IP 54 | |
Converter type |
4-quadrant-converter | |
Power factor (grid) |
0.9 inductive-0.9 capacitive | |
Mass | ||
Complete tower head mass: |
approximately 280 |
Note: The technical data can be changed with the final design.
Annex 3, License Agreement of SCD (2008-07-28)
Page 2 of 2
Annex 4: Status of Industrial Property Rights
No. |
Description |
Filing date |
Patent-No. Germany |
Patent-No. PCT | Patent-No. China |
Valid to | Notice | |||||||
1 | SCD-Trademark Name | 17.03.07 | 30717852 | 31.03.17 | Granted | |||||||||
2 | SCD-Picture Trademark | 17.03.07 | 30717850 | 31.03.17 | Granted | |||||||||
3 | Load transmitting components | 15.03.07 | 102007012408.4 | WO2008/000345 | 15.03.27 | Granted | ||||||||
4 | Generator housing for WEC | 05.04.08 | 102008017376.2 | 05.04.28 | Applied | |||||||||
5 | Individual Blade Adjustment | 11.10.99 | 19948997 | WO01/27471 | 1360666 | 11.10.19 | Granted | |||||||
6 | Gearbox assembly for WEC | 26.04.03 | 103 18 945 | 26.04.23 | Granted | |||||||||
7 | Device for preventing penetration of corrosive salt particle… | 23.12.98 | 19859628.6 | WO00/39459 | 1096564 | 23.12.18 | Granted | |||||||
8 | Method for laying elect. cables… | 24.12.98 | 19860211.1 | WO00/39903 | 1160844 | 24.12.18 | Granted | |||||||
9 | Frequency of towers | 05.04.00 | 100 16 912 | WO01/77524 | 1237271 | 05.04.20 | Granted | |||||||
10 | Offshore-Foundation | 17.10.03 | 103 49 109 | WO2005/040605 | 1867769 | 17.10.23 | Granted | |||||||
11 | Methods for maintenance | 17.03.08 | 10200701128489 | WO2008/00455 | 17.03.28 | Applied | ||||||||
12 | Mold for rotor blades | In preparation | ||||||||||||
13 | Parking position | In preparation |
Annex 4, Licence Agreement SCD (2008-07-28)
Page 1 of 1
Annex 5: Responsibilities
In the scope of supply of Licensor not included are the following items (list may not be complete) which are in the responsibility of the Licensee:
Not included in the scope of supply of Licensor |
Project management and coordination at the Licensee |
Development of prototype site |
Building permission documents for prototype site |
Contract negotiations with components suppliers |
Purchase order for components |
Purchase of measuring campaign |
Assembly work of prototype in the work shop (only supervised by Licensor) |
Transportation of WEC component to WEC site |
Installation work at prototype WEC site (only supervised by Licensor) |
Construction of workshop |
Approvals and permits according to local laws or requirements |
Workshop approval, type certification, project certification |
Grid connection concept incl. transformer |
In the scope of supply of Licensor included are the following items (list may not be complete) which are in the responsibility of the Licensor:
Project management for all aerodyn internal works |
Project management for all sub suppliers of aerodyn |
Technical support of component suppliers for prototype |
A-design assessment incl. gearbox and blade test |
Delivery of all Documents listed in Annex 6 |
Support of licensee for prototype and series production listed in Annex 10 |
Inspection of prototype components incl. QM (supervised by Licensor and Licensee together) |
Annex 5, License Agreement of SCD (2008-07-28)
Page 1 of 1
Annex 6: List of documents
The documents which are supplied by Licensor are defined below. The documents and information listed below are only the important main components and assemblies. In principal all information for the WEC is delivered by Licensor but some small items may not be listed below.
General Documents, specifications, manuals |
WEC Data Sheet |
Hydraulic Circuit Diagram |
Electric system circuit diagram |
Safety and control system specification |
Corrosion protection specification |
Lightning protection specification |
Prototype measurement specification |
Blade outer 3D-geometry |
Blade geometry check templates 2D-data |
Master plug section geometry for 3D-CNC cutting file |
Manuals (payment 6 and 14 specified in Annex 13) |
Assembly manual |
Installation instruction |
Commissioning manual for prototype WEC |
Commissioning manual for series WEC |
Maintenance manual |
Software manual |
Annex 6, License Agreement of SCD (2008-07-28)
Page 1 of 3
Turbine Components (payment 3 and 11 specified in Annex 13) | ||||||||
Specification | Assembly drawing |
Construction drawing |
Detail design by | |||||
Assembly pitch system (12) |
||||||||
Rotor hub |
Licensor | |||||||
Blade bearing |
supplier | |||||||
Pitch system |
supplier | |||||||
Pitch hydraulic |
supplier | |||||||
Blade lock |
Licensor | |||||||
Pitch cylinder |
supplier | |||||||
Small parts |
Licensor |
Assembly hub (10) |
||||||||
Assembly pitch system (12) |
Licensor | |||||||
small parts |
Licensor |
Assembly Drive Train (22) |
||||||||
Gearbox housing |
Licensor | |||||||
Rotor lock |
Licensor | |||||||
Labyrinth seal |
Licensor | |||||||
Rotor bearing |
supplier | |||||||
Gear wheels |
supplier | |||||||
All gear parts |
||||||||
Slip ring unit |
supplier | |||||||
Yaw bearing |
supplier | |||||||
Yaw brake disc |
Licensor | |||||||
Yaw drive |
supplier | |||||||
Yaw brake |
supplier | |||||||
Rotor brake |
supplier | |||||||
Generator stator, windings |
supplier | |||||||
Generator housing |
supplier | |||||||
Small parts |
Licensor |
Assembly Nacelle Fittings (21) |
||||||||
Assembly Drive Train (22) |
Licensor | |||||||
Head carrier |
||||||||
Met mast |
Licensor | |||||||
Cable railways |
Licensor | |||||||
Other parts |
Licensor |
Assembly Nacelle (20) |
||||||||
Assembly Nacelle Fittings (21) |
Licensor | |||||||
Cooling system |
supplier | |||||||
Hydraulic system |
supplier | |||||||
Controller Cabinet |
supplier | |||||||
Rectifier Cabinet |
supplier | |||||||
Internal crane |
supplier | |||||||
Small parts |
Licensor | |||||||
Assembly WEC |
||||||||
Assembly Hub |
Licensor | |||||||
Assembly Nacelle |
Licensor | |||||||
Toolings, jigs for transportation & assembly |
Licensor | |||||||
Tower/Foundation (payment 5 and 13 specified in Annex 13) | ||||||||
Tower shell |
Licensor | |||||||
Tower assembly |
Licensor | |||||||
Tower internals (platforms, ladder, ...) |
Licensor | |||||||
Foundation design (flat foundation) |
Licensor |
Annex 6, License Agreement of SCD (2008-07-28)
Page 2 of 3
Rotor blade and tools (payment 2 and 10 specified in Annex 13) | ||||||||
Specification | Assembly drawing |
Construction drawing |
Detail design by | |||||
Master Plug |
||||||||
General Assembly |
Licensor | |||||||
Assembly master plug suction side |
Licensor | |||||||
Assembly master plug pressure side |
Licensor |
Mould |
||||||||
Assembly main mould |
Licensor | |||||||
Mould heating system |
Licensor | |||||||
Support frame suction side |
Licensor | |||||||
Support frame pressure side |
Licensor | |||||||
Mein mould turning system |
Licensor | |||||||
Assembly spar cab mould suction side |
Licensor | |||||||
Assembly spar cab mould suction side |
Licensor | |||||||
Assembly nose shear web mould |
Licensor | |||||||
Assembly TE shear web mould |
Licensor | |||||||
Small parts |
Licensor |
Rotor blade |
||||||||
General Assembly and Blade connection |
Licensor | |||||||
Blade lamination plan |
||||||||
Positioning spar cab and shear web |
Licensor | |||||||
Shell bonding |
Licensor | |||||||
Cross sections |
Licensor | |||||||
Lighting protection system |
Licensor | |||||||
Tip receptor |
Licensor | |||||||
Blade connection |
Licensor | |||||||
Others |
||||||||
Blade handling frame |
Licensor | |||||||
Laminate mechanical testing |
Licensor | |||||||
Blade test specification |
Licensor | |||||||
Electrical Part (payment 4 and 12 specified in Annex 13) | ||||||||
Specification | Drawing | Description | Detail design by | |||||
Control system |
||||||||
General Assembly |
Licensor | |||||||
Circuit diagram |
Licensor | |||||||
Cabinet overview |
Licensor | |||||||
Cable list |
Licensor | |||||||
I/O list |
Licensor | |||||||
Error and event handling |
Licensor | |||||||
Commissioning workshop |
Licensor | |||||||
Commissioning prototype |
Licensor | |||||||
Controller software |
Licensor | |||||||
Hardware specification |
Licensor | |||||||
Supplier description |
Licensor | |||||||
Small parts |
Licensor | |||||||
Inverter |
||||||||
General Assembly |
Licensor | |||||||
Circuit diagram |
Licensor | |||||||
Cabinet overview |
Licensor | |||||||
Cable list |
Licensor | |||||||
Inverter software |
Annex 6, License Agreement of SCD (2008-07-28)
Page 3 of 3
Annex 7 Conditions of Location and Commissioning
of Prototype
The following conditions of location and commissioning of prototype must be considered by the Licensee:
a. | Availability of technical equipment/facility |
The Licensee is responsible to provide all required equipment and good working conditions on site. This includes at lease one air conditioned office container in a distance of not more than 100m from the turbine, one container for material storage / working, necessary tools and safety equipment and a possibility for remote access to the turbine.
b. | Technical staff |
The mechanical and electrical engineer shall be appointed at site for the commissioning and necessary technical support/communication. The qualified/skilled technician shall be avail at the site.
c. | Airport: |
To ensure the work effectively, driving from airport to work site shall be less than 300km.
d. | Accommodation |
The distance from hotel to prototype site shall be about 1-hour drive to avoid time consuming on the road.
The hotel shall be four-star hotel with international food and internet connection available.
e. | Environmental condition |
The commissioning shall be performed at the temperature range -10°C to 30°C.
Annex 7, License Agreement of SCD (2008-07-28)
Page 1 of 1
Annex 8:
Prototype Report
The requirements for prototype testing are set forth in Chapter 10 of the “Guideline for the Certification of Wind Turbines” issued by Germanischer Xxxxx. Some of the relevant paragraphs are listed below. The most current revision of the guideline and its regulations shall be considered at any time and additional requirements by the Certification Institute must be followed.
General
All measurements shall be carried out and documented by a test institute accredited for these measurements. Alternatively, the test of the turbine behaviour and the load measurements can be carried out by the manufacturer after prior consultation with GL Wind, and then checked and witnessed by a test institute accredited for these measurements. In all cases, the accredited institute shall be responsible for compliance with the fundamental standards and with the requirements of this Guideline. The influence of a turbine variant on the measurement result shall be assessed by the accredited institute which performed the measurements on the original installation.
The wind turbines at which the measurements are carried out shall conform to the greatest possible extent to the design on which the Design Assessment is based. Compliance shall be confirmed in a declaration by the manufacturer. Any deviations shall be reported to GL Wind. If the compliance is adequate for the corresponding test purpose, the measurement can be used for the certification.
The test institute performing the measurements shall record the designations and data on the rating plates of the surveyed plant and on the rating plates of the primary components (at least the rotor blades, gearbox, generator and tower) and shall include them in the measurement report.
Power Curve
Measurement of the power performance of the wind turbine shall be carried out in accordance with IEC 61400-12 “Wind turbine generator systems - Part 12: Wind turbine power performance testing” or DIN EN 61400-12, in each case as the latest version.
Deviations from this standard shall be justified and defined in consultation with GL Wind.
On completion of the measurements, the measured power curve shall be compared by the test institute or by the wind turbine manufacturer with the power curve assumed in the design documentation. Here special attention shall be paid to sufficient correspondence with the assumed values for rated wind speed and rated power.
Annex 8 License Agreement for SCD (2008-07-28)
Page 1 of 3
It shall be observed that a renewed measurement of the power performance is always necessary if the rotor blade type or the rotor diameter is changed. In the case of deviation from the rated rotational speed of the rotor, renewed measurement shall as a rule also be carried out.
The report of the accredited test institute and the comparison shall be submitted to GL Wind for assessment.
Noise Emission
Measurement of the noise emissions of the wind turbine shall be carried out in accordance with 1EC 61400-11 “Wind turbine generator systems—Part 11: Acoustic noise measurement techniques” or DIN EN 61400-11, in each case as the latest version.
Deviations from this standard shall be justified and defined in consultation with GL Wind. It shall be taken into account that especially the rotor blade type, the tower height and the tower type, as well as the type of gearbox in the drive train of the wind turbine, may have an influence on the noise emissions.
The report of the accredited test institute shall be submitted to GL Wind for evaluation.
Electrical Characteristics
Measurement of the electrical characteristics of the wind turbine shall be carried out in accordance with IEC 61400-21 “Wind turbine generator systems Part 21: Measurement and assessment of power quality characteristics of grid connected wind turbines” or DIN EN 61400-21, in each case as the latest version.
Deviations from this standard shall be justified and defined in consultation with GL Wind. It shall be observed that a renewed measurement of the electrical characteristics is necessary as a rule whenever the generator type and the inverter type are changed.
Test of Turbine Behaviour
The test of turbine behaviour is intended to verify the parameters and characteristics used as the basis for the design of the wind turbine. The test of turbine behaviour comprises the following individual tests:
• | test of the safety system |
• | test of the braking systems |
• | test of automatic operation |
• | test of the switching operations |
• | measurement of the natural frequencies |
Annex 8 License Agreement for SCD (2008-07-28)
Page 2 of 3
The tests shall preferably be carried out at the wind turbine fitted with instrumentation for load measurements. The requirements of IEC TS 61 400 - 13 “Wind turbine generator systems - Part 13: Measurement of mechanical loads” shall be applied with the necessary changes to the areas of
• | calibration |
• | requirements for the measurement parameters and the measurement system |
• | reporting |
The test of turbine behaviour shall be carried out by a test institute accredited for load measurements at wind turbines, or shall be verified and witnessed by such an institute. On completion of the measurements, the activities shall be performed by the test institute or by the wind turbine manufacturer and the documents specified there shall be presented to GL Wind.
Load Measurements
Load measurements shall be carried out in accordance with lEC TS 61 400 - 13 “Wind turbine generator systems - Part 13: Measurement of mechanical loads”, as the latest version.
Deviations from this Technical Specification shall be defined in consultation with GL Wind. Before the measurements are conducted, the measurement parameter plan and the extent of the measurements shall be agreed with GL Wind as far as possible.
After completion of the measurements, the, activities shall be performed by the test institute or by the wind turbine manufacturer and the documents specified there shall be presented to GL Wind.
Annex 8 License Agreement for SCD (2008-07-28)
Page 3 of 3
Annex 9:
Condition of Clearance for Series
Production
By providing the documents listed in the following, presenting the measuring results and achieving the defined operating results of the prototype, the WECS is ready for series production. Should other parties involved in the project be obligated to effect deliveries or provide services that have an influence on the readiness for series production, the Licensor will hot accept any responsibility therefore.
1. Manufacturing documents
With the help of the manufacturing documents it must be possible to request, order and produce the required components as well as to assemble the WECSs according to the Licensor’s standards.
1.1 | Layout plan of components |
1.2 | Part lists |
1.3 | Components specifications |
1.4 | Construction drawings concerning components |
1.5 | Subassembly drawings |
1.6 | Assembly drawings and instructions |
2. Documentation of operation of WECS
With the help of these documents it must be possible to install and commission the WECS and operate them continuously, incl. maintenance and repair. These documents will be provided by the Licensor to the extent that they comply with the Guidelines of Germanischer Xxxxx regarding Design Assessment,
2.1 | Installation instruction |
2.2 | Commissioning manual for the prototype |
2.3 | Commissioning manual for the serial WECS |
2.4 | Operating manual |
2.5 | Maintenance manual |
Annex 9, License Agreement of SCD (2008-07-28)
Page 1 of 3
3. Measurement of prototype
The measurement of the prototype must confirm the predicted behaviour of the WECS within the permitted error limits. The essential parts of these measurements have to be carried out by independent institutes. In due time before assembly of the prototype, the Licensor will entrust a suitable measurement institute with such measurements on the basis of the Licensor’s specification (prototype measurement specification), so that the measuring activities can begin upon commissioning of the prototype.
3.1 | Power curve |
3.2 | Noise emission |
3.3 | Electrical characteristics |
3.4 | Turbine behaviour |
3.5 | Loads on WECS |
3.6 | Thermal behaviour |
4. Design Assessment
The Design Assessment is necessary for the granting of building permits and for the insurability of the WECS. Thus clearance for production and operation of the WECS is confirmed by a Certification Authority accepted by the Licensor.
4.1 | Assessment report for Safety and Control System specification |
4.2 | Assessment report for loads |
4.3 | Assessment report for machinery components |
4.4 | Assessment report for electrical system |
4.5 | Assessment report for the tower |
4.6 | Design Assessment according to Guidelines of Germanischer Xxxxx |
5. Operating results of WECS
The prototype WECS must have been operated under all normal operating conditions in automatic mode and withstood extreme conditions without any damage in so far as possible. All the designed functions must be performed.
5.1 | Testing of all safety functions |
5.2 | Testing of all operating states |
5.3 | Automatic mode for at least 6 months |
5.4 | Energy production of at least 2,500 MWh(2.5/3.0MW), 5000MWh (5.0/6.0MW) |
Annex 9, License Agreement of SCD (2008-07-28)
Page 2 of 3
5.5 | Operation at rated power for at least 50 hours |
6. Type certificate
To start with the series production, the licensee must be granted with a type certificate for the WEC from the certification Authority. Following implementation must be performed:
6.1 | Requirements in production and erection |
6.2 | Quality management system |
6.3 | Shop approval of production facilities |
Note: The series production will be started as soon as the aforementioned conditions can be fulfilled and formal protocol shall be duly signed by contract parties.
Annex 9, License Agreement of SCD (2008-07-28)
Page 3 of 3
Annex 10:
Supports for Prototype/Series Production
1. Support for prototype
A | Scope of work for prototype in workshop assembly includes: |
1) Support for workshop assembly and system tests
General comments:
Licensor will support the Licensee in the workshop assembly of the nacelle and help with the system tests. The internal mounting of the main components are also supervised by one Licensor employee. For these tasks, one Licensor employee will be present in the Licensee’s work shop for the certain time frame. Based on current knowledge, a time frame of 2x10 working days for one engineer is required.
Scope of work: | - | 2 visits of one Licensor employee (10 working days each) | ||
- | Supervision of the internal mounting | |||
- | Supervision of the system tests | |||
- | Specification and description of the necessary tests | |||
Tasks not included: | - | Execution and preparation of tests (Licensee) | ||
- | Recording of system tests (Licensee) | |||
- | Execution of mounting tasks (Licensee) | |||
External requirements: | - | Scheduling of the visit at least 3 weeks before the visit | ||
Internal requirements: | - | None | ||
Result of work: | - | Brief protocols of the tasks carried out | ||
2) Inspection of the foundation of the prototype
| ||||
General comments: | Licensor will send one engineer to inspect and check the foundation construction on site of the prototype. The visit will take place after the reinforcement steel work has been finished on site and before the concrete work start. The reinforcement work will be check for compliance with the design drawings and changes will be requested if deviations will arise. The concrete work will then be supervised. A time frame of maximum 3 working days for 1 engineer is therefore required. |
Annex 10, License Agreement of SCD (2008-07-28)
Page 1 of 13
Scope of work: | - | 1 visits of one Licensor employee at the prototype site (3 working days) | ||
- | Check of the reinforcement work and supervision of the concrete work | |||
Tasks not included: | - | Reinforcement or concrete works | ||
External requirements: | - | Scheduling of the visit at least 3 weeks before the visit | ||
Internal requirements: | - | None | ||
Result of work: | - | Brief protocols of the visit |
3) Support during installation of the prototype
General comments: | Licensor will support the Licensee during the installation process of the prototype on site. For this, one Licensor employee will be present on the prototype site for a certain time frame. Based on current knowledge, a time frame of 5 working days is required. | |||
Scope of work: | - | 1 visits of one Licensor employee (5 working days) | ||
- | Supervision of the on site installation | |||
Tasks not included: | - | Execution and preparation of tests | ||
- | Logging of system tests | |||
- | Execution of mounting tasks | |||
External requirements: | - | Scheduling of the visit at least 3 weeks before the visit | ||
Internal requirements: | - | None | ||
Result of work: | - | Brief protocols of the visit |
4) Support in commissioning the prototype
General comments:
Licensor will support the Licensee in commissioning the prototype. To carry out this task, one Licensor employee will be present at the prototype’s location for a certain time frame. The Licensor employee will supervise and support the system tests which are to be carried out upon commissioning. The commissioning process is considered completed when all tests defined in the commissioning protocol were carried out successfully. Based on current knowledge, a time frame for 1 Licensor engineer of 2x15 (2 visits, 15 working days each) working days are therefore required.
Annex 10, License Agreement of SCD (2008-07-28)
Page 2 of 13
Scope of work: | - | Supervision of the system tests defined in the commissioning protocol 2x15 (2 visits of 1 engineer, 15 working days each) | ||
- | Fault finding and troubleshooting on components developed by Licensor | |||
- | Adjustment of control parameters (parameter alterations in the control computer must be carried out. | |||
Tasks not included: | - | Mounting tasks | ||
External requirements: | - | Scheduling of the visit at least 3 weeks before the visit | ||
Internal requirements: | - | None | ||
Result of work: | - | Protocols of tests and work tasks carried out | ||
5) Component inspection at suppliers
| ||||
General comments: | During the manufacturing process of the prototype, Licensor will inspect several main components at the suppliers or the Licensee manufacturing facilities. Licensor will check if these components are manufactured and assembled according to Licensor’s specifications. Licensor will prepare an inspection report for each component or assembly. | |||
Scope of work: | - | Inspection of blade master plug (1 day) | ||
- | Inspection of blade mould (1 day) | |||
- | Inspection of prototype blade (1 day) | |||
- | Inspection of rotor bearing (1 day) | |||
- | Inspection of blade and yaw bearing (1 day) | |||
- | Inspection of hub cast model (1 day) | |||
- | Inspection of cast hub (1 day) | |||
- | Inspection of machined hub (1 day) | |||
- | Inspection of head carrier (1 day) | |||
- | Inspection of pitch system (1 day) | |||
- | Inspection of generator/Inverter system (1 day) | |||
- | Inspection of gear part (1 day) | |||
- | Inspection of hydraulic /cooling / lubrication system (1 day) | |||
Tasks not included: | - | None |
Annex 10, License Agreement of SCD (2008-07-28)
Page 3 of 13
External requirements: | - | Information about inspection 14 days before | ||
Internal requirements: | - | None | ||
Result of work: | - | Inspection report for the above mentioned components or assemblies |
B | Scope of work for rotor blade of prototype includes: |
1) Technical support
General comments:
During the project, Licensor will provide technical support to the Licensee with regard to the following issues:
• | advice on sourcing of processing machines, (resin mixing, bonding paste mixing, drilling and sawing, laminate impregnation) |
• | advice on resin infusion process trials for blade production |
• | advice on design and manufacture/of auxiliary tooling (web moulds, spar cap moulds, bonding angle moulds, web and spar cap positioning jigs) |
With regard to the processing machines Licensor will establish contacts with suitable suppliers and support the Licensee in the evaluation of different options. Licensor assumes no further responsibility with regard to the processing machines, and any other tasks related to the processing machines, in particular commercial negotiations and the final choice of machines, are the Customer’s responsibility.
With regard to the resin infusion process Licensor will specify one test for investigating the resin reactivity in a thick root laminate, one test for investigating the required pre-cure time in a thin laminate and an infusion trial on a representative part of the blade structure in an existing blade mould. Licensor will further provide technical support with regard to additional infusion trials that may be required to ensure a functioning resin infusion process. Licensor assumes no further responsibility with regard to the resin infusion process, and any other tasks related to the resin infusion process, in particular the final specification of the infusion process and the adequate realisation and implementation of the resin infusion process, are the customer’s responsibility.
With regard to the additional tooling Licensor will provide all required lengths, widths and positions of components or blade parts that are needed for the design and manufacture of the additional tooling. Licensor will further provide technical support with regard to the design and manufacture of the additional tooling. Licensor assumes no further responsibility with regard to the additional tooling, and any other tasks related to the additional tooling, in particular the actual design and manufacture of the additional tooling, are the customer’s responsibility.
Annex 10, License Agreement of SCD (2008-07-28)
Page 4 of 13
Scope of work: | - | Supply of information and technical support in accordance with detailed description above | ||
Tasks not included: | - | Preparation of work instructions | ||
- | Support for blade material tests | |||
- | Decision making and direct instructing of personnel | |||
External requirements: | - | English speaking contact person at Licensee with appropriate technical understanding | ||
- | Information by the Licensee with regard to progress of investigations and tests as well as results found | |||
Results of work: | - | Information given under general comments | ||
2) Support for prototype production
General comments:
To ensure a clear and efficient communication during the prototype production and to enable an adequate and efficient definition of procedures, methods and details one Licensor employee will visit the Licensee at certain events during the prototype production. The following events are suggested:
• Kick-off meeting (Maximum 5 working days, 1 engineer)
• Before start of master plug production (Maximum 5 working days, 1 engineer)
• Before start of mould manufacture (Maximum 10 working days, 1 engineer)
• Start of production of prototype blade (Maximum 15 working days, 1 engineer)
The visits will be used, on one hand, to clarify any open issues with regard to the design documentation handed over so far and, on the other hand, to define and prepare the further steps to be taken. The other purpose of the visits will be for Licensor to support the Licensee in practical issues on site. Every visit will be prepared by Licensor and the Licensee and Licensor will prepare visit reports after the visit.
| ||||
Scope of work: | - | Travel to the production facility | ||
- | Project visits at the production facility | |||
- | Preparation of visits and reporting | |||
Tasks not included: | - | Detailed definition and preparation of procedures | ||
- | Definition of material processing requirements and conditions | |||
- | Preparation of work instructions | |||
- | Decision making and direct instructing of personnel |
Annex 10, License Agreement of SCD (2008-07-28)
Page 5 of 13
External requirements: | - | English speaking contact person at Licensee with appropriate technical understanding | ||
Results of work: | - | Prepared project visits including visit reports |
3) Support and evaluation of the blade test
General comments:
The scope of work presupposes one static blade test. The specification of the static blade test which will be submitted by Licensor describes all details which are necessary to perform the blade test such as (list may be not complete):
• | Definition of position of measuring points for strain and deflection, |
• | Definition of measuring points for every load introduction point |
• | Definition of the locations of the load introduction points as well as the load introduction steps during the test |
• | Definition of the mode shapes of the rotor blade |
The test is carried out by the blade manufacturer who is also in charge of data recording. All costs related to the hardware for the test and the labour cost of the Licensee is paid by the Licensee. During the blade test, one Licensor employee and one employee of the Certification institute will be present. The test process is supervised. All labour costs of Licensor and the certification institute will be paid by Licensor. The evaluation of the measured data and a comparison with, the calculation results are carried out by Licensor.
Scope of work: | - | Supervision of the blade tests (maximum 5 working days, 1 Licensor employee and 1 employee of the certification institute) | ||
- | Evaluation of the blade test and comparison with the calculation results | |||
Tasks not included: | - | Implementation of the blade tests | ||
- | Implementation of the measurements | |||
- | Design and drawing of the test bench structure of the rotor blade | |||
External requirements: | - | Information on the test facility | ||
Internal requirements: | - | None | ||
Result of work: | - | Report with evaluation of one static blade test to verify the blade structure |
Annex 10, License Agreement of SCD (2008-07-28)
Page 6 of 13
C. | Support for control system of prototype includes: |
1) Control system hardware installation in the work shop
General comments: | The control cabinets, cables and the sensors will be installed by Licensor or one of its partners in the work shop in China. The installation of the cabinets includes installation of all elements inside the cabinets. The tower base control cabinet will be installed provisional beside the nacelle and connected to the nacelle cabinet in order to perform the workshop tests. The date of the installation must be agreed between all partners. It is assumed that the installation process can be done within one visit in China. A time frame of 5 working days for 1 engineer is assumed. To achieve this the assembly of the nacelle in the work shop must be finished to a sufficient degree. | |||
Scope of work: | - | Installation of the control cabinet in the Licensee work shop in China including all travel and accommodation costs | ||
- | 1 visit, 5 working days, 1 engineer | |||
Tasks not included: | - | Additional visits | ||
External requirements: | - | Nacelle assembly must be finished to a sufficient degree (start of the nacelle control system hardware installation will be agreed between all partners) | ||
- | Transformer and inverter with switch gear must be installed at the workshop | |||
Result of work: | - | Control cabinet hardware installation including sensors and cables | ||
2) Commissioning of the Control System in the work shop
| ||||
General comments: | Licensor or one of its partners will do the commissioning of the control system software and hardware in the customers workshop after the complete assembly of the nacelle and the installation of the control system hardware. Licensor will perform functional test of the control system software and the respective hardware systems as far as it is possible in the workshop. Not all functions or systems can be tested in the workshop. It is assumed that the commissioning process can be done within one visit in China. A time frame of 15 working days for 1 engineer is assumed. | |||
Scope of work: | - | Installation of the control system software on the control system hardware (Siemens) | ||
- | Specification of tests which have to be performed in the work shop |
Annex 10, License Agreement of SCD (2008-07-28)
Page 7 of 13
- | Functional test of the control software functions as far as possible in the work shop | |||
- | 1 visit, 15 working days, 1 engineer | |||
Tasks not included: | - | Full test of all functions | ||
- | Hardware assembly or installation work | |||
External requirements: | - | Nacelle assembly and nacelle control system hardware installation finished | ||
Result of work: | - | Test results of the control system software | ||
- | Specification of tests in the work shop |
3) Control system hardware installation check at the prototype site
General comments: | The electrical installation will be done by the Licensees engineers at the prototype site in China. The cabling will be the same as in the workshop test. The cabling will be checked and tested by one Licensor engineer after the installation has been finished by the Licensee. It is assumed that the check of the installation can be done within one visit in China. A time frame of 5 working days for 1 engineer is assumed. To achieve this installation of the turbine at the prototype site must be finished. | |||
Scope of work: | - | Check and test of the installation of the control system and electrical system including cables at the prototype site in China including all travel and accommodation costs | ||
- | 1 visit, 5 working days, 1 engineer | |||
Tasks not included: | - | Additional visits | ||
- | Installation work at the prototype site | |||
External requirements: | - | Turbine installation at the prototype site must be finished (start of the tower base control system hardware installation will be agreed between all partners) | ||
- | Power cables in the tower must be already installed inside the tower by the tower manufacturer | |||
- | Commissioning at the workshop must be finished successfully | |||
- | Installation and cabling of the control system hardware by the Licensee must be finished | |||
Result of work: | - | Control system hardware installation cheek and test at the prototype site |
Annex 10, License Agreement of SCD (2008-07-28)
Page 8 of 13
4) Commissioning of the Control System at the prototype site
General comments: | Licensor or one of its partners will do the commissioning of the control system software at the prototype site in China after the installation of the turbine and the installation of the nacelle and tower base control cabinet Licensor will perform functional test of the complete control system software and the respective hardware systems. The system tests and the commissioning will be performed according to the “Specification for commissioning of the prototype”. It is assumed that the commissioning process can be done within two visits in China. A time frame of 2x10 working days for 1 engineer is assumed (2 visits, 10 working days each, 1 engineer). | |||
Scope of work: | - | Commissioning of the control, system according to the “Specification for commissioning of the prototype” in China | ||
- | 2 visits, 10 working days each, 1 engineer | |||
Tasks not included: | - | Hardware assembly or installation work | ||
- | Commissioning of the mechanical components and sub-systems | |||
External requirements: | - | Turbine installation at the prototype site finished and control system Hardware installation finished | ||
Result of work: | - | Commissioning of the control system hard and software at the prototype site |
2. Training Courses
1) Control system software training
General comments: | Licensor or one of its partners will do a training course on the final control system software for the Licensee’s engineers. The training course will be held in the office of Licensor in Shanghai. The number of participants from the Licensee is limited to 6 engineers. | |||
Scope of work: | - | 5 working day training course on the final control system software in Shanghai | ||
Tasks not included: | - | Travel costs of the Licensee’s engineers | ||
External requirements: | - | None | ||
Result of work: | - | Training course documents |
Annex 10, License Agreement of SCD (2008-07-28)
Page 9 of 13
2) Training course of Assembling
General comments: | Licensor or one of its partners will do a training course on the turbine assembly for the Licensee’s engineers. The training course will be held at Licensee’s workshop. The number of participants from the Licensee is limited to 10 persons including 3 engineers and 7 technicians at least. | |||
Scope of work: | - | 4 weeks training, 3 days for assembly process training, rest will be for the physical training on assembly in Licensee’s workshop. | ||
External requirements: | - | None | ||
Result of work: | - | Training course documents |
3) Training course of erection
General comments: | Licensor or one of its partners will do a training course on the prototype erection for the Licensee’s engineers. The training course will be held at Licensee’s workshop. The number of participants from the Licensee is limited to 10 persons; the persons who are going to erect the turbine in the future will be strongly preferred to attend this training course. | |||
Scope of work: | - | 1 day for demonstration and presentation of erection of turbine in Licensee’s workshop. | ||
External requirements: | - | None | ||
Result of work: | - | Training course documents | ||
4) Training course of commissioning
| ||||
General comments: | Licensor or one of its partners will do a training course on the prototype commissioning for the Licensee’s engineers. The training course shall be including two parts, theory training will be held at Licensee’s workshop and commissioning training will be held at prototype site. The number of participants in theory training from the Licensee is limited to 10 persons; the persons who are going to assist Licensor’s engineers for commissioning of the turbine in the future will be strongly preferred to attend both training courses. |
Annex 10, License Agreement of SCD (2008-07-28)
Page 10 of 13
Scope of work: | - | 3 days for the theory training and commissioning of prototype refers to support of prototype commissioning. | ||
External requirements: | - | None | ||
Result of work: | - | Training course documents |
5) Training course of regular maintenance
General comments: | Licensor or one of its partners will do a training course on the regular maintenance of turbine for the Licensee’s engineers. The number of participants from the Licensee is limited to 6 persons. | |||
Scope of work: | - | 5 working days for regular maintenance at Licensee’s workshop | ||
External requirements: | - | None | ||
Result of work: | - | Training course documents |
6) Training course of Siemens Controller
General comments: | Licensor or one of its partners will do a training course on the Siemens controller for the Licensee’s engineers in Licensor’s shanghai office. The number of participants from the Licensee is limited to 8 persons. | |||
Scope of work: | - | 3 working days for Siemens controller training in shanghai | ||
Tasks, not included: | - | Travel costs of the Licensee’s engineers | ||
External requirements: | - | None | ||
Result of work: | - | Training course documents |
Annex 10, License Agreement of SCD (2008-07-28)
Page 11 of 13
3. supports for series production
Support during series production will be including two parts:
1) Support for Rotor Blade during Series Production
General comments:
• | One Licensor engineer will regularly visit the production facility of the Licensee during the Support Period which is defined in the contract. During the visits the Licensor engineer will examine the quality control system and the production process of the Licensor rotor blades. The purpose of the visit is explicitly not the training of the production staff of the Licensee. The visits will take place during the Support period. |
In order to examine the complete production process it should be assured by the Licensee that one complete blade including bonding and finishing is produced during the visit period of the Licensor engineer. A report will be prepared after the visit which documents the status of the blade production during the visit of the Licensor employee. Licensor only can make suggestion for improvements or point out possible problems. The Licensee itself is always responsible for the quality of the production and the rotor blade.
Scope of work: | - | Visit of 1 Licensor engineer for the time period defined in the contract | ||
- | Examination of the quality control system and the production process | |||
- | Reporting of the examinations made by the Licensor engineer | |||
- | Closing meeting at the end of the visit and discussion with the management about the visit results | |||
Tasks not included: | - | Practical training of the production staff | ||
- | Production duties | |||
External requirements: | - | Production planning for one complete blade production during the visit | ||
Result of work: | - | Examination reports |
Annex 10, License Agreement of SCD (2008-07-28)
Page 12 of 13
2) Support for nacelle assembly during series production
General comments:
One Licensor engineer will regularly visit the production facility of the Licensee during the Support Period which is defined in the contract. During the visits the Licensor engineers will examine the quality control system and the production process of the WEC. The purpose of the visit is explicitly not the training of the production staff of the Licensee. The visits will take place as often as necessary during the Support period. The Licensor engineers will be supervising the production.
A report will be prepared after the visit which documents the status of the WEC production during the visit of the Licensor employee. Licensor only can make suggestion for improvements or further development and point out observed problems during series production. The Licensee itself is always responsible for the quality of the production and the License WEC.
Scope of work: | - | Visit of Licensor engineers for the time period defined above | ||
- | Examination of the quality control system and the production process | |||
- | Reporting of the examinations made by the Licensor engineers | |||
- | Closing meeting at the end of each visit and discussion with the management about the visit results | |||
Tasks not included: | - | Practical training of the production staff | ||
- | Production duties | |||
External requirements: | - | English speaking contact person during the duration of the visit | ||
Result of work: | - | Examination reports |
Annex 10, License Agreement of SCD (2008-07-28)
Page 13 of 13
Annex 11: List of Suppliers
1. |
Blade | 2 | ||
2. |
Blade Bearing | 3 | ||
3. |
Cables | 3 | ||
4. |
Casting Parts | 3 | ||
5. |
Centralized Lubrication System | 4 | ||
6. |
Control System Hardware | 4 | ||
7. |
Elastomer Bearing | 5 | ||
8. |
Gear Machining | 5 | ||
9. |
High Strength Bolt | 6 | ||
10. |
Hydraulic Filters, Oil Care | 7 | ||
11. |
Hydraulic Rotary Feedthrough | 7 | ||
12. |
Hydraulic Unit | 8 | ||
13. |
Pitch System, Hydraulic Components | 8 | ||
14. |
Rotor Bearing | 8 | ||
15. |
Rotor Brake Calliper | 9 | ||
16. |
Rotor Shaft | 10 | ||
17. |
Slip Ring Unit | 00 | ||
00. |
Xxxxx | 00 | ||
00. |
Transformer | 13 | ||
20. |
Water Cooling System | 13 | ||
21. |
Yaw Bearing | 14 | ||
22. |
Yaw Brake Calliper | 14 | ||
23. |
Yaw Drive, Yaw Gearbox | 15 |
Annex 11, License Agreement of SCD (2008-07-28)
Page 1 of 15
This “Supplier List” is created by aerodyn to help the customers of aerodyn to find suitable suppliers for high quality wind turbine parts. All listed suppliers have already references in wind turbine business. The list is not complete. Most of the listed suppliers are well known by aerodyn and aerodyn has frequently contacted to these companies, aerodyn strongly recommends not to use suppliers, which has no references in wind business. The listed suppliers are not finally fixed at the moment and can be changed by aerodyn during the design process.
1. | Blade |
Company |
Contact Person |
Contact in China | ||
Lianyungang Zhongfu Lianzhong Composites Group Co., Ltd.
Add: Hailian East Road No. 195, Xinpu Dist. Lianyungang, 222006 Jiangsu, PRC E-mail: xxxxxxxx@xxxxx.xxx |
Xx. Xxxx Guanghui General Manager Tel: x00 (0)000-0000000 x00 0000 0000 000 Fax: x00 (0)000-0000000 Email: xxxxx-xxxx@xxxxx.xxx |
|||
Shanghai FRP Research Institute Branch No. 0 xxxxxx xxxx, Xxxxxx Xxxx, Xxxxxxxx Xxxxxxxx, 000000 X. R. China xxxx://xxx.xxxxx.xxx |
Xx. Xxxxx Jinnan Phone: x000000000000 Fax: x000000000000 Email: xxx000@000.xxx |
see company | ||
SINOMA Beijing FRP Research & Design No. 261 Post Box Kangzhuang Yanqing Beijing, 102101 P. R. China xxxx://xxx.xxx.xxx.xx |
Mr. Xxxx Xxx Phone: x00 0000000000 Fax: x00 0000000000 Email: xxxxxxx@xxx.xxx.xx |
see company |
Annex 11, License Agreement of SCD (2008-07-28)
Page 2 of 15
2. | Blade Bearing |
Company |
Contact Person |
Contact in China | ||
XXXXX ERDE GmbH Beckumer Straxxx 00 00000 Xxxxxxxxx Xxxxxxx xxxx://xxx.xxxxxxxxx.xxx |
Xx. Xxxxxx Xxxx Phone: x00 (0) 0000 000 0000 cell: x00 0000 0000000 Fax: x00 0000 000 0000 Email: Xxxxxx.Xxxx@xxxxxxxxxxxx.xxx |
|||
ROLLIX XXXXXXXXXX X.X. 3, Rue Xxxxx Xxxxxxx - BP329 44803 St Herblain Cedex France xxxx://xxx.xxxxxx-xxxxxxxxxx.xxx |
Mr. Xxxxx Xxxxxxxxx Phone: x00 (0)000 000000 Fax: x00 (0)000 0000 00 Email: BrunoPelletier@ xxxxxx-xxxxxxxxxx.xxx |
Sunrise Motion technology Ltd. Room F, G, H, 20/F, JinXuan Building No. 238 East Xxxxxx Xx. Shanghai Xuhui District, Shanghai 200030, P. R. China Xx. Xxxx Xxxx Phone: x00 00 0000 0000 Fax: x00 00 0000 000 Email: xxxxxxxx@xxxxxxxxx.xxx |
3. | Cables |
Company |
Contact Person |
Contact in China | ||
Xxxx Xxxxx |
4. | Casting Parts |
Company |
Contact Person |
Contact in China | ||
Ningbo Yeong-Shang Casting Iron Co. Ltd
Gangkou 1, Bxxxxx Xxxxxxxx(Xxxxxxxx) 000000, Xxxxxx, Xxxxx |
Xx. Xxx Shugen
Tel: x00(0) 000 00000000 Fax: x00(0) 000 00000000 Email: xxxx@xxxx.xxx.xx |
|||
Wuxi FAW Foundry Co. Ltd
Xulai Bridge, Zhongnan rd, 214024, Wuxi, China xxxx://xxx.xxxxx.xxx |
Xx. Xxxx Xxxxxxx
Tel: x00(0) 000 00000000 Fax: x00(0) 000 00000000 Email: xxx@xxxxx.xxx |
Annex 11, License Agreement of SCD (2008-07-28)
Page 3 of 15
HANGZHOU Sound Foundry Co., Ltd. Xiaoshan Guali Industrial Zone Hangzhou 311241 P. R. China Phone: x00-000-00000000 Fax: x00-000-00000000 Email: xxxxx@xxxxx-xxxxxxx.xxx |
5. | Centralized Lubrication System |
Company |
Contact Person |
Contact in China | ||
LINCOLN GmbH Technologiezentrum Europa Nord Neuexxxxxxxxxx 00 00000 Xxxxxxx Xxxxxxx xxxx://xxx.xxxxxxxxxxxxxxxxx.xx |
Tel.: x00 000 00 00 00-0 Fax: x00 000 00 00 00-00 E-Mail: lincolnten@ xxxxxxxxxxxxxxxxx.xx |
Lincoln China Office Room 2208 HuaXia Bank Tower - No. 000 Xxxxxx Xxxx Xxxxx - Xxxxxx Xxxx Xxxnghai 200120 P. R. China Phone: x00-00-0000-0000 Fax: x00-00-0000-0000 xxxx://xxx.xxxxxxxxxxxxxxxxx.xxx.xx | ||
WILLY VOGELAG (SKF) Vertriebs- und Service Center Hamburg Sinsxxxxxx Xxxxxxxx 00-00 00000 Xxxxxxx Xxxxxxx |
Xx. Xxxx Xxxxx Ing. (grad.) Phone: +49 (0) 00-00 00 00 00/75 Fax: +49 (0) 40-76 10 28 96 Wmail: Xxxx.Xxxxx@xxxxx.xxx.xxx |
Xxxxx Lubrication System (Shanghai) Co. Ltd. 6th Floor, Shi Yan Building, No. 501 Xxx Xxx Road Jinquiao Export Processing Zone, Pudong Shanghai 201206 P. R. China Phone: x00 00 00 00 00 00 Fax: x00 00 00 00 00 00 Email: xxxxx@xxxxxxx.xxx.xx |
6. | Control System Hardware |
Company |
Contact Person |
Contact in China | ||
Siemens AG |
Annex 11, License Agreement of SCD (2008-07-28)
Page 4 of 15
7. | Elastomer Bearing |
Company |
Contact Person |
Contact in China | ||
CONTITECH VIBRATION CONTOL GMBH Jädekamp 30 |
Xx. Xxxxxx Knickelmann Phone: x00 000 00 00 00 0 Fax: x00 000 00 00 00 0 Email: xxxxxx.xxxxxxxxxxx@xx.xxxxxxxxx.xx |
|||
D-30419 Hannover xxx.xxxxxxxxxxxxx.xxx |
Xx. Xxxxxxxx Xxxxxx Phone: x00 000 0 00 00 00 Fax: x00 000 0 00 00 00 Email: xxxxxxx.xxxxxx@xxxxxxxxxx.xx |
|||
FOR GERMANY ONLY: XXXXXXXXXX KG Schnackenburgerallee 180 D-22525 Hamburg, Germany xxx.xxxxxxxxxx.xx |
||||
ESM Energie- und Schwingungstechnik Xxxxxx GmbH Auf xxx Xxx 0 00000 Xxxxxxx - Xxxxxxxxxxx Xxxxxxx xxxx://xxx.xxx-xxxx.xx |
Xx. Xxxxx Xxxxxx Phone: x00 0000 00000 Fax: x00 0000 000000 Email: xxxx@xxx-xxxx.xx |
8. | Gear Machining |
Company |
Contact Person |
Contact in China | ||
Xxxxxxx Xxxxxx Maschinen- und Zahnradfabrik GmbH
Postxxxx 00 00 - 00000 Xxxx-Xxxxxx-Xxxxxx 0 X-77933 Xxxx / Schwarzwald Email: xxxxxxx@xxxxxx-xxxx.xx xxxx://xxx.xxxxxx-xxxx.xx |
Xx. X. Xxxxxxxxxxx Phone: x00 (0)0000 000 0 Fax: x00 (0)0000 000 000 |
Annex 11, License Agreement of SCD (2008-07-28)
Page 5 of 15
PW Xxxxxxxx Xxxxxxxxx XxxX
Xxx Xxxxxxxxxxx 00 X-06280 Sulzbach
Email: xx@xxxxxxxxx.xx xxxx://xxx.xxxxxxxxx.xx |
Ms. Xxxx Xxxxxxx Phone: x00 (0)0000 00000 Fax: x00 (0)0000 0000 00 |
|||
Zahnradfertigung Xxx.
Bloexxxxxxxxxxxxx 00 X-00000 Xxxxxxxxxxxx Xxxil: xxxx@xxxxxxx-xxx.xx |
Xx. Xxx
Phone: x00(0)0000 0000 Fax: x00(0)0000 00000 Email: x.xxx@xxxxxxx-xxx.xx |
9. | High Strength Bolt |
Company |
Contact Person |
Contact in China | ||
August Friedberg GmbH Achternbergstraße 38 A D-45000 Xxxxxxxxxxxxx
Postxxxx 00 00 00 X-00000 Xxxxxxxxxxxxx X-Xail: Xxxx@xxxxxx-xxxxxxxxx.xx xxx.xxxxxx-xxxxxxxxx.xx |
Xxxxxx Xxxxxx Phone: +49 (0) 0 00-00 00 000 Fax: +49 (0) 0 00-00 00 000 xxxxxx.xxxxxx@xxxxxx-xxxxxxxxx.xx |
|||
PEINER Umformtechnik GmbH Woltxxxxx Xxxxxxx 00-00 X-00000 Xxxxx Xxxefon 0000-0000-000-0 Telefax 0049-5171-545-180 Internet: xxx.xxxxxx-xx.xxx |
Xx. Xxx Xxxxxxxxxx Tel. x00(0)0000-000 203 Fax x00(0)0000-000 314
eMail: xxxxx@xxxxxx-xx.xxx |
Annex 11, License Agreement of SCD (2008-07-28)
Page 6 of 15
Shanghai Jinma High Strength Fastener Co., Ltd.
Jialxx Xx. 000, 000000, Xxxxxxxx, Xxxxx xxxx://xxx.xxxxxxxxx.xxx |
Mr. Xxxxx Xx Vice General Manager Tel: x00 (0)00 00000000 x00 (0)00 00000000 Fax: x00 (0)00 00000000 x00 (0)00 00000000 E-mail: xxxxxxxxxxx@000.xxx Xxxxxxx000@000.xxx |
|||
Shanghai Shenguang High Strength Bolts Co., Ltd.
Add: Chaoxxxx Xx, Xxxxxxxxx, Xxxxxx, 000000, Xxxxxxxx, Xxxxx xxxx://xxx.xxxx.xx |
Mr. Gu Mingyi General Manager Tel: x00 (0)00 00000000 x00 (0)00000000000 Fax: x00 (0)00 00000000 E-mail: xxxxxxx@xxxx.xx |
10. | Hydraulic Filters, Oil Care |
Company |
Contact Person |
Contact in China | ||
XXXXXXX & HENNEMANN GmbH Marlowring 5 D-22525 Hamburg, Germany xxx.xxxxxxxxxxxxxxxx.xxx |
Xx. Xxxxxxx Xxxxxx Phone: x00 0000 00 00 00 Fax: x00 0000 00 00 00 Email: xxx.xx@xxx.xx |
11. | Hydraulic Rotary Feedthrough |
Company |
Contact Person |
Contact in China | ||
DEUBIN GmbH Nassaustraße 10 D-65719 Hofheim-Wallau Germany xxx.xxxxxxx.xx |
Xx. Xxxxx Xxxxxxxx Phone: x00 0000 00 00 0 Fax: x00-0000 00 00 0 Email: xxxxxxxxx@xxxxxxx.xx |
|||
GAT – Gesellschaft für Antriebstechnik mbH Schoßbergstraße 19 D-65201 Wiesbaden, Germany xxx.xxx-xxx.xx |
Xx. Xxxx Xxxxx Xxxxxxx Phone: x00 000 000 000 0 Fax: x00 0000 000 000 Email: xxxxxxxx@xxx-xxx.xx |
Annex 11, License Agreement of SCD (2008-07-28)
Page 7 of 15
12. | Hydraulic Unit |
Company |
Contact Person |
Contact in China | ||
HYDAC INTERNATIONAL Muehxxxxxx 000 -000 00000 Xxxxxxxxxxx Xxxxxxx xxxx://xxx.xxxxx.xxx |
Xx. Xxxxxx Xxxxxx Phone: x00 0000 00 00 00 Fax: x00 0000 00 00 00 Email: xxxxxx.xxxxxx@xxxxx.xxx |
Hydac Technologgy (Shanghai) Limited Shanghai Minhang Economics & Technological Development Zone 00 Xxxxxxxx Xx Xxxxxxxx 000000 X. R China Xx. Xxxxx Xxxx Phone: x00 00 00000000 Fax: x00 00 00000000 Email: xxxxxxx@xxxxx.xxx.xx |
13. | Pitch System, Hydraulic Components |
Company |
Contact Person |
Contact in China | ||
AVN HYDRAULIK A/S Suensonsvej 14 DK-8600 Silkeborg, Danmark xxx.xxx.xx |
Xx. Xxx Xxxxxxx Phone: x00 00 00 00 00 Fax: x00 00 00 00 00 Email: xx@xxx.xx |
|||
BOSCH REXROTH AG Mobile Hydraulics Walsroder Straße 93 D-30853 Langenhagen, Germany xxx.xxxxxxxxxxxx.xx |
Mr. Harald Behrings Phone: x00 000 000 000 000 Fax: x00 000 000 000 00 Email: xxxxxx.xxxxxxx@xxxxxxxxxxxx.xx |
14. | Rotor Bearing |
Company |
Contact Person |
Contact in China | ||
SKF GmbH Xxxxxx-Xxxxxx-Xxxxxxx 00 00000 Xxxxxxxxxxx Xxxxxxx xxxx://xxx.xxx.xxx |
Xx. Xxxxxxxx Xxxxxxx Phone: x00 0000 000000 Fax: x00 0000 000000 Email: xxxxxxxx.xxxxxxxx@xxx.xxx |
Annex 11, License Agreement of SCD (2008-07-28)
Page 8 of 15
TIMKEN EUROPA GMBH Landxxxxxxx 00-00 X-00000 Xxxx, Xxxxxxx |
Xx. Xxxx Xxxxxxx Phone: x00 0000 00 00 00 Fax: x00 0000 00 00 00 Email: xxxxxxxx@xxxxxx.xxx |
|||
SCHAEFFLER KG Gxxxx-Xxxxxxxx-Xxxxxxx 00 00000 Xxxxxxxxxxx Xxxxxxx xxxx://xxx.xxx.xxx |
Xx. Xxxxxx Xxxxxxxxx Phone: x00 0000 000000 Fax: x00 0000 000000 Email: xxxxxx.xxxxxxxxx@xxxxxxxxxx.xxx |
Schaeffler Holding (China) Co., Ltd. Center of Competence 229 Yanshan Road Taicang 215400, Jiang Su Province P. R. China Xx. Xxxxxxxx Xxxxxx Phone: x00 000 0000 0000 Mob.: x00 000 0000 0000 Fax: x00 000 0000 0000 Email: xxxxxxxx.xxxxxx@xxxxxxxxxx.xxx xxxx://xxx.xxx.xxx |
15. | Rotor Brake Calliper |
Company |
Contact Person |
Contact in China | ||
SVENDBORG BRAKES A/S Kircxxxxxxxxxxx 00 00000 Xxxxxx Xxxxxxx xxxx://xxx.xxxxxxxxx-xxxxxx.xx |
Xx. Xxxxxxx Xxxxxx Phone: x00 0000 000 000 Fax: x00 0000 000000 Email: x.xxxxxx@xxxxxxxxx-xxxxxx.xx |
KTR Power Transmission Technology (Shanghai) Co, Ldt. Xx. Xxx Xxxxxx Xxxxx 0, Xxxx. 00 Xx. 351 Xxx Xxxx Road Xxx Xxxx 201206, Pudong Shanghai P. R. China Phone: x00 (00) 00 00 0 000 (00) x00 (00) 00 00 00 00 Fax: x00 (00) 00 00 0 000 Email: xxxxxxxx@xxxx.xxxxxx.xx.xx x.xxxxxx@xxx.xxx xxx-xx@xxx.xxx http.//xxx.xxx.xxx |
Annex 11, License Agreement of SCD (2008-07-28)
Page 9 of 15
SIME-Stromag SAS Avenue de l’Europe -BP 24 18150 La Guerche-sur-l’Aubois France xxxx://xxx.xxxx-xxxxxxx.xxx |
Ms. Xxxxxxx Devoulon Phone: x00 000000000 Fax: x00 000000000 Email: x.xxxxxxxx@xxxx-xxxxxxx.xxx |
Beijing Xxxxx PTC. Jiajiangtiancheng Plaza Room 2201, A Block Jia 2, Sxxxx Xxxx Xxxxxxxxxxxxx Xxxx Xxxxxxx 000102 P. R. China Xx. Xxxx Que Phone: x00 00 000000000 Fax: x00 00 00000000 Email: xxxxxxxx@xxxx.xxx |
16. | Rotor Shaft |
Company |
Contact Person |
Contact in China | ||
SKODA STEEL Tyloxx 0/00 00000 Xxxxx Xxxxx Xxxxxxxx xxxx://xxx.xxxxx-xxxxx.xxx |
Ms. Jitka Matuchová Phone: x000 0000 000 00 Fax: x000 0000 000 00 Email: xxxxx.xxxxxxxxx@xxxxx-xxxxx.xx |
|||
Special Steel Factory of Inner Mongolia North Heavy Industries Group No.100 sub-mailbox of the third Mailxxx, Xxxxxxxx Xxxxxxxx, 000000, Xxxxxx, Xxxxx xxxx://xxx.xxxx.xxx |
Xx. Xxxxx Jianjun Tel: x00(0)000 0000000 Fax: x00(0)000 0000000 |
|||
China National Erzhong Group Co. Ltd.
Zhujiang west rd No. 000,000000, Xxxxxx, Xxxxxxx, Xxxxx |
Mr. Xx Xxx Tel: x00(0)000 0000000 Fax: x00(0)000 0000000 |
Annex 11, License Agreement of SCD (2008-07-28)
Page 10 of 15
17. | Slip Ring Unit |
Company |
Contact Person |
Contact in China | ||
LABEL S.A.S. EUREKA Industrievertretungen Eschxxxxxx Xxx 00 00000 Xxxxxxxxxxx Xxxxxxx xxxx://xxx.xxxxx.xx |
Xx. Xxxxxx Xxxx Phone: x00 000 0000000 Fax: x00 000 0000000 Email: xxxx@xxxxxx-xx.xx |
|||
SCHLEIFRING und APPAXXXXXXX XxxX Xx Xxxxxxxxxx 00 00000 Xxxxxxxxxxxxxxxxx Xxxxxxx xxxx://xxx.xxxxxxxxxxx.xx |
Xx. Xxxxxx Xxxxxxxx Phone: x00 0000 0000 Fax: x00 0000 00000 Email: xxxxxxxxx@Xxxxxxxxxxx.xx |
Shenzhen Kaito-Filtec Trade Co 20A QINGTIANGE SKY CASTLE Bldg. JINGTIAN Road Shenzhen / Guangdong 518036 P. R. China Xx. Xxxxxx Xx Phone: x00 000 0000 0000 Fax: x00 000 0000 0000 Email: xxxx@xxxxxxxxxxx.xxx.xx xxxx@xxxxx-xxxxxxxxx.xxx xxxx://xxx.xxxxxxxxxxx.xxx.xx | ||
XXXXX Elektrotechnik Xxxxxx Xxxxx GmbH Aindxxxxxx Xxxxxxx 00 00000 Xxxxxxxx Xxxxxxx xxxx://xxx.xxxxx.xx |
Xx. Xxxxx Xxxxx Phone: x00 000 000000 Fax: x00 000 0000000 Email: xxxxxxxx@xxxxx.xx |
|||
STEMMANN Technik GmbH Quendorier Straxxx 00 00000 Xxxxxxxxx Xxxxxxx xxxx://xxx.xxxxxxxxx.xx |
Xx Xxxxx Xxxxxxxx Phone: +49 (0) 59 23 - 81 - 208 Fax: +49 (0) 59 23 - 81 - 274 Email: x.xxxxxxxx@xxxxxxxx.xx |
|||
GAT – Gesellschaft für Antriebstechnik mbH Schoßbergstraße 19 D-65201 Wiesbaden, Germany xxx.xxx-xxx.xx |
Xx. Xxxx Xxxxx Xxxxxxx Phone: x00 000 000 000 0 Fax: x00 0000 000 000 Email: xxxxxxxx@xxx-xxx.xx |
Annex 11, License Agreement of SCD (2008-07-28)
Page 11 of 15
18. | Tower |
Company |
Contact Person |
Contact in China | ||
Qingdao Jieneng High & New Technology Co., Ltd.
Xxxxx Xx. 889, Economic & Technique Xxxxxxxxxxx xxxx, 000000, Qingdao, China xxxx://xxx.xxxxxxxxx.xxx |
Mr. Xxxx Xx Vice Manager of Sales Dept. Tel: x00 (0)000 00000000 x00 (0)00000000000 Fax: x00 (0)000 00000000 E-mail: xx@xxxxxxxxx.xxx |
|||
Baotou Beifang Chuangye Steel Structure Co., Ltd.
Mailbox 2, 014010, Baotou, Inner Mongolia |
Xx. Xxx Zhonggui General Manager Tel: x00 (0)000 0000000 x00 (0)000 0000000 Fax: x00 (0)000 0000000 |
|||
Shanghai Taisheng Power Engineering Machinery Co., Ltd.
Weiqing Rd. 1988, Xxxxxxx Xxxxxxxx, 000000, Xxxxxxxx, Xxxxx xxxx://xxx.xxxxx.xxx |
Xx. Xxxxx Xxxxx General Manager Assistant Tel: x00 (0)00 00000000 x00 (0)00000000000 Fax: x00 (0)00 00000000 E-mail: xxxxxxxxx@xxxxx.xxx.xx |
|||
Chengxi Shipyard Co., Ltd.
Xxxxxx Xx. 0, 000000, Xxxxxxxx, Xxxxx xxxx://xxx.xxxxxxx.xxx |
Mr. Hong Haiyun Steel Construction Dept. Director of Business Section
Tel: x00 (0)000 00000000 x00 (0)000 00000000 Fax: x00 (0)000 00000000 E-mail: xxxxxxxx_xxxxxxx@xxx.000.xxx |
Annex 11, License Agreement of SCD (2008-07-28)
Page 12 of 15
19. | Transformer |
Company |
Contact Person |
Contact in China | ||
PAUWELS Xxxxxxxxxxxxxxxxx 000 0000 Xxxxxxxx Xxxxxxx xxxx://xxx.xxxxxxx.xxx |
Mr. Jan Delercq Phone: x00 00000000 Fax: x00 00000000 Email: x.xxxxxxx@xxxxxxx.xxx |
|||
SGB Starkstrom-Geraetebau GmbH Xxxxxx. 00 00000 Xxxxxxxxxx Xxxxxxx xxxx://xxx.xxx-Xxxxx.xx |
Xx. Xxxxxx Xxxxxxxxx Phone: x00 000 0000000 Fax: x00 000 0000000 Email: xxxxxx.xxxxxxxxx@xxx-xxxxx.xx |
|||
ABB Oy X. Xxx 000 00000 Xxxxxxxx Xxxxxxxx xxxx://xxx.xxx.xxx |
Mr. Veikko Hyvaerinen Phone: x00 000 0000000 Fax: x00 000 0000000 Email: xxxxxx.xxxxxxxxx@xx.xxx.xxx |
ABB Drives Xx. Xxxx Xxxxxx Beijing P. R. China Phone: x00 (0) 00 00000 000 mobil: x00 00 00 000 00 00 |
20. | Water Cooling System |
Company |
Contact Person |
Contact in China | ||
HYDAC INTERNATIONAL Xxxxxxxxxx 000 -000 00000 Xxxxxxxxxxx Xxxxxxx xxxx://xxx.xxxxx.xxx |
Mr. Xxxx-Xxxxx Effelsberg Phone: x00 00 0000000 Fax: x00 00 00000000 Email: xxxx-xxxxx.effelslsberg@ xxxxx.xxx |
Hydac Technologgy (Shanghai) Limited Shanghai Minhang Economics & Technological Development Xxxx 00 Xxxxxxxx Xx Xxxxxxxx 000000 P. R China Xx. Xxxxx Xxxx Phone: x00 00 00000000 Fax: x00 00 00000000 Email: xxxxxxx@xxxxx.xxx.xx |
Annex 11, License Agreement of SCD (2008-07-28)
Page 13 of 15
21. | Yaw Bearing |
Company |
Contact Person |
Contact in China | ||
XXXXX ERDE GmbH Beckumer Xxxxxxx 00 00000 Xxxxxxxxx Xxxxxxx xxxx://xxx.xxxxxxxxx.xxx |
Xx. Xxxxxx Xxxx Phone: x00 0000 0000000 Fax: x00 0000 0000000 Email: Xxxxxx.Xxxx@xxxxxxxxxxxx.xxx |
|||
ROLLIX XXXXXXXXXX X.X. 3, Rue Xxxxx Xxxxxxx - BP329 44803 St Herblain Cedex France xxxx://xxx.xxxxxx-xxxxxxxxxx.xxx |
Mr. Xxxxx Xxxxxxxxx Phone: x00 (0)000 0000 00 Fax: x00 (0)000 0000 00 Email: Xxxxx-Xxxxxxxxx@ |
Sunrise Motion technology Ltd. Room F, G, H, 20/F, JinXuan Building No. 238 East Xxxxxx Xx. Shanghai Xuhui District, Shanghai 200030 P. R. China Xx. Xxxx Xxxx Phone: x00 00 0000 0000 Fax: x00 00 0000 000 Email: xxxxxxxx@xxxxxxxxx.xxx |
22. | Yaw Brake Calliper |
Company |
Contact Person |
Contact in China | ||
SVENDBORG BRAKES A/S Xxxxxxxxxxxxxxx 00 00000 Xxxxxx Xxxxxxx xxxx://xxx.xxxxxxxxx-xxxxxx.xx |
Xx. Xxx Xxxxxx Phone: x00 0000 000 0000 Fax: x00 0000 000000 Email: x.xxxxxx@xxxxxxxxx-xxxxxx.xx |
KTR Power Transmission Technology (Shanghai) Co, Ltd.. Xxxxx 0, Xxxx. 00 No. 351 Xxx Xxxx Road Xxx Xxxx 201206, Pudong Shanghai P. R. China Xx. Xxx Xxxxxx Phone: x00 (00) 00 00 0 000 (00) x00 (00)00 00 00 00 Fax: x00(00)00 00 0 000 Email: xxxxxxxx@xxxx.xxxxxx.xx.xx x.xxxxxx@xxx.xxx xxx-xx@xxx.xxx http//xxx.xxx.xxx |
Annex 11, License Agreement of SCD (2008-07-28)
Page 14 of 15
SIME-Stromag SAS Avenue de l’Europe -BP 24 18150 La Guerche-sur-l’Aubois France xxxx://xxx.xxxx-xxxxxxx.xxx |
Ms. Xxxxxxx Devoulon Phone: x00 000000000 Fax: x00 000000000 Email: x.xxxxxxxx@xxxx-xxxxxxx.xxx |
Beijing Xxxxx PTC. Jiajiangtiancheng Plaza Room 2201, A Block Jia 0, Xxxxx Xxxx Xxxxxxxxxxxxx Xxxx Xxxxxxx 100102 P. R. China Xx. Xxxx Que Phone: x00 00 000000000 Fax: x00 00 00000000 Email: xxxxxxxx@xxxx.xxx |
23. | Yaw Drive, Yaw Gearbox |
Company |
Contact Person |
Contact in China | ||
ZOLLERN GmbH Xxxxxx. 0 00000 Xxxxxxxxxxxx Xxxxxxx xxxx://xxx.xxxxxxx.xx |
Xx. Xxxxxx Xxxx Phone: x00 0000 000000 Fax: x00 0000 000000 Email: xxxxxx.xxxx@xxxxxxx.xx |
Zollern (Tianjin) Maschinery Co., Ltd. Xx. 00, 0xx Xxxxxx Xxxx-Xxxxxxx 000000 X. X. Xxxxx Xx. Xxxx Yi, Xx. Xxxxx Xxxx Phone: x00 0000000000 Phone: x00 00000000000 Fax: x00 0000000000 Email: xxxxx@xxxxxxx.xxxx.xxx | ||
BONFIGLIOLI Getriebe GmbH Xxxxxxxxx Xxxxxxx 00 00000 Xxxxxxxx Xxxxxxx xxxx://xxx.xxxxxxxxxxx.xxx |
Xx. Xxxxxxx Xxxxx Phone: x00 0000 000000 Fax: x00 0000 000000 Email: x.xxxxx@xxxxxxxxxxx.xx |
Bonfiglioli Drives (Shanghai) Xx.Xxx. Xx. 0 Xxxxxxxx, 00 Tian Ying Road, Shanghai 201712, Qingpu District P. R CHINA Xx. Xxx Kenian (Xxxxxxx Xxx) Phone: x00-00-00000000 Fax: x00-00-00000000 E-mail: xxx@xxxxxxxxxxx.xxx.xx xxxx://xxx.xxxxxxxxxxx.xx | ||
NANJING HIGH SPEED GEAR MANUFACTURING CO. No. 299, Xxx Xxx Da Road, Jiangning Science Garden, Nanjing, China xxxx://xxx.xxx.xxx.xx |
Xx. Xxx Jiangping Tel: x00-(0)00 00000000 Fax: x00 (0)00 00000000 Email: xxxxxxxxxxxx@xxx.xxx.xx |
Annex 11, License Agreement of SCD (2008-07-28)
Page 15 of 15
Annex 12:
Guidelines of Germanischer Xxxxx on Quality
Management
The requirements for manufacturing are set forth in Chapter 3 of some of “Guideline for the Certification of Wind Turbines” issued by Germanischer Xxxxx. Some of the paragraphs relevant for the production of WECs are listed below. The most current revision of the guideline and its regulations shall be considered at any time and additional requirements by the Certification Institute must be followed.
Requirements for Manufacturers
Manufacturers shall be suitable for the work to be carried out as regards their workshop facilities, manufacturing processes as well as training and capabilities of the personnel. Proof of this may be provided by means of a documented and certified quality management system. If required, GL Wind will issue a shop approval on request of a manufacturer, provided the approval conditions are fulfilled.
It is the responsibility of the manufacturer to observe and conform to this Guideline, the pertinent laws and ordinances technical regulations, standards and data sheets, such as those from the chemicals industry etc. Insofar as the requirements for the manufacturers set out below (especially as regards quality control) are not further defined, these shall be defined in accordance with the quality management requirements. Details shall be agreed with GL Wind for each individual case.
Works equipment
The manufacturers shall have at their disposal suitable facilities and equipment for faultless execution of the work. External facilities may be included for consideration only if these meet the prerequisites for competent execution and are available without restriction. Equipment and facilities include, on the scale necessary for the manufacture in question, for instance the following:
• | workshops, roofed-over working areas as required, equipment for assembly sites |
• | store-rooms for materials |
• | drying facilities- lifting gear for assembly and transport |
• | processing machinery and tools |
• | tools and equipment for welding and cutting |
• | appliances for joining-up, and for welding, laminating, bonding and gluing |
• | air-condition monitoring instruments |
• | facilities for preheating and heat treatment |
• | test equipment and materials plus means for their calibration |
Annex 12 License Agreement for SCD (2008-07-28)
Page 1 of 4
Personnel
The personnel employed by the company shall be such as to ensure that the components can be competently prepared, manufactured and tested to the extent necessary. GL Wind may require proof of the technical qualifications of the staff. The respective areas of responsibility shall be laid down and arrangements made for deputies for those responsible.
Shop approval
Shop approval is required for welding, laminating and bonding. Shop approvals by other organizations can be recognized after consultation with GL Wind. GL Wind reserves the right to demand approval for other manufacturing methods or working techniques.
Quality Management
Provided the manufacturer operates and applies a quality management (QM) system in accordance with a recognized standard, arid, this has been evaluated by GL Wind, a portion of the proofs required in this Guideline may be provided within the context of the QM system. A certification of the QM system by an accredited certification body is recognized through the assessment by GL Wind.
Recognition of the QM system obliges the manufacturer to observe the requirements laid down in this Guideline. The obligation for proof of this rests on the company. GL Wind verifies the effectiveness of the system and the work-specific requirements on the basis, of the documentation submitted by the company, e.g. within the context of shop approval, and checks it, at its discretion, by random inspections or by witnessing tests within the QM system.
The manufacturer is responsible for ensuring that all tests and inspections laid down in accordance with this Guideline, as well as with any standards, specifications and other regulations that are also applicable, are carried out.
GL Wind shall be notified without request prior to the introduction of any alterations to the QM system or to production processes which can be expected to have a significant effect on product quality. GL Wind reserves the right to check these issues (extraordinary inspection) and to review the approval of the QM system.
Insofar as the certification of the QM system of a certification body was recognized by GL Wind, the manufacturer is under an obligation to inform GL Wind without delay about the loss of the certificate’s validity.
Materials
Only suitable materials with guaranteed properties (e.g. strength, toughness - at low temperatures if appropriate, cold deformability, suitability for welding, resistance to rot etc.) may be used for the force- and moment-transmitting components of a wind turbine.
Annex 12 License Agreement for SCD (2008-07-28)
Page 2 of 4
Materials chosen shall be matched to the demands to be made on the component, particularly the type of load (shock load, oscillating load) as well as the external conditions and to the design. The materials chosen shall be named clearly and comprehensively in the documents (drawings, parts lists) to be submitted for approval.
All materials not listed shall be treated in accordance with the relevant standards as regards quality requirements and test conditions. The special environmental and operational conditions of the wind turbine shall be taken into account.
The temperature range for the materials to be used is laid down in the Guideline. The use of materials outside this temperature range necessitates special consultation with GL Wind.
For components which are mounted on or installed in wind turbines, only materials approved by GL may be used in the case of wind turbines for which an application for project certification has been submitted.
For the components listed below, such as
• | rotor blades |
• | blade bearings |
• | rotor hub |
• | main bearing |
• | brake |
• | generator |
• | main frame |
• | blade-pitch, rotor and yaw locks |
• | yaw bearing |
• | tower and (optionally) foundation |
that are important for the integrity of the wind turbine and also present a high danger potential for human health and life, an implementation of the design requirements in production and erection is required.
Production and Testing
The manufacturers shall ensure that only recognized and approved production processes are used and that the conditions defined as a basis for the recognition and approval are observed.
Laminating fibre-reinforced plastics
All workshops, store-rooms and their operational equipment shall meet the requirements of the relevant safety authorities and employers’ liability insurance associations. The responsibility for compliance with these requirements is solely the company’s.
Annex 12 License Agreement for SCD (2008-07-28)
Page 3 of 4
The danger of contamination of materials for laminating shall as a rule be kept to a minimum by rigorous separation of production areas and other workshops as well as store-rooms. Only the quantity of materials required for production within the next two days shall be stored in the laminating workshops.
Whilst laminating and gluing is progressing, dust-generating machinery may be operated in the laminating workshop only to a limited extent and only if fitted with a dust collection unit. Painting or spraying work is only permissible within the laminating workshop if the company can ensure that such activities will not affect the laminating quality.
Store-rooms
Laminating resin compounds and adhesives shall be stored according to the manufacturer’s instructions. The temperature in the store-rooms shall be recorded continuously.
Annex 12 License Agreement for SCD (2008-07-28)
Page 4 of 4
Annex 13: Payment Schedule for
2.5/3MW & 5/6MW Turbine
1. After signing contract |
Euro: 5.0 million | |
2. After delivery of first batch of document for 2.5/3MW |
Euro: 1.0 million | |
3. After delivery of second batch of document for 2.5/3MW |
Euro: 1.5 million | |
4. After delivery of third batch of document for 2.5/3MW |
Euro: 1.0 million | |
5. After delivery of fourth batch of document for 2.5/3MW |
Euro: 0.5 million | |
6. After delivery of fifth batch of document for 2.5/3MW |
Euro: 0.5 million | |
7. After erection of turbine and start of commissioning for 2.5/3MW |
Euro: 0.5 million | |
8. After issue of A-design assessment from GL for 2.5/3MW |
Euro: 1.0 million | |
9. Before start of design work of 5/6MW |
Euro: 2.0 million | |
10. After delivery of first batch of document for 5/6 MW |
Euro: 1.0 million | |
11. After delivery of second batch of document for 5/6 MW |
Euro: 1.5 million | |
12. After delivery of third batch of document for 5/6 MW |
Euro: 1.0 million | |
13. After delivery of fourth batch of document for 5/6 MW |
Euro: 0.5 million |
Annex 13, License Agreement of SCD (2008-07-28)
Page 1 of 2
14. After delivery of fifth batch of document for 5/6 MW |
Euro: 0.5 million | |
15. After erection of turbine and start of commissioning for 5/6 MW |
Euro: 0.5 million | |
16. After issue of A-design assessment from GL for 5/6 MW |
Euro: 1.0 million |
Annex 13, License Agreement of SCD (2008-07-28)
Page 2 of 2
Annex 14 Time Schedule
The time schedule (beginning with the date of receipt of the first part of the basic payment according to Art.21.1) for the transfer of the contractual know-how shall be as follows:
Time schedule after |
Project milestone | |
3 month | Delivery of documents to build the master plug for the first rotor blade with power 2.5/3.0 MW including 3D geometry data. | |
4 month | Delivery of the document to order the long-term delivery components, such as casting parts, bearings, gears and generator parts. | |
5 month | Delivery of specification of other components such as pitch system, hydraulic system, rotor brake, yaw drive, yaw brakes, cooling system. | |
6 month | a. delivery of documents of tower
b. delivery of documents to build the mould of rotor blade | |
7 month | Start with the development of the 5.0/6.0 MW offshore turbine. | |
8 month | a. delivery of documents to build the first rotor blade for blade test for 2.5/3.0XX
x. delivery of documents of foundation | |
9 month | Delivery of documents to build the secondary components for the turbine 2.5/3.0MW | |
10 month | Start of workshop assembly of the prototype 2.5/3.0MW (may be affected by the delivery time of the components) | |
11 month | Delivery of documents to build the master plug for the rotor blade for 5.0/6.0 MW turbine | |
12 month | Erection and start of commissioning of prototype 2.5/3.0 MW at site | |
13 month | Delivery of documents to order the long-term delivery components for 5.0/6.0 MW, such as casting parts, bearings, gears and generator parts | |
14 month | Measuring campaign of 2.5/3.0 MW turbine will be started | |
15 month | Delivery of specification of other components such as pitch system, hydraulic system, yaw drive, yaw brakes, rotor brake, cooling system for 5.0/6.0MW turbine. |
Annex 14, License Agreement of SCD (2008-07-28)
Page 1 of 2
17 month | a. delivery of documents to build the mould for the rotor blade 5.0/6.0XX
x. delivery of documents of tower | |
20 month | a. delivery of documents to build the first rotor blade for blade test 5.0/6.0XX
x. delivery of documents of foundation | |
21 month | Delivery of documents to build the secondary components for the turbine | |
22 month | Start of the workshop assembly of the prototype 5.0/6.0MW turbine (may be affected by the delivery time of the components) | |
24 month | Erection and start of commissioning of prototype 5.0/6.0MW at site | |
26 month | Measuring campaign of turbine 5.0/6.0MW will be started |
Note: This schedule may be slightly changed after detailed project planning. The Licensee will be informed with the detail schedule one month after start of the project.
Annex 14, License Agreement of SCD (2008-07-28)