CONTRACT FOR QUICKBIRD SPACECRAFT
CONTRACT NUMBER SE.1M.PRJ.0004.A
INTRODUCTION
------------
EarthWatch Incorporated, a corporation organized and existing under the laws of
the State of Delaware, having an office at 0000 Xxxx Xxxx, Xxxxxxxx, Xxxxxxxx
00000 (hereinafter referred to as "EarthWatch") and Ball Aerospace &
Technologies Corp., a corporation organized and existing under the laws of
Delaware, with offices at 0000 Xxxxxxxx Xxxxxx, Xxxxxxx, Xxxxxxxx 00000
(hereafter referred to as "BATC") entered into a Letter Contract effective
February 5, 1996 for the EarthWatch QuickBird Space Segment Project. The parties
acknowledge the Letter Contract has been terminated. This Contract supersedes
that Letter Contract effective February 5, 1996 as amended. This Agreement is
effective from June 9, 1998 (the "Effective Date").
ARTICLE 1: OVERALL SCOPE OF THE PROJECT
---------------------------------------
Subject to the Terms and Conditions set forth in Exhibit A entitled "Contract
for the EarthWatch Project One QuickBird Space Segment" attached hereto of this
contract BATC shall provide the necessary resources for the definition, design,
production, integration, test, verification, of one (1) QuickBird Spacecraft,
Ground Support Equipment (GSE), and associated miscellaneous data and software.
In connection therewith, BATC shall perform the Services and produce the
Deliverables specified in the Statement of Work, number SE. 1 M. PRJ. 002 dated
May 28, 1998, entitled EarthWatch QuickBird Satellite attached hereto as EXHIBIT
C (the "Statement of Work") in accordance with the delivery dates. Subject to
the Terms and Conditions, Exhibit A, of this Contract, EarthWatch agrees to
accept the Services and Deliverables specified in the Statement of Work. The
Deliverables shall meet the requirements specified in the Specification,
entitled Spacecraft Bus and Instrument EarthWatch QuickBird Spacecraft dated
June 23, 1997, attached hereto as EXHIBIT D (the " Specifications").
ARTICLE 2: PRICE AND PAYMENT
----------------------------
2.1 Price
The total fixed prices for the Deliverables and Services, are specified in
Exhibit E. All prices contained within this provision are exclusive of shipping
costs, transportation insurance, and all taxes, as defined in Exhibit A
paragraph 5 occasioned by the sale, ownership or use of the goods or services
furnished. EarthWatch agrees to pay all such taxes and duties.
2.2 Payments
--------
2.2. 1. Payments shall be made by EarthWatch to BATC at the time specified
in Exhibit E. The payments are in advance of the performance of the milestones
specified for each month.
In the event BATC does not complete a milestone by the end of the month, BATC
shall issue a credit in the amount of the missed milestone. EarthWatch may
reduce the amount of the next payment by the amount of the credit unless BATC
completes the milestone before the due date of the next payment. If EarthWatch
takes the credit, EarthWatch shall pay for that milestone when completed at the
time of the next payment.
2.2.2. It is recognized that EarthWatch currently has sufficient funds in
place only to make the payments specified for the Telescope Option (No. 2) set
forth in Exhibit E and that additional financing needs to be obtained by
EarthWatch to make additional payments to perform the entire scope of the
Contract. EarthWatch agrees to keep BATC informed of its efforts to obtain said
additional financing and if EarthWatch does not exercise its option to stop work
per Article 7, EarthWatch agrees to:
(a) demonstrate to BATC's satisfaction that sufficient funds are available to
make payments as they are due per Exhibit E and cover termination liabilities
per Section 6 of Exhibit A; or
(b) if BATC is not satisfied per (a) above, EarthWatch shall establish an
irrevocable letter of credit for such time periods as mutually agreed, confirmed
at a United States bank acceptable to BATC, in amounts necessary to secure
payments for the termination liabilities arising under Section 6 of Exhibit A.
Such amounts shall be provided to EarthWatch by BATC from time to time
consistent with the financing situation. Such letters of credit shall provide
payment to BATC immediately upon presentation of an invoice by BATC for an
amount validated by the third party audit specified in Section 6 of Exhibit A
following termination of this contract, in whole or in part, for any reason. The
amount in the letter of credit at any time shall not be greater than the total
termination liability less payments made to date by EarthWatch unless otherwise
mutually agreed.
ARTICLE 3. OPTION TO PURCHASE ONE ADDITIONAL QUICKBIRD SPACE SEGMENT
--------------------------------------------------------------------
BATC grants to EarthWatch an option to purchase one (1) additional One Meter
QuickBird Space Segment in accordance with the terms and conditions set forth in
this Contract. The prices and option exercise dates required in the exercise of
this option are set forth in Exhibit B, 'Option To Purchase" One (1) One Meter
Spacecraft Segment of this Contract. This option is only valid if the stop work
options per article 7 are not in effect at the time of the exercise date.
ii
ARTICLE 4. EXHIBITS
-------------------
The following EXHIBITS are attached to the Contract and are a part hereof.
EXHIBIT A contains the Terms and Conditions applicable to this Contract.
EXHIBIT B contains the Option to Purchase Requirement applicable to this
Contract.
EXHIBIT C contains the Statement of Work applicable to this Contract.
EXHIBIT D contains the Specification applicable to this Contract.
EXHIBIT E contains the Payment Schedules applicable to this Contract.
EXHIBIT F contains the Three Party Confidentiality Agreement applicable to this
Contract.
IN WITNESS WHEREOF, the parties hereto have caused this Contract to be executed
in duplicate by their respective duly authorized representatives as of the date
first above written.
EarthWatch Incorporated:
By: /s/ Xxxxxx X. Xxxxx
-----------------------------
Xxxxxx X. Xxxxx
Chief Executive Officer & President
Ball Aerospace & Technologies Corp.
By: /s/ E.L. Vande Noord
------------------------------
E. L. Vande Noord
Senior Vice President and General Manager
Ball Aerospace & Technologies Corp.
iii
EXHIBIT A
to
Contract for the EarthWatch Project One QuickBird Space Segment
Terms and Conditions
UNLESS OTHERWISE STATED, ALL CAPITALIZED TERMS USED HEREIN SHALL HAVE THE
MEANING ASCRIBED TO THEM IN THIS CONTRACT, EXHIBIT C--STATEMENT OF WORK, OR
EXHIBIT D--SPECIFICATION
1. Acceptance of Deliverables.
1.1 Acceptance of the Spacecraft. Shipment approval and preliminary
acceptance by EarthWatch shall occur at BATC's facility following
satisfactory completion of the Pre-Ship Review as specified in the
Statement of Work section 11.2. Final acceptance of the Spacecraft shall
occur at the launch site if launched within the Continental United
States (CONUS) or immediately following entry into international
airspace if launched other than the CONUS.
1.2 Acceptance of Ground Support Equipment or Other Deliverables. Shipment
approval shall occur as specified in the Statement of Work. GSE items to
be delivered under this Contract shall be accepted by EarthWatch after
lift-off of the Spacecraft. Acceptance of Telescope or Instrument
Deliverables under the options specified in ''7.2.2 and 7.2.3 shall
occur as specified in Exhibit C; Statement of Work.
1.3 Title and Risk of Loss of Spacecraft and Other Deliverables. Except as
noted below, title to the Deliverables shall remain with BATC and
identification and Title to the Deliverables shall pass to EarthWatch
upon acceptance at the launch site or immediately upon entry into
international airspace. The risk of loss for Deliverables shall pass to
EarthWatch upon completion of the Shipment approval and preliminary
acceptance, as specified in EXHIBIT C.
1.4 Title and Risk of Loss of Telescope and Instrument Deliverables. In the
event that EarthWatch selects an option as identified in '7 title and
risk of loss of the Telescope and Instrument Deliverables shall pass to
EarthWatch following final payment.
2. Mutual Confidentiality: Disclosure of confidential and proprietary
information shall be treated in accordance with the terms of the Three Party
Confidentiality Agreement between BATC, EarthWatch, and Kodak dated as
noted, included herein as EXHIBIT F.
1
Subject to good faith concerns related to disclosure of BATC confidential
and proprietary information and technical data to competitors, BATC
authorizes EarthWatch to disclose confidential and proprietary information
and technical data to EarthWatch contractors, subcontractors, and existing
EarthWatch Master Distributors (Telespazio and Hitachi), including their
contractors and subcontractors, as necessary to design and implement the
EarthWatch Remote Ground Terminals, Mission Control Center, and data archive
and image processing facilities provided that EarthWatch shall enter into
Confidentiality Agreements with each such entity that requires such entity
to protect the information in the same manner as EarthWatch is required to
do under the terms of this Contract. BATC shall evaluate entering into such
agreements with future Master Distributors as EarthWatch may designate.
EarthWatch is aware that such information may be subject to export
restrictions and EarthWatch will be responsible for complying with all
export regulations as noted in (S)16.5.
3. Use of Facilities: BATC and BATC's employees, contractors and agents who are
performing Services shall have access to appropriate EarthWatch and
Contractor sites as needed to perform their tasks. BATC shall be responsible
for BATC's and associated personnel observing site rules and regulations,
including, but not limited to, safety regulations, security requirements and
rules relating to working in harmony with others at the site.
BATC agrees to afford EarthWatch, its employees and employees of EarthWatch
Master Distributors (Telespazio and Hitachi) access to all work being
performed at BATC's facilities, at all reasonable times during the term of
the contract provided that such access does not unreasonably interfere with
such work. The number of EarthWatch employees who have such access shall be
controlled by mutual agreement between BATC and EarthWatch. EarthWatch and
its employees will abide by BATC site regulations, including, but not
limited to safety regulations, security requirements and rules relating to
access to BATC's facilities. EarthWatch is aware that all technical data
information is subject to export restrictions and EarthWatch will be
responsible for providing the necessary government authorizations and
approvals. BATC shall provide all reasonable support to assist EarthWatch in
gaining such approvals.
4. Payment Directions and Security Interests:
4.1 Security Interests. BATC shall retain title until title passes pursuant
to (S)(S) 1.3 and 1.4 hereof. Following passage of title, BATC shall
retain a perfected first security interest in the Deliverables until all
amounts due and payable to BATC have been paid in full.
In the event BATC becomes insolvent or bankrupt and is unable to provide
adequate assurance of performance acceptable to EarthWatch, EarthWatch
shall have the right to take possession of the components for one
QuickBird Satellite and shall have a perfected first security interest
to the extent of payments by EarthWatch to BATC until title transfers.
2
4.2 EarthWatch shall make payments net in U.S. dollars on or before the
dates specified in Exhibit E or B, as the case may be, to the following
address:
BATC
c/o The First National Bank of Chicago
Attn.: 70644/Ball Corporation
X.X. Xxx 00000
Xxxxxxx, XX 00000-0000
Payments may also be made by wire transfer to:
The First National Bank of Chicago, Chicago, IL
Routing/Transfer No. 71000013
Account No. 50-11884
Include the following information:
EarthWatch Incorporated, Longmont, CO
Customer No. 041860101
Payment No.: To be completed with each transfer from Exhibit E
Amount Paid: To be completed with each transfer from Exhibit E
Contract No. SE.1M.PRJ.0004.A
4.5 Milestone Completion: BATC shall prepare and deliver to EarthWatch a
Milestone Certificate for each milestone that BATC completes. EarthWatch
shall sign each certificate to signify EarthWatch's agreement that the
milestone has been completed. In the event that EarthWatch does not
agree with the completion of a milestone EarthWatch shall so notify BATC
in writing within five (5) business days of receipt of the milestone
certificate. If it is determined that BATC has not completed the
milestone as specified in Exhibit E, the payment will be credited as
provided for in Article 2.2.
5. Taxes: All taxes and similar assessments, levies and government-imposed
obligations arising with respect to Deliverables and/or support services
(except for taxes on BATC's income) shall be the obligation of and be paid
by EarthWatch whether such taxes become due upon payments under the contract
or upon a future tax assessment as a result of an audit, or other event or
notification by the relevant tax authority. For this purpose and unless
otherwise indicated below, taxes shall mean any and all U.S., and its states
and localities, and Russian, including any regional, state, province or
other locality, sales and use, value added (including reverse charge value
added tax), turnover, import duty, import VAT, property, excise, privilege
or other fees, duties or taxes assessed by the sale, ownership, or use of
the goods or services provided.
5.1 Sales and Use Taxes. All applicable payments for sales and use taxes
shall be collected from EarthWatch by BATC and remitted to the proper
taxing authority, in the legally defined time frame determined by each
taxing authority.
5.1.1 Non-Recurring Engineering Services. The parties have initially
determined that there are Non-Recurring Engineering Services
associated with the
3
performance of this Contract. Such services will be exempt from
Sales and Use Tax. BATC has identified that $1,900,000 of the
price is for such services.
5.1.2 Sales Tax Exemption. The final products are tangible personal
property and subject to Colorado Sales and Use Tax unless a
properly completed Colorado Resale or Sales Tax Exemption
Certificate is provided to BATC by EarthWatch. EarthWatch agrees
to reimburse BATC for tax, interest, and any penalty assessed by
the State of Colorado or other taxing authority arising from a
determination by the State of Colorado or other taxing authority
that the claim for exemption is denied or that the non-recurring
engineering services are taxable as sales. BATC shall provide all
reasonable support to assist EarthWatch in gaining such
determination.
5.2 Licenses. Gross Receipts, Business and Occupation Taxes. Each company
will be responsible for its own licenses, gross receipts (with the
exception of any sales taxes referred to as gross receipts), and
business and occupation taxes.
5.3 Property Taxes. Each company will be responsible for property taxes due
on property owned by the respective company with the exception of any
assessed property that constitutes a contract Deliverable. EarthWatch
will be responsible for property taxes on Contract Deliverables.
5.4 Other Taxes. Each company will be responsible for its own corporate
income or franchise taxes based upon income and/or net worth.
6. Termination
-----------
6.1 Termination by BATC for Default by EarthWatch. BATC may terminate
EarthWatch for default if EarthWatch does not pay BATC the amounts due
under this contract as specified in Article 2, Section 4 of Exhibit A
and Exhibit E. In addition, BATC may terminate EarthWatch for Default if
30 days after receipt of a notice for Termination for Default and
EarthWatch fails to cure the default condition. Conditions constituting
default include: (a) BATC determines in good faith that EarthWatch does
not have the ability to adequately cover financial liabilities,
including its existing and future obligations to BATC pursuant to
paragraph 2.2.2 of Article 2; (b) EarthWatch declares bankruptcy or
enters receivership or; (c) EarthWatch fails to meet any material
obligation under this contract.
6.1.1 Upon issuing a termination notice to EarthWatch under this
section, BATC shall promptly stop work and place no further
orders, terminate all existing orders (to the extent necessary)
and shall settle with any and all applicable subcontractors and
vendors in a commercially reasonable manner. EarthWatch shall be
required to pay BATC's incurred costs(as verified by a mutually
agreeable, independent, third party audit), any unpaid procurement
obligations (as verified by a mutually agreeable independent third
party
4
audit), reasonable and customary termination expenses (as verified by
a mutually agreeable independent third party audit) plus a reasonable
profit not to exceed the contract value. EarthWatch shall also pay
interest at the rate of 15% per annum accruing 30 days after the
receipt of an invoice and the cost of collections for such, if any,
including reasonable attorney's fees.
6.1.2 Upon receipt of all amounts due under the contract, BATC shall
provide to EarthWatch in an "as is" condition, all Deliverables for
the contracted QuickBird Satellite(s) including flight hardware,
ground support equipment, software, and data as defined in the
Statement of Work, either completed or in process as of the date of
termination. To the extent permitted to do so under the subcontracts.
6.1.3 If EarthWatch fails to pay BATC, for any reason, the total amount due
under this contract, the rights, titles and possession of all the
contract Deliverables will be vested in BATC and EarthWatch and/or
any appointed receivership shall not have any claim in ownership.
6.1.4 In the event of default by EarthWatch, nothing in this section shall
preclude BATC from pursuing its other remedies at law or equity.
6.2 Termination by EarthWatch for Default by BATC. EarthWatch may terminate
BATC for default if 30 days after receipt of a notice for Termination for
Default and BATC fails to cure the default condition. Conditions that
constitute default are: BATC fails to meet any material obligation under
this contract.
6.2.1 Upon receipt of a termination notice under this section, BATC shall
promptly stop work and place no further orders, and terminate all
existing orders (to the extent necessary) and shall settle with any
and all applicable subcontractors and vendors in a commercially
reasonable manner. EarthWatch will pay BATC's actual incurred costs
(as verified by a mutually agreeable, independent, third party audit)
and any unpaid procurement obligations (as verified by an independent
third party audit). This shall not exceed 90% of the contract value.
EarthWatch shall also pay interest at the rate of 15% per annum
accruing 30 days after the receipt of a termination invoice and the
cost of collections for such, if any, including reasonable attorney's
fees.
6.2.2 Upon receipt of all amounts due under the contract, BATC shall
provide to EarthWatch in an "as is" condition, all Deliverables for
the contracted QuickBird Satellite(s) including flight hardware,
ground support equipment, software, and data as defined in the
Statement of Work, either completed or in process as of the date of
termination. To the extent permitted to do so under the subcontracts.
6.2.3 In the event of default by BATC, nothing in this section shall
preclude EarthWatch from pursuing its other remedies at law or
equity.
5
6.3 Termination for Convenience by EarthWatch. EarthWatch may in good
faith terminate the Contract at any time for convenience on 30 days
written notice to BATC provided EarthWatch is not in default of any
material provision of this contract prior to the date of termination.
Upon receipt of a termination notice under this section, BATC shall
promptly stop work and place no further orders, and terminate (to the
extent necessary) and shall settle with any and all applicable
subcontractors and vendors in a commercially reasonable manner. In the
event of such termination, EarthWatch will pay BATC's incurred costs
(as verified by a mutually agreeable independent third party audit),
any unpaid procurement obligations (as verified by an independent
third party audit), reasonable and customary termination costs (as
verified by a mutually agreeable, independent, third party audit) from
the effective date of termination, and a reasonable profit not to
exceed the contract value. EarthWatch shall pay interest at the rate
of 15% per annum accruing 30 days after the receipt of a termination
invoice and the costs of collection for such, if any, including
reasonable attorney fees. Unless directed otherwise, EarthWatch hereby
authorizes BATC to take all reasonable measures to mitigate the costs
of a termination, including resale to other programs or companies.
6.3.1 Alternatively, upon payment by EarthWatch of all of the amount
due, BATC shall provide to EarthWatch, in an "as is" condition,
all Deliverables for the contracted QuickBird Satellite(s)
including flight hardware, ground support equipment, software,
and data as defined in the Statement of Work, either completed
or in process as of the date of termination. To the extent
permitted to do so under the subcontracts, BATC shall assign
all of its rights and obligations under any uncompleted
Subcontracts for the contracted QuickBird Satellite(s) to
EarthWatch upon the written request of EarthWatch at the time
of notification of termination and payment of all amounts due.
Assignment of any subcontract shall not convey any of BATC's
rights to intellectual property and BATC property in the
possession of the Subcontractor which is not a deliverable
under the subcontract. Should EarthWatch elect to complete the
performance specified under this contract itself, BATC shall
provide to EarthWatch a no-cost, limited use license to all
background technology and data necessary to complete the
Deliverables for the contracted QuickBird Satellite(s).
6.4 Other Consequences of Termination. Upon the expiration or termination
of this Contract, BATC and BATC's personnel shall promptly return to
EarthWatch or destroy, as EarthWatch directs, all papers, written
materials, equipment and other information furnished to BATC or BATC's
personnel by EarthWatch in connection with or as a result of its
performance under this Contract.
7. Stop Work Period and Mechanism. Subject of the terms and conditions of this
contract on or before September 20, 1998, due to certain EarthWatch
financial limitations, it may be necessary for EarthWatch to direct BATC to
suspend work as of October 1, 1998 as defined in Exhibit C, statement of
work for a period not to exceed one hundred and fifty
6
days (150) consecutive days or until March 1, 1999. The parties recognize
that EarthWatch may in good faith, and not in default of the contract,
require BATC to suspend work on all aspects of the contract, or stop work
on the program with the specific exception of the instruments requirements.
Should EarthWatch elect to proceed with the instrument, EarthWatch shall be
obligated to continue to proceed with and pay for the instrument as
otherwise required by this contract
7.1 Monthly Service Charges. During the period of suspension, EarthWatch
will pay to BATC pursuant to Article 4, "Payment Terms" a monthly
service charge of $95,000. Each payment shall be made on the last day
of each month of the suspension period. If work resumes during any
month, BATC will credit EarthWatch against the next due payment, an
amount equal to the adjusted pro rata amount for any partial month in
which work is suspended.
7.2 Stop Work Options. Subject to the terms and conditions of this
contract, EarthWatch has three separate options concerning the stop
work period.
7.2.1 Resumption of the Project. EarthWatch may authorize resumption
of work on the contract at any time prior to the close of business,
March 1, 1999. If EarthWatch elects to authorize BATC to proceed and
resume the contract, the price of the total contract not including
monthly service charges will be increased in accordance with the
schedule in Exhibit E.
7.2.2 Telescope Option. On or before September 20, 1998, EarthWatch
can notify BATC of its intent to exercise its option to purchase the
following components as defined in the Statement of Work: the
assembled telescope following one completed vibration test, one set of
the Solid State Recorders, one set of Wide Band Transmitters, one High
Gain Antenna, and one High Gain Antenna Gimbal and associated wide
band radio frequency materials including subcontracted items. Delivery
of these components shall occur on or before October 31, 1998. All
milestone payments made during this contract shall count towards the
payment for the telescope. The balance due, if any, shall be paid
following the acceptance and delivery of the components. Fulfillment
of this option will end the contractual obligations of the parties
except for those duties related to warranty, intellectual property
rights, and liability for intellectual property infringement. Amounts
due shall bear interest at the rate of 15% per annum and BATC shall be
entitled to collection including reasonable attorney fees.
7.2.3 Instrument Option. On or before September 20, 1998, EarthWatch
can notify BATC of its intent to exercise its option to purchase the
following components as defined in the Statement of Work: the
completely assembled and tested instrument consisting of the Ball
provided telescope and the EarthWatch provided (through Kodak) Sensor
Subsystem, one set of the Solid State Recorders, one set of Wide Band
Transmitters with Radio Frequency material, one High Gain Antenna, and
one High Gain Antenna Gimbal. Delivery of these components shall occur
on or before March 30, 1999. All milestone payments made during this
contract shall count towards the payment for the instrument. Remaining
payments
7
shall be paid per Exhibit E for the instrument option payment.
Fulfillment of this option will end the contractual obligations of the
parties except for those duties related to warranty, intellectual
property rights, and liability for intellectual property infringement.
7.2.4 Termination for Convenience. In the event that EarthWatch
elects not to exercise the options noted in (S)(S)7.2.1 through 7.2.3,
the contract will be treated as a termination for the convenience of
EarthWatch in accordance with (S)6.3.
8. Changes. In the event EarthWatch desires to change the scope of work, the
delivery schedules, or any other term of the Contract, EarthWatch shall
submit a detailed description of the requested change to BATC. BATC shall
respond within 15 working days with its proposal for adjustments to the
contract consideration, delivery schedule and other terms of the Contract.
Upon mutual agreement on a new contract consideration, delivery schedule
and other effected terms, the Contract shall be modified by a bilateral
modification to incorporate the agreed change. A modification to this
contract with a mutually agreed upon not to exceed price can be agreed upon
to implement a change in advance of negotiation of price, schedule and
other elements of the contract. BATC shall have no obligation to implement
any change until the Contract has been so modified. However, BATC may
implement any change requested by EarthWatch prior to the completion of the
change negotiation. This decision shall not impair BATC's rights to
additional consideration, schedule adjustment or modification of any other
contract term.
8.1 In the event EarthWatch creates a delay by failure to act in a timely
manner, or by an action that in some way prevents or impedes BATC from
making progress, including, but not limited to EarthWatch's failure to
provide customer furnished equipment and/or services in accordance
with the contract requirements, a bilateral adjustment shall be made
under the provisions of this clause to the extent of the schedule
delay that EarthWatch is specifically responsible for causing. In the
event EarthWatch reasonably withholds acceptance and/or approvals, a
delay shall not be deemed to have been caused by EarthWatch. In the
event such withholding of acceptance and/or approvals is unreasonable,
a delay shall be deemed to have been caused by EarthWatch to the
extent that such an act is the predominant cause of the delay to the
project schedule.
8.2 The file management change to the Solid State Recorder (SSR) that was
authorized under the Engineering Services Contract and the testing of
the 9MHz input data rate will be incorporated into the scope of this
Contract with no change to the price of QuickBird 1 or QuickBird 2.
The task authorized under the Engineering Services Contract will be
closed out without any charges for that task.
9. EarthWatch Furnished Equipment and Services. EarthWatch will provide items
and services at the BATC designated location(s) in accordance with the
schedules set forth in EXHIBIT C Statement of Work. The contract deliveries
and BATC's performance are based upon expectations that the EarthWatch
furnished equipment and/or services are suitable for use and will be
delivered in accordance with the schedule EXHIBIT C. If any of the
equipment or services delivered are not in accordance with these
expectations,
8
BATC will advise EarthWatch of the specific problems within five
business days after discovery of such defects. They will constitute a
change that will be handled in accordance with the Changes clause.
BATC cost impacts may include but not be limited to direct and
indirect costs of the change, inefficiency, schedule extension, etc.;
however, BATC will be obligated under these circumstances to develop a
proposal that will optimize the cost and schedule impact of a change.
From time to time during the performance of this Contract, EarthWatch
may provide up to ten skilled engineers and/or technicians to augment
the BATC labor force. Prior to assigning individuals, EarthWatch and
BATC shall mutually agree on the skill mix and assignment of
personnel. The assigned individuals shall be directed by BATC's
Program Manager and Cost Account Manager(s). The assigned individuals
shall be collocated with BATC's program personnel in Boulder,
Colorado. The EarthWatch employees shall utilize computers provided by
EarthWatch if required.
9.1 In the event EarthWatch provides labor within the meaning of this
article, it is understood that the EarthWatch employees assigned
must be EarthWatch employees continuously from June 1998 to the
time of the assignment to the Contract. EarthWatch shall provide
an accounting of such support to BATC using BATC timesheet format
and account number. Upon mutual review and agreement, the parties
shall modify the Contract to adjust the price to recognize the
application of EarthWatch resources.
9.2 EarthWatch shall indemnify and hold harmless BATC for any cost or
other impact due to actions of EarthWatch employees while
performing within this clause. Such indemnification and hold
harmless shall cover mistakes, negligence and any other risks to
which BATC and/or EarthWatch may be exposed, including workmen's
compensation and comprehensive liability insurance. BATC shall
notify EarthWatch promptly upon identifying conduct of EarthWatch
employees that could create the liabilities identified in this
paragraph.
10. Limitation of Liability. The contract value shall be the maximum limit of
BATC's liability arising out of, or resulting from this contract or the
performance or nonperformance or breach thereof. Liability shall attach to
BATC up to the amount of payments received by BATC under this Contract. IN
NO EVENT SHALL EITHER PARTY BE OBLIGATED IN ANY MANNER TO PAY INCIDENTAL,
CONSEQUENTIAL, OR PUNITIVE DAMAGES, INCLUDING BUT NOT LIMITED TO LOSS OF
PROFITS, OR EXEMPLARY DAMAGES TO THE OTHER PARTY.
11. Technology Rights.
------------------
11.1 Data Ownership. Data developed by BATC under this contract shall be
and remain the property of BATC. Except for data provided per the
Three Party Confidentiality Agreement (EXHIBIT F) which may or may
not be the subject of a separate license agreement, EarthWatch is
granted a license to use the data only on its own projects for
collecting and distributing image products (data) and EarthWatch will
not use or permit third parties to use data delivered by BATC by
designing, developing, manufacturing or having manufactured
spacecraft hardware
9
or software for sale or distribution to or use by third parties.
EarthWatch will not provide this data for use by a third party to
produce an equivalent spacecraft system for EarthWatch's use.
EarthWatch shall have the right to procure components for their use.
EarthWatch shall have the right to provide third parties such BATC
data as necessary for the direct reception of EarthWatch imagery
products.
11.2 Data Legend. Data delivered under this contract shall be marked with
an appropriate legend which indicates that it is licensed to
EarthWatch for EarthWatch's use so long as such use is within the
purposes specified above and whether it is provided on an
unrestricted basis.
11.4 EarthWatch Developed Data. Subject to Section B4 of the Agreement
dated 10/13/97, data developed by EarthWatch shall be and remain the
property of EarthWatch. EarthWatch grants to BATC and BATC accepts a
paid-up, nonexclusive, worldwide license to use as defined in Exhibit
Six (6) of the Agreement dated 10/13/97 data which has been developed
by EarthWatch.
11.3 Future Licenses. Should BATC or EarthWatch desire to use the data
which have been licensed for future applications, the parties shall
negotiate license agreements as appropriate for such future
applications.
11.4 License To Use Data In The Event Of Termination Under Specific
Circumstances. In the event of a termination of the contract under
the contract article titled " Termination for Convenience of
EarthWatch" which results from the most dire financial circumstances
which force EarthWatch to decide to complete the QuickBird spacecraft
without BATC involvement, or if BATC is terminated for default, BATC
shall grant a limited royalty free license to use BATC data (whether
or not deliverable data under the contract) required to complete the
spacecraft and payload manufacture, integration and testing. Such
license agreement shall be effective for QuickBird 1 only with the
other specific terms of the license to be negotiated between the
parties.
12. Excusable Delays. Neither party shall be liable for default or delay
caused by any occurrence beyond its reasonable control, including but not
limited to fires, strikes or labor disputes, acts of God or of the public
enemy, war, riot or civil commotion and govermnental control, regulation
or permit and/or embargo. Financial condition or inability to pay shall
not be an excusable delay. In the event BATC should be delayed in the
completion of any portion of the work by reason of any occurrence
identified as an excusable delay, the time within which the portion of the
work is to be completed shall be extended by the period of such delay, but
no such extension shall be made unless a notice with evidence thereof is
presented by BATC to EarthWatch in writing in a timely manner after the
occurrence of such delay. However, EarthWatch shall have the right to
terminate this Contract for EarthWatch's Convenience under Section 7.3
above if such extension is equal to or greater than one hundred eighty
(180) days.
10
13. Product Warranty Provisions. BATC DISCLAIMS ALL WARRANTIES, EXPRESS OR
IMPLIED, INCLUDING BUT NOT LIMITED TO THE WARRANTIES OF MERCHANTABILITY AND
FITNESS FOR A PARTICULAR PURPOSE. IN NO EVENT SHALL BATC BE LIABLE FOR
DIRECT, INCIDENTAL OR CONSEQUENTIAL DAMAGES EVEN IF BATC HAS BEEN ADVISED
OF SUCH DAMAGES.
13.1 Repairs to Deliverables after completion of the shipment approval and
preliminary acceptance will be completed on a mutually acceptable time
and material basis.
14. Compliance with Laws. BATC agrees that it will comply with all applicable
federal, state and local laws, regulations and codes in effect in the USA
as of the Effective Date, and throughout the duration of work under this
Contract.
15. Patent Indemnity. BATC will defend at its expense any legal proceeding
brought against EarthWatch, to the extent that it is based on a claim that
the design or use of any Deliverables under this Contract is a direct
infringement of a U.S. copyright, or of a U.S. patent, and will pay all
damages and costs awarded by a court of final appeal attributable to such
claim, provided that EarthWatch: (i) provides Notice of the claim promptly
to BATC; (ii) gives BATC sole control of the defense and settlement of
same; (iii) provides to BATC all available information, assistance and
authority to defend; and (iv) has not compromised or settled such
proceeding without BATC's prior written consent.
15.1 Should any Deliverables or any portion thereof become, or in BATC's
opinion be likely to become the subject of a claim of infringement,
BATC shall, at its own expense and as EarthWatch's sole and exclusive
remedy, elect to: (i) obtain for EarthWatch the right to use such
Deliverables; (ii) replace or modify the Deliverables so that they
become non-infringing and still satisfy all other requirements of this
Contract.
15.2 BATC's liability under this clause, subject to Section 10, shall be
limited to the value of the contract. In the event of termination,
BATC's liability under this clause shall be limited proportionately to
the amount paid to BATC by EarthWatch under this contract.
15.3 BATC shall have no liability for any infringement or claim which
results from (i) use of the Deliverables in combination with any non-
BATC provided equipment, software or data, if such infringement would
have been avoided by use of the Deliverables without such equipment,
software, or data; or (ii) BATC compliance with designs of EarthWatch
that when implemented results in such infringement.
15.4 THIS ARTICLE STATES THE ENTIRE LIABILITY OF BATC WITH RESPECT TO
INFRINGEMENT OF ANY INTELLECTUAL PROPERTY RIGHTS BY THE DELIVERABLES
AND BATC SHALL HAVE NO ADDITIONAL LIABILITY WITH RESPECT TO ANY
ALLEGED OR PROVEN INFRINGEMENT.
11
16. General Provision.
-----------------
16.1 Public Release of Information. During the term of this Contract, each
party shall seek the approval of the other at least 15 days prior to
the release of information regarding this Contract, including, but not
limited to, news releases, advertising materials, prepared speeches,
external company reports, information shared with third parties, and
other information releases concerning the work performed under this
Contract, provided BATC shall be entitled to inform the public,
customers or potential customers that EarthWatch is a customer of BATC
for QuickBird. The use of either parties' corporate logos by the other
party shall also require prior written approval. Such approvals shall
not be unreasonably withheld.
16.1.1 If the information to be released has been previously approved
or is already in the public domain, then no approval shall be
required. These restrictions shall not be construed to limit
either parties' disclosure of such information as required by
Federal, State, or local laws and regulations or courts of
competent jurisdiction, or as necessary to satisfy reporting
requirements to current or potential investors.
16.1.2 Release of information regarding the existence of this contract
shall not require the prior approval of either party.
16.2 Notices. All contractual correspondence, including notices, reports
and documentation, shall be addressed as follows:
BATC EARTHWATCH
---- ----------
BATC EarthWatch Incorporated
X.X. Xxx 0000 0000 Xxxx Xxxx
Xxxxxxx, XX 00000 Xxxxxxxx, XX 00000
Attn.: T.H. Lapotosky Attn.: Xxxxx Xxxxxxxx
Director of Contracts Director of Contracts
& Government Compliance
Facsimile No.: 000-000-0000 Facsimile No.: 000-000-0000
Either party may change these addresses for the receipt of the
notices at any time by providing notice to the other party.
16.2.1 Authorized Representatives: The only individuals authorized to
make changes to this Contract and to sign contract documents
are:
BATC EARTHWATCH INC.
---- ---------------
E. L. Vande Noord Xxxxxxx X Xxxxxxxxx III
Senior Vice President and Chief Executive Officer and
General Manager President
or or
12
Xxxxxx X. Xxxxx
Chief Technical Officer
For Technical Concerns
Xxxxx Xxxxxx Xxxx X. Xxxxxxxx
Vice President of Commercial Space Senior Director - Space
Operations Segment
or
For Contractual Concerns
T.H. Lapotosky Xxxxx X. Xxxxxxxx
Director of Contracts & Director of Contracts
Government Compliance
16.2.2 Either party may change its authorized representatives at any
time by providing written notice to the other party.
16.3 Governing Law. The validity, interpretation, and performance of this
Contract shall be controlled by and construed under the laws of the
State of Colorado. Both parties have agreed that for the purposes of
this contract, venue shall be the County of Boulder, Colorado.
16.4 Export: The data, hardware and software provided to EarthWatch under
this Contract is subject to the prohibition limitations and laws
regulating the export of technical data as specified in the Department
of State International Traffic in Arms Regulations (22 CFR Parts 120
through 130). EarthWatch shall be responsible for obtaining required
Export Licenses and approvals. BATC will provide reasonable assistance
in supporting EarthWatch efforts.
16.5 Disputes. Any dispute or controversy arising out of, in connection
with or in relation to this contract will be determined and settled on
an informal basis if possible. To that end, each party shall have the
right to meet with senior management of the other party in an attempt
to resolve any dispute. If the dispute remains unresolved and after
providing a 30 day notice of its intentions, either party may request
resolution by arbitration. Arbitration shall be held in Longmont
Colorado in accordance with the rules then prevailing of the American
Arbitration Association. Arbitration may be conducted by one
arbitrator by the mutual agreement of the parties or by three
arbitrators if the parties cannot so agree, with each party choosing
one arbitrator and the AAA choosing the third. Any award rendered
therein will be conveyed in a written, reasoned opinion and shall be
final and binding upon BATC and EarthWatch and may be entered thereon
in the District Court of the State of Colorado for the County of
Boulder.
16.6 Attorneys Fees and Reasonable Costs. On any effort by BATC to collect
money due under the terms of this contract, EarthWatch shall pay all
costs of collection, including but not limited to attorney's fees. In
any litigation, arbitration or court proceeding between the parties,
the prevailing party will be entitled to recover, in
13
addition to any other amounts awarded, attorneys' fees and all
reasonable costs of proceedings incurred in enforcing this
contract.
16.7 Construction of Agreement. This contract has been negotiated by
the respective parties hereto and the language of this Agreement
shall not be construed for or against any party as a result of
the party having drafted the contract.
16.8 Remedies. The rights and remedies provided herein shall be
cumulative and in addition to any other rights and remedies
provided by law or equity.
16.9 Order of Precedence. In the event of any conflict, the
controlling document shall be determined by the following order
of precedence:
This Contract and EXHIBITS A and E,
The Three Party Confidentiality Agreement between BATC,
EarthWatch, and Kodak, dated January 20, 1997, EXHIBIT F,
The Statement of Work, EXHIBIT C
The Specification, EXHIBIT D
16.10 Assignment. Neither party may assign any rights or obligations
hereunder without the prior express written consent of the
other, except to a third party pursuant to a merger, sale of all
or substantially all assets, or other corporate reorganization.
However, either party may assign its rights and obligations to a
wholly owned subsidiary. Should such assignment result in an
increase in costs to the other party, that party may initiate a
change request in accordance with the Changes Clause (8) of this
Contract. Subject to the above restrictions on assignment, this
Contract shall inure to the benefit of and bind the successors
and assigns of the parties.
16.11 Uniform Commercial Code. The provisions of the Uniform
Commercial Code as adopted by the state of Colorado shall apply
to the contract's service aspects to the same extent as the UCC
applies to the products.
16.12 EarthWatch Financial Data. EarthWatch agrees to provide to BATC
monthly updates outlining the current status of EarthWatch's
financial ability to adequately cover financial liabilities,
including its existing and future obligations to BATC.
16.13 Insurance. BATC shall furnish evidence of insurance coverage in
the following amounts:
All Risk Policy for the BATC facility in Boulder, Colorado
to the full stated value of all components to be integrated
in QuickBird 1 & 2, if exercised, with EarthWatch listed as
loss payee as EarthWatch interests may appear. Workers
Compensation Insurance to the statutory limits Foreign
Workers Compensation Insurance with a limit of $1,000,000
with $100,000 of repatriation
Comprehensive General Liability of $1,000,000
14
Foreign General Liability of $1,000,000
Automobile Insurance of $1,000,000
Umbrella Coverage limited to $10 million in excess of
general liability, and employer's liability.
BATC shall be responsible for all deductible costs.
EarthWatch shall carry corresponding insurance coverage to cover BATC
employees working at EarthWatch facilities.
16.13.1 Recognizing that BATC is furnishing goods and services to
EarthWatch and BATC has no control over the use of such goods
and services in the combination with products, equipment, or
services performed by EarthWatch or third parties, as further
consideration for BATC's furnishing goods and services
hereunder, and to the extent permitted by law, EarthWatch
agrees to defend, indemnify and hold harmless Ball
Corporation, Ball Technologies Holdings Corp., BATC and their
officers, directors, employees and agents against any and all
losses, damages, suits or causes of action, resulting from any
injury to persons (including death) or damage to property of
EarthWatch or third parties, including economic loss, arising
out of or in any way connected with use of the Deliverables,
specifically excluding those resulting directly and solely
from BATC's negligence.
16.13.2 To the extent that BATC's employees enter upon premises
occupied by or under the control of EarthWatch, or any of its
customers, or suppliers, in the course of the performance of
this Contract, BATC shall take all necessary precautions to
prevent the occurrence of any injury (including death) to any
such persons, and except to the extent that any such injury or
damage is due directly and solely to EarthWatch's negligence
shall indemnify, defend, and hold EarthWatch, its officers,
employees, and agents harmless from any and all costs, losses,
expense, damages, claims, suit, or any liability whatsoever,
including attorney's fees, arising out of claims by such
employees. BATC shall maintain worker's compensation and
employer's liability insurance covering all employees of BATC
engaged in the performance of this Contract for claims arising
under any applicable Worker's Compensation and Occupational
Disease Acts. BATC shall furnish certificates evidencing such
insurance which expressly provide that no expiration,
termination, or modification shall take place without thirty
(30) days written notice to EarthWatch.
16.14 No Joint Venture. Nothing contained in this Contract shall be deemed
or construed as creating a joint venture or partnership between the
parties. Except as expressly set forth, no party is by virtue of
this Contract authorized as an agent, employee or legal
representative of any other party, and the relationship of the
parties is, and at all times will continue to be, that of
independent contractors.
15
16.15 Severability. If any provisions of this Contract, or application
thereof, shall for any reason and to any extent be invalid or
unenforceable, the remainder of this Contract, and (if appropriate)
such provision to other persons or circumstances, shall remain in
full force and effect and be interpreted so as best to reasonably
effect the intent of the parties thereto.
16.16 No Waiver. The failure of any party to enforce any of the provisions
of this Contract shall not be construed to be a waiver of the right
of such party thereafter to enforce such provisions.
17. Definitive Agreement. This Contract, once signed, constitutes a legally
binding and enforceable obligation on the part of each of the parties
hereto and their successors in interest, subject to the terms and
conditions contained herein. This Contract may only be amended by a written
instrument signed by the authorized representatives of the parties.
18. Effectivity of Contract. This Contract becomes effective when two
conditions have been satisfied: the execution of the Contract by both
parties and the approval of the Contract by the EarthWatch Board of
Directors.
19. Entire Agreement. This Contract, including the EXHIBITS hereto constitute
the entire understanding and contract of the parties with respect to their
subject matter and supersedes all prior and contemporaneous agreements. By
signing this Contract, each party represents to the other that it has the
authority to sign this Contract and this Contract is enforceable against it
in accordance with its terms.
16
EXHIBIT B
OPTION TO PURCHASE ONE (1) ONE METER
SPACECRAFT SEGMENT
Price & Schedule
----------------
Assuming EarthWatch is otherwise in full compliance with the contract and no
stop work is in effect, BATC grants to EarthWatch an Option to Purchase One (1)
additional One Meter QuickBird Space Segment in accordance with the Terms and
Conditions of this Contract. EarthWatch will signify its exercise of this option
by providing BATC a signed and dated copy of this Exhibit on or before the close
of business of the last day of the expiration of the "Exercise Period" noted
below. The Firm Price and the associated delivery schedule is indicated below.
Exercise
Period Contract Start Date Price Delivery Schedule
-------- ------------------- ----- -----------------
No. 1 6/1/98 thru 12/15/98 $29,000,000 August 1, 2000
Payment Schedule
----------------
Prior to exercise, EarthWatch and BATC shall negotiate detailed milestones
associated with the nominal payment schedule set forth below:
Pay Date Payment $
-------- --------------
1-Jan-99 2,900,000
1-Feb-99 2,900,000
1-Mar-99 2,900,000
1-Apr-99 2,900,000
1-May-99 2,900,000
1-Jun-99 1,500,000
1-Jul-99 1,500,000
1-Aug-99 1,300,000
1-Sep-99 1,300,000
1-Oct-99 1,300,000
1-Nov-99 1,300,000
1-Dec-99 700,000
1-Jan-00 700,000
1-Feb-00 700,000
1-Mar-00 700,000
1-Apr-00 700,000
1-May-00 700,000
1-Jun-00 700,000
1-Jul-00 1,400,000
Total $29,000,000
EarthWatch Inc.
------------------------- --------------------------
Name Date
-------------------------------
Signature
EXHIBIT C
[The Company has not filed this exhibit with the Commission because it contains
voluminous and highly technical data that the Company believes is not material
to investors.]
EXHIBIT D
[The Company has not filed this exhibit with the Commission because it contains
voluminous and highly technical data that the Company believes is not material
to investors.]
EXHIBIT E
PRICE AND PAYMENT SCHEDULE
Full ProJect Deliverables and Services Price
--------------------------------------------
The total fixed price for the Deliverables and Services for the first One (1)
Meter QuickBird Space Segment is $32,400,000. The price acknowledges the
payments made by EarthWatch under the letter contract that preceded this
Contract.
Telescope Option Price
----------------------
The total fixed price for the certain deliverables set forth in Article 7.2.2 is
$6,400,000.
Instrument Option Price
-----------------------
The total fixed price for the certain deliverables set forth in Article 7.2.3 is
$9,450,000.
Restart Prices
--------------
The total adjusted fixed price for the certain deliverables following the Stop
Work period as set forth in Article 7.2.4 is dependent on the date of
authorization to restart.
Delivery-(calculated
Restart Dates QB#1 Prices from execution of contract)
10/02/98-11/01/98 $33,372,000 18.50 mos.
11/02/98-12/01/98 $33,534,000 19.75 mos.
12/02/98-01/01/99 $33,696,000 21.00 mos.
01/02/99-02/01/99 $33,858,000 22.25 mos.
02/02/99-03/01/99 $34,020,000 23.50 mos.
Payment Schedule
----------------
No. 1 Full Project Payment Schedule
The following Payment Schedule specifies the amount of the fixed price amount
that is due and payable for the contracted QuickBird Space Segment in accordance
with the payment terms and conditions in Articles 2 & 4. The milestone events
covering the first QuickBird Spacecraft are noted below:
--------------------------------------------------------------------------------------------------------------------
Pay Milestone Total Cum.
Date Description Value Payment Payment
--------------------------------------------------------------------------------------------------------------------
0 6/9/98 a Full set of optics received $ 400,000 $1,200,000 $ 1,200,000
--------------------------------------------------------------------------------------------------------------------
b RWAs received $ 400,000
--------------------------------------------------------------------------------------------------------------------
c Primary & secondary optics bonded to optical mount $ 400,000 $1,250,000 $ 2,450,000
--------------------------------------------------------------------------------------------------------------------
1 6/30/98 a Spacecraft Test Requirement Document initial release $ 400,000
--------------------------------------------------------------------------------------------------------------------
b Optical bench preps complete $ 400,000
--------------------------------------------------------------------------------------------------------------------
c Full set of optical mounts complete $ 400,000
--------------------------------------------------------------------------------------------------------------------
d GPS Receiver order placed $ 50,000
--------------------------------------------------------------------------------------------------------------------
2 7/31/98 a Bus Structure complete (inserts & painting) $ 450,000 $1,250,000 $ 3,700,000
--------------------------------------------------------------------------------------------------------------------
b Solid State Recorders complete $ 400,000
--------------------------------------------------------------------------------------------------------------------
c RF box Engineering Models received $ 400,000
--------------------------------------------------------------------------------------------------------------------
3 8/31/98 a Primary/Secondary telescope roll test complete $ 450,000 $1,250,000 $ 4,950,000
--------------------------------------------------------------------------------------------------------------------
b Power boxes complete (Battery, PDA, PCU) $ 400,000
--------------------------------------------------------------------------------------------------------------------
c Command & Telemetry Unit received $ 400,000
--------------------------------------------------------------------------------------------------------------------
4 9/30/98 a Telescope Assy Complete (mirror pins staked) $ 450,000 $1,250,000 $ 6,200,000
--------------------------------------------------------------------------------------------------------------------
b Propulsion module complete $ 400,000
--------------------------------------------------------------------------------------------------------------------
c Gimbal received $ 400,000
--------------------------------------------------------------------------------------------------------------------
5 10/31/98 a Telescope Vibration test complete $ 850,000 $5,650,000 $11,850,000
--------------------------------------------------------------------------------------------------------------------
b Stim Lamp complete $ 800,000
--------------------------------------------------------------------------------------------------------------------
c RF box set (XWBT, XNBT, SBR) received $ 800,000
--------------------------------------------------------------------------------------------------------------------
d Wideband data interface EM test complete (SSS
simulator, SSR, & VVBT) $ 800,000
--------------------------------------------------------------------------------------------------------------------
e Phase 1 & 2 harness complete $ 800,000
--------------------------------------------------------------------------------------------------------------------
f Structure preps complete (heaters, thermistors) $ 800,000
--------------------------------------------------------------------------------------------------------------------
g Spacecraft Computer received $ 800,000
--------------------------------------------------------------------------------------------------------------------
6 11/30/98 a Telescope Thermal cycle test complete $ 850,000 $5,650,000 $17,500,000
--------------------------------------------------------------------------------------------------------------------
b Instrument radiator thermal test complete $ 800,000
--------------------------------------------------------------------------------------------------------------------
c Phase 3, 4, & 5 harness complete $ 800,000
--------------------------------------------------------------------------------------------------------------------
d Deployable cover & sunshade complete $ 800,000
--------------------------------------------------------------------------------------------------------------------
e STOC certified $ 800,000
--------------------------------------------------------------------------------------------------------------------
f Initial Spacecraft Power on $ 800,000
--------------------------------------------------------------------------------------------------------------------
g Flight software loaded into software test bench $ 800,000
--------------------------------------------------------------------------------------------------------------------
7 12/31/98 a Fliqht Software (thru FQT) loaded into SCC $ 550,000 $1,100,000 $18,600,000
--------------------------------------------------------------------------------------------------------------------
b Telescope ready for SSS integration $ 550,000
--------------------------------------------------------------------------------------------------------------------
8 1/31/99 a SSS & SSR functional test complete $ 500,000 $1,550,000 $20,150,000
--------------------------------------------------------------------------------------------------------------------
b Mid deck integration complete (RWAs & torquers) $ 500,000
--------------------------------------------------------------------------------------------------------------------
c Sensor subsystem simulator integration complete $ 550,000
--------------------------------------------------------------------------------------------------------------------
9 2/28/99 a Focal Plane, installed, aligned & staked $ 550,000 $1,550,000 $21,700,000
--------------------------------------------------------------------------------------------------------------------
b Star tracker electrical integration complete (on bus) $ 500,000
--------------------------------------------------------------------------------------------------------------------
c SAD/HDRS integration complete $ 500,000
--------------------------------------------------------------------------------------------------------------------
10 3/31/99 a Instrument SNR Measurement complete $ 500,000 $1,000,000 $22,700,000
--------------------------------------------------------------------------------------------------------------------
b Instrument ready to integrate into bus $ 500,000
--------------------------------------------------------------------------------------------------------------------
11 4/30/99 a Bus ready for instrument integration $ 500,000 $1,000,000 $23,700,000
--------------------------------------------------------------------------------------------------------------------
b Instrument Installation complete $ 500,000
--------------------------------------------------------------------------------------------------------------------
12 5/31/99 a Instrument integration complete $ 500,000 $1,000,000 $24,700,000
--------------------------------------------------------------------------------------------------------------------
b System baseline performance tests completed
successfully $ 500,000
--------------------------------------------------------------------------------------------------------------------
13 6/30/99 a Complete thermal blanket installation $ 500,000 $1,000,000 $25,700,000
--------------------------------------------------------------------------------------------------------------------
b Start Thermal Vac test $ 500,000
--------------------------------------------------------------------------------------------------------------------
14 7/31/99 a Successfully complete Thermal Vacuum Test $ 500,000 $1,000,000 $26,700,000
--------------------------------------------------------------------------------------------------------------------
b Complete Solar array installation $ 500,000
--------------------------------------------------------------------------------------------------------------------
15 8/31/99 a Successfully complete End to End Compatability test $ 500,000 $1,000,000 $27,700,000
--------------------------------------------------------------------------------------------------------------------
b Successfully complete Vibration Test $ 500,000
--------------------------------------------------------------------------------------------------------------------
16 9/30/99 a Successfully complete acoustic test $ 500,000 $1,000,000 $28,700,000
--------------------------------------------------------------------------------------------------------------------
b Successfully complete post environmental deployment $ 500,000
--------------------------------------------------------------------------------------------------------------------
17 10/31/99 a Spacecraft Ready to ship $3,000,000 $3,000,000 $31,700,000
--------------------------------------------------------------------------------------------------------------------
18 11/30/99 a Spacecraft ready for launch $ 350,000 $ 350,000 $32,050,000
--------------------------------------------------------------------------------------------------------------------
19 12/31/99 a Completion of In-Orbit test $ 350,000 $ 350,000 $32,400,000
====================================================================================================================
No. 2 Telescope Option Payment Schedule consists of payments made for the Full
Project in accordance with the payment terms and conditions in Articles 2 & 4.
A final payment of the balance due up to the total fixed price set forth above
will be made on delivery of the telescope.
No. 3 Instrument Option Payment Schedule consists of payments made for the Full
Project in accordance with the payment terms and conditions in Articles 2 & 4.
Detailed milestones for the balance due will be negotiated following the
selection of this option. The nominal payments for the balance due shall be as
follows:
Due Date Amount $
-------- --------
10/31/98 550,000
11/30/98 500,000
12/31/98 500,000
1/31/99 500,000
2/28/99 500,000
3/31/99 500,000
AMENDMENT 1
to
CONTRACT SE.1M.PRJ.0004.A
between
EARTHWATCH, INC. AND BALL AEROSPACE AND TECHNOLOGIES CORP.
for the
CONTRACT FOR QUICKBIRD SPACECRAFT
This Amendment incorporates the following changes to the Contract.
Article 7 Stop Work Period and Mechanism
Article 7.2.2 Telescope Option
Article 7.2.3 Instrument Option
IN WITNESS WHEREOF, the parties hereto have caused this Amendment to be executed
by their respective duly authorized representatives as of Friday, September 18,
1998.
EARTHWATCH, INCORPORATED
By: /s/ Xxxxx Xxxxxxxx 9/18/98
------------------------------ -------------------------
Date
BALL AEROSPACE SYSTEMS DIVISION
By: /s/ T.H. Lapotosky 9/17/98
------------------------------ -------------------------
Date
Amendment Number 1
Contract Number SE.1M.PRJ.0004A
Page 2
ARTICLE 7. Stop Work Period and Mechanism. Change "September 20, 1998" in the
second line to read "September 23, 1998."
ARTICLE 7.2.2 Telescope Option. Change "September 20, 1998" in the first line to
read "September 23, 1998."
ARTICLE 7.2.3 Instrument Option. Change "September 20, 1998" in the first line
to read "September 23, 1998."
AMENDMENT 2
to
CONTRACT SE.1M.PRJ.0004.A
between
EARTHWATCH, INC. AND BALL AEROSPACE AND TECHNOLOGIES CORP.
for the
CONTRACT FOR QUICKBIRD SPACECRAFT
This Amendment incorporates the following changes to the Contract
Exhibit A - To Contract for the EarthWatch Project One QuickBird Space Segment
Terms and Conditions
. Article 7, Stop Work Period and Mechanism
. Article 7.2.2. Telescope Option
. Article 7.2.3. Instrument Option
Exhibit B - Option to Purchase One (1) One Meter Space Segment
. Price and Schedule
. Payment Schedule
Exhibit C - Statement of Work - Doc. No. SE.1M.PRJ.002 Dated May 28, 1998
. Attachment 2; Customer Furnished Equipment List
Exhibit E - Price and Payment Schedule
. Full Project Deliverables and Services Price
. Telescope Option Price
. Instrument Option Price
. Restart Price
. Payment Schedule
IN WITNESS WHEREOF, the parties hereto have caused this Amendment to be executed
by their respective duly authorized representatives as of Friday, September 18,
1998.
Amendment No. 2
Page 2 of 2
EARTHWATCH, INCORPORATED
By: /s/ Xxxxxxx X. Xxxxxxxxx III 9/23/98
------------------------------------ ---------------------------
Date
BALL AEROSPACE SYSTEMS DIVISION
By: /s/ T.H. Lapotosky 9/23/98
------------------------------------ ---------------------------
T.H. Lapotosky Date
Director, Contracts & Government Compliance
EXHIBIT A TO CONTRACT FOR THE EARTHWATCH PROJECT ONE QUICKBIRD SPACE
SEGMENT TERMS AND CONDITIONS
. Article 7, Stop Work Period and Mechanism: Change the First Sentence to read:
"Subject to the terms and conditions of this contract on or before November
16, 1998, due to certain EarthWatch financial limitations, it may be
necessary for EarthWatch to direct BATC to suspend work as well as suspend
payments as of November 30, 1998 (including the payment of $4,4000,000 due
November 30, 1998) as defined in Exhibit C, Statement of Work for a period
not to exceed ninety (90) consecutive days or until March 1, 1999."
. Article 7.2.2, Telescope Option: Change the first and second sentences to
read: "On or before November 16, 1998, EarthWatch can notify BATC of its
intent to exercise its option to purchase the following components as defined
in the Statement of Work: the assembled telescope following one completed
vibration test, one set of the Solid State Recorders, one set of Wide Band
Transmitters, one High Gain Antenna, one High Gain Antenna and Gimbal with
associated wide band radio frequency materials including Subcontracted items,
one set of "S" Band Receivers and one set of "X-Narrow" Band Transmitters.
Delivery of these components shall occur on or before December 30, 1998."
. Article 7.2.3, Instrument Option: Change the first and second sentences to
read: "On or before November 16, 1998, EarthWatch can notify BATC of its
intent to exercise its option to purchase the following components as defined
in the Statement of Work: the telescope and the EarthWatch provided (through
Kodak) Sensor Subsystem, one set of Solid State Recorders, one set of Wide
Band Transmitters with Radio Frequency material, one High Gain Antenna, one
High Gain Antenna Gimbal, one set of "S" Band Receivers and one set of "X-
Narrow" Band Transmitters. Delivery of these components shall occur on or
before April 30, 1999."
EXHIBIT B - OPTION TO PURCHASE ONE (1) ONE METER SPACECRAFT SEGMENT
. Price and Schedule: Change the Contract Start Date and Price as follows:
Contract Start Date: 6/1/98 thru 11/16/98
Price: @ $28,880,000
. Payment Schedule: Change "1 Feb 99" payment to read @ $2,780,000.
Change the "Total" to read @ $28,880,000.
EXHIBIT C - STATEMENT OF WORK EARTHWATCH QUICKBIRD SATELLITE DATED
MAY 28, 1998 DOC. NO. SE.1M.PRJ.002
. Attachment 2, Customer Furnished Equipment List: Change Item "Sensor
Subsystem SOW Ref. 10.2.2. "S/C delivery date to read "01/29/99."
EXHIBIT E - PRICE AND PAYMENT SCHEDULE
. Full Project Deliverables and Services Price: Change the first sentence to
read: "The total fixed price for the Deliverables and Services for the first
One (1) Meter QuickBird Space Segment is $32,710,000.
. Telescope Option Price: Change to read: "The total fixed price for the
certain deliverables set forth in Article 7.2.2 is $8,800,000.
. Instrument Option Price: Change to read: "The total fixed price for the
certain deliverables set forth in Article 7.2.3 is $11,850,000.
. Restart Prices: Change as follows:
Delivery (calculated from
Restart Dates QB #1 Prices execution of Contract)
------------- ------------ -------------------------
12/01/98 - 01/04/99 $33,691,300 18.50 mos.
01/05/99 - 02/01/99 $33,854,850 19.75 mos.
02/02/99 - 03/01/99 $34,018,400 21.00 mos.
. No. 3 Instrument Option Payment Schedule: Change as follows:
Due Date Amount $
-------- --------
11/30/98 $650,000
12/31/98 $650,000
01/31/99 $650,000
02/28/99 $650,000
03/31/99 $650,000
. Substitute the attached revised SE.1M.PRJ.0004.A, dated September 23, 1998
payment milestone schedule for SE.1M.PRJ.0004.A dated June 4,1998 schedule.
SE.lM.PRJ.0004.A
Dated September 23, 1998
Page 1 of 2
-------------------------------------------------------------------------------------------------------
Pay Date Description Milestone Total Cumm
Value Payment Payment
-------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------
0 6/9/98 a Full set of optics received $ 400,000 $1,200,000 $ 1,200,000
-------------------------------------------------------------------------------------------------------
b RWAs received $ 400,000
-------------------------------------------------------------------------------------------------------
c Primary & secondary optics bonded to optical $ 400,000
mounts
-------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------
1 6/30/98 a Spacecraft Test Requirement Document initial $ 400,000 $1,250,000 $ 2,450,000
release
-------------------------------------------------------------------------------------------------------
b Optical bench preps complete $ 400,000
-------------------------------------------------------------------------------------------------------
c Full set of optical mounts complete $ 400,000
-------------------------------------------------------------------------------------------------------
d GPS Receiver order placed $ 50,000
-------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------
2 7131/98 a Bus Structure complete (inserts & painting) $ 450,000 $1,250,000 $ 3,700,000
-------------------------------------------------------------------------------------------------------
b Solid State Recorders complete $ 400,000
-------------------------------------------------------------------------------------------------------
c RF box Engineering Models received $ 400,000
-------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------
3 8/31/98 a Primary/Secondary telescope roll test $ 450,000 $1,250,000 $ 4,950,000
complete
-------------------------------------------------------------------------------------------------------
b Power boxes complete (Battery, PDA, PCU) $ 400,000
-------------------------------------------------------------------------------------------------------
c Command & Telemetry Unit received $ 400,000
-------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------
4 9/30/98 a Telescope Assy Complete (mirror pins $ 450,000 $1,250,000 $ 6,200,000
staked)
-------------------------------------------------------------------------------------------------------
b Propulsion module complete $ 400,000
-------------------------------------------------------------------------------------------------------
c Gimbal received $ 400,000
-------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------
5 10/31/98 a Telescope Vibration test complete $ 350,000 $2,400,000 $ 8,600,000
-------------------------------------------------------------------------------------------------------
b Stim Lamp complete $ 350,000
-------------------------------------------------------------------------------------------------------
c RF box set (XWBT, XNBT, SBR) received $ 300,000
-------------------------------------------------------------------------------------------------------
d Wideband data interface EM test complete $ 350,000
(SSS simulator, SSR, & WBT)
-------------------------------------------------------------------------------------------------------
e Phase 1 & 2 harness complete $ 350,000
-------------------------------------------------------------------------------------------------------
f Structure preps complete (heaters, $ 350,000
thermistors)
-------------------------------------------------------------------------------------------------------
g Spacecraft Computer received $ 350,000
-------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------
6 11/30/98 a Telescope Thermal cycle test complete $ 650,000 $4,400,000 $13,000,000
-------------------------------------------------------------------------------------------------------
b Instrument radiator thermal test complete $ 650,000
-------------------------------------------------------------------------------------------------------
c Phase 3, 4, & 5 harness complete $ 650,000
-------------------------------------------------------------------------------------------------------
d Deployable cover & sunshade complete $ 650,000
-------------------------------------------------------------------------------------------------------
e STOC certified $ 600,000
-------------------------------------------------------------------------------------------------------
f Initial Spacecraft Power on $ 600,000
-------------------------------------------------------------------------------------------------------
g Flight software loaded into software test $ 600,000
bench
-------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------
7 2/31198 a Flight Software (thru FQT) loaded into SCC $1,150,000 $5,650,000 $18,650,000
-------------------------------------------------------------------------------------------------------
b Telescope ready for SSS integration $1,150,000
-------------------------------------------------------------------------------------------------------
c Telescope vacuum dryout complete $1,150.000
-------------------------------------------------------------------------------------------------------
SE.lM.PRJ.0004.A
Dated September 23, 1998
Page 2 of 2
---------------------------------------------------------------------------------------------------------------
d Complete EPDS integration $1,100,000
---------------------------------------------------------------------------------------------------------------
e SCC integration complete $1,100,000
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
8 1/31/99 a SSS & SSR functional test complete $ 500,000 $1,810,000 $ 20,460,000
---------------------------------------------------------------------------------------------------------------
b Mid deck integration complete (RWAs & $ 500,000
torquers)
---------------------------------------------------------------------------------------------------------------
c Sensor subsystem simulator integration $ 550,000
complete
---------------------------------------------------------------------------------------------------------------
d Complete telescope thermal blanket $ 260,000
installation
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
9 2/28/99 a Focal Plane, installed, aligned & staked $ 550,000 $1,550,000 $ 22,010,000
---------------------------------------------------------------------------------------------------------------
b Star tracker electrical integration complete (on $ 500,000
bus)
---------------------------------------------------------------------------------------------------------------
c SAD/HDRS integration complete $ 500,000
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
10 3/31/99 a Instrument SNR Measurement complete $ 500,000 $1,000,000 $ 23,010,000
---------------------------------------------------------------------------------------------------------------
b Instrument ready to integrate into bus $ 500,000
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
11 4/30/99 a Bus ready for instrument integration $ 500,000 $1,000,000 $ 24,010,000
---------------------------------------------------------------------------------------------------------------
b Instrument Installation complete $ 500,000
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
12 5/31/99 a Instrument integration complete $ 500,000 $1,000,000 $ 25,010,000
---------------------------------------------------------------------------------------------------------------
b System baseline performance tests $ 500,000
completed successfully
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
13 6/30/99 a Complete thermal blanket installation $ 500,000 $1,000,000 $ 26,010,000
---------------------------------------------------------------------------------------------------------------
b Start Thermal Vac test $ 500,000
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
14 7/31/99 a Successfully complete Thermal Vacuum Test $ 500,000 $1,000,000 $ 27,010,000
---------------------------------------------------------------------------------------------------------------
b Complete Solar array installation $ 500,000
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
15 8/31/99 a Successfully complete End to End $ 500,000 $1,000 000 $ 28,010,000
Compatability test
---------------------------------------------------------------------------------------------------------------
b Sucessfully complete Vibration Test $ 500,000
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
16 9/30/99 a Successfully complete acoustic test $ 500,000 $1,000,000 $ 29,010,000
---------------------------------------------------------------------------------------------------------------
b Successfully complete post environmental $ 500,000
deployment tests
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
17 10/31/99 a Spacecraft Ready to ship $3,000,000 $3,000,000 $ 32,010,000
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
18 11/30/99 a Spacecraft ready for launch $ 350,000 $ 350,000 $ 32,360,000
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
19 12/31/99 a Completion of In-Orbit test $ 350,000 $ 350,000 $ 32,710,000
---------------------------------------------------------------------------------------------------------------
AMENDMENT 3
to
CONTRACT SE.1M.PRJ.004.A
between
EARTHWATCH INCORPORATED AND BALL AEROSPACE AND TECHNOLOGIES CORP.
for the
CONTRACT FOR QUICKBIRD SPACECRAFT
This Amendment is issued to incorporate a change to the QuickBird "Narrow Band
Modulation Indexing." This activity shall be performed for a firm fixed price as
noted in Exhibit E.
This amendment incorporates revisions to the following documents:
Exhibit D - Specification, Spacecraft Bus and Instrument, EarthWatch QuickBird
Spacecraft, Doc. No. SE.lM.PRJ.003
. Telemetry Modulation Indices
. Telemetry Downlink Attenuation
Exhibit E - Price and Payment Schedule
. Full Project Deliverables and Service Price
. Telescope Option Price
. Instrument Option Price
. Restart Price
. Payment Schedule
IN WITNESS WHEREOF, the parties hereto have caused this Amendment to be executed
by their respective duly authorized representatives.
EARTHWATCH INCORPORATED
By: /s/ Xxxxxxx X. Xxxxxxxxx III 10/12/98
------------------------------------------- -----------------
Xxxxxxx X. Xxxxxxxxx III Date
Chief Executive Officer & President
BALL AEROSPACE SYSTEMS DIVISION
By: /s/ T.H. Lapotosky 11/17/98
------------------------------------------- -----------------
T.H. Lapotosky Date
Director, Contracts and Government
Compliance
Amendment 3 to
Contract IM.PRJ.0004.A
EXHIBIT E - PRICE AND PAYMENT SCHEDULE
Full Project Deliverables and Services Price
--------------------------------------------
Change the first sentence to read:
The total fixed price for the Deliverables and Services for the first One
(1) Meter QuickBird Space Segment is $32,786,000.
Telescope Option Price
----------------------
Delete and replace as follows:
The total fixed price for the certain deliverables set forth in Article
7.2.2 is $8,876,000.
Instrument Option Price
-----------------------
Delete and replace as follows:
The total fixed price for the certain deliverables set forth in Article
7.2.3 is $11,926,000.
Restart Prices
--------------
Delivery (calculated from
Restart Dates QB # 1 Prices execution of Contract)
------------- ------------- -------------------------
12/01/98 - 01/04/99 $33,767,300 18.50 mos.
01/05/99 - 02/01/99 $33,930,850 19.75 mos.
02/02/99 - 03/01/99 $34,094,400 21.00 mos.
Payment Schedule
----------------
Delete the SE.1M.PRJ.004.A, dated September 23, 1998 payment milestone schedule
and replace with the attached SE.1M.PRJ.004.A, dated October 12, 1998 schedule.
SE.1M.PRJ.0004.A
Dated October 12, 1998
Page 1 of 2
-----------------------------------------------------------------------------------------------------------------
Item Pay Item Milestone Total Cum
# Date Line Description Value Payment Payment
=================================================================================================================
0 6/9/98 a Full set of optics received $ 400,000 $1,200,000 $ 1,200,000
-----------------------------------------------------------------------------------------------------------------
b RWAs received $ 400,000
-----------------------------------------------------------------------------------------------------------------
c Primary & secondary optics bonded to optical $ 400,000
mounts
-----------------------------------------------------------------------------------------------------------------
1 6/30/98 a Spacecraft Test Requirement Document initial $ 400,000 $1,250,000 $ 2,450,000
release
-----------------------------------------------------------------------------------------------------------------
b Optical bench preps complete $ 400,000
-----------------------------------------------------------------------------------------------------------------
c Full set of optical mounts complete $ 400,000
-----------------------------------------------------------------------------------------------------------------
d GPS Receiver order placed $ 50,000
-----------------------------------------------------------------------------------------------------------------
2 7/31/98 a Bus Structure complete (inserts & painting) $ 450,000 $1,250,000 $ 3,700,000
-----------------------------------------------------------------------------------------------------------------
b Solid State Recorders complete $ 400,000
-----------------------------------------------------------------------------------------------------------------
c RF box Engineering Models received $ 400,000
-----------------------------------------------------------------------------------------------------------------
3 8/31/98 a Primary/Secondary telescope roll test complete $ 450,000 $1,250,000 $ 4,950,000
-----------------------------------------------------------------------------------------------------------------
b Power boxes complete (Battery, PDA. PCU) $ 400,000
-----------------------------------------------------------------------------------------------------------------
c Command & Telemetry Unit received $ 400,000
-----------------------------------------------------------------------------------------------------------------
4 9/30/98 a Telescope Assy Complete (mirror pins staked) $ 450,000 $1,250,000 $ 6,200,000
-----------------------------------------------------------------------------------------------------------------
b Propulsion module complete $ 400,000
-----------------------------------------------------------------------------------------------------------------
c Gimbal received $ 400,000
-----------------------------------------------------------------------------------------------------------------
5 10/31/98 a Telescope Vibration test complete $ 350,000 $2,476,000 $ 8,676,000
-----------------------------------------------------------------------------------------------------------------
b Stim Lamp complete $ 350,000
-----------------------------------------------------------------------------------------------------------------
c RF box set (XWBT, XNBT, SBR) received $ 300,000
-----------------------------------------------------------------------------------------------------------------
d Wideband data interface EM test complete (SSS $ 350,000
simulator, SSR, & WBT)
-----------------------------------------------------------------------------------------------------------------
e Phase 1 & 2 harness complete $ 350,000
-----------------------------------------------------------------------------------------------------------------
f Structure preps complete (heaters, thermistors) $ 350,000
-----------------------------------------------------------------------------------------------------------------
g Spacecraft Computer received $ 350,000
-----------------------------------------------------------------------------------------------------------------
h Narrow Band Modulation Indexing $ 76,000
-----------------------------------------------------------------------------------------------------------------
6 11/30/98 a Telescope Thermal cycle test complete $ 650,000 $4,400,000 $13,076,000
-----------------------------------------------------------------------------------------------------------------
b Instrument radiator thermal test complete $ 650,000
-----------------------------------------------------------------------------------------------------------------
c Phase 3, 4, & 5 harness complete $ 650,000
-----------------------------------------------------------------------------------------------------------------
d Deployable cover & sunshade complete $ 650,000
-----------------------------------------------------------------------------------------------------------------
e STOC certified $ 600,000
-----------------------------------------------------------------------------------------------------------------
f Initial Spacecraft Power on $ 600,000
-----------------------------------------------------------------------------------------------------------------
g Flight software loaded into software test bench $ 600,000
-----------------------------------------------------------------------------------------------------------------
7 12/31/98 a Flight Software (thru FQT) loaded into SCC $1,150,000 $5,650,000 $18,726,000
-----------------------------------------------------------------------------------------------------------------
b Telescope ready for SSS integration $1,150,000
-----------------------------------------------------------------------------------------------------------------
c Telescope vacuum dryout complete $1,150,000
-----------------------------------------------------------------------------------------------------------------
d Complete EPDS integration $1,100,000
-----------------------------------------------------------------------------------------------------------------
e SCC integration complete $1,100,000
=================================================================================================================
SE.IM.PRJ.0004.A
Dated October 12, 1998
Page 2 of 2
Item Pay Line Milestone Total Cum
# Date Item Description Value Payment Payment
--------------------------------------------------------------------------------
8 1/31/99 a SSS & SSR
functional test
complete $ 500,000 $1,810,000 $20,536,000
--------------------------------------------------------------------------------
b Mid deck
integration
complete (RWAs & $ 500,000
--------------------------------------------------------------------------------
c Sensor subsystem
simulator
integration complete $ 550,000
--------------------------------------------------------------------------------
d Complete telescope
thermal blanket
installation $ 260,000
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
9 2/28/99 a Focal Plane,
installed, aligned
& staked $ 550,000 $1,550,000 $22,086,000
--------------------------------------------------------------------------------
b Star tracker
electrical
integration
complete (on $ 500,000
--------------------------------------------------------------------------------
c SAD/HDRS
integration complete $ 500,000
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
10 3/31/99 a Instrument SNR
Measurement complete $ 500,000 $1,000,000 $23,086,000
--------------------------------------------------------------------------------
b Instrument ready to
integrate into bus $ 500,000
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
11 4/30/99 a Bus ready for
instrument
integration $ 500,000 $1,000,000 $24,086,000
--------------------------------------------------------------------------------
b Instrument
Installation
complete $ 500,000
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
12 5/31/99 a Instrument
integration complete $ 500,000 $1,000,000 $25,086,000
--------------------------------------------------------------------------------
b System baseline
performance tests
completed
successfully $ 500,000
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
13 6/30/99 a Complete thermal
blanket installation $ 500,000 $1,000,000 $26,086,000
--------------------------------------------------------------------------------
b Start Thermal Vac
test $ 500,000
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
14 7/31/99 a Successfully
complete Thermal
Vacuum Test $ 500,000 $1,000,000 $27,086,000
--------------------------------------------------------------------------------
b Complete Solar
array installation $ 500,000
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
15 8/31/99 a Successfully
complete End to End
Compatability
test $ 500,000 $1,000,000 $28,086,000
--------------------------------------------------------------------------------
b Successfully
complete Vibration
Test $ 500,000
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
16 9/30/99 a Successfully
complete acoustic
test $ 500,000 $1,000,000 $29,086,000
--------------------------------------------------------------------------------
b Successfully
complete post
environmental
deployment tests $ 500,000
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
17 10/31/99 a Spacecraft Ready to
ship $3,000,000 $3,000,000 $32,086,000
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
18 11/30/99 a Spacecraft ready
for launch $ 350,000 $ 350,000 $32,436,000
--------------------------------------------------------------------------------
--------------------------------------------------------------------------------
19 12/31/99 a Completion of
In-Orbit test $ 350,000 $ 350,000 $32,786,000
--------------------------------------------------------------------------------
SE.1M.PRJ.0004.A
Dated October 12, 1998
Page 1 of 2
-------------------------------------------------------------------------------------------------------------------
Item Pay Line Milestone Total Cum
# Date Item Description Value Payment Payment
-------------------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------
0 6/9/98 a Full set of optics received $ 400,000 $1,200,000 $ 1,200,000
-------------------------------------------------------------------------------------------------------------------
b RWAs received $ 400,000
-------------------------------------------------------------------------------------------------------------------
c Primary & secondary optics bonded to optical $ 400,000
mounts
-------------------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------
1 6/30/98 a Spacecraft Test Requirement Document initial $ 400,000 $1,250,000 $ 2,450,000
release
-------------------------------------------------------------------------------------------------------------------
b Optical bench preps complete $ 400,000
-------------------------------------------------------------------------------------------------------------------
c Full set of optical mounts complete $ 400,000
-------------------------------------------------------------------------------------------------------------------
d GPS Receiver order placed $ 50,000
-------------------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------
2 7/31/98 a Bus Structure complete (inserts & painting) $ 450,000 $1,250,000 $ 3,700,000
-------------------------------------------------------------------------------------------------------------------
b Solid State Recorders complete $ 400,000
-------------------------------------------------------------------------------------------------------------------
c RF box Engineering Models received $ 400,000
-------------------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------
3 8/31/98 a Primary/Secondary telescope roll test complete $ 450,000 $1,250,000 $ 4,950,000
-------------------------------------------------------------------------------------------------------------------
b Power boxes complete (Battery, PDA, PCU) $ 400,000
-------------------------------------------------------------------------------------------------------------------
c Command & Telemetry Unit received $ 400,000
-------------------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------
4 9/30/98 a Telescope Assy Complete (mirror pins staked) $ 450,000 $1,250,000 $ 6,200,000
-------------------------------------------------------------------------------------------------------------------
b Propulsion module complete $ 400,000
-------------------------------------------------------------------------------------------------------------------
c Gimbal received $ 400,000
-------------------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------
5 10/31/98 a Telescope Vibration test complete $ 350,000 $2,476,000 $ 8,676,000
-------------------------------------------------------------------------------------------------------------------
b Stim Lamp complete $ 350,000
-------------------------------------------------------------------------------------------------------------------
c RF box set (XWBT, XNBT, SBR) received $ 300,000
-------------------------------------------------------------------------------------------------------------------
d Wideband data interface EM test complete (SSS $ 350,000
simulator, SSR, & WBT)
-------------------------------------------------------------------------------------------------------------------
e Phase 1 & 2 harness complete $ 350,000
-------------------------------------------------------------------------------------------------------------------
f Structure preps complete (heaters, thermistors) $ 350,000
-------------------------------------------------------------------------------------------------------------------
g Spacecraft Computer received $ 350,000
-------------------------------------------------------------------------------------------------------------------
h Narrow Band Modulation Indexing $ 76,000
-----------------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------
6 11/30/98 a Telescope Thermal cycle test complete $ 650,000 $4,400,000 $13,076,000
-------------------------------------------------------------------------------------------------------------------
b Instrument radiator thermal test complete $ 650,000
-------------------------------------------------------------------------------------------------------------------
c Phase 3, 4, & 5 harness complete $ 650,000
-------------------------------------------------------------------------------------------------------------------
d Deployable cover & sunshade complete $ 650,000
-------------------------------------------------------------------------------------------------------------------
e STOC certified $ 600,000
-------------------------------------------------------------------------------------------------------------------
f Initial Spacecraft Power on $ 600,000
-------------------------------------------------------------------------------------------------------------------
g Flight software loaded into software test bench $ 600,000
-------------------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------
7 12/31/98 a Flight Software (thru FQT) loaded into SCC $1,150,000 $5,650,000 $18,726,000
-------------------------------------------------------------------------------------------------------------------
b Telescope ready for SSS integration $1,150,000
-------------------------------------------------------------------------------------------------------------------
c Telescope vacuum dryout complete $1,150,000
-------------------------------------------------------------------------------------------------------------------
d Complete EPDS integration $1,100,000
-------------------------------------------------------------------------------------------------------------------
e SCC integration complete $1,100,000
-------------------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------
SE.1M.PRJ.0004.A
Dated October 12, 1998
Page 2 of 2
-------------------------------------------------------------------------------------------------------------------
Item Pay Line Milestone Total Cum
# Date Item Description Value Payment Payment
-------------------------------------------------------------------------------------------------------------------
-------------------------------------------------------------------------------------------------------------------
8 1/31/99 a SSS & SSR functional test complete $ 500,000 $1,810,000 $20,536,000
-----------------------------------------------------------------------------------------------------------------
b Mid deck integration complete (RWAs & $ 500,000
-----------------------------------------------------------------------------------------------------------------
c Sensor subsystem simulator integration complete $ 550,000
-----------------------------------------------------------------------------------------------------------------
d Complete telescope thermal blanket installation $ 260,000
-----------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------
9 2/28/99 a Focal Plane, installed, aligned & staked $ 550,000 $1,550,000 $22,086,000
-----------------------------------------------------------------------------------------------------------------
b Star tracker electrical integration complete (on $ 500,000
-----------------------------------------------------------------------------------------------------------------
c SAD/HDRS integration complete $ 500,000
-----------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------
10 3/31/99 a Instrument SNR Measurement complete $ 500,000 $1,000,000 $23,086,000
-----------------------------------------------------------------------------------------------------------------
b Instrument ready to integrate into bus $ 500,000
-----------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------
11 4/30/99 a Bus ready for instrument integration $ 500,000 $1,000,000 $24,086,000
-----------------------------------------------------------------------------------------------------------------
b Instrument Installation complete $ 500,000
-----------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------
12 5/31/99 a Instrument integration complete $ 500,000 $1,000,000 $25,086,000
-----------------------------------------------------------------------------------------------------------------
b System baseline performance tests completed $ 500,000
successfully
-----------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------
13 6/30/99 a Complete thermal blanket installation $ 500,000 $1,000,000 $26,086,000
-----------------------------------------------------------------------------------------------------------------
b Start Thermal Vac test $ 500,000
-----------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------
14 7/31/99 a Successfully complete Thermal Vacuum Test $ 500,000 $1,000,000 $27,086,000
-----------------------------------------------------------------------------------------------------------------
b Complete Solar array installation $ 500,000
-----------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------
15 8/31/99 a Successfully complete End to End Compatability $ 500,000 $1,000,000 $28,086,000
test
-----------------------------------------------------------------------------------------------------------------
b Successfully complete Vibration Test $ 500,000
-----------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------
16 9/30/99 a Successfully complete acoustic test $ 500,000 $1,000,000 $29,086,000
-----------------------------------------------------------------------------------------------------------------
b Sucessfully complete post environmental $ 500,000
deployment tests
-----------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------
17 10/31/99 a Spacecraft Ready to ship $3,000,000 $3,000,000 $32,086,000
-----------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------
18 11/30/99 a Spacecraft ready for launch $ 350,000 $ 350,000 $32,436,000
-----------------------------------------------------------------------------------------------------------------
-----------------------------------------------------------------------------------------------------------------
19 12/31/99 a Completion of In-Orbit test $ 350,000 $ 350,000 $32,786,000
-----------------------------------------------------------------------------------------------------------------
AMENDMENT 4
to
CONTRACT SE.1M.PRJ.0004.A
between
EARTHWATCH, INCORPORATED AND BALL AEROSPACE AND TECHNOLOGIES CORP.
for the
CONTRACT FOR QUICKBIRD SPACECRAFT
This Amendment is issued to incorporate a change to the Contract document that
incorporates a four (4) day extension to the various options and off-ramp
election dates.
Exhibit A - Terms and Conditions
. Article 7, Stop Work Period and Mechanism
. Article 7.2.2. Telescope Option
. Article 7.2.3. Instrument Option
Exhibit E - Price and Payment Schedule
. Telescope Option Price
. Instrument Option price
. Payment Schedule
IN WITNESS WHEREOF, the parties hereto have caused this Amendment to be executed
by their respective duly authorized representatives.
EARTHWATCH, INCORPORATED
By: /s/ Xxxxxxx X. Xxxxxxxxx III 11/16/98
----------------------------------- ------------
Xxxxxxx X. Xxxxxxxxx III Date
Chief Executive Officer & President
BALL AEROSPACE SYSTEMS DIVISION
By: /s/ T.H. Lapotosky 11/13/98
----------------------------------- ------------
T.H. Lapotosky Date
Director, Contracts & Government
Compliance
EXHIBIT A - TERMS AND CONDITIONS
Article 7 - Stop Work Period and Mechanism
------------------------------------------
- Change "November 16, 1998" to "November 20, 1998" in the first sentence.
Article 7.2.2 - Telescope Option
--------------------------------
- Change "November 16, 1998" to "November 20, 1998" in the first sentence.
Article 7.2.3 - Instrument Option
---------------------------------
- Change "November 16, 1998" to "November 20, 1998" in the first sentence.
EXHIBIT E - PRICE AND PAYMENT SCHEDULE
Telescope Option
----------------
- Change the price from "$8,876,000" to "$9,176,000."
Instrument Option
-----------------
- Change the price from "$11,926,000" to "$12,226,000."
Payment Schedule
----------------
- Change the First payment (11/30/98) from "$650,000" to "$950,000."
AMENDMENT 5
to
CONTRACT SE.1M.PRJ.0004.A
between
EARTHWATCH, INCORPORATED AND BALL AEROSPACE AND TECHNOLOGIES CORP.
for the
CONTRACT FOR QUICKBIRD SPACECRAFT
This Amendment is issued to incorporate a change to the Contract document that
incorporates a three (3) day extension to the various options and off-ramp
election dates.
Exhibit A - Terms and Conditions
. Article 7, Stop Work Period and Mechanism
. Article 7.2.2. Telescope Option
. Article 7.2.3. Instrument Option
IN WITNESS WHEREOF, the parties hereto 11/20/98 to be executed by their
respective duly authorized representatives.
EARTHWATCH, INCORPORATED
By: /s/ Xxxxxxx X. Xxxxxxxxx III 11/24/98
------------------------------------- ----------------
Xxxxxxx X. Xxxxxxxxx III Date
Chief Executive Officer & President
BALL AEROSPACE SYSTEMS DIVISION
By: /s/ T.H. Lapotsky 11/20/98
------------------------------------- ----------------
T.H. Lapotsky Date
Director, Contracts & Government
Compliance
EXHIBIT A - TERMS AND CONDITIONS
Article 7 - Stop Work Period and Mechanism
------------------------------------------
- Change "November 20, 1998" to "November 23, 1998" in the first sentence.
Article 7.2.2 - Telescope Option
--------------------------------
- Change "November 20, 1998" to "November 23, 1998" in the first sentence.
Article 7.2.3 - Instrument Option
---------------------------------
- Change "November 20, 1998" to "November 23, 1998" in the first sentence.
AMENDMENT 6
to
CONTRACT SE.1M.PRJ.0004.A
between
EARTHWATCH, INCORPORATED AND BALL AEROSPACE AND TECHNOLOGIES CORP.
for the
CONTRACT FOR QUICKBIRD SPACECRAFT
This Amendment is issued to incorporate a change to the Contract document that
incorporates a one (1) day extension to the various options and off-ramp
election dates.
Exhibit A - Terms and Conditions
. Article 7, Stop Work Period and Mechanism
. Article 7.2.2. Telescope Option
. Article 7.2.3. Instrument Option
IN WITNESS WHEREOF, the parties hereto have caused this Amendment to be executed
by their respective duly authorized representatives.
EARTHWATCH, INCORPORATED
By: /s/ Xxxxx Xxxxxxxx 11/23/98
------------------------------------------ ---------------
For Xxxxxxx X. Xxxxxxxxx III Date
Chief Executive Officer & President
BALL AEROSPACE SYSTEMS DIVISION
By: /s/ T.H. Lapotosky 11/23/98
------------------------------------------- ----------------
T.H. Lapotosky Date
Director, Contracts & Government Compliance
EXHIBIT A - TERMS AND CONDITIONS
Article 7 - Stop Work Period and Mechanism
------------------------------------------
- Change "November 23, 1998" to "November 24, 1998" in the first sentence.
Article 7.2.2 - Telescope Option
--------------------------------
- Change "November 23, 1998" to "November 24, 1998" in the first sentence.
Article 7.2.3 - Instrument Option
---------------------------------
- Change "November 23, 1998" to "November 24, 1998" in the first sentence.
AMENDMENT 7
to
CONTRACT SE.1M.PRJ.0004.A
between
EARTHWATCH, INCORPORATED AND BALL AEROSPACE AND TECHNOLOGIES CORP.
for the
CONTRACT FOR QUICKBIRD SPACECRAFT
This Amendment is issued to incorporate a change to the Contract document that
incorporates a six (6) day extension to the various options and off-ramp
election dates.
Exhibit A - Terms and Conditions
. Article 7, Stop Work Period and Mechanism
. Article 7.2.2. Telescope Option
. Article 7.2.3. Instrument Option
Entire Agreement. This Amendment, hereto constitutes the entire understanding
of the parties with respect to the subject matter of this Amendment and
supersedes all prior and contemporaneous agreements or understandings. By
signing this Amendment, each party represents to the other that it has the
authority to sign this Amendment and this Amendment is enforceable against it
in accordance with its terms.
IN WITNESS WHEREOF, the parties hereto have caused this Amendment to be
executed by their respective duly authorized representatives.
EARTHWATCH, INCORPORATED
/s/ Xxxxxxx X. Xxxxxxxxx III 11/24/98
By:____________________________________________ ____________________
Xxxxxxx X. Xxxxxxxxx III Date
Chief Executive Officer & President
BALL AEROSPACE SYSTEMS DIVISION
/s/ T.H. Lapotosky 11/24/98
By:____________________________________________ ____________________
T.H. Lapotosky Date
Director, Contracts & Government Compliance
EXHIBIT A - TERMS AND CONDITIONS
Article 7 - Stop Work Period and Mechanism
------------------------------------------
- Change "November 24, 1998" to "November 30, 1998" in the first sentence.
Article 7.2.2 - Telescope Option
--------------------------------
- Change "November 24, 1998" to "November 30, 1998" in the first sentence.
Article 7.2.3 - Instrument Option
---------------------------------
- Change "November 24, 1998" to "November 30, 1998" in the first sentence.
AMENDMENT 8
to
CONTRACT SE.1M.PRJ.0004.A
between
EARTHWATCH, INCORPORATED AND BALL AEROSPACE AND TECHNOLOGIES CORP.
for the
CONTRACT FOR QUICKBIRD SPACECRAFT
This Amendment is issued to incorporate a change to the Contract document
that incorporates a one (1) day extension to the various options and off-ramp
election dates.
Exhibit A - Terms and Conditions
. Article 7, Stop Work Period and Mechanism
. Article 7.2.2. Telescope Option
. Article 7.2.3. Instrument Option
Entire Agreement. This Amendment, hereto constitutes the entire understanding
of the parties with respect to the subject matter of this Amendment and
supersedes all prior and contemporaneous agreements or understandings. By
signing this Amendment, each party represents to the other that it has the
authority to sign this Amendment and this Amendment is enforceable against it
in accordance with its terms.
IN WITNESS WHEREOF, the parties hereto have caused this Amendment to be
executed by their respective duly authorized representatives.
EARTHWATCH, INCORPORATED
/s/ Xxxxx Xxxxxxxx 11/30/98
By:_____________________________________________ ______________________
Xxxxxxx X. Xxxxxxxxx III Date
Chief Executive Officer & President
BALL AEROSPACE SYSTEMS DIVISION
/s/ T.H. Lapotosky 11/30/98
By:_____________________________________________ ______________________
T.H. Lapotosky Date
Director, Contracts & Government Compliance
EXHIBIT A - TERMS AND CONDITIONS
Article 7 - Stop Work Period and Mechanism
------------------------------------------
- Change "November 30, 1998" to "December 1, 1998" in the first sentence.
Article 7.2.2 - Telescope Option
--------------------------------
- Change "November 30, 1998" to "December 1, 1998" in the first sentence.
Article 7.2.3 - Instrument Option
---------------------------------
- Change "November 30, 1998" to "December 1, 1998" in the first sentence.
AMENDMENT 9
to
CONTRACT SE.1M.PRJ.0004.A
between
EARTHWATCH, INCORPORATED AND BALL AEROSPACE AND TECHNOLOGIES CORP.
for the
CONTRACT FOR QUICKBIRD SPACECRAFT
This Amendment incorporates the following changes to the Contract.
Exhibit A - Terms and Conditions
. Article 7, Stop Work Period and Mechanism
. Article 7.2.2. Telescope Option
. Article 7.2.3. Instrument Option
Exhibit B - Option to Purchase One (1) One Meter Space Segment
. Price and Schedule
. Payment Schedule
Exhibit E - Price and Payment Schedule
. Full Project Deliverables and Services Price
. Telescope Option Price
. Instrument Option Price
. Restart Price
. Payment Schedule
Entire Agreement. This Amendment, including the EXHIBITS hereto constitutes the
entire understanding of the parties with respect to the subject matter of this
Amendment and supersedes all prior and contemporaneous agreements or
understandings. By signing this Amendment, each party represents to the other
that it has the authority to sign this Amendment and this Amendment is
enforceable against it in accordance with its terms.
IN WITNESS WHEREOF, the parties hereto have caused this Amendment to be executed
by their respective duly authorized representatives.
EARTHWATCH, INCORPORATED
/s/ Xxxxxxx X. Xxxxxxxxx III 12/1/98
By:_____________________________________________ ______________________
Xxxxxxx X. Xxxxxxxxx III Date
Chief Executive Officer & President
BALL AEROSPACE SYSTEMS DIVISION
/s/ T.H. Lapotosky 12/1/98
By:_____________________________________________ ______________________
T.H. Lapotosky Date
Director, Contracts & Government Compliance
EXHIBIT A TO CONTRACT FOR THE EARTHWATCH PROJECT ONE QUICKBIRD SPACE
SEGMENT TERMS AND CONDITIONS
Article 7 - Stop Work Period and Mechanism: Change the First Sentence to read:
"Subject to the terms and conditions of this contract on or before January 15,
1999, due to certain EarthWatch financial limitations, it may be necessary for
EarthWatch to direct BATC to suspend work as well as suspend payments as
defined in Exhibit C, Statement of Work until March 1, 1999."
Article 7.2.2 - Telescope Option: Change the first and second sentences to read:
"On or before January 15, 1999, EarthWatch can notify BATC of its intent to
exercise its option to purchase the following components as defined in the
Statement of Work: the assembled telescope including "STIM Lamp" following one
completed vibration and thermal test, one set of the Solid State Recorders, one
set of Wide Band Transmitters, one High Gain Antenna, one High Gain Antenna
Gimbal with associated wide band radio frequency materials including
Subcontracted items, two sets of "S" Band Receivers and two sets of "X-Narrow"
Band Transmitters. Delivery of these components shall occur on or before
February 26, 1999, with the exception of the 2nd set of RF Components. These
components will be delivered on or before June 30, 1999."
Article 7.2.3 - Instrument Option: Change the first and second sentences to
read: "On or before January 15, 1999, EarthWatch can notify BATC of its intent
to exercise its option to purchase the following components as defined in the
Statement of Work: the telescope including "STIM Lamp" and the EarthWatch
provided (through Kodak) Sensor Subsystem, one set of Solid State Recorders, one
set of Wide Band Transmitters with Radio Frequency material, one High Gain
Antenna, one High Gain Antenna Gimbal, two sets of "S" Band Receivers and two
sets of "X-Narrow" Band Transmitters. Delivery of these components shall occur
on or before May 31, 1999, with the exception of the 2nd set of RF Components.
These components will be delivered on or before June 30, 1999."
EXHIBIT B - OPTION TO PURCHASE ONE (1) ONE METER SPACECRAFT SEGMENT
. Price and Schedule: Change the Contract Start Date and Price as follows:
-------------------
Exercise Period Contract Start Date Price Delivery Schedule
--------------- ------------------- ----- -----------------
No. 1 6/1/98 thru 1/15/99 $30,450,000 November 1, 2000
. Payment Schedule:
-----------------
Prior to exercise, EarthWatch and BATC shall negotiate detailed milestones
associated with the nominal payment schedule set forth below:
----------------------------
Pay Date Payment $
----------------------------
1-Feb-99
1-Mar-99 $ 2,900,000
1-Apr-99 $ 2,900,000
1-May-99 $ 2,900,000
1-Jun-99 $ 2,900,000
1-Jul-99 $ 2,900,000
1-Aug-99 $ 1,500,000
1-Sep-99 $ 1,500,000
1-Oct-99 $ 1,300,000
1-Nov-99 $ 1,300,000
1-Dec-99 $ 1,300,000
1-Jan-00 $ 1,300,000
1-Feb-00 $ 1,120,000
1-Mar-00 $ 700,000
1-Apr-00 $ 700,000
1-May-00 $ 700,000
1-Jun-00 $ 700,000
1-Jul-00 $ 700,000
1-Aug-00 $ 700,000
1-Sep-00 $ 700,000
1-Oct-00 $ 330,000
1-Nov-00 $ 1,400,000
----------------------------
Total $30,450,000
----------------------------
EXHIBIT E - PRICE AND PAYMENT SCHEDULE
Full Project Deliverables and Services Price: Change the first sentence to read
"The total fixed price for the Deliverables and Services for the first One (1)
Meter QuickBird Space Segment is $33,490,000."
Telescope Option Price: Change to read: "The total fixed price for the certain
deliverables set forth in Article 7.2.2 is $10,176,000."
Instrument Option Price: Change to read: "The total fixed price for the certain
deliverables set forth in Article 7.2.3 is $12,661,000."
Restart Prices: Change as follows:
Delivery (calculated from
Restart Dates QB #1 Prices execution of Contract)
------------- ------------ ----------------------
01/15/99 - 03/01/99 $34,300,000 20.5 mos.
. No. 3 Instrument Option Payment Schedule: Change as follows:
Due Date Amount $
-------- --------
01/31/99 $895,000
02/28/99 $895,000
03/31/99 $895,000
. Substitute the attached revised SE.1M.PRJ.0004.A dated June 4, 1998 payment
milestone schedule with SE.1M.PRJ.0004.A dated December 1, 1998.
SE.1M.PRJ.0004.A
Dated December 01, 1998
Pay Milestone Total Cumm
Date Description Value Payment Payment
---------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------
6/9/98 a Full set of optics received $ 400,000 $1,200,000 $ 1,200,000
---------------------------------------------------------------------------------------------------------
b RWAs received $ 400,000
---------------------------------------------------------------------------------------------------------
c Primary & secondary optics bonded to optical mounts $ 400,000
---------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------
6/30/98 a Spacecraft Test Requirement Document initial release $ 400,000 $1,250,000 $ 2,450,000
---------------------------------------------------------------------------------------------------------
b Optical bench preps complete $ 400,000
---------------------------------------------------------------------------------------------------------
c Full set of optical mounts complete $ 400,000
---------------------------------------------------------------------------------------------------------
d GPS Receiver order placed $ 50,000
---------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------
7/31/98 a Bus Structure complete (inserts & painting) $ 450,000 $1,250,000 $ 3,700,000
---------------------------------------------------------------------------------------------------------
b Solid State Recorders complete $ 400,000
---------------------------------------------------------------------------------------------------------
c RF box Engineering Models received $ 400,000
---------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------
8/31/98 a Primary/Secondary telescope roll test complete $ 450,000 $1,250,000 $ 4,950,000
---------------------------------------------------------------------------------------------------------
b Power boxes complete (Battery, PDA, PCU) $ 400,000
---------------------------------------------------------------------------------------------------------
c Command & Telemetry Unit received $ 400,000
---------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------
9/30/98 a Telescope Assy Complete (mirror pins staked) $ 450,000 $1,250,000 $ 6,200,000
---------------------------------------------------------------------------------------------------------
b Propulsion module complete $ 400,000
---------------------------------------------------------------------------------------------------------
c Gimbal received $ 400,000
---------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------
10/31/98 a Telescope Vibration test complete $ 720,000 $2,476,000 $ 8,676,000
---------------------------------------------------------------------------------------------------------
b Wideband data interface EM test complete $ 420,000
(SSS simulator, SSR, & WBT)
---------------------------------------------------------------------------------------------------------
c Phase 1 & 2 harness complete $ 420,000
---------------------------------------------------------------------------------------------------------
d Structure preps complete (heaters, thermistors) $ 420,000
---------------------------------------------------------------------------------------------------------
e Spacecraft Computer received $ 420,000
---------------------------------------------------------------------------------------------------------
f Narrow Band Modulation Indexing S 76,000
---------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------
12/1/98 a Telescope Thermal cycle test complete $ 225,000 $1,300,000 $ 9,976,000
---------------------------------------------------------------------------------------------------------
b Instrument radiator thermal test complete $ 215,000
---------------------------------------------------------------------------------------------------------
c Phase 3, 4, & 5 harness complete $ 215,000
---------------------------------------------------------------------------------------------------------
e STOC certified $ 215,000
---------------------------------------------------------------------------------------------------------
f Initial Spacecraft Power on $ 215,000
---------------------------------------------------------------------------------------------------------
g Flight software loaded into software test bench $ 215,000
---------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------
1/31/99 a Flight Software (thru FQT) loaded into SCC $1,375,000 $6,815,000 $16,791,000
---------------------------------------------------------------------------------------------------------
b Mid deck integration complete (RWAs & torquers) $1,360,000 1
---------------------------------------------------------------------------------------------------------
c Telescope vacuum dryout complete (inc post thermal test) $1,360,000
---------------------------------------------------------------------------------------------------------
d Complete EPDS integration $1,360,000
---------------------------------------------------------------------------------------------------------
e SCC Integration complete $1,360,000
---------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------
2/28/99 a SSS & SSR functional test complete $ 600,000 $3,000,000 $19,791,000
---------------------------------------------------------------------------------------------------------
b Telescope ready for SSS integration $ 600,000
---------------------------------------------------------------------------------------------------------
c Sensor subsystem simulator integration complete $ 600,000
---------------------------------------------------------------------------------------------------------
d Complete telescope thermal blanket installation $ 600,000
---------------------------------------------------------------------------------------------------------
e Narrowband RF box set (XNST & SBR) received $ 600,000
---------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------
3/31/99 a Focal Plane, installed, aligned & staked $ 600,000 $3,000,000 $22,791,000
---------------------------------------------------------------------------------------------------------
Page 1 of 2
SE.1M.PRJ.0004.A
Dated December 01, 1998
---------------------------------------------------------------------------------------------------------
b Star tracker electrical integration complete (on bus) $ 600,000
---------------------------------------------------------------------------------------------------------
c SAO/HDRS integration complete $ 600,000
---------------------------------------------------------------------------------------------------------
d Deployable cover & sunshade complete $ 600,000
---------------------------------------------------------------------------------------------------------
e Wideband RF box set (WBT) received $ 600,000
---------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------
4/30/99 a Instrument SNR Measurement complete $ 500,000 $1,000,000 $23,791,000
---------------------------------------------------------------------------------------------------------
b Instrument ready to integrate into bus $ 500,000
---------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------
5/31/99 a Bus ready for instrument integration $ 500,000 $1,000,000 $24,791,000
---------------------------------------------------------------------------------------------------------
b Instrument Installation complete $ 500,000
---------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------
6/30/99 a Instrument integration complete $ 500,000 $1,000,000 $25,791,000
---------------------------------------------------------------------------------------------------------
b System baseline performance tests completed sucessfully $ 500,000
---------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------
7/31/99 a Complete thermal blanket installation $ 500,000 $1,000,000 $26,791,000
---------------------------------------------------------------------------------------------------------
b Start Thermal Vac test $ 500,000
---------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------
8/31/99 a Successfully complete Thermal Vacuum Test $ 500,000 $1,000,000 $27,791,000
---------------------------------------------------------------------------------------------------------
b Complete Solar array installation $ 500,000
---------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------
9/30/99 a Successfully complete End to End Compatability test $ 500,000 $1,000,000 $28,791,000
---------------------------------------------------------------------------------------------------------
b Successfully complete Vibration Test $ 500,000
---------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------
10/31/99 a Successfully complete acoustic test $ 500,000 $1,000,000 $29,791,000
---------------------------------------------------------------------------------------------------------
b Successfully complete post environmental deployment tests$ 500,000
---------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------
11/30/99 a Spacecraft Ready to ship $3,000,000 $3,000,000 $32,791,000
---------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------
12/31/99 a Spacecraft ready for launch $ 350,000 $ 350,000 $33,141,000
---------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------
1/30/99 a Completion of In-Orbit test $ 349,000 $ 349,000 $33,490,000
---------------------------------------------------------------------------------------------------------
Page 2 of 2
AMENDMENT 10
to
CONTRACT SE.1M.PRJ.0004.A
between
EARTHWATCH, INCORPORATED AND BALL AEROSPACE AND TECHNOLOGIES CORP.
for the
CONTRACT FOR QUICKBIRD SPACECRAFT
This Amendment is issued to incorporate a change to the Contract document that
incorporates a three (3) day extension to the various options and off-ramp
election dates.
Exhibit A - Terms and Conditions
. Article 7, Stop Work Period and Mechanism
. Article 7.2.2. Telescope Option
. Article 7.2.3. Instrument Option
Entire Agreement. This Amendment, hereto constitute the entire understanding
of the parties with respect to the subject matter of this Amendment and
supersedes all prior and contemporaneous agreements or understandings. By
signing this Amendment, each party represents to the other that it has the
authority to sign this Amendment and this Amendment is enforceable against it
in accordance with its terms.
IN WITNESS WHEREOF, the parties hereto have caused this Amendment to be
executed by their respective duly authorized representatives.
EARTHWATCH, INCORPORATED
/s/ Xxxxxxx X. Xxxxxxxxx III
By:_____________________________________________ _______________________
Xxxxxxx X. Xxxxxxxxx III Date
Chief Executive Officer & President
BALL AEROSPACE SYSTEMS DIVISION
/s/ T.H. Lapotosky 01/15/99
By:_____________________________________________ _______________________
T.H. Lapotosky Date
Director, Contracts & Government Compliance
EXHIBIT A - TERMS AND CONDITIONS
Article 7 - Stop Work Period and Mechanism
------------------------------------------
- Change "January 15, 1999" to "January 18, 1999" in the first sentence.
Article 7.2.2 - Telescope Option
--------------------------------
- Change "January 15, 1999" to "January 18, 1999" in the first sentence.
Article 7.2.3 - Instrument Option
---------------------------------
- Change "January 15, 1999" to "January 18, 1999" in the first sentence.
AMENDMENT 11
to
CONTRACT SE.1M.PRJ.0004.A
between
EARTHWATCH, INCORPORATED AND BALL AEROSPACE AND TECHNOLOGIES CORP.
for the
CONTRACT FOR QUICKBIRD SPACECRAFT
This Amendment incorporates the following changes to the Contract.
Exhibit A - Terms and Conditions
. Article 7, Stop Work Period and Mechanism
. Article 7.2.2. Telescope Option
. Article 7.2.3. Instrument Option
Exhibit B - Option to Purchase One (1) One Meter Space Segment
. Price and Schedule
. Payment Schedule
Exhibit E - Price and Payment Schedule
. Full Project Deliverables and Services Price
. Telescope Option Price
. Instrument Option Price
. Restart Price
. Payment Schedule
Entire Agreement. This Amendment, including the EXHIBITS hereto constitute the
entire understanding of the parties with respect to the subject matter of this
Amendment and supersedes all prior and contemporaneous agreements or
understandings. By signing this Amendment, each party represents to the other
that it has the authority to sign this Amendment and this Amendment is
enforceable against it in accordance with its terms.
IN WITNESS WHEREOF, the parties hereto have caused this Amendment to be executed
by their respective duly authorized representatives.
EARTHWATCH, INCORPORATED
/s/ Xxxxxxx X. Xxxxxxxxx III 1/18/99
By:_____________________________________________ _______________________
Xxxxxxx X. Xxxxxxxxx III Date
Chief Executive Officer & President
BALL AEROSPACE SYSTEMS DIVISION
/s/ T.H. Lapotosky 01/18/99
By:_____________________________________________ _______________________
T.H. Lapotosky Date
Director, Contracts & Government Compliance
EXHIBIT A TO CONTRACT FOR THE EARTHWATCH PROJECT ONE QUICKBIRD SPACE
SEGMENT TERMS AND CONDITIONS
Article 7 - Stop Work Period and Mechanism: Change the First Sentence to read:
"Subject to the terms and conditions of this contract on or before January 22,
1999, due to certain EarthWatch financial limitations, it may be necessary for
EarthWatch to direct BATC to suspend work as well as suspend payments as defined
in Exhibit C, Statement of Work until March 1, 1999."
Article 7.2.2 - Telescope Option: Change the first and second sentences to read:
"On or before January 22, 1999, EarthWatch can notify BATC of its intent to
exercise its option to purchase the following components as defined in the
Statement of Work: the assembled telescope including "STIM Lamp" following one
completed vibration and thermal test, one set of the Solid State Recorders, one
set of Wide Band Transmitters, one High Gain Antenna, one High Gain Antenna
Gimbal with associated wide band radio frequency materials including
Subcontracted items, two sets of "S" Band Receivers and two sets of "X-Narrow"
Band Transmitters. Delivery of these components shall occur on or before
February 26, 1999, with the exception of the 2nd set of RF Components. These
components will be delivered on or before June 30, 1999."
Article 7.2.3 - Instrument Option: Change the first and second sentences to
read: "On or before January 22, 1999, EarthWatch can notify BATC of its intent
to exercise its option to purchase the following components as defined in the
Statement of Work: the telescope including "STIM Lamp" and the EarthWatch
provided (through Kodak) Sensor Subsystem, one set of Solid State Recorders, one
set of Wide Band Transmitters with Radio Frequency material, one High Gain
Antenna, one High Gain Antenna Gimbal, two sets of "S" Band Receivers and two
sets of "X-Narrow" Band Transmitters. Delivery of these components shall occur
on or before May 31, 1999, with the exception of the 2nd set of RF Components.
These components will be delivered on or before June 30, 1999."
EXHIBIT B - OPTION TO PURCHASE ONE (1) ONE METER SPACECRAFT SEGMENT
. Price and Schedule: Change the Contract Start Date and Price as follows:
-------------------
Exercise Period Contract Start Date Price Delivery Schedule
--------------- ------------------- ----- -----------------
No. 1 6/1/98 thru 1/22/99 $30,450,000 November 1, 2000
. Payment Schedule:
-----------------
Prior to exercise, EarthWatch and BATC shall negotiate detailed milestones
associated with the nominal payment schedule set forth below:
-------------------------------
Pay Date Payment $
-------------------------------
1-Feb-99
1-Mar-99 $ 2,900,000
1-Apr-99 $ 2,900,000
1-May-99 $ 2,900,000
1-Jun-99 $ 2,900,000
1-Jul-99 $ 2,900,000
1-Aug-99 $ 1,500,000
1-Sep-99 $ 1,500,000
1-Oct-99 $ 1,300,000
1-Nov-99 $ 1,300,000
1-Dec-99 $ 1,300,000
1-Jan-00 $ 1,300,000
1-Feb-00 $ 1,120,000
1-Mar-00 $ 700,000
1-Apr-00 $ 700,000
1-May-00 $ 700,000
1-Jun-00 $ 700,000
1-Jul-00 $ 700,000
1-Aug-00 $ 700,000
1-Sep-00 $ 700,000
1-Oct-00 $ 330,000
1-Nov-00 $ 1,400,000
-------------------------------
Total $30,450,000
-------------------------------
EXHIBIT E - PRICE AND PAYMENT SCHEDULE
Full Project Deliverables and Services Price: Change the first sentence to read
"The total fixed price for the Deliverables and Services for the first One (1)
Meter QuickBird Space Segment is $33,490,000."
Telescope Option Price: Change to read: "The total fixed price for the certain
deliverables set forth in Article 7.2.2 is $10,376,000."
Instrument Option Price: Change to read: "The total fixed price for the certain
deliverables set forth in Article 7.2.3 is $12,861,000."
Restart Prices: Change as follows:
Delivery (calculated from
Restart Dates QB #1 Prices execution of Contract)
------------- ------------ ----------------------
01/22/99 - 03/01/99 $34,300,000 20.5 mos.
. No. 3 Instrument Option Payment Schedule: Change as follows:
Due Date Amount $
-------- --------
01/31/99 $895,000
02/28/99 $895,000
03/31/99 $895,000
. Substitute the attached revised SE.1M.PRJ.0004.A dated December 1, 1998
payment milestone schedule with SE.1M.PRJ.0004.A dated January 15, 1999.
SE.1M.PRJ.0004.A
Dated January 15, 1999
---------------------------------------------------------------------------------------------------------------
Milestone Total
Pay Date Description Value Payment Cumm Payment
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
6/9/98 a Full set of optics received $ 400,000 $1,200,000 $ 1,200,000
---------------------------------------------------------------------------------------------------------------
b RWAs received $ 400,000
---------------------------------------------------------------------------------------------------------------
c Primary & secondary optics bonded to optical mounts $ 400,000
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
6/30/98 a Spacecraft Test Requirement Document initial release $ 400,000 $1,250,000 $ 2,450,000
---------------------------------------------------------------------------------------------------------------
b Optical bench preps complete $ 400,000
---------------------------------------------------------------------------------------------------------------
c Full set of optical mounts complete $ 400,000
---------------------------------------------------------------------------------------------------------------
d GPS Receiver order placed $ 50,000
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
7/31/98 a Bus Structure complete (inserts & painting) $ 450,000 $1,250,000 $ 3,700,000
---------------------------------------------------------------------------------------------------------------
b Solid State Recorders complete $ 400,000
---------------------------------------------------------------------------------------------------------------
c RF box Engineering Models received $ 400,000
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
8/31/98 a Primary/Secondary telescope roll test complete $ 450,000 $1,250,000 $ 4,950,000
---------------------------------------------------------------------------------------------------------------
b Power boxes complete (Battery, PDA, PCU) $ 400,000
---------------------------------------------------------------------------------------------------------------
c Command & Telemetry Unit received $ 400,000
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
9/30/98 a Telescope Assy Complete (mirror pins staked) $ 450,000 $1,250,000 $ 6,200,000
---------------------------------------------------------------------------------------------------------------
b Propulsion module complete $ 400,000
---------------------------------------------------------------------------------------------------------------
c Gimbal received $ 400,000
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
10/31/98 a Telescope Vibration test complete $ 720,000 $2,476,000 $ 8,676,000
---------------------------------------------------------------------------------------------------------------
b Wideband data interface EM test complete (SSS simulator,
SSR, & WBT) $ 420,000
---------------------------------------------------------------------------------------------------------------
c Phase 1 & 2 harness complete $ 420,000
---------------------------------------------------------------------------------------------------------------
d Structure preps complete (heaters, thermistors) $ 420,000
---------------------------------------------------------------------------------------------------------------
e Spacecraft Computer received $ 420,000
---------------------------------------------------------------------------------------------------------------
f Narrow Band Modulation Indexing $ 76,000
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
12/1/98 a Telescope Thermal cycle test complete $ 225,000 $1,300,000 $ 9,976,000
---------------------------------------------------------------------------------------------------------------
b Instrument radiator thermal test complete $ 215,000
---------------------------------------------------------------------------------------------------------------
c Phase 3, 4, & 5 harness complete $ 215,000
---------------------------------------------------------------------------------------------------------------
e STOC certified $ 215,000
---------------------------------------------------------------------------------------------------------------
f Initial Spacecraft Power on $ 215,000
---------------------------------------------------------------------------------------------------------------
g Flight software loaded into software test bench $ 215,000
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
1/19/99 a Execution of Amendment 11 $ 200,000 $ 200,000 $10,176,000
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
1/31/99 a Flight Software (thru FQT) loaded into SCC $1,175,000 $6,615,000 $16,791,000
---------------------------------------------------------------------------------------------------------------
b Mid deck integration complete (RWAs & torquers) $1,360,000
---------------------------------------------------------------------------------------------------------------
c Telescope vacuum dryout complete (inc post thermal test) $1,360,000
---------------------------------------------------------------------------------------------------------------
d Complete EPDS integration $1,360,000
---------------------------------------------------------------------------------------------------------------
e SCC Integration complete $1,360,000
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
2/28/99 a SSS & SSR functional test complete $ 600,000 $3,000,000 $19,791,000
---------------------------------------------------------------------------------------------------------------
b Telescope ready for SSS integration $ 600,000
---------------------------------------------------------------------------------------------------------------
c Sensor subsystem simulator integration complete $ 600,000
---------------------------------------------------------------------------------------------------------------
d Complete telescope thermal blanket installation $ 600,000
---------------------------------------------------------------------------------------------------------------
e Narrowband RF box set (XNBT & SBR) received $ 600,000
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
3/31/99 a Focal Plane, installed, aligned & staked $ 600,000 $3,000,000 $22,791,000
---------------------------------------------------------------------------------------------------------------
b Star tracker electrical integration complete (on bus) $ 600,000
---------------------------------------------------------------------------------------------------------------
c SAD/HDRS integration complete $ 600,000
---------------------------------------------------------------------------------------------------------------
d Deployable cover & sunshade complete $ 600,000
---------------------------------------------------------------------------------------------------------------
SE.1M.PRJ.0004.A
Dated January 15, 1999
---------------------------------------------------------------------------------------------------------------
e Wideband RF box set (WBT) received $ 600,000
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
4/30199 a Instrument SNR Measurement complete $ 500,000 $1,000,000 $23,791,000
---------------------------------------------------------------------------------------------------------------
b Instrument ready to integrate into bus $ 500,000
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
5/31/99 a Bus ready for instrument integration $ 500,000 $1,000,000 $24,791,000
---------------------------------------------------------------------------------------------------------------
b Instrument installation complete $ 500,000
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
6/30/99 a Instrument integration complete $ 500,000 $1,000,000 $25,791,000
---------------------------------------------------------------------------------------------------------------
b System baseline performance tests completed successfully $ 500,000
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
7/31/99 a Complete thermal blanket installation $ 500,000 $1,000,000 $26,791,000
---------------------------------------------------------------------------------------------------------------
b Start Thermal Vac test $ 500,000
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
8/31/99 a Successfully complete Thermal Vacuum Test $ 500.000 $1,000,000 $27,791,000
---------------------------------------------------------------------------------------------------------------
b Complete Solar array installation $ 500,000
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
9/30/99 a Successfully complete End to End Compatability test $ 500,000 $1,000,000 $28,791,000
---------------------------------------------------------------------------------------------------------------
b Successfully complete Vibration Test $ 500,000
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
10/31/99 a Successfully complete acoustic test $ 500,000 $1,000,000 $29,791,000
---------------------------------------------------------------------------------------------------------------
b Successfully complete post environmental deployment tests $ 500,000
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
11/30/99 a Spacecraft Ready to ship $3,000,000 $3,000,000 $32,791,000
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
12/31/99 a Spacecraft ready for launch $ 350,000 $ 350,000 $33,141,000
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
1/30/99 a Completion of In-Orbit test S 349,000 $ 349,000 $33,490,000
---------------------------------------------------------------------------------------------------------------
AMENDMENT 12
to
CONTRACT SE.1M.PRJ.0004.A
between
EARTHWATCH, INCORPORATED AND BALL AEROSPACE AND TECHNOLOGIES CORP.
for the
CONTRACT FOR QUICKBIRD SPACECRAFT
This Amendment incorporates the following changes to the Contract.
Exhibit A - Terms and Conditions
. Article 7, Stop Work Period and Mechanism
. Article 7.2.2. Telescope Option
. Article 7.2.3. Instrument Option
Exhibit B - Option to Purchase One (1) One Meter Space Segment
. Price and Schedule
. Payment Schedule
Exhibit E - Price and Payment Schedule
. Full Project Deliverables and Services Price
. Telescope Option Price
. Instrument Option Price
. Restart Price
. Payment Schedule
Entire Agreement. This Amendment, including the EXHIBITS hereto constitute the
entire understanding of the parties with respect to the subject matter of this
Amendment and supersedes all prior and contemporaneous agreements or
understandings. By signing this Amendment, each party represents to the other
that it has the authority to sign this Amendment and this Amendment is
enforceable against it in accordance with its terms.
IN WITNESS WHEREOF, the parties hereto have caused this Amendment to be executed
by their respective duly authorized representatives.
EARTHWATCH, INCORPORATED
/s/ Xxxxxxx X. Xxxxxxxxx III 1/22/99
By:_____________________________________________ _________________________
Xxxxxxx X. Xxxxxxxxx III Date
Chief Executive Officer & President
BALL AEROSPACE SYSTEMS DIVISION
/s/ T.H. Lapotosky 01/22/99
By:_____________________________________________ _________________________
T.H. Lapotosky Date
Director, Contracts & Government Compliance
EXHIBIT A TO CONTRACT FOR THE EARTHWATCH PROJECT ONE QUICKBIRD SPACE
SEGMENT TERMS AND CONDITIONS
Article 7 - Stop Work Period and Mechanism: Change the First Sentence to read:
"Subject to the terms and conditions of this contract on or before January 27,
1999, due to certain EarthWatch financial limitations, it may be necessary for
EarthWatch to direct BATC to suspend work as well as suspend payments as defined
in Exhibit C, Statement of Work until March 1, 1999."
Article 7.2.2 - Telescope Option: Change the first and second sentences to read:
"On or before January 27, 1999, EarthWatch can notify BATC of its intent to
exercise its option to purchase the following components as defined in the
Statement of Work: the assembled telescope including "STIM Lamp" following one
completed vibration and thermal test, one set of the Solid State Recorders, one
set of Wide Band Transmitters, one High Gain Antenna, one High Gain Antenna
Gimbal with associated wide band radio frequency materials including
Subcontracted items, two sets of "S" Band Receivers and two sets of "X-Narrow"
Band Transmitters. Delivery of these components shall occur on or before
February 26, 1999, with the exception of the 2nd set of RF Components. These
components will be delivered on or before June 30, 1999."
Article 7.2.3 - Instrument Option: Change the first and second sentences to
read: "On or before January 27, 1999, EarthWatch can notify BATC of its intent
to exercise its option to purchase the following components as defined in the
Statement of Work: the telescope including "STIM Lamp" and the EarthWatch
provided (through Kodak) Sensor Subsystem, one set of Solid State Recorders, one
set of Wide Band Transmitters with Radio Frequency material, one High Gain
Antenna, one High Gain Antenna Gimbal, two sets of "S" Band Receivers and two
sets of "X-Narrow" Band Transmitters. Delivery of these components shall occur
on or before May 31, 1999, with the exception of the 2nd set of RF Components.
These components will be delivered on or before June 30, 1999."
EXHIBIT B - OPTION TO PURCHASE ONE (1) ONE METER SPACECRAFT SEGMENT
. Price and Schedule: Change the Contract Start Date and Price as follows:
-------------------
Exercise Period Contract Start Date Price Delivery Schedule
--------------- ------------------- ----- -----------------
No. 1 6/1/98 thru 1/27/99 $30,450,000 November 1, 2000
. Payment Schedule:
----------------
Prior to exercise, EarthWatch and BATC shall negotiate detailed milestones
associated with the nominal payment schedule set forth below:
--------------------------------
Pay Date Payment $
--------------------------------
1-Feb-99
1-Mar-99 $ 2,900,000
1-Apr-99 $ 2,900,000
1-May-99 $ 2,900,000
1-Jun-99 $ 2,900,000
1-Jul-99 $ 2,900,000
1-Aug-99 $ 1,500,000
1-Sep-99 $ 1,500,000
1-Oct-99 $ 1,300,000
1-Nov-99 $ 1,300,000
1-Dec-99 $ 1,300,000
1-Jan-00 $ 1,300,000
1-Feb-00 $ 1,120,000
1-Mar-00 $ 700,000
1-Apr-00 $ 700,000
1-May-00 $ 700,000
1-Jun-00 $ 700,000
1-Jul-00 $ 700,000
1-Aug-00 $ 700,000
1-Sep-00 $ 700,000
1-Oct-00 $ 330,000
1-Nov-00 $ 1,400,000
--------------------------------
Total $30,450,000
--------------------------------
EXHIBIT E - PRICE AND PAYMENT SCHEDULE
Full Project Deliverables and Services Price: The first sentence remains "The
total fixed price for the Deliverables and Services for the first One (1) Meter
QuickBird Space Segment is $33,490,000."
Telescope Option Price: Change to read: "The total fixed price for the certain
deliverables set forth in Article 7.2.2 is $10,496,000."
Instrument Option Price: Change to read: "The total fixed price for the certain
deliverables set forth in Article 7.2.3 is $12,981,000."
Restart Prices: Change as follows:
Delivery (calculated from
Restart Dates QB #1 Prices execution of Contract)
------------- ------------ ----------------------
01/27/99 - 03/01/99 $34,300,000 20.5 mos.
. No. 3 Instrument Option Payment Schedule: Remains as follows:
Due Date Amount $
-------- --------
01/31/99 $895,000
02/28/99 $895,000
03/31/99 $895,000
. Substitute the attached revised SE.1M.PRJ.0004.A dated December 1, 1998
payment milestone schedule with SE.1M.PRJ.0004.A dated January 22, 1999.
SE.1M.PRJ.0004.A
Dated January 22, 1999
Pay Description Milestone Total Cumm
Date Value Payment Payment
--------------------------------------------------------------------------------------------------------------
0 6/9/98 a Full set of optics received $ 400,000 $1,200,000 $ 1,200,000
--------------------------------------------------------------------------------------------------------------
b RWAs received $ 400,000
--------------------------------------------------------------------------------------------------------------
c Primary & secondary optics bonded to optical moun $ 400,000
--------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------
1 6/30/98 a Spacecraft Test Requirement Document initial rele $ 400,000 $1,250,000 $ 2,450,000
--------------------------------------------------------------------------------------------------------------
b Optical bench preps complete $ 400,000
--------------------------------------------------------------------------------------------------------------
c Full set of optical mounts complete $ 400,000
--------------------------------------------------------------------------------------------------------------
d GPS Receiver order placed $ 50,000
--------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------
2 7/31/98 a Bus Structure complete (inserts & painting) $ 450,000 $1,250,000 $ 3,700,000
--------------------------------------------------------------------------------------------------------------
b Solid State Recorders complete $ 400,000
--------------------------------------------------------------------------------------------------------------
c RF box Engineering Models received $ 400,000
--------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------
3 8/31/98 a Primary/Secondary telescope roll test complete $ 450,000 $1,250,000 $ 4,950,000
--------------------------------------------------------------------------------------------------------------
b Power boxes complete (Battery, PDA, PCU) $ 400,000
--------------------------------------------------------------------------------------------------------------
c Command & Telemetry Unit received $ 400,000
--------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------
4 9/30/98 a Telescope Assy Complete (mirror pins staked) $ 450,000 $1,250,000 $ 6,200,000
--------------------------------------------------------------------------------------------------------------
b Propulsion module complete $ 400,000
--------------------------------------------------------------------------------------------------------------
c Gimbal received $ 400,000
--------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------
5 10/31/98 a Telescope Vibration test complete $ 720,000 $2,476,000 $ 8,676,000
--------------------------------------------------------------------------------------------------------------
b Wideband data interface EM test complete (SSS $ 420,000
simulator, SSR, & WBT)
--------------------------------------------------------------------------------------------------------------
c Phase 1 & 2 harness complete $ 420,000
--------------------------------------------------------------------------------------------------------------
d Structure preps complete (heaters, thermistors) $ 420,000
--------------------------------------------------------------------------------------------------------------
e Spacecraft Computer received $ 420,000
--------------------------------------------------------------------------------------------------------------
f Narrow Band Modulation Indexing $ 76,000
--------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------
6 12/1/98 a Telescope Thermal cycle test complete $ 225,000 $1,300,000 $ 9,976,000
--------------------------------------------------------------------------------------------------------------
b Instrument radiator thermal test complete $ 215,000
--------------------------------------------------------------------------------------------------------------
c Phase 3, 4, & 5 harness complete $ 215,000
--------------------------------------------------------------------------------------------------------------
e STOC certified $ 215,000
--------------------------------------------------------------------------------------------------------------
f Initial Spacecraft Power on $ 215,000
--------------------------------------------------------------------------------------------------------------
g Flight software loaded into software test bench $ 215,000
--------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------
1/19/99 a Execution of Amendment 11 $ 200,000 $ 200,000 $10,176,000
--------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------
1/25/99 a Execution of Amendment 12 $ 120,000 $ 120,000 $10,296,000
--------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------
7 1/31/99 a Flight Software (thru FQT) loaded into SCC $1,175,000 $6,495,000 $16,791,000
--------------------------------------------------------------------------------------------------------------
b Mid deck integration complete (RWAs & torquers) $1,240,000
--------------------------------------------------------------------------------------------------------------
c Telescope vacuum dryout complete (inc post therm $1,360,000
--------------------------------------------------------------------------------------------------------------
d Complete EPDS integration $1,360,000
--------------------------------------------------------------------------------------------------------------
e SCC Integration complete $1,360,000
--------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------
8 2/28/99 a SSS & SSR functional test complete $ 600,000 $3,000,000 $19,791,000
--------------------------------------------------------------------------------------------------------------
b Telescope ready for SSS integration $ 600,000
--------------------------------------------------------------------------------------------------------------
c Sensor subsystem simulator integration complete $ 600,000
--------------------------------------------------------------------------------------------------------------
SE.1M.PRJ.0004.A
Dated January 22, 1999
--------------------------------------------------------------------------------------------------------------
d Complete telescope thermal blanket installation $ 600,000
--------------------------------------------------------------------------------------------------------------
e Narrowband RF box set (XNBT & SBR) received $ 600,000
--------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------
9 3/31/99 a Focal Plane, installed, aligned & staked $ 600,000 $3,000,000 $22,791,000
--------------------------------------------------------------------------------------------------------------
b Star tracker electrical integration complete (on bus) $ 600,000
--------------------------------------------------------------------------------------------------------------
c SAD/HDRS integration complete $ 600,000
--------------------------------------------------------------------------------------------------------------
d Deployable cover & sunshade complete $ 600,000
--------------------------------------------------------------------------------------------------------------
e Wideband RF box set (WBT) received $ 600,060
--------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------
10 4/30/99 a Instrument SNR Measurement complete $ 500,000 $1,000,000 $23,791,000
--------------------------------------------------------------------------------------------------------------
b Instrument ready to integrate into bus $ 500,000
--------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------
11 5/31/99 a Bus ready for instrument integration $ 500,000 $1,000,000 $24,791,000
--------------------------------------------------------------------------------------------------------------
b Instrument Installation complete $ 500,000
--------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------
12 6/30/99 a Instrument integration complete $ 500,000 $1,000,000 $25,791,000
--------------------------------------------------------------------------------------------------------------
b System baseline performance tests completed suc $ 500,000
--------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------
13 7/31/99 a Complete thermal blanket installation $ 500,000 $1,000,000 $26,791,000
--------------------------------------------------------------------------------------------------------------
b Start Thermal Vac test $ 500,000
--------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------
14 8/31/99 a Successfully complete Thermal Vacuum Test $ 500,000 $1,000,000 $27,791,000
--------------------------------------------------------------------------------------------------------------
b Complete Solar array installation $ 500,000
--------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------
15 9/30/99 a Successfully complete End to End Compatability test $ 500,000 $1,000,000 $28,791,000
--------------------------------------------------------------------------------------------------------------
b Successfully complete Vibration Test $ 500,000
--------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------
16 10/31/99 a Successfully complete acoustic test $ 500,000 $1,000,000 $29,791,000
--------------------------------------------------------------------------------------------------------------
b Successfully complete post environmental deployme $ 500,000
--------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------
17 11/30/99 a Spacecraft Ready to ship $3,000,000 $3,000,000 $32,791,000
--------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------
18 12/31/99 a Spacecraft ready for launch $ 350,000 $ 350,000 $33 141,000
--------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------
19 1/30/99 a Completion of In-Orbit test $ 349,000 $ 349,000 $33,490,000
--------------------------------------------------------------------------------------------------------------
AMENDMENT 13
to
CONTRACT SE.1M.PRJ.0004.A
between
EARTHWATCH, INCORPORATED AND BALL AEROSPACE AND TECHNOLOGIES CORP.
for the
CONTRACT FOR QUICKBIRD SPACECRAFT
This Amendment is issued to incorporate a change to the Contract document that
incorporates a three (3) day extension to the various options and off-ramp
election dates.
Exhibit A - Terms and Conditions
. Article 7, Stop Work Period and Mechanism
. Article 7.2.2. Telescope Option
. Article 7.2.3. Instrument Option
Entire Agreement. This Amendment, hereto constitute the entire understanding of
the parties with respect to the subject matter of this Amendment and supersedes
all prior and contemporaneous agreements or understandings. By signing this
Amendment, each party represents to the other that it has the authority to sign
this Amendment and this Amendment is enforceable against it in accordance with
its terms.
IN WITNESS WHEREOF, the parties hereto have caused this Amendment to be
executed by their respective duly authorized representatives.
EARTHWATCH, INCORPORATED
/s/ Xxxxxxx X. Xxxxxxxxx III 01/27/99
By:_____________________________________________ ________________________
Xxxxxxx X. Xxxxxxxxx III Date
Chief Executive Officer & President
BALL AEROSPACE SYSTEMS DIVISION
/s/ T.H. Lapotosky 01/27/99
By:_____________________________________________ ________________________
T.H. Lapotosky Date
Director, Contracts & Government Compliance
EXHIBIT A - TERMS AND CONDITIONS
Article 7 - Stop Work Period and Mechanism
------------------------------------------
- Change "January 27, 1999" to "January 29, 1999" in the first sentence.
Article 7.2.2 - Telescope Option
--------------------------------
- Change "January 27, 1999" to "January 29, 1999" in the first sentence.
Article 7.2.3 - Instrument Option
---------------------------------
- Change "January 27, 1999" to "January 29, 1999" in the first sentence.
AMENDMENT 14
to
CONTRACT SE.1M.PRJ.0004.A
between
EARTHWATCH, INCORPORATED AND BALL AEROSPACE AND TECHNOLOGIES CORP.
for the
CONTRACT FOR QUICKBIRD SPACECRAFT
This Amendment is issued to incorporate a change to the Contract document that
incorporates a three (3) day extension to the various options and off-ramp
election dates.
Exhibit A - Terms and Conditions
. Article 7, Stop Work Period and Mechanism
. Article 7.2.2. Telescope Option
. Article 7.2.3. Instrument Option
Entire Agreement. This Amendment, hereto constitute the entire understanding of
the parties with respect to the subject matter of this Amendment and supersedes
all prior and contemporaneous agreements or understandings. By signing this
Amendment, each party represents to the other that it has the authority to sign
this Amendment and this Amendment is enforceable against it in accordance with
its terms.
IN WITNESS WHEREOF, the parties hereto have caused this Amendment to be executed
by their respective duly authorized representatives.
EARTHWATCH, INCORPORATED
/s/ Xxxxxxx X. Xxxxxxxxx III 02/1/99
By:____________________________________________ ________________________
Xxxxxxx X. Xxxxxxxxx III Date
Chief Executive Officer & President
BALL AEROSPACE SYSTEMS DIVISION
/s/ T.H. Lapotosky 01/29/99
By:____________________________________________ ________________________
T.H. Lapotosky Date
Director, Contracts & Government Compliance
EXHIBIT A - TERMS AND CONDITIONS
Article 7 - Stop Work Period and Mechanism
------------------------------------------
- Change "January 29, 1999" to "February 1, 1999" in the first sentence.
Article 7.2.2 - Telescope Option
--------------------------------
- Change "January 29, 1999" to "February 1, 1999" in the first sentence.
Article 7.2.3 - Instrument Option
---------------------------------
- Change "January 29, 1999" to "February 1, 1999" in the first sentence.
AMENDMENT 15
to
CONTRACT SE.1M.PRJ.0004.A
between
EARTHWATCH, INCORPORATED AND BALL AEROSPACE AND TECHNOLOGIES CORP.
for the
CONTRACT FOR QUICKBIRD SPACECRAFT
This Amendment incorporates the following changes to the Contract.
Exhibit A - Terms and Conditions
. Article 7.2.2. Telescope Option
. Article 7.2.3. Instrument Option
Exhibit B - Option to Purchase One (1) One Meter Space Segment
. Price and Schedule
. Payment Schedule
Exhibit E - Price and Payment Schedule
. Full Project Deliverables and Services Price
. Telescope Option Price
. Instrument Option Price
. Restart Price
. Payment Schedule
Entire Agreement. This Amendment, including the EXHIBITS hereto constitute the
entire understanding of the parties with respect to the subject matter of this
Amendment and supersedes all prior and contemporaneous agreements or
understandings. By signing this Amendment, each party represents to the other
that it has the authority to sign this Amendment and this Amendment is
enforceable against it in accordance with its terms.
IN WITNESS WHEREOF, the parties hereto have caused this Amendment to be executed
by their respective duly authorized representatives.
EARTHWATCH, INCORPORATED
/s/ Xxxxxxx X. Xxxxxxxxx III
By:____________________________________________ ________________________
Xxxxxxx X. Xxxxxxxxx III Date
Chief Executive Officer & President
BALL AEROSPACE SYSTEMS DIVISION
/s/ T.H. Lapotosky 02/01/99
By:____________________________________________ ________________________
T.H. Lapotosky Date
Director, Contracts & Government Compliance
EXHIBIT A TO CONTRACT FOR THE EARTHWATCH PROJECT ONE QUICKBIRD SPACE
SEGMENT TERMS AND CONDITIONS
Article 7.2.2 - Telescope Option: Change the first and second sentences to read:
"On or before February 16, 1999, EarthWatch can notify BATC of its intent to
exercise its option to purchase the following components as defined in the
Statement of Work: the assembled telescope including "STIM Lamp" following one
completed vibration and thermal test, one set of the Solid State Recorders, one
set of Wide Band Transmitters, one High Gain Antenna, one High Gain Antenna
Gimbal with associated wide band radio frequency materials including
Subcontracted items, two sets of "S" Band Receivers and two sets of "X-Narrow"
Band Transmitters. Delivery of these components shall occur on or before March
31, 1999, with the exception of the 2nd set of RF Components. These components
will be delivered on or before June 30, 1999."
Article 7.2.3 - Instrument Option: Change the first and second sentences to
read: "On or before February 16, 1999, EarthWatch can notify BATC of its intent
to exercise its option to purchase the following components as defined in the
Statement of Work: the telescope including "STIM Lamp" and the EarthWatch
provided (through Kodak) Sensor Subsystem, one set of Solid State Recorders, one
set of Wide Band Transmitters with Radio Frequency material, one High Gain
Antenna, one High Gain Antenna Gimbal, two sets of "S" Band Receivers and two
sets of "X-Narrow" Band Transmitters. Delivery of these components shall occur
on or before May 31, 1999, with the exception of the 2nd set of RF Components.
These components will be delivered on or before June 30, 1999."
EXHIBIT B - OPTION TO PURCHASE ONE (1) ONE METER SPACECRAFT SEGMENT
. Price and Schedule: Change the Contract Start Date and Price as follows:
-------------------
Exercise Period Contract Start Date Price Delivery Schedule
--------------- ------------------- ----- -----------------
No. 1 6/1/98 thru 2/16/99 $31,050,000 December 1, 2000
. Payment Schedule:
-----------------
Prior to exercise, EarthWatch and BATC shall negotiate detailed milestones
associated with the nominal payment schedule set forth below:
---------------------------------
Pay Date Payment $
---------------------------------
1-Apr-99 $ 2,900,000
1-May-99 $ 2,900,000
1-Jun-99 $ 2,900,000
1-Jul-99 $ 2,900,000
1-Aug-99 $ 2,900,000
1-Sep-99 $ 1,500,000
1-Oct-99 $ 1,500,000
1-Nov-99 $ 1,300,000
1-Dec-99 $ 1,300,000
1-Jan-00 $ 1,300,000
1-Feb-00 $ 1,300,000
1-Mar-00 $ 1,120,000
1-Apr-00 $ 700,000
1-May-00 $ 700,000
1-Jun-00 $ 700,000
1-Jul-00 $ 700,000
1-Aug-00 $ 700,000
1-Sep-00 $ 700,000
1-Oct-00 $ 700,000
1-Nov-00 $ 330,000
1-Dec-00 $ 2,000,000
---------------------------------
Total $31,050,000
---------------------------------
EXHIBIT E - PRICE AND PAYMENT SCHEDULE
Full Project Deliverables and Services Price: The first sentence is to be
changed to read "The total fixed price for the Deliverables and Services for the
first One (1) Meter QuickBird Space Segment is $33,795,000."
Telescope Option Price: Change to read: "The total fixed price for the certain
deliverables set forth in Article 7.2.2 is $10,576,000."
Instrument Option Price: Change to read: "The total fixed price for the certain
deliverables set forth in Article 7.2.3 is $13,061,000."
Restart Prices: DELETE
. No. 3 Instrument Option Payment Schedule: Remains as follows:
Due Date Amount $
-------- --------
03/31/99 $895,000
04/30/99 $895,000
05/31/99 $895,000
. Substitute the attached revised SE.1M.PRJ.0004.A dated January 22, 1998
payment milestone schedule with SE.1M.PRJ.0004.A dated February 1, 1999.
SE.1M.PRJ.0004.A
Amendment Number 15
Dated 1 February 1999
Pay Milestone Total Cumm
Date Description Value Payment Payment
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
0 6/9/98 a Full set of optics received $ 400,000 $1,200,000 $ 1,200,000
---------------------------------------------------------------------------------------------------------------
b RWAs received $ 400,000
---------------------------------------------------------------------------------------------------------------
c Primary & secondary optics bonded to optical mount $ 400,000
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
1 6/30/98 a Spacecraft Test Requirement Document initial relea $ 400,000 $1,250,000 $ 2,450,000
---------------------------------------------------------------------------------------------------------------
b Optical bench preps complete $ 400,000
---------------------------------------------------------------------------------------------------------------
c Full set of optical mounts complete $ 400,000
---------------------------------------------------------------------------------------------------------------
d GPS Receiver order placed $ 50,000
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
2 7/31/98 a Bus Structure complete (inserts & painting) $ 450,000 $1,250,000 $ 3,700,000
---------------------------------------------------------------------------------------------------------------
b Solid State Recorders complete $ 400,000
---------------------------------------------------------------------------------------------------------------
c RF box Engineering Models received $ 400,000
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
3 8/31/98 a Primary/Secondary telescope roll test complete $ 450,000 $1,250,000 $ 4,950,000
---------------------------------------------------------------------------------------------------------------
b Power boxes complete (Battery, PDA, PCU) $ 400,000
---------------------------------------------------------------------------------------------------------------
c Command & Telemetry Unit received $ 400,000
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
4 9/30/98 a Telescope Assy Complete (mirror pins staked) $ 450,000 $1,250,000 $ 6,200,000
---------------------------------------------------------------------------------------------------------------
b Propulsion module complete $ 400,000
---------------------------------------------------------------------------------------------------------------
c Gimbal received $ 400,000
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
5 10/31/98 a Telescope Vibration test complete $ 720,000 $2,476,000 $ 8,676,000
---------------------------------------------------------------------------------------------------------------
b Wideband data interface EM test complete (SSS
simulator, SSR, & WBT) $ 420,000
---------------------------------------------------------------------------------------------------------------
c Phase 1 & 2 harness complete $ 420,000
---------------------------------------------------------------------------------------------------------------
d Structure preps complete (heaters, thermistors) $ 420,000
---------------------------------------------------------------------------------------------------------------
e Spacecraft Computer received $ 420,000
---------------------------------------------------------------------------------------------------------------
f Narrow Band Modulation Indexing $ 76,000
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
6 12/1/98 a Telescope Thermal cycle test complete $ 225,000 $1,300,000 $ 9,976,000
---------------------------------------------------------------------------------------------------------------
b Instrument radiator thermal test complete $ 215,000
---------------------------------------------------------------------------------------------------------------
c Phase 3, 4, & 5 harness complete $ 215,000
---------------------------------------------------------------------------------------------------------------
e STOC certified $ 215,000
---------------------------------------------------------------------------------------------------------------
f Initial Spacecraft Power on $ 215,000
---------------------------------------------------------------------------------------------------------------
g Flight software loaded into software test bench $ 215,000
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
7 1/19/99 a Execution of Amendment 11 $ 200,000 $ 200,000 $10,176,000
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
8 1/25/99 a Execution of Amendment 12 $ 120,000 $ 120,000 $10,296,000
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
8 2/1/99 a Execution of Amendment 15 $ 80,000 $ 80,000 $10,376,000
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
10 3/31/99 a Focal Plane, installed, aligned & staked $1,000,000 $3,930,000 $14,306,000
---------------------------------------------------------------------------------------------------------------
b Star tracker electrical integration complete (on bus) $1,000 000
---------------------------------------------------------------------------------------------------------------
c SAD/HDRS integration complete $1,000,000
---------------------------------------------------------------------------------------------------------------
d Narrowband RF box set (XNBT & SBR) received $ 930,000
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
11 4/30/99 a Instrument SNR Measurement complete $1,000,000 $3,930,000 $18,236,000
---------------------------------------------------------------------------------------------------------------
b Instrument ready to integrate into bus $1,000,000
---------------------------------------------------------------------------------------------------------------
c Wideband RF box set (WBT) received $1,000,000
---------------------------------------------------------------------------------------------------------------
d Deployable cover & sunshade complete $ 930,000
---------------------------------------------------------------------------------------------------------------
SE.1M.PRJ.0004.A
Amendment Number 15
Dated 1 February 1999
---------------------------------------------------------------------------------------------------------------
12 5/31/99 a Bus ready for instrument integration $2,000,000 $3,930,000 $22,166,000
---------------------------------------------------------------------------------------------------------------
b Instrument Installation complete $1,930,000
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
13 6/30/99 a Instrument integration complete $2,000,000 $3,930,000 $26,096,000
---------------------------------------------------------------------------------------------------------------
b System baseline performance tests completed suce $1,930,000
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
14 7/31/99 a Complete thermal blanket installation $ 500,000 $1,000,000 $27,096,000
---------------------------------------------------------------------------------------------------------------
b Start Thermal Vac test $ 500,000
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
15 8/31/99 a Sucessfully complete Thermal Vacuum Test $ 500,000 $1,000,000 $28,096,000
---------------------------------------------------------------------------------------------------------------
b Complete Solar array installation $ 500,000
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
16 9/30/99 a Sucessfully complete End to End Compatability test $ 500,000 $1,000,000 $29,096,000
---------------------------------------------------------------------------------------------------------------
b Sucessfully complete Vibration Test $ 500,000
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
17 10/31/99 a Sucessfully complete acoustic test $ 500,000 $1,000,000 $30,096,000
---------------------------------------------------------------------------------------------------------------
b Sucessfully complete post environmental deployme $ 500,000
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
18 11/30/99 a Spacecraft Ready to ship $3,000,000 $3,000,000 $33,096,000
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
19 12/31/99 a Spacecraft ready for launch $ 350,000 $ 350,000 $33,446,000
---------------------------------------------------------------------------------------------------------------
---------------------------------------------------------------------------------------------------------------
20 1/30/99 a Completion of In-Orbit test $ 349,000 $ 349,000 $33,795,000
---------------------------------------------------------------------------------------------------------------
AMENDMENT 16
to
CONTRACT SE.1M.PRJ.0004.A
between
EARTHWATCH, INCORPORATED AND BALL AEROSPACE AND TECHNOLOGIES CORP.
for the
CONTRACT FOR QUICKBIRD SPACECRAFT
This Amendment is issued to incorporate a change to the Contract document
that incorporates a fifteen (15) day extension to the various options and
off-ramp election dates.
Exhibit A - Terms and Conditions
. Article 7.2.2. Telescope Option
. Article 7.2.3. Instrument Option
Exhibit B - Price and Schedule
. Price and Schedule
Entire Agreement. This Amendment, hereto constitute the entire understanding
of the parties with respect to the subject matter of this Amendment and
supersedes all prior and contemporaneous agreements or understandings. By
signing this Amendment, each party represents to the other that it has the
authority to sign this Amendment and this Amendment is enforceable against
it in accordance with its terms.
IN WITNESS WHEREOF, the parties hereto have caused this Amendment to be
executed by their respective duly authorized representatives.
EARTHWATCH, INCORPORATED
/s/ Xxxxx X. Xxxxxxxx 2/16/99
By:_____________________________________________ ______________________
Xxxxx X. Xxxxxxxx Date
Director of Contracts
BALL AEROSPACE SYSTEMS DIVISION
/s/ Xxxx X. Xxxxxxx 2/17/99
By:_____________________________________________ ______________________
for T.H. Lapotosky Date
Director, Contracts & Government Compliance
AMENDMENT 16 to CONTRACT SE.1M.PRJ.0004.A
EXHIBIT A - TERMS AND CONDITIONS
Article 7.2.2 - Telescope Option
---------------------------------
- Change "February 16, 1999" to "March 2, 1999" in the first sentence.
Article 7.2.3 - Instrument Option
---------------------------------
- Change "February 16, 1999" to "March 2, 1999" in the first sentence.
EXHIBIT B - OPTION TO PURCHASE ONE (1) ONE METER SPACECRAFT SEGMENT
Price and Schedule
------------------
- Change the Contract Start Date from "6/1/98 thru 2/16/99" to "6/1/98 thru
3/2/99."
AMENDMENT 17
to
CONTRACT SE.1M.PRJ.0004.A
between
EARTHWATCH, INCORPORATED AND BALL AEROSPACE AND TECHNOLOGIES CORP.
for the
CONTRACT FOR QUICKBIRD SPACECRAFT
This Amendment is issued to incorporate a change to the Contract document that
incorporates a thirteen- (13) day extension to the various options and off-ramp
election dates.
Exhibit A - Terms and Conditions
. Article 7.2.2. Telescope Option
. Article 7.2.3. Instrument Option
Exhibit B - Price and Schedule
. Price and Schedule
Entire Agreement. This Amendment, hereto constitute the entire understanding of
the parties with respect to the subject matter of this Amendment and supersedes
all prior and contemporaneous agreements or understandings. By signing this
Amendment, each party represents to the other that it has the authority to sign
this Amendment and this Amendment is enforceable against it in accordance with
its terms.
IN WITNESS WHEREOF, the parties hereto have caused this Amendment to be executed
by their respective duly authorized representatives.
EARTHWATCH, INCORPORATED
/s/ Xxxxx X. Xxxxxxxx 3/2/99
By:_____________________________________________ ______________________
Xxxxx X. Xxxxxxxx Date
Director of Contracts
BALL AEROSPACE SYSTEMS DIVISION
/s/ Xxxx X. Xxxxxxx 3/12/99
By:_____________________________________________ ______________________
Xxxx X. Xxxxxxx Date
Manager of Contracts
Commercial Space Operations
EXHIBIT A - TERMS AND CONDITIONS
Article 7.2.2 - Telescope Option
--------------------------------
- Change "March 2, 1999" to "March 15, 1999" in the first sentence.
Article 7.2.3 - Instrument Option
---------------------------------
- Change "March 2, 1999" to "March 15, 1999" in the first sentence.
EXHIBIT B - OPTION TO PURCHASE ONE (1) ONE METER SPACECRAFT SEGMENT
Price and Schedule
------------------
- Change the Contract Start Date from "6/1/98 thru 3/02/99" to "6/1/98 thru
3/15/99."
AMENDMENT 18
to
CONTRACT SE.1M.PRJ.0004.A
between
EARTHWATCH, INCORPORATED AND BALL AEROSPACE AND TECHNOLOGIES CORP.
for the
CONTRACT FOR QUICKBIRD SPACECRAFT
This Amendment is issued to incorporate a change to the Contract document that
incorporates a seven (7) day extension to the various options and off-ramp
election dates.
Exhibit A - Terms and Conditions
. Article 7.2.2. Telescope Option
. Article 7.2.3. Instrument Option
Exhibit B - Price and Schedule
. Price and Schedule
Entire Agreement. This Amendment, hereto constitute the entire understanding of
the parties with respect to the subject matter of this Amendment and supersedes
all prior and contemporaneous agreements or understandings. By signing this
Amendment, each party represents to the other that it has the authority to sign
this Amendment and this Amendment is enforceable against it in accordance with
its terms.
IN WITNESS WHEREOF, the parties hereto have caused this Amendment to be executed
by their respective duly authorized representatives.
EARTHWATCH, INCORPORATED
/s/ Xxxxx X. Xxxxxxxx 3/15/99
By:_____________________________________________ ______________________
for Xxxxxxx X. Xxxxxxxxx III Date
Chief Executive Officer & President
BALL AEROSPACE SYSTEMS DIVISION
/s/ Xxxx X. Xxxxxxx 3/15/99
By:_____________________________________________ ______________________
Xxxx X. Xxxxxxx Date
Manager of Contracts
Commercial Space Operations
EXHIBIT A - TERMS AND CONDITIONS
Article 7.2.2 - Telescope Option
--------------------------------
- Change "March 15, 1999" to "March 22, 1999" in the first sentence.
Article 7.2.3 - Instrument Option
---------------------------------
- Change "March 15, 1999" to "March 22, 1999" in the first sentence.
EXHIBIT B - OPTION TO PURCHASE ONE (1) ONE METER SPACECRAFT SEGMENT
Price and Schedule
------------------
- Change the Contract Start Date from "6/1/98 thru 3/15/99" to "6/1/98 thru
3/22/99."
AMENDMENT 19
to
CONTRACT SE.1M.PRJ.0004.A
between
EARTHWATCH, INCORPORATED AND BALL AEROSPACE AND TECHNOLOGIES CORP.
for the
CONTRACT FOR QUICKBIRD SPACECRAFT
This Amendment is issued to incorporate a change to the Contract document
that incorporates a seven (7) day extension to the various options and off-
ramp election dates and administrative modification to BATC's Notices
addresses and BATC's Contracts Authorization Representatives.
Exhibit A - Terms and Conditions
. Article 7.2.2. Telescope Option
. Article 7.2.3. Instrument Option
. Article 16.2. Notices
. Article 16.2.1. Authorization Representative
Exhibit B - Price and Schedule
. Price and Schedule
Entire Agreement. This Amendment, hereto constitute the entire understanding
of the parties with respect to the subject matter of this Amendment and
supersedes all prior and contemporaneous agreements or understandings. By
signing this Amendment, each party represents to the other that it has the
authority to sign this Amendment and this Amendment is enforceable against it
in accordance with its terms,
IN WITNESS WHEREOF, the parties hereto have caused this Amendment to be executed
by their respective duly authorized representatives.
EARTHWATCH, INCORPORATED
/s/ Xxxxxxx X. Xxxxxxxxx III 3/22/99
By:_____________________________________________ ______________________
Xxxxxxx X. Xxxxxxxxx III Date
Chief Executive Officer & President
BALL AEROSPACE SYSTEMS DIVISION
/s/ Xxxxx Xxxxxx 3/22/99
By:_____________________________________________ ______________________
Xxxxx Xxxxxx Date
Vice President of Commercial Space Operations
1 of 2
AMENDMENT 19
CONTRACT SE.1M.PRJ.0004.A
EXHIBIT A - TERMS AND CONDITIONS
Article 7.2.2 - Telescope Option
--------------------------------
- Change "March 22, 1999" to "March 29, 1999" in the first sentence.
Article 7.2.3 - Instrument Option
---------------------------------
- Change "March 22, 1999" to "March 29, 1999" in the first sentence.
Article 16.2 - Notices
----------------------
- Change the BATC addressee as follows:
From To
---- --
BATC BATC
---- ----
BATC BATC
P.C. Box 1062 P.O. Box 1062
Xxxxxxx, XX 00000 Xxxxxxx, XX 00000
Attn.: Attn.: Xxxx X. Xxxxxxx
Manager of Contracts
Facsimile No.: 000-000-0000
Article 16.2.1 - Authorization Representative:
----------------------------------------------
- Change BATC Contracts Authorized Representatives as follows:
From To
---- --
Xxxx X. Xxxxxxx
Manager of Contracts
EXHIBIT B - OPTION TO PURCHASE ONE (1) ONE METER SPACECRAFT SEGMENT
Price and Schedule
------------------
- Change the Contract Start Date from "6/1/98 thru 3/22/99" to "6/1/98
thru 3/29/99."
2 of 2
AMENDMENT 20
to
CONTRACT SE.1M.PRJ.0004.A
between
EARTHWATCH, INCORPORATED AND BALL AEROSPACE AND TECHNOLOGIES CORP.
for the
CONTRACT FOR QUICKBIRD SPACECRAFT
This Amendment is issued to incorporate a change to the Contract document that
incorporates a one (1) day extension to the various options and off-ramp
election dates and administrative modification to BATC's Notices addressee and
BATC's Contracts Authorization Representatives.
Exhibit A - Terms and Conditions
. Article 7.2.2. Telescope Option
. Article 7.2.3. Instrument Option
Exhibit B - Price and Schedule
. Price and Schedule
Entire Agreement. This Amendment, hereto constitute the entire understanding of
the parties with respect to the subject matter of this Amendment and supersedes
all prior and contemporaneous agreements or understandings. By signing this
Amendment, each party represents to the other that it has the authority to sign
this Amendment and this Amendment is enforceable against it in accordance with
its terms.
IN WITNESS WHEREOF, the parties hereto have caused this Amendment to be executed
by their respective duly authorized representatives.
EARTHWATCH, INCORPORATED
/s/ Xxxxx X. Xxxxxxxx 3/29/99
By:_____________________________________________ ______________________
Xxxxx X. Xxxxxxxx Date
Director of Contracts
BALL AEROSPACE SYSTEMS DIVISION
/s/ Xxxx X. Xxxxxxx 3/30/99
By:_____________________________________________ ______________________
Xxxx X. Xxxxxxx Date
Manager of Contracts
1 of 2
AMENDMENT 20
CONTRACT SE.1M.PRJ.0004.A
EXHIBIT A - TERMS AND CONDITIONS
Article 7.2.2 - Telescope Option
--------------------------------
- Change "March 29, 1999" to "March 30, 1999" in the first sentence.
Article 7.2.3 - Instrument Option
---------------------------------
- Change "March 29, 1999" to "March 30, 1999" in the first sentence.
EXHIBIT B - OPTION TO PURCHASE ONE (1) ONE METER SPACECRAFT SEGMENT
Price and Schedule
------------------
- Change the Contract Start Date from "6/1/98 thru 3/29/99" to "6/1/98 thru
3/30/99."
2 of 2
AMENDMENT 21
to
CONTRACT SE.1M.PRJ.0004.A
between
EARTHWATCH, INCORPORATED AND BALL AEROSPACE AND TECHNOLOGIES CORP.
for the
CONTRACT FOR QUICKBIRD SPACECRAFT
This Amendment is issued to incorporate a change to the Contract document that
incorporates a one (1) day extension to the various options and off-ramp
election dates and administrative modification to BATC's Notices addressee and
BATC's Contracts Authorization Representatives.
Exhibit A - Terms and Conditions
. Article 7.2.2. Telescope Option
. Article 7.2.3. Instrument Option
Exhibit B - Price and Schedule
. Price and Schedule
Entire Agreement. This Amendment, hereto constitute the entire understanding of
the parties with respect to the subject matter of this Amendment and supersedes
all prior and contemporaneous agreements or understandings. By signing this
Amendment, each party represents to the other that it has the authority to sign
this Amendment and this Amendment is enforceable against it in accordance with
its terms.
IN WITNESS WHEREOF, the parties hereto have caused this Amendment to be executed
by their respective duly authorized representatives.
EARTHWATCH, INCORPORATED
/s/ Xxxxx X. Xxxxxxxx 30 Mar 99
By:_____________________________________________ ______________________
Xxxxx X. Xxxxxxxx Date
Director of Contracts
BALL AEROSPACE SYSTEMS DIVISION
/s/ Xxxx X. Xxxxxxx 31 March 1999
By:_____________________________________________ ______________________
Xxxx X. Xxxxxxx Date
Manager of Contracts
1 of 2
AMENDMENT 21
CONTRACT SE.1M.PRJ.0004.A
EXHIBIT A - TERMS AND CONDITIONS
Article 7.2.2 - Telescope Option
--------------------------------
- Change "March 30, 1999" to "March 31, 1999" in the first sentence.
Article 7.2.3 - Instrument Option
---------------------------------
- Change "March 30, 1999" to "March 31, 1999" in the first sentence.
EXHIBIT B - OPTION TO PURCHASE ONE (1) ONE METER SPACECRAFT SEGMENT
Price and Schedule
------------------
- Change the Contract Start Date from "6/1/98 thru 3/30/99" to "6/1/98 thru
3/31/99."
2 of 2
AMENDMENT 22
to
CONTRACT SE.1M.PRJ.0004.A
between
EARTHWATCH, INCORPORATED AND BALL AEROSPACE AND TECHNOLOGIES CORP.
for the
CONTRACT FOR QUICKBIRD SPACECRAFT
This Amendment is issued to incorporate a change to the Contract document
that incorporates a one (1) day extension to the various options and off-ramp
election dates and administrative modification to BATC's Notices addressee
and BATC's Contracts Authorization Representatives.
Exhibit A - Terms and Conditions
. Article 7.2.2. Telescope Option
. Article 7.2.3. Instrument Option
Exhibit B - Price and Schedule
. Price and Schedule
Exhibit E - Price and Payment Schedule
Entire Agreement. This Amendment, hereto constitutes the entire understanding
of the parties with respect to the subject matter of this Amendment and
supersedes all prior and contemporaneous agreements or understandings. By
signing this Amendment, each party represents to the other that it has the
authority to sign this Amendment and this Amendment is enforceable against it
in accordance with its terms.
IN WITNESS WHEREOF, the parties hereto have caused this Amendment to be
executed by their respective duly authorized representatives.
EARTHWATCH, INCORPORATED
By: /s/ Xxxxx Xxxxxxxx 4/1/99
----------------------------------- -----------------------
for Xxxxxxx X. Xxxxxxxxx III Date
Chief Executive Officer & President
BALL AEROSPACE SYSTEMS DIVISION
By: /s/ Xxxx X. Xxxxxxx 4/1/99
----------------------------------- -----------------------
Xxxx X. Xxxxxxx Date
Manager of Contracts
1 of 2
AMENDMENT 22
CONTRACT SE.lM.PRJ.0004.A
EXHIBIT A - TERMS AND CONDITIONS
Article 7.2.2 - Telescope Option
--------------------------------
- Change "March 31, 1999" to "April 1, 1999" in the first sentence.
Article 7.2.3 - Instrument Option
---------------------------------
- Change "March 31, 1999" to "April 1, 1999" in the first sentence.
EXHIBIT B - OPTION TO PURCHASE ONE (1) ONE METER SPACECRAFT SEGMENT
Price and Schedule
------------------
- Change the Contract Start Date from "6/1/98 thru 3/31/99" to "6/1/98 thru
4/1/99."
EXHIBIT E - PRICE AND PAYMENT SCHEDULE
- Change item 10 of Payment Schedule for Contract SE.1M.PRJ.0004.A dated 1
February 1999 from "3/31/99" to "4/1/99".
2 of 2
AMENDMENT 23
to
CONTRACT SE.1M.PRJ.0004.A
between
EARTHWATCH, INCORPORATED AND BALL AEROSPACE AND TECHNOLOGIES CORP.
for the
CONTRACT FOR QUICKBIRD SPACECRAFT
This Amendment is issued to incorporate a change to the Contract document that
incorporates a one (1) day extension to the various options and off-ramp
election dates and administrative modification to BATC's Notices addressee and
BATC's Contracts Authorization Representatives.
Exhibit A - Terms and Conditions
. Article 7.2.2. Telescope Option
. Article 7.2.3. Instrument Option
Exhibit B - Price and Schedule
. Price and Schedule
. Payment Schedule
Exhibit E - Price and Payment Schedule
Entire Agreement. This Amendment, hereto constitute the entire understanding of
the parties with respect to the subject matter of this Amendment and supersedes
all prior and contemporaneous agreements or understandings. By signing this
Amendment, each party represents to the other that it has the authority to sign
this Amendment and this Amendment is enforceable against it in accordance with
its terms.
IN WITNESS WHEREOF, the parties hereto have caused this Amendment to be executed
by their respective duly authorized representatives.
EARTHWATCH, INCORPORATED
/s/ Xxxxx Xxxxxxxx 1 Apr 99
By:__________________________________________ ______________________
Xxxxxxx X. Xxxxxxxxx III Date
Chief Executive Officer & President
BALL AEROSPACE SYSTEMS DIVISION
/s/ Xxxx X. Xxxxxxx 4/2/99
By:__________________________________________ ______________________
Xxxx X. Xxxxxxx Date
Manager of Contracts
1 of 2
AMENDMENT 23
CONTRACT SE.1M.PRJ.0004.A
EXHIBIT A - TERMS AND CONDITIONS
Article 7.2.2 - Telescope Option
--------------------------------
- Change "April 1, 1999" to "April 2, 1999" in the first sentence.
Article 7.2.3 - Instrument Option
---------------------------------
- Change "April 1, 1999" to "April 2, 1999" in the first sentence.
EXHIBIT B - OPTION TO PURCHASE ONE (1) ONE METER SPACECRAFT SEGMENT
Price and Schedule
------------------
- Change the Contract Start Date from "6/11/98 thru 4/1/99" to "6/11/98 thru
4/2/99."
Payment Schedule
----------------
- Change due date on detail milestone for initial payment from "April 1, 1999"
to "April 2, 1999"
EXHIBIT E - PRICE AND PAYMENT SCHEDULE
- Change item 10 of Payment Schedule for Contract SE.1M.PRJ.0004.A dated 1
February 1999 from "4/1/99" to "4/2/99".
2 of 2
AMENDMENT 24
to
CONTRACT SE.1M.PRJ.0004.A
between
EARTHWATCH, INCORPORATED AND BALL AEROSPACE AND TECHNOLOGIES CORP.
for the
CONTRACT FOR QUICKBIRD SPACECRAFT
This Amendment is issued to incorporate a change to the Contract document that
incorporates a three (3) day extension to the various options and off-ramp
election dates and administrative modification to BATC's Notices addressee and
BATC's Contracts Authorization Representatives.
Exhibit A - Terms and Conditions
. Article 7.2.2. Telescope Option
. Article 7.2.3. Instrument Option
Exhibit B - Price and Schedule
. Price and Schedule
. Payment Schedule
Exhibit E - Price and Payment Schedule
Entire Agreement. This Amendment, hereto constitute the entire understanding of
the parties with respect to the subject matter of this Amendment and supersedes
all prior and contemporaneous agreements or understandings. By signing this
Amendment, each party represents to the other that it has the authority to sign
this Amendment and this Amendment is enforceable against it in accordance with
its terms.
IN WITNESS WHEREOF, the parties hereto have caused this Amendment to be executed
by their respective duly authorized representatives.
EARTHWATCH, INCORPORATED
/s/ Xxxxx Xxxxxxxx 4/2/99
By:__________________________________________ ______________________
Xxxxxxx X. Xxxxxxxxx III Date
Chief Executive Officer & President
BALL AEROSPACE SYSTEMS DIVISION
/s/ Xxxx X. Xxxxxxx 4/5/99
By:__________________________________________ ______________________
Xxxx X. Xxxxxxx Date
Manager of Contracts
1 of 2
AMENDMENT 24
CONTRACT SE.1M.PRJ.0004.A
EXHIBIT A - TERMS AND CONDITIONS
Article 7.2.2 - Telescope Option
--------------------------------
- Change "April 2, 1999" to "April 5, 1999" in the first sentence.
Article 7.2.3 - Instrument Option
---------------------------------
- Change "April 2, 1999" to "April 5, 1999" in the first sentence.
EXHIBIT B - OPTION TO PURCHASE ONE (1) ONE METER SPACECRAFT SEGMENT
Price and Schedule
------------------
- Change the Contract Start Date from "6/1/98 thru 4/2/99" to "6/1/98 thru
4/5/99."
Payment Schedule
----------------
- Change due date on detail milestone for initial payment from "April 2, 1999"
to "April 5, 1999"
EXHIBIT E - PRICE AND PAYMENT SCHEDULE
- Change item 10 of Payment Schedule for Contract SE.1M.PRJ.0004.A dated 1
February 1999 from "4/2/99" to "4/5/99".
2 of 2
AMENDMENT 25
to
CONTRACT SE.1M.PRJ.0004.A
between
EARTHWATCH, INCORPORATED AND BALL AEROSPACE AND TECHNOLOGIES CORP.
for the
CONTRACT FOR QUICKBIRD SPACECRAFT
This Amendment is issued to incorporate a change to the Contract document that
incorporates a one (1) day extension to the various options and off-ramp
election dates and administrative modification to BATC's Notices addressee and
BATC's Contracts Authorization Representatives.
Exhibit A - Terms and Conditions
. Article 7.2.2. Telescope Option
. Article 7.2.3. Instrument Option
Exhibit B - Price and Schedule
. Price and Schedule
. Payment Schedule
Exhibit E - Price and Payment Schedule
Entire Agreement. This Amendment, hereto constitute the entire understanding of
the parties with respect to the subject matter of this Amendment and supersedes
all prior and contemporaneous agreements or understandings. By signing this
Amendment, each party represents to the other that it has the authority to sign
this Amendment and this Amendment is enforceable against it in accordance with
its terms.
IN WITNESS WHEREOF, the parties hereto have caused this Amendment to be executed
by their respective duly authorized representatives.
EARTHWATCH, INCORPORATED
/s/ Xxxxx Xxxxxxxx 4/5/99
By:__________________________________________ ______________________
Xxxxxxx X. Xxxxxxxxx III Date
Chief Executive Officer & President
BALL AEROSPACE SYSTEMS DIVISION
/s/ Xxxx X. Xxxxxxx 4/5/99
By:__________________________________________ ______________________
Xxxx X. Xxxxxxx Date
Manager of Contracts
1 of 2
AMENDMENT 25
CONTRACT SE.1M.PRJ.0004.A
EXHIBIT A - TERMS AND CONDITIONS
Article 7.2.2 - Telescope Option
--------------------------------
- Change "April 5, 1999" to "April 6, 1999" in the first sentence.
Article 7.2.3 - Instrument Option
---------------------------------
- Change "April 5, 1999" to "April 6, 1999" in the first sentence.
EXHIBIT B - OPTION TO PURCHASE ONE (1) ONE METER SPACECRAFT SEGMENT
Price and Schedule
------------------
- Change the Contract Start Date from "6/1/98 thru 4/5/99" to "6/1/98 thru
4/6/99."
Payment Schedule
----------------
- Change due date on detail milestone for initial payment from "April 5, 1999"
to "April 6, 1999"
EXHIBIT E - PRICE AND PAYMENT SCHEDULE
- Change item 10 of Payment Schedule for Contract SE.1M.PRJ.0004.A dated 1
February 1999 from "4/5/99" to "4/6/99".
2 of 2
AMENDMENT 26
to
CONTRACT SE.1M.PRJ.0004.A
between
EARTHWATCH, INCORPORATED AND BALL AEROSPACE AND TECHNOLOGIES CORP.
for the
CONTRACT FOR QUICKBIRD SPACECRAFT
This Amendment is issued to incorporate a change to the Contract document that
incorporates a one (1) day extension to the various options and off-ramp
election dates and administrative modification to BATC's Notices addressee and
BATC's Contracts Authorization Representatives.
Exhibit A - Terms and Conditions
. Article 7.2.2. Telescope Option
. Article 7.2.3. Instrument Option
Exhibit B - Price and Schedule
. Price and Schedule
. Payment Schedule
Exhibit E - Price and Payment Schedule
Entire Agreement. This Amendment, hereto constitute the entire understanding of
the parties with respect to the subject matter of this Amendment and supersedes
all prior and contemporaneous agreements or understandings. By signing this
Amendment, each party represents to the other that it has the authority to sign
this Amendment and this Amendment is enforceable against it in accordance with
its terms.
IN WITNESS WHEREOF, the parties hereto have caused this Amendment to be executed
by their respective duly authorized representatives.
EARTHWATCH, INCORPORATED
/s/ Xxxxx Xxxxxxxx 4/6/99
By:__________________________________________ ______________________
Xxxxxxx X. Xxxxxxxxx III Date
Chief Executive Officer & President
BALL AEROSPACE SYSTEMS DIVISION
/s/ Xxxx X. Xxxxxxx 4/6/99
By:__________________________________________ ______________________
Xxxx X. Xxxxxxx Date
Manager of Contracts
1 of 2
AMENDMENT 26
CONTRACT SE.1M.PRJ.0004.A
EXHIBIT A - TERMS AND CONDITIONS
Article 7.2.2 - Telescope Option
--------------------------------
- Change "April 6, 1999" to "April 7, 1999" in the first sentence.
Article 7.2.3 - Instrument Option
---------------------------------
- Change "April 6, 1999" to "April 7, 1999" in the first sentence.
EXHIBIT B - OPTION TO PURCHASE ONE (1) ONE METER SPACECRAFT SEGMENT
Price and Schedule
------------------
- Change the Contract Start Date from "6/1/98 thru 4/6/99" to "6/1/98 thru
4/7/99."
Payment Schedule
----------------
- Change due date on detail milestone for initial payment from "April 6, 1999"
to "April 7, 1999"
EXHIBIT E - PRICE AND PAYMENT SCHEDULE
- Change item 10 of Payment Schedule for Contract SE.1M.PRJ.0004.A dated 1
February 1999 from "4/6/99" to "4/7/99".
2 of 2
AMENDMENT 27
to
CONTRACT SE.1M.PRJ.0004.A
between
EARTHWATCH, INCORPORATED AND BALL AEROSPACE AND TECHNOLOGIES CORP.
for the
CONTRACT FOR QUICKBIRD SPACECRAFT
This Amendment is issued to incorporate a change to the Contract document that
incorporates a one (1) day extension to the various options and off-ramp
election dates and administrative modification to BATC's Notices addressee and
BATC's Contracts Authorization Representatives.
Exhibit A - Terms and Conditions
. Article 7.2.2. Telescope Option
. Article 7.2.3. Instrument Option
Exhibit B - Price and Schedule
. Price and Schedule
. Payment Schedule
Exhibit E - Price and Payment Schedule
Entire Agreement. This Amendment, hereto constitute the entire understanding of
the parties with respect to the subject matter of this Amendment and supersedes
all prior and contemporaneous agreements or understandings. By signing this
Amendment, each party represents to the other that it has the authority to sign
this Amendment and this Amendment is enforceable against it in accordance with
its terms.
IN WITNESS WHEREOF, the parties hereto have caused this Amendment to be
executed by their respective duly authorized representatives.
EARTHWATCH, INCORPORATED
/s/ Xxxxx Xxxxxxxx 4/7/99
By:__________________________________________ ______________________
Xxxxxxx X. Xxxxxxxxx III Date
Chief Executive Officer & President
BALL AEROSPACE SYSTEMS DIVISION
/s/ Xxxx X. Xxxxxxx 4/7/99
By:__________________________________________ ______________________
Xxxx X. Xxxxxxx Date
Manager of Contracts
1 of 2
AMENDMENT 27
CONTRACT SE.1M.PRJ.0004.A
EXHIBIT A - TERMS AND CONDITIONS
Article 7.2.2 - Telescope Option
--------------------------------
- Change "April 7, 1999" to "April 8, 1999" in the first sentence.
Article 7.2.3 - Instrument Option
---------------------------------
- Change "April 7, 1999" to "April 8, 1999" in the first sentence.
EXHIBIT B - OPTION TO PURCHASE ONE (1) ONE METER SPACECRAFT SEGMENT
Price and Schedule
------------------
- Change the Contract Start Date from "6/1/98 thru 4/7/99" to "6/1/98 thru
4/8/99."
Payment Schedule
----------------
- Change due date on detail milestone for initial payment from "April 7, 1999"
to "April 8, 1999"
EXHIBIT E - PRICE AND PAYMENT SCHEDULE
- Change item 10 of Payment Schedule for Contract SE.1M.PRJ.0004.A dated 1
February 1999 from "4/7/99" to "4/8/99".
2 of 2
AMENDMENT 28
to
CONTRACT SE.1M.PRJ.0004.A
between
EARTHWATCH, INCORPORATED AND BALL AEROSPACE AND TECHNOLOGIES CORP.
for the
CONTRACT FOR QUICKBIRD SPACECRAFT
This Amendment is issued to incorporate a change to the Contract document that
incorporates a one (1) day extension to the various options and off-ramp
election dates and administrative modification to BATC's Notices addressee and
BATC's Contracts Authorization Representatives.
Exhibit A - Terms and Conditions
. Article 7.2.2. Telescope Option
. Article 7.2.3. Instrument Option
Exhibit B - Price and Schedule
. Price and Schedule
. Payment Schedule
Exhibit E - Price and Payment Schedule
Entire Agreement. This Amendment, hereto constitute the entire understanding of
the parties with respect to the subject matter of this Amendment and supersedes
all prior and contemporaneous agreements or understandings. By signing this
Amendment, each party represents to the other that it has the authority to sign
this Amendment and this Amendment is enforceable against it in accordance with
its terms.
IN WITNESS WHEREOF, the parties hereto have caused this Amendment to be executed
by their respective duly authorized representatives.
EARTHWATCH, INCORPORATED
/s/ Xxxxx Xxxxxxxx 8 Apr 99
By:__________________________________________ ______________________
Xxxxx Xxxxxxxx Date
Director of Contracts
BALL AEROSPACE SYSTEMS DIVISION
By:__________________________________________ ______________________
Xxxx X. Xxxxxxx Date
Manager of Contracts
1 of 2
AMENDMENT 28
to
CONTRACT SE.1M.PRJ.0004.A
between
EARTHWATCH, INCORPORATED AND BALL AEROSPACE AND TECHNOLOGIES CORP.
for the
CONTRACT FOR QUICKBIRD SPACECRAFT
This Amendment is issued to incorporate a change to the Contract document that
incorporates a one (1) day extension to the various options and off-ramp
election dates and administrative modification to BATC's Notices addressee and
BATC's Contracts Authorization Representatives.
Exhibit A - Terms and Conditions
. Article 7.2.2. Telescope Option
. Article 7.2.3. Instrument Option
Exhibit B - Price and Schedule
. Price and Schedule
. Payment Schedule
Exhibit E - Price and Payment Schedule
Entire Agreement. This Amendment, hereto constitute the entire understanding of
the parties with respect to the subject matter of this Amendment and supersedes
all prior and contemporaneous agreements or understandings. By signing this
Amendment, each party represents to the other that it has the authority to sign
this Amendment and this Amendment is enforceable against it in accordance with
its terms.
IN WITNESS WHEREOF, the parties hereto have caused this Amendment to be executed
by their respective duly authorized representatives.
EARTHWATCH, INCORPORATED
By:__________________________________________ ______________________
Xxxxxxx X. Xxxxxxxxx III Date
Chief Executive Officer & President
BALL AEROSPACE SYSTEMS DIVISION
/s/ Xxxx X. Xxxxxxx 4/8/99
By:__________________________________________ ______________________
Xxxx X. Xxxxxxx Date
Manager of Contracts
1 of 2
AMENDMENT 28
CONTRACT SE.1M.PRJ.0004.A
EXHIBIT A - TERMS AND CONDITIONS
Article 7.2.2 - Telescope Option
--------------------------------
- Change "April 8, 1999" to "April 9, 1999" in the first sentence.
Article 7.2.3 - Instrument Option
---------------------------------
- Change "April 8, 1999" to "April 9, 1999" in the first sentence.
EXHIBIT B - OPTION TO PURCHASE ONE (1) ONE METER SPACECRAFT SEGMENT
Price and Schedule
-------------------
- Change the Contract Start Date from "6/1/98 thru 4/8/99" to "6/1/98 thru
4/9/99."
Payment Schedule
----------------
- Change due date on detail milestone for initial payment from "April 8, 1999"
to "April 9, 1999"
EXHIBIT E - PRICE AND PAYMENT SCHEDULE
- Change item 10 of Payment Schedule for Contract SE.1M.PRJ.0004.A dated 1
February 1999 from "4/8/99" to "4/9/99".
2 of 2
AMENDMENT 29
to
CONTRACT SE.1M.PRJ.0004.A
between
EARTHWATCH, INCORPORATED AND BALL AEROSPACE AND TECHNOLOGIES CORP.
for the
CONTRACT FOR QUICKBIRD SPACECRAFT
This Amendment is issued to incorporate a change to the Contract document that
incorporates a three (3) day extension to the various options and off-ramp
election dates and administrative modification to BATC's Notices addressee and
BATC's Contracts Authorization Representatives.
Exhibit A - Terms and Conditions
. Article 7.2.2. Telescope Option
. Article 7.2.3. Instrument Option
Exhibit B - Price and Schedule
. Price and Schedule
. Payment Schedule
Exhibit E - Price and Payment Schedule
Entire Agreement. This Amendment, hereto constitute the entire understanding
of the parties with respect to the subject matter of this Amendment and
supersedes all prior and contemporaneous agreements or understandings. By
signing this Amendment, each party represents to the other that it has the
authority to sign this Amendment and this Amendment is enforceable against
it in accordance with its terms.
IN WITNESS WHEREOF, the parties hereto have caused this Amendment to be
executed by their respective duly authorized representatives.
EARTHWATCH, INCORPORATED
/s/ Xxxxx Xxxxxxxx 4/9/99
By:__________________________________________ ______________________
for Xxxxxxx X. Xxxxxxxxx III Date
Chief Executive Officer & President
BALL AEROSPACE SYSTEMS DIVISION
/s/ Xxxx X. Xxxxxxx 4/9/99
By:__________________________________________ ______________________
Xxxx X. Xxxxxxx Date
Manager of Contracts
1 of 2
AMENDMENT 29
CONTRACT SE.1M.PRJ.0004.A
EXHIBIT A - TERMS AND CONDITIONS
Article 7.2.2 - Telescope Option
--------------------------------
- Change "April 9, 1999" to "April 12, 1999" in the first sentence.
Article 7.2.3 - Instrument Option
---------------------------------
- Change "April 89, 1999" to "April 12, 1999" in the first sentence.
EXHIBIT B - OPTION TO PURCHASE ONE (1) ONE METER SPACECRAFT SEGMENT
Price and Schedule
-------------------
- Change the Contract Start Date from "6/1/98 thru 4/9/99" to "6/1/98 thru
4/12/99."
Payment Schedule
----------------
- Change due date on detail milestone for initial payment from "April 9,
1999" to "April 12, 1999"
EXHIBIT E - PRICE AND PAYMENT SCHEDULE
- Change item 10 of Payment Schedule for Contract SE.1M.PRJ.0004.A dated 1
February 1999 from "4/9/99" to "4/12/99".
2 of 2
AMENDMENT 30
to
CONTRACT SE.1M.PRJ.0004.A
between
EARTHWATCH, INCORPORATED AND BALL AEROSPACE AND TECHNOLOGIES CORP.
for the
CONTRACT FOR QUICKBIRD SPACECRAFT
This Amendment is issued to incorporate a change to the Contract document that
incorporates a one (1) business day extension to the various options and off-
ramp election dates and administrative modification to BATC's Notices addressee
and BATC's Contracts Authorization Representatives.
Exhibit A - Terms and Conditions
. Article 7.2.2. Telescope Option
. Article 7.2.3. Instrument Option
Exhibit B - Price and Schedule
. Price and Schedule
. Payment Schedule
Exhibit E - Price and Payment Schedule
Entire Agreement. This Amendment, hereto constitute the entire understanding of
the parties with respect to the subject matter of this Amendment and supersedes
all prior and contemporaneous agreements or understandings. By signing this
Amendment, each party represents to the other that it has the authority to sign
this Amendment and this Amendment is enforceable against it in accordance with
its terms.
IN WITNESS WHEREOF, the parties hereto have caused this Amendment to be executed
by their respective duly authorized representatives.
EARTHWATCH, INCORPORATED
/s/ Xxxxx Xxxxxxxx 4/12/99
By:__________________________________________ ______________________
Xxxxx Xxxxxxxx Date
Director of Contracts
BALL AEROSPACE SYSTEMS DIVISION
/s/ Xxxx X. Xxxxxxx 4/12/99
By:__________________________________________ ______________________
Xxxx X. Xxxxxxx Date
Manager of Contracts
1 of 2
AMENDMENT 30
CONTRACT SE.1M.PRJ.0004.A
EXHIBIT A - TERMS AND CONDITIONS
Article 7.2.2 - Telescope Option
--------------------------------
- Change "April 12, 1999" to "April 13, 1999" in the first sentence.
Article 7.2.3 - Instrument Option
---------------------------------
- Change "April 12, 1999" to "April 13, 1999" in the first sentence.
EXHIBIT B - OPTION TO PURCHASE ONE (1) ONE METER SPACECRAFT SEGMENT
Price and Schedule
-------------------
- Change the Contract Start Date from "6/1/98 thru 4/12/99" to "6/1/98 thru
4/13/99."
Payment Schedule
----------------
- Change due date on detail milestone for initial payment from "April 12,
1999" to "April 13, 1999"
EXHIBIT E - PRICE AND PAYMENT SCHEDULE
- Change item 10 of Payment Schedule for Contract SE.1M.PRJ.0004.A dated 1
February 1999 from "4/12/99" to "4/13/99".
2 of 2
AMENDMENT 31
to
CONTRACT SE.1M.PRJ.0004.A
between
EARTHWATCH, INCORPORATED AND BALL AEROSPACE AND TECHNOLOGIES CORP.
for the
CONTRACT FOR QUICKBIRD SPACECRAFT
This Amendment is issued to incorporate a change to the Contract document that
incorporates a one (1) business day extension to the various options and off-
ramp election dates and administrative modification to BATC's Notices addressee
and BATC's Contracts Authorization Representatives.
Exhibit A - Terms and Conditions
. Article 7.2.2. Telescope Option
. Article 7.2.3. Instrument Option
Exhibit B - Price and Schedule
. Price and Schedule
. Payment Schedule
Exhibit E - Price and Payment Schedule
Entire Agreement. This Amendment, hereto constitute the entire understanding of
the parties with respect to the subject matter of this Amendment and supersedes
all prior and contemporaneous agreements or understandings. By signing this
Amendment, each party represents to the other that it has the authority to sign
this Amendment and this Amendment is enforceable against it in accordance with
its terms.
IN WITNESS WHEREOF, the parties hereto have caused this Amendment to be executed
by their respective duly authorized representatives.
EARTHWATCH, INCORPORATED
/s/ Xxxxx Xxxxxxxx 4/13/99
By:__________________________________________ ______________________
Xxxxx Xxxxxxxx Date
Director of Contracts
BALL AEROSPACE SYSTEMS DIVISION
/s/ Xxxx X. Xxxxxxx 4/13/99
By:__________________________________________ ______________________
Xxxx X. Xxxxxxx Date
Manager of Contracts
1 of 2
AMENDMENT 31
CONTRACT SE.1M.PRJ.0004.A
EXHIBIT A - TERMS AND CONDITIONS
Article 7.2.2 - Telescope Option
--------------------------------
- Change "April 13, 1999" to "April 14, 1999" in the first sentence.
Article 7.2.3 - Instrument Option
---------------------------------
- Change "April 13, 1999" to "April 14, 1999" in the first sentence.
EXHIBIT B - OPTION TO PURCHASE ONE (1) ONE METER SPACECRAFT SEGMENT
Price and Schedule
------------------
- Change the Contract Start Date from "6/1/98 thru 4/13/99" to "6/1/98 thru
4/14/99."
Payment Schedule
----------------
- Change due date on detail milestone for initial payment from "April 13,
1999" to "April 14, 1999"
EXHIBIT E - PRICE AND PAYMENT SCHEDULE
- Change item 10 of Payment Schedule for Contract SE.1M.PRJ.0004.A dated 1
February 1999 from "4/13/99" to "4/14/99".
2 of 2
SE.1M.PRJ.0004.A
April 14, 1999
EXHIBIT B
OPTION TO PURCHASE ONE (1) ONE METER
SPACECRAFT SEGMENT
(As Amended through Amendment 31 to the Contract)
Price & Schedule
----------------
Assuming EarthWatch is otherwise in full compliance with the contract and no
stop work is in effect, BATC grants to EarthWatch an Option to Purchase One (1)
additional One Meter QuickBird Space Segment in accordance with the Terms and
Conditions of this Contract. EarthWatch will signify its exercise of this option
by providing BATC a signed and dated copy of this Exhibit on or before the close
of business of the last day of the expiration of the "Exercise Period" noted
below. The Firm Price and the associated delivery schedule is indicated below.
Exercise
Period Contract Start Date Price Delivery Schedule
------ -------------------- ----- -----------------
No. 1 6/l/98 thru 04/14/98 $31,050,000 December 1, 2000
Payment Schedule
----------------
Prior to exercise, EarthWatch and BATC shall negotiate detailed milestones
associated with the nominal payment schedule set forth below:
--------------------------------
Pay Date Payment $
--------------------------------
1-Apr-99 2,900,000
--------------------------------
1-May-99 2,900,000
--------------------------------
1 Jun-99 2,900,000
--------------------------------
1-Jul-99 2,900,000
--------------------------------
1-Aug-99 2,900,000
--------------------------------
1-Sep-99 1,500,000
--------------------------------
1-Oct-99 1,500,000
--------------------------------
1-Nov-99 1,300,000
--------------------------------
1-Dec-99 1,300,000
--------------------------------
1-Jan-00 1,300,000
--------------------------------
1-Feb-00 1,300,000
--------------------------------
1-Mar-00 1,120,000
--------------------------------
1-Apr-00 700,000
--------------------------------
1-May-00 700,000
--------------------------------
Public Release of Information Contained Herein is Controlled
Per Contractual Agreement. 1
SE.1M.PRJ.0004.A
April 14, 1999
1-Jun-00 700,000
------------------------------
1-Jul-00 700,000
------------------------------
1-Aug-00 700,000
------------------------------
1-Sep-00 700,000
------------------------------
1-Oct-00 700,000
------------------------------
1-Nov-00 330,000
------------------------------
1-Dec-00 2,000,000
------------------------------
Total $31,050,000
------------------------------
EarthWatch Inc.
/s/ Xxxxxx X. Xxxxx April 14, 1999
---------------------------- ------------------------
Name Date
-----------------------------
Signature
Public Release of Information Contained Herein is Controlled
Per Contractual Agreement. 2
AMENDMENT 32
to
CONTRACT SE.1M.PRJ.0004.A
between
EARTHWATCH, INCORPORATED AND BALL AEROSPACE AND TECHNOLOGIES CORP.
for the
CONTRACT FOR QUICKBIRD SPACECRAFT
This Amendment incorporates the following changes to the Contract:
Exhibit C - Statement of Work, EarthWatch QuickBird Satellite, Doc. No
SE.1M.PRJ.002
. Contract Deliverables - Deliverable Items
Exhibit D - Specification, Spacecraft Bus and Instrument, EarthWatch QuickBird
Spacecraft, Doc. SE.1M.PRJ.003
. Software
Exhibit E - Price and Payment Schedule
. Full Project Deliverables and Services Price
. Payment Schedule
Entire Agreement. This Amendment, hereto constitutes the entire understanding of
the parties with respect to the subject matter of this Amendment and supersedes
all prior and contemporaneous agreements or understandings. By signing this
Amendment, each party represents to the other that it has the authority to sign
this Amendment and this Amendment is enforceable against it in accordance with
its terms.
IN WITNESS WHEREOF, the parties hereto have caused this Amendment to be executed
by their respective duly authorized representatives.
EARTHWATCH, INCORPORATED
By: /s/ Xxxxxxx X. Xxxxxxxxx III 4/29/99
---------------------------------- --------------------------
Xxxxxxx X. Xxxxxxxxx III Date
Chief Executive Officer & President
BALL AEROSPACE SYSTEMS DIVISION
By: /s/ Xxxx X. Xxxxxxx 5/4/99
---------------------------- --------------------------
Xxxx X. Xxxxxxx Date
Manager of Contracts
Dated April 16, 1999
--------------------------------------------------------------------------------------------------------------------
Pay Milestone Total Cum.
Date Description Value Payment Payment
--------------------------------------------------------------------------------------------------------------------
0 6/9/98 a Full set of optics received $ 400,000 $1,200,000 $ 1,200,000
--------------------------------------------------------------------------------------------------------------------
b RWAs received $ 400,000
--------------------------------------------------------------------------------------------------------------------
c Primary & secondary optics bonded to optical mount $ 400,000
--------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------
1 6/30/98 a Spacecraft Test Requirement Document initial release $ 400,000 $1,250,000 $ 2,450,000
--------------------------------------------------------------------------------------------------------------------
b Optical bench prepe complete $ 400,000
--------------------------------------------------------------------------------------------------------------------
c Full set of optical mounts complete $ 400,000
--------------------------------------------------------------------------------------------------------------------
d GPS Receiver order placed $ 50,000
--------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------
2 7/31/98 a Bus Structure complete (inserts & painting) $ 450,000 $1,250,000 $ 3,700,000
--------------------------------------------------------------------------------------------------------------------
b Solid State Recorders complete $ 400,000
--------------------------------------------------------------------------------------------------------------------
c RF box Engineering Models received $ 400,000
--------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------
3 8/31/98 a Primary/Secondary telescope roll test complete $ 450,000 $1,250,000 $ 4,950,000
--------------------------------------------------------------------------------------------------------------------
b Power boxes complete (Battery, PDA, PCU) $ 400,000
--------------------------------------------------------------------------------------------------------------------
c Command & Telemetry Unit received $ 400,000
--------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------
4 9/30/98 a Telescope Assy Complete (mirror pins staked) $ 450,000 $1,250,000 $ 6,200,000
--------------------------------------------------------------------------------------------------------------------
b Propulsion module complete $ 400,000
--------------------------------------------------------------------------------------------------------------------
c Gimbal received $ 400,000
--------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------
5 10/31/98 a Telescope Vibration test complete $ 720,000 $2,476,000 $ 6,676,000
--------------------------------------------------------------------------------------------------------------------
b Wideband data interface EM test complete (SSS $ 420,000
simulator, SSR & WBT)
--------------------------------------------------------------------------------------------------------------------
c Phase 1 & 2 harness complete $ 420,000
--------------------------------------------------------------------------------------------------------------------
d Structure preps complete (heater, thermistors) $ 420,000
--------------------------------------------------------------------------------------------------------------------
e Spacecraft Computer received $ 420,000
--------------------------------------------------------------------------------------------------------------------
f Narrow Band Modulation Indexing $ 76,000
--------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------
6 12/1/98 a Telescope Thermal cycle test complete $ 225,000 $1,300,000 $ 9,976,000
--------------------------------------------------------------------------------------------------------------------
b Instrument radiator thermal test complete $ 215,000
--------------------------------------------------------------------------------------------------------------------
c Phase 3, 4, & 5 harness complete $ 215,000
--------------------------------------------------------------------------------------------------------------------
e STOC certified $ 215,000
--------------------------------------------------------------------------------------------------------------------
f Initial Spacecraft Power on $ 215,000
--------------------------------------------------------------------------------------------------------------------
g Flight software loaded into software test bench $ 215,000
--------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------
7 1/19/99 a Execution of Amendment 11 $ 200,000 $ 200,000 $10,176,000
--------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------
8 1/25/99 a Execution of Amendment 12 $ 120,000 $ 120,000 $10,296,000
--------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------
9 2/1/99 a Execution of Amendment 15 $ 80,000 $ 60,000 $10,376,000
--------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------
10 4/8/99 a Focal Plane Installed, aligned and staked $1,000,000 $3,830,000 $14,306,000
--------------------------------------------------------------------------------------------------------------------
b Star tracker electrical integration complete (on bus) $1,000,000
--------------------------------------------------------------------------------------------------------------------
c SAD/HDRS integration complete $1,000,000
--------------------------------------------------------------------------------------------------------------------
d Narrowband RF box set (XNBT & SBR) received $ 930,000
--------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------
11 4/30/99 a Instrument SNR Measurement complete $1,000,000 $3,830,000 $18,236,000
--------------------------------------------------------------------------------------------------------------------
b Instrument ready to integrate into bus $1,000,000
--------------------------------------------------------------------------------------------------------------------
c Wideband RF box set (WBT) received $1,000,000
--------------------------------------------------------------------------------------------------------------------
d Deployable cover & sunshade complete $ 930,000
--------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------
12 5/31/99 a Bus ready for instrument integraton $2,000,000 $3,830,000 $22,158,000
--------------------------------------------------------------------------------------------------------------------
b Instrument installation complete $1,930,000
--------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------
13 6/30/99 a Instrument integration complete $2,000,000 $3,830,000 $28,098,000
--------------------------------------------------------------------------------------------------------------------
b System baseline performance test completed $1,930,000
sucessfully
--------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------
14 7/31/99 a Complete thermal blanket installation $ 500,000 $1,250,000 $27,346,000
--------------------------------------------------------------------------------------------------------------------
b Start Thermal Vac test $ 500,000
--------------------------------------------------------------------------------------------------------------------
c Xxxxxx Control & Software mode successfully $ 250,000
tested on bus
--------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------
15 8/31/99 a Sucessfully complete Thermal Vacuum Test $ 500,000 $1,000,000 $28,346,000
--------------------------------------------------------------------------------------------------------------------
b Complete Solar array installation $ 500,000
--------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------
16 9/30/99 a Sucessfully complete End to End Compatability test $ 500,000 $1,000,000 $29,346,000
--------------------------------------------------------------------------------------------------------------------
b Sucessfully complete Vibration test $ 500,000
--------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------
17 10/31/99 a Sucessfully complete acoustic test $ 500,000 $1,000,000 $30,346,000
--------------------------------------------------------------------------------------------------------------------
b Sucessfully complete post environmental $ 500,000
deployment tests
--------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------
18 11/30/99 a Spacecraft Ready to ship $3,000,000 $3,000,000 $33,346,000
--------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------
19 12/31/99 a Spacecraft ready for launch $ 350,000 $ 350,000 $33,696,000
--------------------------------------------------------------------------------------------------------------------
20 1/30/99 a Completion of in-Orbit test $ 349,000 $ 349,000 $34,045,000
--------------------------------------------------------------------------------------------------------------------
AMENDMENT 33
to
CONTRACT SE.lM.PRJ.0004.A
between
EARTHWATCH, INCORPORATED
AND
BALL AEROSPACE AND TECHNOLOGIES CORP.
FOR
THE QUICKBIRD SPACECRAFT CONTRACT
This Amendment incorporates the following changes to the Contract:
Exhibit B - Option to Purchase One (1) One Meter Spacecraft Segment
. Price & Schedule
. Payment Schedule
Exhibit E - Price and Payment Schedule
. Payment Schedule
Entire Agreement. This Amendment, hereto constitute the entire understanding of
the parties with respect to the subject matter of this Amendment and supersedes
all prior and contemporaneous agreements or understandings. By signing this
Amendment, each party represents to the other that it has the authority to sign
this Amendment and this Amendment is enforceable against it in accordance with
its terms.
IN WITNESS W11EREOF, the parties hereto have caused this Amendment to be
executed by their respective duly authorized representatives.
EARTHWATCH, INCORPORATED
By: /s/ Xxxxx Xxxxxxxx 5/27/99
------------------------------ -------------------------
Xxxxx Xxxxxxxx Date
Director of Contracts
BALL AEROSPACE SYSTEM DIVISION
By: /s/ Xxxx X. Xxxxxxx 5/27/99
------------------------------ ---------------------------
Xxxx X. Xxxxxxx Date
Manager of Contracts
AMENDMENT 33
CONTRACT SE.1M.PRI.0004.A
Exhibit B - Option to Purchase One (1) One Meter Spacecraft Segment
Price & Schedule
----------------
This is to confirm that EarthWatch exercised option to purchase one (1) One
Meter Spacecraft Segment from BATC by having provided BATC with an original
signed copy of Exhibit B, dated April 14, 1999 to BATC.
Payment Schedule
----------------
Substitute the SE.1M.PRJ.0004.A payment milestone schedule included in Exhibit B
with the attached SE.1M.PRJ.0004A dated May 26, 1999 payment milestone
schedule.
Exhibit E - Price and Payment Schedule
--------------------------------------
Payment Schedule
----------------
Substitute the SE.1M.PRJ.0004.A dated February 16, 1999 payment milestone
schedule with the attached SE.1M.PRJ.0004A dated May 26, 1999 payment
milestone schedule.
EarthWatch QuickBird 1 Milestone Payment Schedule
Amendment 33
SE.1M.PRJ.004A
Dated May 26, 1999
Pay Milestone Total Cumm
Date Description Value Payment Payment
--------------------------------------------------------------------------------------------------------------------------------
0 6/9/98 a Full set of optics received $ 400,000 $ 1,200,000 $ 1,200,000
--------------------------------------------------------------------------------------------------------------------------------
b RWAs received $ 400,000
--------------------------------------------------------------------------------------------------------------------------------
c Primary & secondary optics bonded to optical mount $ 400,000
--------------------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------------------
1 6/30/98 a Spacecraft Test Requirement Document initial relea $ 400,000 $ 1,250,000 $ 2,450,000
--------------------------------------------------------------------------------------------------------------------------------
b Optical bench preps complete $ 400,000
--------------------------------------------------------------------------------------------------------------------------------
c Full set of optical mounts complete $ 400,000
--------------------------------------------------------------------------------------------------------------------------------
d GPS Receiver order placed $ 50,000
--------------------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------------------
2 7/31/98 a Bus Structure complete (inserts & painting) $ 450,000 $ 1,250,000 $ 3,700,000
--------------------------------------------------------------------------------------------------------------------------------
b Solid State Recorders complete $ 400,000
--------------------------------------------------------------------------------------------------------------------------------
c RF box Engineering Models received $ 400,000
--------------------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------------------
3 8/31/98 a Primary/Secondary telescope roll test complete $ 450,000 $ 1,250,000 $ 4,950,000
--------------------------------------------------------------------------------------------------------------------------------
b Power boxes complete (Battery, PDA, PCU) $ 400,000
--------------------------------------------------------------------------------------------------------------------------------
c Command & Telemetry Unit received $ 400,000
--------------------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------------------
4 9/30/98 a Telescope Assy Complete (mirror pins staked) $ 450,000 $ 1,250,000 $ 6,200,000
--------------------------------------------------------------------------------------------------------------------------------
b Propulsion module complete $ 400,000
--------------------------------------------------------------------------------------------------------------------------------
c Gimbal received $ 400,000
--------------------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------------------
5 10/31/98 a Telescope Vibration test complete $ 720,000 $ 2,476,000 $ 8,676,000
--------------------------------------------------------------------------------------------------------------------------------
b Wideband data interface EM test complete (SSS
simulator, SSR, & WBT) $ 420,000
--------------------------------------------------------------------------------------------------------------------------------
c Phase 1 & 2 harness complete $ 420,000
--------------------------------------------------------------------------------------------------------------------------------
d Structure preps complete (heaters, thermistors) $ 420,000
--------------------------------------------------------------------------------------------------------------------------------
e Spacecraft Computer received $ 420,000
--------------------------------------------------------------------------------------------------------------------------------
f Narrow Band Modulation Indexing $ 76,000
--------------------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------------------
6 12/1/98 a Telescope Thermal cycle test complete $ 225,000 $ 1,300,000 $ 9,976,000
--------------------------------------------------------------------------------------------------------------------------------
b Instrument radiator thermal test complete $ 215,000
--------------------------------------------------------------------------------------------------------------------------------
c Phase 3, 4, & 5 harness complete $ 215,000
--------------------------------------------------------------------------------------------------------------------------------
e STOC certified $ 215,000
--------------------------------------------------------------------------------------------------------------------------------
f Initial Spacecraft Power on $ 215,000
--------------------------------------------------------------------------------------------------------------------------------
g Flight software loaded into software test bench $ 215,000
--------------------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------------------
7 1/19/99 a Execution of Amendment 11 $ 200,000 $ 200,000 $10,176,000
--------------------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------------------
8 1/25/99 a Execution of Amendment 12 $ 120,000 $ 120,000 $10,296,000
--------------------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------------------
9 2/1/99 a Execution of Amendment 15 $ 80,000 $ 80,000 $10,376,000
--------------------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------------------
10 4/8/99 a Star tracker electrical integration comp $2,000,000 $ 3,930,000 $14,306,000
--------------------------------------------------------------------------------------------------------------------------------
b SAD/SADE integration complete $1,930,000
--------------------------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------------------------
11 4/30/99 a Wideband RF box set (WBT) received $1,000,000 $ 3,000,000 $17,306,000
--------------------------------------------------------------------------------------------------------------------------------
b Deployable cover & sunshade complete $1,000,000
--------------------------------------------------------------------------------------------------------------------------------
5/27/99
EarthWatch QuickBird 1 Milestone Payment Schedule Amendment 33
SE.1M.PRJ.004A
Dated May 26,1999
--------------------------------------------------------------------------------------------------------------
c Gimbal & GDE integration complete $1,000,000
--------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------
12 6/1/99 a Bus ready for instrument integration $1,000,000 $3,000,000 $20,306,000
--------------------------------------------------------------------------------------------------------------
b Sensor Subsystem preinstallation testing complete $1,000,000
--------------------------------------------------------------------------------------------------------------
c Sunshade & trackers installed onto telescope $1,000,000
--------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------
13 6/30/99 a IRUs delivered, installed & reintegrated $1,000,000 $3,000,000 $23,306,000
--------------------------------------------------------------------------------------------------------------
b Xxxx Xxxxxxx box bus modifications made $1,000,000
--------------------------------------------------------------------------------------------------------------
c Narrowband RF box set (XNBT & SBR) received $1,000,000
--------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------
14 7/31/99 a Focal Plane installed, aligned, and staked $ 395,000 $1,040,000 $24,346,000
--------------------------------------------------------------------------------------------------------------
b Instrument ready to integrate into bus $ 395,000
--------------------------------------------------------------------------------------------------------------
c Gimbal Control & Software mods successfully tested $ 250,000
--------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------
15 8/31/99 a Instrument Installation complete $ 500,000 $1,000,000 $25,346,000
--------------------------------------------------------------------------------------------------------------
b Instrument Integration complete $ 500,000
--------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------
16 9/30/99 a System baseline performance tests completed suce $ 500,000 $1,000,000 $26,346,000
--------------------------------------------------------------------------------------------------------------
b Battery louver assembly complete and installed $ 500,000
--------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------
17 11/2/99 a Complete thermal blanket installation $ 500,000 $1,000,000 $27,346,000
--------------------------------------------------------------------------------------------------------------
b Start Thermal Vac test $ 500,000
--------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------
18 11/30/99 a Successfully complete Thermal Vacuum Test $ 500,000 $1,000,000 $28,346,000
--------------------------------------------------------------------------------------------------------------
b Complete Solar array installation $ 500,000
--------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------
19 12/30/99 a Successfully complete End to End Compatability test $ 500,000 $1,000,000 $29,346,000
--------------------------------------------------------------------------------------------------------------
b Successfully complete Vibration Test $ 500,000
--------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------
20 1/31/00 a Successfully complete acoustic test $ 500,000 $1,000,000 $30,346,000
--------------------------------------------------------------------------------------------------------------
b Successfully complete post environmental deployme $ 500,000
--------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------
21 2/29/00 a Spacecraft Ready to ship $3,000,000 $3,000,000 $33,346,000
--------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------
22 3/31/00 a Spacecraft ready for launch $ 350,000 $ 350,000 $33,696,000
--------------------------------------------------------------------------------------------------------------
--------------------------------------------------------------------------------------------------------------
23 5/1/00 a Completion of In-Orbit test $ 349,000 $ 349,000 $34,045,000
--------------------------------------------------------------------------------------------------------------
5/27/99
EarthWatch QuickBird 2 Milestone Payment Schedule
Amendment 33
SE.lM.PRJ,0004.A
Dated May 26, 1999
Pay Milestone Total Cumm
Date Description Value Payment Payment
----------------------------------------------------------------------------------------------------------------------
1 4/14/99 a Execution of contract option $2,900,000 $2,900,000 $ 2,900,000
----------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------------
2 5/1/99 a All major Subcontracts placed $2,900,060 $2,900,000 $ 5,800,000
----------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------------
3 6/1/99 a Program baseline schedules released $ 850,000 $2,500,000 $ 8,300,000
----------------------------------------------------------------------------------------------------------------------
b Gimbal received $ 850,000
----------------------------------------------------------------------------------------------------------------------
c Full set of optical mounts complete $ 800,000
----------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------------
4 6/30/99 a Full set of optics received $ 650,000 $2,000,000 $10,300,000
----------------------------------------------------------------------------------------------------------------------
b Panel bonding complete $ 650,000
----------------------------------------------------------------------------------------------------------------------
c 80% of electrical board fab complete $ 700,000
----------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------------
5 7/31/99 a Full set of Optics Bonded Complete $ 500,000 $1,000,000 $11,300,000
----------------------------------------------------------------------------------------------------------------------
b Bench Preps Complete $ 500,000
----------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------------
6 8/31/99 a Full set of RF components recieved (NBT, SBR, $ 850,000 $2,500,000 $13,800,000
----------------------------------------------------------------------------------------------------------------------
b Zenith Deck Received & machining complete $ 850,000
----------------------------------------------------------------------------------------------------------------------
c Structure match machining complete $ 800,000
----------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------------
7 9/30/99 a Telescope Roll & Wavefront verification $ 850,000 $2,500,000 $16,300,000
----------------------------------------------------------------------------------------------------------------------
b CPU shipped to Xxxxxxxx $ 850,000
----------------------------------------------------------------------------------------------------------------------
c Sunshade & Cover Complete $ 800,000
----------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------------
8 11/2/99 a Harness Complete $ 450,000 $1,300,000 $17,600,000
----------------------------------------------------------------------------------------------------------------------
b Structure complete $ 450,000
----------------------------------------------------------------------------------------------------------------------
c Telescope Vibration successfully complete $ 400,000
----------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------------
9 11/30/99 a Structure Preps & Harness Installation Complete $ 625,000 $2,500,000 $20,100,000
----------------------------------------------------------------------------------------------------------------------
b Power Boxes (PCU, SEP, PDAs) complete $ 625,000
----------------------------------------------------------------------------------------------------------------------
c Star trackers complete $ 625,000
----------------------------------------------------------------------------------------------------------------------
d Stim Lamp & electronics complete $ 625,000
----------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------------
10 12/30/99 a Spacecraft Initial Power on $ 650,000 $1,300,000 $21,400,000
----------------------------------------------------------------------------------------------------------------------
b GPS receivers received $ 650,000
----------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------------
11 1/31/00 a SCC and CTU received $ 650,000 $1,300,000 $22,700,000
----------------------------------------------------------------------------------------------------------------------
b Telescope Complete $ 650,000
----------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------------
12 2/29/00 a RWAs and IRUs received $ 560,000 $1,120,000 $23,820,000
----------------------------------------------------------------------------------------------------------------------
b Propulsion Module Complete $ 560,000
----------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------------
13 3/31/00 a Battery Complete $ 700,000 $ 700,000 $24,520,000
----------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------------
14 5/1/00 a Instrument Complete $ 700,000 $ 700,000 $25,220,000
----------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------------
15 6/1/00 a Bus Ready for Instrument Installation $ 700,000 $ 700,000 $25,920,000
----------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------------
16 7/1/00 a Instrument Integration Complete $ 700,000 $ 700,000 $26,620,000
----------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------------
17 8/1/00 a Spacecraft Initial Tests $ 700,000 $ 700,000 $27,320,000
----------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------------
18 9/1/00 a Complete Thermal Vac $ 700,000 $ 700,000 $28,020,000
----------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------------
19 10/1/00 a Solar Array Installation Complete $ 700,000 $ 700,000 $28,720,000
----------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------------
20 11/1/00 a Complete Vibration Testing $ 330,000 $ 330,000 $29,050,000
----------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------------
21 12/1/00 a Spacecraft Ready to Ship $2,000,000 $2,000,000 $31,050,000
----------------------------------------------------------------------------------------------------------------------
5/27/99
AMENDMENT 34
to
CONTRACT SE.1M.PRJ.0004.A
between
EARTHWATCH, INCORPORATED
AND
BALL AEROSPACE AND TECHNOLOGIES CORP.
FOR
THE QUICKBIRD SPACECRAFT CONTRACT
This Amendment incorporates the following changes to the Contract Specifications
and Payment Schedule:
Exhibit D - Specifications, Spacecraft Bus & Instrument
. 2.1.2 Non-Government Documents
. 3.1.3.7 Fault
. 3.3.3.1.9 Sun Avoidance
. 3.5.2.6 Emergency Mode
. 3.5.2.9 Solar Panel Gimbal Control
. 3.6.4.2.3 Specific Maneuvers
. 3.7.2 General Requirements
. 3.7.2.1 Configuration
. 3.7.5 Solar Array Performance
. 3.8.1 Performance Requirements
. 3.8.2 Subsystem Design Requirements
Exhibit E - Price and Payment Schedule
. Payment Schedule
Entire Agreement. This Amendment, hereto constitute the entire understanding of
the parties with respect to the subject matter of this Amendment and supersedes
all prior and contemporaneous agreements or understandings. By signing this
Amendment, each party represents to the other that it has the authority to sign
this Amendment and this Amendment is enforceable against it in accordance with
its terms.
IN WITNESS WHEREOF, the parties hereto have caused this Amendment to be executed
by their respective duly authorized representatives.
EARTHWATCH, INCORPORATED
------------------------
By: /s/ Xxxxx Xxxxxxxx 10/12/97
------------------------------- ---------------------------
Xxxxx Xxxxxxxx Date
Director of Contracts
BALL AEROSPACE SYSTEMS DIVISION
-------------------------------
By: /s/ Xxxx X. Xxxxxxx 10/18/99
---------------------------- ---------------------------
Xxxx X. Xxxxxxx Date
Manager of Contracts
Amendment 34
SE.1M.PRJ.004A
Dated July 20, 1999
EarthWatch QuickBird 1 Milestone Payment Schedule
----------------------------------------------------------------------------------------------------------------------------------
Pay Milestone Total Cumm
Date Description Value Payment Payment
----------------------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------------------------
0 6/9/98 a Full set of optics received $ 400,000 $1,200,000 $ 1,200,000
----------------------------------------------------------------------------------------------------------------------------------
b RWAs received $ 400,000
----------------------------------------------------------------------------------------------------------------------------------
c Primary & secondary optics bonded to optical mount $ 400,000
----------------------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------------------------
1 6/30/98 a Spacecraft Test Requirement Document initial release $ 400,000 $1,250,000 $ 2,450,000
----------------------------------------------------------------------------------------------------------------------------------
b Optical bench preps complete $ 400,000
----------------------------------------------------------------------------------------------------------------------------------
c Full set of optical mounts complete $ 400,000
----------------------------------------------------------------------------------------------------------------------------------
d GPS Receiver order placed $ 50,000
----------------------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------------------------
2 7/31/98 a Bus Structure complete (inserts & painting) $ 450,000 $1,250,000 $ 3,700,000
----------------------------------------------------------------------------------------------------------------------------------
b Solid State Recorders complete $ 400,000
----------------------------------------------------------------------------------------------------------------------------------
c RF box Engineering Models received $ 400,000
----------------------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------------------------
3 8/31/98 a Primary/Secondary telescope roll test complete $ 450,000 $1,250,000 $ 4,950,000
----------------------------------------------------------------------------------------------------------------------------------
b Power boxes complete (Battery, PDA, PCU) $ 400,000
----------------------------------------------------------------------------------------------------------------------------------
c Command & Telemetry Unit received $ 400,000
----------------------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------------------------
4 9/30/98 a Telescope Assy Complete (mirror pins staked) $ 450,000 $1,250,000 $ 6,200,000
----------------------------------------------------------------------------------------------------------------------------------
b Propulsion module complete $ 400,000
----------------------------------------------------------------------------------------------------------------------------------
c Gimbal received $ 400,000
----------------------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------------------------
5 10/31/98 a Telescope Vibration test complete $ 720,000 $2,476,000 $ 8,676,000
----------------------------------------------------------------------------------------------------------------------------------
Wideband data interface EM test complete (SSS
b simulator, SSR, & WBT) $ 420,000
----------------------------------------------------------------------------------------------------------------------------------
c Phase 1 & 2 harness complete $ 420,000
----------------------------------------------------------------------------------------------------------------------------------
d Structure preps complete (heaters, thermistors) $ 420,000
----------------------------------------------------------------------------------------------------------------------------------
e Spacecraft Computer received $ 420,000
----------------------------------------------------------------------------------------------------------------------------------
f Narrow Band Modulation indexing $ 76,000
----------------------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------------------------
6 12/1/98 a Telescope Thermal cycle test complete $ 225,000 $1,300,000 $ 9,976,000
----------------------------------------------------------------------------------------------------------------------------------
b Instrument radiator thermal test complete $ 215,000
----------------------------------------------------------------------------------------------------------------------------------
c Phase 3, 4, & 5 harness complete $ 215,000
----------------------------------------------------------------------------------------------------------------------------------
e STOC certified $ 215,000
----------------------------------------------------------------------------------------------------------------------------------
f Initial Spacecraft Power on $ 215,000
----------------------------------------------------------------------------------------------------------------------------------
g Flight software loaded into software test bench $ 215,000
----------------------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------------------------
7 1/19/99 a Execution of Amendment 11 $ 200,000 $ 200,000 $10,176,000
----------------------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------------------------
8 1/25/99 a Execution of Amendment 12 $ 120,000 $ 120,000 $10,296,000
----------------------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------------------------
9 2/1/99 a Execution of Amendment 15 $ 80,000 $ 80,000 $10,376,000
----------------------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------------------------
10 4/8/99 a Star tracker electrical integration complete (on bus) $2,000,000 $3,930,000 $14,306,000
----------------------------------------------------------------------------------------------------------------------------------
b SAD/SADE integration complete $1,930,000
----------------------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------------------------
11 4/30/99 a Wideband RF box set (WBT) received $1,000,000 $3,000,000 $17,306,000
----------------------------------------------------------------------------------------------------------------------------------
b Deployable cover & sunshade complete $1,000,000
----------------------------------------------------------------------------------------------------------------------------------
Amendment 34
SE.1M.PRJ.004A
Dated July 20, 1999
EarthWatch QuickBird 1 Milestone Payment Schedule
----------------------------------------------------------------------------------------------------------------------------------
c Gimbal & GDE integration complete $1,000,000
----------------------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------------------------
12 6/1/99 a Bus ready for instrument integration $1,000,000 $3,000,000 $20,306,000
----------------------------------------------------------------------------------------------------------------------------------
b Sensor Subsystem preinstallation testing complete $1,000,000
----------------------------------------------------------------------------------------------------------------------------------
c Sunshade & trackers installed onto telescope $1,000,000
----------------------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------------------------
13 6/30/99 a IRUs delivered, installed & reintegrated $1,000,000 $3,000,000 $23,306,000
----------------------------------------------------------------------------------------------------------------------------------
b Xxxx Xxxxxxx box bus modifications made $1,000,000
----------------------------------------------------------------------------------------------------------------------------------
c Narrowband RF box set (XNBT & SBR) received $1,000,000
----------------------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------------------------
14 7/31/99 a Focal Plane installed, aligned, and staked $ 395,000 $1,040,000 $24,346,000
----------------------------------------------------------------------------------------------------------------------------------
b Instrument ready to integrate into bus $ 395,000
----------------------------------------------------------------------------------------------------------------------------------
c Gimbal Control & Software mods successfully tested $ 250,000
----------------------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------------------------
15 8/31/99 a Instrument installation complete $ 500,000 $1,000,000 $25,346,000
----------------------------------------------------------------------------------------------------------------------------------
b Instrument integration complete $ 500,000
----------------------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------------------------
16 9/30/99 a System baseline performances tests completed since $ 500,000 $1,000,000 $26,346,000
----------------------------------------------------------------------------------------------------------------------------------
b Battery louver assembly completed and installed $ 500,000
----------------------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------------------------
17 11/2/99 a Complete thermal blanket installation $ 500,000 $1,280,000 $27,626,000
----------------------------------------------------------------------------------------------------------------------------------
b Start Thermal Vac test $ 500,000
----------------------------------------------------------------------------------------------------------------------------------
c SEP emergency mode controller rework complete $ 280,000
----------------------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------------------------
18 11/30/99 a Successfully complete Thermal Vacuum Test $ 500,000 $1,000,000 $28,626,000
----------------------------------------------------------------------------------------------------------------------------------
b Complete Solar array installation $ 500,000
----------------------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------------------------
19 12/30/99 a Successfully complete End to End Compatability test $ 500,000 $1,000,000 $29,626,000
----------------------------------------------------------------------------------------------------------------------------------
b Successfully complete Vibration Test $ 500,000
----------------------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------------------------
20 1/31/00 a Successfully complete acoustic test $ 500,000 $1,000,000 $30,626,000
----------------------------------------------------------------------------------------------------------------------------------
b Successfully complete post environmental deployment $ 500,000
----------------------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------------------------
21 2/29/00 a Spacecraft Ready to ship $3,000,000 $3,000,000 $33,626,000
----------------------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------------------------
22 3/31/00 a Spacecraft ready for launch $ 350,000 $ 350,000 $33,976,000
----------------------------------------------------------------------------------------------------------------------------------
----------------------------------------------------------------------------------------------------------------------------------
23 5/1/00 a Completion of in-Orbit test $ 349,000 $ 349,000 $34,325,000
----------------------------------------------------------------------------------------------------------------------------------
AMENDMENT 35
to
CONTRACT SE.1M.PRJ.0004.A
between
EARTHWATCH, INCORPORATED
AND
BALL AEROSPACE AND TECHNOLOGIES CORP.
FOR
THE QUICKBIRD SPACECRAFT CONTRACT
This Amendment incorporates the following changes to the Statement of Work and
Payment Schedule of the Contract:
Exhibit C - Statement of Work
Exhibit E - Price and Payment Schedule
. Payment Schedule
Entire Agreement. This Amendment, hereto constitute the entire understanding of
the parties with respect to the subject matter of this Amendment and supersedes
all prior and contemporaneous agreements or understandings. By signing this
Amendment, each party represents to the other that it has the authority to sign
this Amendment and this Amendment is enforceable against it in accordance with
its terms.
IN WITNESS WHEREOF, the parties hereto have caused this Amendment to be executed
by their respective duly authorized representatives.
EARTHWATCH, INCORPORATED
By: /s/ Xxxxx Xxxxxxxx 12/16/99
------------------------------- ----------------------------
Xxxxx Xxxxxxxx Date
Director of Contracts
BALL AEROSPACE SYSTEMS DIVISION
By: /s/ Xxxx X. Xxxxxxx 12/22/99
---------------------------- ---------------------------
Xxxx X. Xxxxxxx Date
Manager of Contracts
AMENDMENT 35
CONTRACT SE.1M.PRJ.0004.A
Exhibit C - Statement of Work
-----------------------------
WAS
---
3.1 DELIVERABLE ITEMS
a. Spacecraft Number 1: November 3, 1999
b. Spacecraft Number 2: August 1, 2000 (Assumes
December 15, 1998 option
exercise)
c. Spacecraft Test Operations Console with 2/nd/ spacecraft
IS
--
3.1 DELIVERABLE ITEMS
a. Spacecraft Number 1: May 19, 2000
b. Spacecraft Number 2: December 22, 2000
c. Spacecraft Test Operations Console with 2/nd/ spacecraft
Exhibit E - Price and Payment Schedule
--------------------------------------
Payment Schedule
----------------
Substitute the SE.1M.PRJ.0004.A dated July 20, 1999 payment milestone schedule
with the attached SE.1M.PRJ.0004A dated December 13, 1999 payment milestone
schedule.
Amend. 35
SE.1M.PRJ.0004.A
Dated December 13, 0000
XX-00 XxxxxXxxx 1 Payment Milestone Schedule
-----------------------------------------------------------------------------------------------------------------
Forecasted Total Cum
Item Pay Item Milestone Payment Payment
# Date Line Description Value Forecast Forecast
-----------------------------------------------------------------------------------------------------------------
0 6/9/98 a Full set of optics received $ 400,000 $1,200,000 $ 1,200,000
b RWAs received $ 400,000
c Primary & secondary optics bonded to optical $ 400,000
mounts
1 6/30/98 a Spacecraft Test Requirement Document initial $ 400,000 $1,250,000 $ 2,450,000
release
b Optical bench preps complete $ 400,000
c Full set of optical mounts complete $ 400,000
d GPS Receiver order placed $ 50,000
2 7/31/98 a Bus Structure complete (inserts & painting) $ 450,000 $1,250,000 $ 3,700,000
b Solid State Recorders complete $ 400,000
c RF box Engineering Models received $ 400,000
3 8/31/98 a Primary/Secondary telescope roll test complete $ 450,000 $1,250,000 $ 4,950,000
b Power boxes complete (Battery, PDA, PCU) $ 400,000
c Command & Telemetry Unit received $ 400,000
4 9/30/98 a Telescope Assy Complete (mirror pins staked) $ 450,000 $1,250,000 $ 6,200,000
b Propulsion module complete $ 400,000
c Gimbal received $ 400,000
5 10/31/98 a Telescope Vibration test complete $ 720,000 $2,476,000 $ 8,676,000
b Wideband data interface EM test complete (SSS $ 420,000
simulator, SSR, & WBT)
c Phase 1 & 2 harness complete $ 420,000
d Structure preps complete (heaters, thermistors) $ 420,000
e Spacecraft Computer received $ 420,000
f Narrow Bond Modulation Indexing $ 76,000
6 12/1/98 a Telescope Thermal cycle test complete $ 225,000 $1,300,000 $ 9,975,000
b Instrument radiator thermal test complete $ 215,000
c Phase 3, 4, & 5 harness complete $ 215,000
d STOC certified $ 215,000
e Initial Spacecraft Power on $ 215,000
f Flight software loaded into software test bench $ 215,000
7 1/19/99 a Execution of Amendment 11 $ 200,000 $ 200,000 $10,176,000
8 1/25/99 a Execution of Amendment 12 $ 120,000 $ 120,000 $10,296,000
9 2/1/99 a Execution of Amendment 15 $ 80,000 $ 80,000 $10,376,000
10 4/8/99 a Star Tracker Electrical Integration Complete $2,000,000 $3,830,000 $14,306,000
(on bus)
b SAD/SADE Integration Complete $1,830,000
11 4/30/99 a Wideband RF Box Set (WBT) received $1,000,000 $3,000,000 $17,306,000
b Deployable Cover & Sunshades Complete $1,000,000
c Gimbal & GDE Integration Complete $1,000,000
12 5/31/99 a Bus Ready for Instrument Integration $1,000,000 $3,000,000 $20,306,000
b Sensor Subsystem Preinstallation Testing $1,000,000
Complete
c Sunshade & Trackers Installed onto Telescope $1,000,000
13 6/30/99 a IRUs delivered, installed & reintegrated $1,000,000 $3,000,000 $23,306,000
b Xxxx Solomon Box Bus Modifications Made $1,000,000
c Narrowband RF Box Set (XNBT & SBR) received $1,000,000
14 7/31/99 a Focal Plane Installed, Aligned and Staked $ 385,000 $1,040,000 $24,346,000
b Instrument ready to Integrate into bus $ 385,000
c Gimbal Control & Software Mods $ 250,000
Successfully Tested on Bus
15 8/31/99 a Instrument Installation complete $ 500,000 $1,000,000 $25,346,000
b Instrument Integration complete $ 500,000
12/15/99
Amend. 35
SE.1M.PRJ.0004.A
Dated December 13, 0000
XX-00 XxxxxXxxx 1 Payment Milestone Schedule
-----------------------------------------------------------------------------------------------------------------
Forecasted Total Cum
Item Pay Item Milestone Payment Payment
# Date Line Description Value Forecast Forecast
-----------------------------------------------------------------------------------------------------------------
16 9/30/99 a System Baseline Performance Tests $ 500,000 $1,000,000 $26,346,000
Completed Successfully
b Battery Louver Assembly Complete and Installed $ 500,000
17 10/31/99 a Complete thermal blanket installation $ 500,000 $1,280,000 $27,826,000
b Start Thermal Vac Test $ 500,000
c SEP Emergency Mode Controller Rework $ 280,000
Complete
18 11/30/99 a Successfully complete Thermal Vacuum Test $ 800,000 $1,000,000 $28,626,000
b Complete Solar Array installation $ 600,000
19 12/30/99 a De-integrate instrument from Spacecraft Bus $ 220,000 $ 660,000 $29,288,000
b Repeat Radiometric Calibration after EKC fix $ 220,000
c Re-integration on instrument into Spacecraft $ 220,000
Bus
20 1/31/00 a Successfully complete End to End Compatability $ 500,000 $1,000,000 $30,286,000
test
b Successfully complete Vibration Test $ 500,000
21 2/28/00 a Successfully complete acoustic test $ 500,000 $1,000,000 $31,286,000
b Successfully complete post environmental $ 500,000
deployment tests
22 3/31/00 a Spacecraft Ready to ship $3,000,000 $3,000,000 $34,286,000
23 4/30/00 a Spacecraft ready for launch $ 350,000 $ 350,000 $34,636,000
24 6/30/00 a Completion of in-Orbit test $ 349,000 $ 349,000 $34,985,000
-----------------------------------------------------------------------------------------------------------------
12/15/99
Amend. 35
SE.1M.PRJ.0004A
Dated December 13, 0000
XX-00 XxxxxXxxx 1 Payment Milestone Schedule
-----------------------------------------------------------------------------------------------------------------
Forecasted Total Cum
Item Pay Item Milestone Payment Payment
# Date Line Description Value Forecast Forecast
-----------------------------------------------------------------------------------------------------------------
1 4/14/99 a Execution of Contract Option $2,900,000 $2,900,000 $ 2,900,000
2 5/1/99 a All Major Subcontracts Placed $2,900,000 $2,900,000 $ 5,800,000
3 6/1/99 a Program Baseline Schedules Released $ 850,000 $2,500,000 $ 8,300,000
b Gimbal Received $ 850,000
c Full Set of Optical Mounts Complete $ 800,000
4 8/30/99 a Full Set of Optics Received $ 680,000 $2,000,000 $10,300,000
b Panel Bonding Complete $ 680,000
c 80% of Electrical Board Fab Complete $ 700,000
5 7/31/99 a Full Set of Optics Bonded Complete $ 500,000 $1,000,000 $11,300,000
b Bench Preps Complete $ 500,000
6 8/31/99 a Full Set of RF Components Received $ 850,000 $2,500,000 $13,800,000
(NBT, SBR, WBDT)
b Zenith Deck Received & Machining Complete $ 850,000
c Structure Match Machining Complete $ 800,000
7 9/30/99 a Telescope Roll & Wavefront Verification $ 850,000 $2,500,000 $16,300,000
b CPU Shipped to Xxxxxxxx $ 850,000
c Sunshade & Cover Complete $ 800,000
8 10/31/99 a Harness Complete $ 450,000 $1,300,000 $17,600,000
b Structure Complete $ 450,000
c Telescope Vibration Successfully Complete $ 400,000
9 11/30/99 a Structure Preps & Harness Installation $ 625,000 $2,500,000 $20,100,000
Complete
b Power Boxes (PCU, SEP, PDAs) complete $ 625,000
c Star Trackers Complete $ 625,000
d Slim Lamp & Electronics Complete $ 625,000
10 12/31/99 a Spacecraft Initial Power on $ 650,000 $1,600,000 $21,700,000
b GPS Receivers Received $ 650,000
c Large Tank Subcontracts Placed $ 150,000
d Large Tank Zenith Deck Modifications Complete $ 150,000
11 1/31/00 a SCC and CTU Received $ 850,000 $1,311,500 $23,011,500
b Telescope Complete $ 850,000
c CDU Lockout Timer and VTCW Hold Change $ 11,800
12 2/28/00 a RWAs and IRUs received $ 550,000 $ 710,000 $23,721,500
b Star Trackers Small Shades and Final Test $ 150,000
Complete
13 3/31/00 a Battery Complete $ 700,000 $ 700,000 $24,421,500
14 4/30/00 a Propulsion Module Complete $ 560,000 $ 560,000 $24,881,500
15 5/31/00 a Bus Ready for Instrument Instllation $ 700,000 $ 700,000 $25,681,500
16 6/30/00 a Instrument Completetion Complete $ 700,000 $ 700,000 $26,361,500
17 7/31/00 a Instrument Integration Complete $ 700,000 $ 700,000 $27,081,500
18 8/31/00 a Spacecraft Initial Tests $ 700,000 $ 700,000 $27,781,500
19 9/30/00 a Complete Thermal Vac $ 700,000 $ 700,000 $28,491,500
12/15/90
Amend. 35
SE.1M.PRJ.0004.A
Dated December 13, 0000
XX-00 XxxxxXxxx 2 Payment Milestone Schedule
Forecasted Total Cum
Item Pay Line Milestone Payment Payment
# Date Item Description Value Forecast Forecast
-----------------------------------------------------------------------------------------------------------------
20 10/31/00 a Solar Array Installation Complete $ 700,000 $ 700,000 $28,181,500
21 11/30/00 a Complete Vibration Testing $ 330,000 $ 330,000 $29,511,500
22 12/31/00 a Spacecraft Ready to Ship $2,000,000 $2,000,000 $31,511,600
AMENDMENT 36
CONTRACT SE. 1M.PRJ.0004.A
AMENDMENT 36
to
CONTRACT SE.1M.PRJ.0004.A
between
EARTHWATCH, INCORPORATED
AND
BALL AEROSPACE AND TECHNOLOGIES CORP.
FOR
THE QUICKBIRD SPACECRAFT CONTRACT
This Amendment incorporates the following changes to the QuickBird 2
Specifications and QuickBird 2 Payment Schedule of the Contract:
Exhibit D - Specifications
Articles 3.1.2.1, 3.1.3.6, 3.2.1, 3.3.3, 3.6.1, 3.6.2.1.2, 3.6.2.1.4, 3.6.2.3,
3.6.4.1, 3.6.4.2.1, and 3.6.4.2.3
Exhibit E - Price and Payment Schedule
QuickBird 2 Payment Milestone Schedule
Entire Aggreement. This Amendment, hereto constitute the entire understanding of
the parties with respect to the subject matter of this Amendment and supersedes
all prior and contemporaneous agreements or understandings. By signing this
Amendment, each party represents to the other that it has the authority to sign
this Amendment and this Amendment is enforceable against it in accordance with
its terms.
IN WITNESS WHEREOF, the parties hereto have caused this Amendment to be executed
by their respective duly authorized representatives.
EARTHWATCH, INCORPORATED
By: /s/ Xxxxx Xxxxxxxx Date: 3/3/00
-------------------------------- -----------------
Xxxxx Xxxxxxxx
Director of Contracts
BALL AEROSPACE & TECHNOLOGIES CORPORATION
By: /s/ Xxxx X. Xxxxxxx Date: 3/3/00
--------------------------------- -----------------
Xxxx X. Xxxxxxx
Manager of Contracts
EarthWatch QuickBird Milestone Payment Schedule Amend 36
SE.1M.PRJ.004A
PM-08 QuickBird 2 Payment Milestone Schedule Dated: February 4, 2000
-----------------------------------------------------------------------------------------------------------------------
Line Forecasted Total Payment Cum Payment
Item # Pay Date Item Description Milestone Value Forecast Forecast
-----------------------------------------------------------------------------------------------------------------------
1 4/14/99 a Execution of Contract Option $2,900,000 $2,900,000 $ 2,900,000
2 5/1/99 a All Major Subcontracts Placed $2,900,000 $2,900,000 $ 5,800,000
3 6/1/99 a Program Baseline Schedules Released $ 850,000 $2,500,000 $ 8,300,000
b Gimbal Received $ 850,000
c Full Set of Optical Mounts Complete $ 800,000
4 6/30/99 a Full Set of Optics Received $ 650,000 $2,000,000 $10,300,000
b Panel Bonding Complete $ 650,000
c 80% of Electrical Board Fab Complete $ 700,000
5 7/31/99 a Full Set of Optics Bonded Complete $ 500,000 $1,000,000 $11,300,000
b Bench Preps Complete $ 500,000
6 8/31/99 a Full Set of RF Components Received (NBT, SBR, WBDT) $ 850,000 $2,500,000 $13,800,000
b Zenith Deck Received & Machining Complete $ 850,000
c Structure Match Machining Complete $ 800,000
7 9/30/99 a Telescope Roll & Wavefront Verification $ 850,000 $2,500,000 $16,300,000
b CPU Shipped to Xxxxxxxx $ 850,000
c Sunshade & Cover Complete $ 800,000
8 10/31/99 a Harness Complete $ 450,000 $1,300,000 $17,600,000
b Structure Complete $ 450,000
c Telescope Vibration Successfully Complete $ 400,000
9 11/30/99 a Structure Preps & Harness Installation Complete $ 625,000 $2,500,000 $20,100,000
b Power Boxes (PCU, SEP, PDAs) complete $ 625,000
c Star Trackers Complete $ 625,000
d Stim Lamp & Electronics Complete $ 625,000
10 12/31/99 a Spacecraft Initial Power on $ 650,000 $1,600,000 $21,700,000
b GPS Receivers Received $ 650,000
c Large Tank Subcontracts Placed $ 150,000
d Large tank Zenith Deck Modifications Complete $ 150,000
11 1/31/00 a SCC and CTU Received $ 650,000 $1,301,500 $23,001,500
b Telescope Complete $ 650,000
c CDU Lockout Timer Change $ 1,500
12 2/28/00 a RWAs and IRUs received $ 560,000 $ 710,000 $23,711,500
b Star Trackers Small Shades and Final Test Complete $ 150,000
13 3/31/00 a Battery Complete $ 700,000 $ 700,000 $24,411,500
14 4/30/00 a Bus Baseline Performance Tests Complete $ 560,000 $ 810,000 $25,221,500
b Large Propulsion Tank Received $ 250,000
15 5/31/00 a Bus Ready for Instrument Installation $ 700,000 $1,100,000 $26,321,500
b Large Propulsion Tank Welded $ 400,000
16 6/30/00 a Instrument Complete $ 700,000 $1,100,000 $27,421,500
b Propulsion Module Complete $ 400,000
17 7/31/00 a Instrument Integration Complete $ 700,000 $ 700,000 $28,121,500
18 8/31/00 a Spacecraft Initial Tests $ 700,000 $ 700,000 $28,821,500
19 9/30/00 a Complete Thermal Vac $ 700,000 $ 700,000 $29,521,500
20 10/31/00 a Solar Array Installation Complete $ 700,000 $ 700,000 $30,221,500
21 11/30/00 a Complete Vibration Testing $ 330,000 $ 330,000 $30,551,500
22 12/31/00 a Spacecraft Ready to Ship $2,000,000 $2,000,000 $32,551,500
-----------------------------------------------------------------------------------------------------------------------
AMENDMENT 37
to
CONTRACT SE.1M.PRJ.0004.A
between
EARTHWATCH, INCORPORATED
and
BALL AEROSPACE AND TECHNOLOGIES CORP.
for
THE QUICKBIRD SPACECRAFT CONTRACT
This Amendment incorporates the following changes to the Statement of Work and
Payment Schedule of the Contract:
Exhibit C - Statement of Work
Exhibit E - Price and Payment Schedule
Payment Schedule
Entire Agreement. This Amendment, hereto constitute the entire understanding of
the parties with respect to the subject matter of this Amendment and supersedes
all prior and contemporaneous agreements or understandings. By signing this
Amendment, each party represents to the other that it has the authority to sign
this Amendment and this Amendment is enforceable against it in accordance with
its terms.
IN WITNESS WHEREOF, the parties hereto have caused this Amendment to be executed
by their respective duly authorized representatives
EARTHWATCH, INCORPORATED
By: /s/ Xxxxx Xxxxxxxx 6/12/00
Xxxxx Xxxxxxxx Date
Director of Contracts
BALL AEROSPACE & TECHNOLOGIES CORP.
By:
Xxxx X. Xxxxxxx Date
Manager of Contracts
CONTRACT SE.1M.PRJ.00004.A
AMENDMENT 37
Exhibit C - Statement of Work: The exhibit is modified to change the delivery
schedule for Spacecraft Number 2. No other changes to the exhibit are made.
WAS
---
3.1 DELIVERABLE ITEMS
a. Spacecraft Number 1: May 19, 2000
b. Spacecraft Number 2: December 22, 2000
IS
--
3.1 DELIVERABLE ITEMS
a. Spacecraft Number 1: May 19, 2000
b. Spacecraft Number 2: March 21, 2001
Exhibit E - Price and Payment Schedule
Payment Schedule
Substitute the SE.1M.PRJ.00004.A dated December 13, 1999 payment milestone
schedule with the attached SE.1M.PRJ.00004A dated May 30,2000 payment milestone
schedule.
This Amendment covers BATC's cost impact through 6/1/2000, resulting from
EarthWatch/Xxxxxxx Kodak delivery delay of the Flight Module 2 Sensor Subsystem
to BATC. All subsequent impact to BATC following 6/1/2000, if any shall be the
subject of a future proposal and Amendment to this contract.
CONTRACT SE.1M.PRJ.0004.A
AMENDMENT 37
May 30, 2000
--------------------------------------------------------------------------------------------------------
Pay Total Cum
Date Milestone Description Value Payment Payment
--------------------------------------------------------------------------------------------------------
4/1/99 1 thru 6 QuickBird 2 payments to date $21,296,500 $21,296,500 $21,296,500
through 7 a,b
3/31/00 8 a,b
9 a,c,d
00 x,x,x
00x,x
00x,x
13
--------------------------------------------------------------------------------------------------------
5/30/00 7c Sunshade & Cover Complete $ 200,000 $ 517,520 $21,814,020
8c Telescope Vibration Successfully $ 317,520
Complete
--------------------------------------------------------------------------------------------------------
6/30/00 10a Spacecraft Initial Power-On $ 312,263 $ 562,263 $22,376,283
14b Large Propulsion Tank Received $ 250,000
--------------------------------------------------------------------------------------------------------
7/31/00 11b Telescope Complete $ 613,606 $ 613,606 $22,989,889
--------------------------------------------------------------------------------------------------------
8/31/00 9b Power Boxes (PCU, SEP, PDAs) Complete $ 664,513 $ 664,513 $23,654,402
--------------------------------------------------------------------------------------------------------
9/30/00 15b Large Propulsion Tank Welded $ 200,000 $ 697,669 $24,352,071
14a Bus Baseline Performance Tests Complete $ 497,669
--------------------------------------------------------------------------------------------------------
10/31/00 16b Propulsion Module Complete $ 400,000 $ 731,429 $25,083,500
15a Bus Ready for Instrument Installation $ 331,429
--------------------------------------------------------------------------------------------------------
11/30/00 16a Instrument Complete $ 400,000 $ 760,417 $25,843,917
17a Instrument Integration Complete $ 360,417
--------------------------------------------------------------------------------------------------------
12/31/00 18a Spacecraft Initial Tests $ 700,000 $ 1,084,583 $26,928,500
19a Complete Thermal Vac $ 384,583
--------------------------------------------------------------------------------------------------------
1/31/01 20a Solar Array Installation Complete $ 1,500,000 $ 3,072,500 $30,001,000
21a Complete Vibration Testing $ 1,572,500
--------------------------------------------------------------------------------------------------------
2/28/01 22a Spacecraft Ready to Ship $ 3,036,250 $ 3,036,250 $33,037,250
--------------------------------------------------------------------------------------------------------