SALES AGREEMENT
Exhibit 10.1
This Sales Agreement (“Agreement”) entered into this 1st day of July, 2005 between M D Xxxxx, Inc., 0000 X. 00xx Xxxxxx, Xxxxxx, XX, 00000 (“Xxxxx”) and PV Exploration Company, 0000 Xxxx Xxxxxx, Xxxxxxxxxxxx, Xxxxxxxx (“PV Exploration”).
In consideration of the covenants and agreements contained herein, the receipt and sufficiency of which are hereby acknowledged, the parties agree as follows:
1.
Xxxxx agrees to sell and PV Exploration agrees to purchase (i) five (5) drilling rigs meeting the specifications set forth on Exhibit A attached hereto (the “Rigs”) and (ii) spare parts and equipment meeting the specifications set forth on Exhibit F attached hereto (collectively, the “Spare Parts”). PV Exploration shall have the right to make changes in the specifications for the Rigs and the Spare Parts upon written notice to Xxxxx. If any such changes affect Xxxxx’x cost of fabricating the Rigs or acquiring the Spare Parts, the parties shall mutually agree in writing to an equitable adjustment to the Purchase Price.
2.
The total purchase price for all the Rigs and Spare Parts (the “Purchase Price”) shall be as follows:
PV Exploration Rig #1
$6,700,000
PV Exploration Rig #2
6,700,000
PV Exploration Rig #3
6,700,000
PV Exploration Rig #4
6,700,000
PV Exploration Rig #5
6,700,000
Spare Parts
4,242,000
TOTAL
$ 37,742,000
3.
The Purchase Price shall be paid as follows:
a.
Eighteen Million Eight Hundred Seventy-one Thousand Dollars ($18,871,000), representing one-half of the Purchase Price, shall be deposited with Western National Bank, Odessa, Texas (“Escrow Agent”) within five (5) business days following the execution of this Agreement (the “Down Payment”). Escrow Agent shall pay the Down Payment to Xxxxx in installments in accordance with the payment procedures described on Exhibit B attached hereto;
b.
The remaining Eighteen Million Eight Hundred Seventy-one Thousand Dollars ($18,871,000), representing the remaining one-half of the Purchase Price, shall be paid to Xxxxx proportionately as each Rig is delivered and accepted by PV Exploration (i.e. as each Rig is delivered to and accepted by PV Exploration, PV Exploration shall pay $3,350,000 to Xxxxx) and when the Spare Parts are delivered and accepted by PV Exploration; and
c.
Any sales, use, excise or similar tax applicable to the sale of the Rigs shall be borne and paid by PV Exploration or, in the alternative, PV Exploration will provide Xxxxx with appropriate tax exemption certificates. In this regard, Xxxxx and PV Exploration contemplate that the sale of the Rigs shall be exempt from sales taxes under Section 151.324 of the Texas Tax Code, since the Rigs are to be promptly removed from Texas and used for the exploration of oil and gas outside the state of Texas.
4.
Subject to the testing procedures and inspections by PV Exploration as provided below, PV Exploration shall make final payment for each Rig and the Spare Parts (as described in paragraph 3b. above) at the time and place of delivery of each Rig and the Spare Parts upon tender by Xxxxx of (i) an Assignment and Xxxx of Sale in the form attached hereto as Exhibit C and (ii) any other title transfer documents (if any) reasonably requested by PV Exploration. As a condition to PV Exploration’s acceptance of the Rigs and the Spare Parts, each Rig and the Spare Parts shall successfully complete the testing procedures described on Exhibit D attached hereto.
5.
The Rigs and the Spare Parts shall be delivered for inspection, testing and transfer of title at Xxxxx’x yard in Odessa, Texas according to the following delivery schedule:
Rig Number
Delivery Date
PV Exploration Rig #1
November 15, 2005
PV Exploration Rig #2
December 15, 2005
PV Exploration Rig #3
January 15, 2006
PV Exploration Rig #4
February 15, 2006
PV Exploration Rig #5
March 15, 2006
The parties agree that time is of the essence with respect to the above-described delivery schedule. Xxxxx and PV Exploration shall keep in close communication regarding the progress of construction of each of the Rigs. Xxxxx shall give PV Exploration at least ten (10) days notice prior to the actual delivery date for each Rig and the Spare Parts so that PV Exploration shall have sufficient time to inspect each Rig and the Spare Parts and conduct the testing procedures described above.
6.
Xxxxx warrants to PV Exploration the following:
x.
Xxxxx is and shall be upon delivery to PV Exploration the legal owner of the Rigs and the Spare Parts;
b.
The Rigs and the Spare Parts are now, and will at transfer of title, be free and clear of any security interests, liens and encumbrances of whatsoever nature which would prevent Xxxxx from transferring good title, free and clear, to PV Exploration;
x.
Xxxxx warrants title to the Rigs and the Spare Parts against the claims of all persons or entities, including vendors and suppliers of equipment that is incorporated into the Rigs;
x.
Xxxxx is in good legal standing with full authority to enter into this agreement, perform its obligations hereunder and convey the Rigs and the Spare Parts to PV Exploration as described above;
e.
The Rigs shall meet the specifications described on Exhibit A and the Spare Parts shall meet the specifications described on Exhibit F. Both the Rigs and the Spare Parts shall be fit for the purposes for which they are ordinarily intended; and
f.
The Rigs will be assembled in Xxxxx’x yard in Odessa, Texas, will not be assigned to any other customer and will be delivered to PV Exploration free of any rightful claims by third parties arising from patent or trademark infringement.
All manufacturer’s warranties on the Spare Parts and on all material and equipment incorporated in the Rigs shall either run directly to PV Exploration or shall be assignable to PV Exploration. The installation of all such material and equipment shall be in strict accordance with the manufacturer’s requirements. Xxxxx shall be responsible for enforcing or, at Xxxxx’x option, performing all such warranties.
7.
Title to, and risk of loss with relation to, each of the Rigs shall remain in Xxxxx, on a Rig by Rig basis, until inspection, testing, payment of the remaining portion of the Purchase Price of each such Rig and transfer of documents of title. Likewise, title to, and risk of loss with relation to, the Spare Parts shall remain in Xxxxx until inspection, testing, payment of the remaining portion of the Purchase Price for the Spare Parts and transfer of title documents. Prior thereto, Xxxxx shall maintain the insurance described on Exhibit E hereto. Xxxxx shall furnish to PV Exploration certificates of insurance evidencing such coverage, together with evidence of the payment of all premiums therefore. Xxxxx shall indemnify and hold harmless PV Exploration, its officers, agents, employees, affiliates, successors and assigns, from and against any and all suits, actions, claims, demands, costs and expenses (including attorneys’ fees) of any nature for personal injury, death, physical damage to property or patent or trademark infringement arising out of or resulting from Xxxxx’x activities under this Agreement.
8.
PV Exploration shall have the right to inspect and conduct the above-described testing procedures on each Rig and the Spare Parts at Xxxxx’x yard in Odessa, Texas, prior to accepting delivery. In the event any such Rig or Spare Parts does not meet PV Exploration’s standards, PV Exploration shall, within two (2) business days of such inspection and/or testing notify Xxxxx in writing of any claimed defect. Xxxxx shall have a reasonable time to cure any such defect. In the event the parties disagree as to the existence or extent of any defect, the parties shall attempt to resolve the issue in good faith within ten (10) days. In the event PV Exploration fails to notify Xxxxx as provided above and the Rig and/or Spare Parts shall have passed the above-described testing procedures, PV Exploration shall be deemed to have made unqualified acceptance of the Rig and/or Spare Parts subject, however, to the warranties described in paragraph 6 above.
9. If the Parties disagree as to any matter under this Agreement, including without limitation any dispute as to the termination, construction, validity, interpretation, enforceability or breach of the Agreement, they will first attempt to resolve such disagreement through a meeting, to be held within ten (10) days of any such dispute, of senior executives of each party.
If such meeting of senior executives of each party fails to resolve the matter within thirty (30) days of the date of such meeting, then thereafter any such dispute, controversy or claim arising out of or in relation to or in connection with the Agreement or the operations carried out under this Agreement shall be exclusively and finally settled by arbitration in accordance with this paragraph 9 and the most current commercial arbitration rules of the American Arbitration Association. Either party may submit such dispute, controversy or claim to arbitration by notice to the other party.
The arbitration shall be heard and determined by three (3) arbitrators. Each side shall appoint an arbitrator of its choice within thirty (30) days of the submission of a notice of arbitration. The party-appointed arbitrators shall in turn appoint a presiding arbitrator of the tribunal within thirty (30) days following the appointment of both party-appointed arbitrators. All decisions and awards by the arbitration tribunal shall be made by majority vote.
Unless otherwise expressly agreed in writing by the parties to the arbitration proceedings:
(i) The arbitration proceedings shall be held at a location in Texas as determined by the arbitrators;
( ii)
The arbitrator(s) shall be and remain at all times wholly independent and impartial;
(iii)
Any procedural issues and substantive law shall be determined by the applicable laws of the State of Texas, other than those laws which would refer the matter to another jurisdiction;
(iv)
The costs of the arbitration proceedings (including attorneys' fees and costs) shall be awarded to the prevailing party unless otherwise determined by the arbitrators.
(v)
The decision of the majority of the arbitrators shall be reduced to writing and shall be final and binding without the right of appeal. The arbitrator’s decision shall be the sole and exclusive remedy regarding any claims, counterclaims, issues or accountings presented to the arbitrators and any such award shall be promptly paid in U.S. dollars free of any deduction or offset, as decided by the arbitrators. Any costs or fees incident to enforcing the award shall, to the maximum extent permitted by law, be charged against the party resisting such enforcement;
(vi)
Consequential, punitive or other similar damages shall not be allowed except those payable to third parties for which liability is allocated among the parties by the arbitral award;
(vii)
The award shall include interest at the rate of twelve percent (12%) per annum from the date of any breach or violation of this Agreement, as determined by the arbitral award, and from the date of the award until paid in full;
(viii)
Judgment upon the award may be entered in any court having jurisdiction over the person or the assets of the party owing the judgment, or application may be made to such court for a judicial acceptance of the award and an order of enforcement, as the case may be;
(ix)
The arbitration shall proceed in the absence of a party who, after due notice, fails to answer or appear. An award shall not be made solely on the default of a party, but the arbitrator(s) shall require the party who is present to submit such evidence as the arbitrator(s) may determine is reasonably required to make an award;
10.
All representations and warranties of Xxxxx shall survive closing of the transactions contemplated herein.
11.
This Agreement shall be binding upon and inure to the benefit of the parties hereto and their respective successors and assigns; provided, however, Xxxxx shall not assign its rights or obligations under this Agreement (directly or indirectly) without the prior written consent of PV Exploration.
12.
This Agreement may not be modified in any way except in writing executed by both the parties.
13.
If any clause of this Agreement is held to be unenforceable by a court of competent jurisdiction, such clause will be deleted and the balance of the Agreement will remain in full force and effect.
14.
This Agreement may be executed in counterparts. Execution of this Agreement via facsimile shall be effective, and signatures received via facsimile shall be binding upon the parties hereto and shall be effective as originals.
15.
This writing constitutes the entire agreement of the parties and there are no outstanding understandings or agreements, oral or written. Each party, in entering into this Agreement has not relied upon any representation of the other party other than contained herein.
16.
Xxxxx hereby grants to PV Exploration a security interest in the Rigs (including the component parts thereof) and the Spare Parts, to the extent of the Down Payment, to secure the performance by Xxxxx of its obligations under this Agreement. Xxxxx hereby authorizes PV Exploration to file appropriate financing statements to perfect such security interest. Xxxxx will cooperate with PV Exploration and agrees to execute documentation to secure the Rigs (including the component parts thereof) and the Spare Parts. Xxxxx warrants and represents that, except for the security interest granted hereby, the Rigs (including the component parts thereof) and the Spare Parts are and shall continue to be free and clear of any adverse claim, security interest or other encumbrance. If it is determined that Xxxxx’x lenders have an existing lien or security interest that could constitute an adverse claim, security interest or encumbrance on the Rigs (including the component parts thereof) or the Spare Parts, Xxxxx shall obtain an appropriate release or subordination thereof to the security interest granted to PV Exploration hereunder.
17.
Subject to compliance with governing laws and applicable notification requirements of the New York Stock Exchange, the parties agree that prior to making any announcement or statement with respect to this Agreement or the transaction contemplated herein, the party desiring to make such public announcement or statement shall consult with the other party and exercise all reasonable efforts (i) to agree on the text of a joint public announcement or statement or (ii) to obtain approval of the other party of the text of its own public announcement or statement.
IN WITNESS WHEREOF, the parties have executed this Agreement effective the 1st day of July, 2005
M D XXXXX, INC. | PV EXPLORATION COMPANY | |||
By: | By: | |||
Title: | Title: |
EXHIBIT A
RIG SPECIFICATIONS
XXXXXXX AND SUBSTRUCTURE | |||
XXXXXXX/MAST | yes/no | ||
Make/type : | |||
Rated for wind speed : | |||
With full set back : | knots | ||
With no set back : | knots | ||
Height : | ft | ||
Dimensions of base : | ft x ft | ||
Dimensions of crown : | ft x ft | ||
Gross nominal capacity : | lbs | ||
Static hook load : | lbs | ||
Minimum number of lines : | no. | ||
Ladders with safety cages and rests : | yes/no | ||
Platform for crown sheave access : | yes/no | ||
Pull Down System | |||
pull down capacity : | lbs | ||
Lighting system explosion proof : | yes/no | ||
BREAK-OUT MACHINE | |||
SUBSTRUCTURE | yes/no | ||
Make/type : | |||
Slip Bowl height (above Ground Level) : | ft | ||
Length: | ft | ||
Width : | ft | ||
Setback capacity : | kips | ||
Simultaneous setback-hookload capacity : | kips | ||
Slip Bowl beam capacity (total) : | st | ||
Clear height below Slip Bowl beams (to Ground Level) : | ft |
Hydraulic Pipe Arm | |||
DRAWWORKS AND ASSOCIATED EQUIPMENT | yes/no | ||
Drawworks | |||
Make/type : | |||
Motors make/type : | |||
Quantity : | |||
Rated input power : | hp | ||
Drum size (diameter x length) : | in | ||
Drum type (grooved/smooth) : | |||
For drill line size : | in | ||
Brake type (disk/drum) : | |||
Maximum Hook Load - 12 lines : | lbs | ||
Maximum Hook Load - 10 lines : | lbs | ||
Maximum Hook Load - 8 lines : | lbs | ||
Makeup cathead type : | lbs | ||
Crown block safety devices : | |||
Make/type : | |||
Independent fresh water cooling system for | |||
drawworks and Air brake : | yes/no | ||
Automatic driller : | yes/no | ||
Make/type : | |||
Slickline Unit | |||
Make/model : | |||
Wire length (nominal) : | ft | ||
Wire size : | in | ||
Max working load : | lbs | ||
Safe working load : | lbs | ||
Depth counter : | yes/no | ||
Pull indicator : | yes/no | ||
XXXXXXX HOISTING EQUIPMENT | yes/no | ||
Crown Block | |||
Make/Type : | |||
Rated Capacity : | st | ||
No. of sheaves : | no | ||
Sheave diameter : | st | ||
Sheave grooved for line size : | in | ||
Traveling Block | |||
Make/Type : | |||
Rated Capacity : | st | ||
No. of sheaves : | |||
Sheave diameter : | in | ||
Sheave grooved for line size : | in | ||
Hook | |||
Make/Type : | |||
Rated Capacity : | |||
Complete with spring assembly/hook locking device : | |||
Drilling Line | |||
Diameter : | in | ||
Construction : | |||
Length (original) : | ft | ||
Drilling line reel : | |||
Drum cover : | Yes/no | ||
Drilling line drum power driven : | |||
Spare drilling line : | Yes/no | ||
Location (rig, yard, etc.) : | |||
Roller guides : | yes/no | ||
Dead Line Anchor | |||
Make/Type : | |||
Weight sensor : | yes/no | ||
Deadline dampener : | yes/no | ||
ROTATING SYSTEM | yes/no | ||
Rotating Table | |||
Make/Type : | |||
Maximum opening : | in | ||
Rated capacity : | st | ||
Two speed gearbox : | |||
Emergency chain drive : | |||
Driven by an independent electric motor : | |||
Electric motor make/type : | |||
Output power : | |||
Maximum continuous torque : | |||
Drip pan/mud collection system : | |||
Top Drive | |||
Make : | |||
Type (electric/hydraulic) : | |||
Rated capacity : | st | ||
Working pressure : | psi | ||
Output power : | ft/lbs | ||
Maximum continuous torque @ 150 rpm: | ft/lbs | ||
Two speed gear box : | |||
Maximum continuous rotary speed : | rpm | ||
Manually operated xxxxx cock : | yes/no | ||
Cooling system type : | |||
Upper inside BOP: | yes/no | ||
Floating Cushion Sub (Upper Torque Sub): | yes/no | ||
Rotating Rated capacity : | st | ||
Working pressure : | psi | ||
Output power : | ft/lbs | ||
Top Drive tubular running tool: | in |
POWER SUPPLY SYSTEMS | |||
RIG POWER PLANT | yes/no | ||
Diesel Engines | |||
Quantity: | no. | ||
Make/Type : | |||
Maximum continuous power : | hp | ||
At rotation speed of : | rpm | ||
Equipped with spark arrectors : | yes/no | ||
Mufflers installed : | yes/no | ||
AC - Generator | |||
Quantity: | no. | ||
Make/Type : | |||
Continuous power : | kw | ||
At rotation speed of : | rpm | ||
Output volts : | volts | ||
COMPRESSED AIR SYSTEMS | yes/no | ||
Air Compressors - Primary | |||
Quantity : | no. | ||
Make : | |||
Model : | |||
Rated Capacity : | ft3/min | ||
Working pressure : | psi | ||
Prime mover (electric/diesel) : | |||
Continuous power : | hp |
Air Compressor - Booster | |||
Quantity : | no. | ||
Make : | |||
Model : | |||
Rated Capacity : | ft3/min | ||
Working pressure : | psi | ||
Prime mover (electric/diesel) : | |||
Continuous power : | hp | ||
Mist Pump: | |||
Quantity : | no. | ||
Make : | |||
Model : | |||
Rated Capacity : | gpm | ||
Working pressure : | psi | ||
Prime mover (electric/diesel) : | |||
Continuous power : | hp | ||
Air Compressors - Medium Pressure (rig air) : | |||
Quantity : | no. | ||
Make : | |||
Model : | |||
Rated Capacity : | ft3/min | ||
Working pressure : | psi | ||
Prime mover (electric/diesel) : | |||
Continuous power : | hp | ||
AIR RECEIVERS | yes/no | ||
Volume (total) : | ft3 | ||
Pressure : | psi | ||
Location : | |||
Volume (total) : | ft3 | ||
Pressure : | psi | ||
Location : | |||
FUEL TANK | |||
Volume | Gals | ||
WELL CONTROL | ||
LOW PRESSURE BLOWOUT PREVENTERS | ||
All appropriate components H2S rated | yes/no | |
RAM TYPE PREVENTERS | yes/no | |
Quantity : | no. | |
Make/model : | ||
Type (single/double/triple) : | ||
Size : | in | |
Working pressure : | psi | |
Ram locks : | yes/no | |
Type (manual/hydraulic) : | ||
H2S service : | yes/no | |
Side outlets : | no. | |
Size : | in | |
WP : | psi | |
Bottom connection : | ||
Top connection : | ||
Shear ram boosters : | yes/no | |
Available Rams (installed & spare) | ||
Quantity/type/size : | (Sets) | no. / type / in. |
Quantity/type/size : | (Sets - pipe) | no. / type / in. |
ANNULAR PREVENTER | yes/no | |
Quantity : | no. | |
Make/type : | ||
Size : | in | |
Working pressure : | psi | |
Bottom connection : | ||
Top connection : | ||
Blocking Valve: | ||
ROTATING HEAD | yes/no | |
KILL LINE VALVES | yes/no | |
Quantity : | no. | |
Make/type : | ||
Size : | in | |
Working pressure : | psi | |
Gasket type : | ||
Hydraulic/manual/non-return : | ||
Quantity : | no. | |
Make/type : | ||
Size : | in | |
Working pressure : | psi | |
Gasket type : | ||
Hydraulic/manual/non-return : | ||
CHOKE LINE VALVES (full opening) | yes/no | |
Quantity : | ||
Make/type : | ||
Nominal Size : | in | |
Working pressure : | psi | |
Gasket type : | ||
Hydraulic/manual : | ||
Quantity : | ||
Make/type : | ||
Nominal Size : | in | |
Working pressure : | psi | |
Gasket type : | ||
Hydraulic/manual : |
BOP CONTROL SYSTEM | yes/no | |
Accumulator Unit | ||
Make/model : | ||
Location : | ||
Fluid reservoir capacity : | U.S. gal | |
Oil/water mix. Rate : | U.S. gal/min | |
Glycol reservoir capacity : | U.S. gal | |
Total accumulator capacity (w/o precharge) : | U.S. gal | |
System working pressure : | psi | |
Control manifold model : | ||
Regulator type : | ||
Total useful accumulator volume | ||
equals all preventer opening and closing volumes : | yes/no | |
Plus percent additional volume : | % | |
Accumulator Hydraulic Pumps | ||
Electric Driven: | ||
Quantity : | no. | |
Make/model : | ||
Each driven by motor of power : | hp | |
Flow rate of each pump : | U.S. gal/min | |
At operating pressure : | psi | |
Air Driven : | ||
Quantity : | no. | |
Make/model : | ||
Flow rate of each pump : | U.S. gal/min | |
At operating pressure : | psi | |
Primary Control Panel | ||
Control panel make/model : | ||
Location : | ||
Panel controls for the following functions : | ||
Annular BOP : | yes/no | |
Ram BOP's : | yes/no | |
Choke line valve : | HCR | yes/no |
System pressure regulator : | yes/no | |
Pressure regulator for annular : | yes/no | |
Flow meter : | yes/no | |
Quantity of pressure gauges : | no. | |
Remote Control Panel | ||
Control panel make/model : | ||
Location : | ||
Panel controls for the following functions : | ||
Annular BOP : | yes/no | |
Ram BOP's : | yes/no | |
Choke line valve : | HCR | yes/no |
System pressure regulator : | yes/no | |
Pressure regulator for annular : | yes/no | |
Flow meter : | yes/no | |
Quantity of pressure gauges : | no. | |
CHOKE MANIFOLD COMPONENTS | ||
All appropriate components H2S rated | yes/no | |
CHOKE MANIFOLD | yes/no | |
Nominal size : | in | |
Minimum ID : | in | |
Maximum WP : | psi | |
Quantity of fixed chokes : | no. | |
Make/model : | ||
Size (ID) : | in | |
Quantity of adjustable chokes : | no. | |
Make/model : | ||
Size (ID) : | in | |
Power choke remote control panel : | yes/no | |
Make/model : | ||
Location : | ||
STEEL CHOKE LINE | yes/no | |
(BOP to MANIFOLD) | ||
Quantity : | no. | |
Make/type : | ||
ID : | in | |
Working pressure : | psi | |
H2S service : | yes/no | |
FLEXIBLE BOP CONTROL HOSES | yes/no | |
Quantity : | no. | |
Make/type : | ||
ID : | in | |
Working pressure : | psi | |
Fire resistant : | yes/no |
BOP TESTING EQUIPMENT | yes/no | |
HYDRAULIC BOP TEST PUMP | ||
BOP HOIST SYSTEM | yes/no | |
Make/type : | ||
Quantity of hoists : | ||
Traveling Stand for BOP's | yes/no |
MUD SYSTEM | |||
MUD PUMPS | yes/no | ||
Quantity : | no. | ||
Make : | |||
Model : | |||
Horsepower: | |||
Type (triplex/duplex) : | |||
Mud pump drive motors/engines: | no. | ||
Motor type : | |||
Continuous power rating per motor : | hp | ||
Fluid end type : | |||
Maximum working pressure : | psi | ||
Test pressure : | psi | ||
Pump stroke counter type : | |||
Supercharging pump type : | yes/size | ||
Driven by motor of power : | hp | ||
Discharge/suction line ID: | in/in | ||
Mud pump pulsation dampener type : | no./pump | ||
Reset relief valve : | |||
Transmission | |||
Quantity : | no./pump | ||
Make/type : | |||
Net Input Torque : | lb-ft | ||
Net Input Power : | hp | ||
Turbine Torque : | lb-ft | ||
TRANSFER PUMPS/MIXING PUMPS | yes/no | ||
Mixing Pumps | |||
Quantity : | no. | ||
Make/model : | |||
Output capacity : | U.S. gpm | ||
Drive motor type : | |||
Power output : | hp | ||
CHARGING PUMPS | yes/no | ||
Quantity : | no. | ||
Make/type : | |||
Capacity (each) : | U.S. gal/min | ||
Driven motor type : | type | ||
Power output : | kw | ||
STANDPIPE MANIFOLD | yes/no | ||
Quantity of standpipes : | no. | ||
Standpipe/ID : | in | ||
H-Type standpipe manifold : | yes/no | ||
Kill line outlet : | yes/no | ||
Fill-up like outlet : | yes/no | ||
Bleed-off line outlet : | yes/no | ||
Outlet for MWD sensor | yes/no | ||
ROTARY HOSES | yes/no | ||
Quantity : | no. | ||
Make/type : | |||
ID x Length : | in x ft | ||
Working pressure : | psi | ||
Snubbing lines : | yes/no | ||
Quantity : | no. | ||
Make/type : | |||
ID x Length : | in x ft | ||
Working pressure : | psi | ||
Snubbing lines : | yes/no | ||
LOW PRESSURE MUD SYSTEM | |||
MUD TANKS (Rounded Bottoms) | yes/no | ||
Quantity : | no. | ||
Total capacity (usable) : | bbl | ||
Usable capacity No. 1 : | bbl | ||
Type (active/reserve) : | |||
Height : | ft | ||
Mixer : | yes/no | ||
High Pressure Mud guns : | yes/no | ||
Usable capacity No. 2 : | bbl | ||
Type (active/reserve) : | |||
Height : | ft | ||
Mixer : | yes/no | ||
High Pressure Mud guns : | yes/no | ||
SHALE SHAKER | yes/no | ||
Primary : | |||
Quantity : | no. | ||
Make/model : | |||
Type : | |||
Nominal flow rate (total) : | gpm | ||
MUD AGITATORS | yes/no | ||
Quantity : | no. | ||
Make/model : | |||
Driven by motor of power : | hp | ||
Located in tanks : | |||
Impeller Blades, Type | |||
BULK SYSTEM | yes/no | ||
MUD XXXXXX | yes/no | ||
Quantity : | no. | ||
Make/model : | |||
Feed pump make/model : | |||
Type/size : | |||
Capacity : | gpm | ||
Drive motor hp : | hp | ||
Is feed pump dedicated to mud xxxxxx(s): | yes/no | ||
DESANDER | yes/no | ||
Cone No. & size | |||
DESILTER | yes/no | ||
Cone No. & size | |||
CEMENT STANDPIPE | yes/no | ||
Quantity of standpipes : | no. | ||
Standpipe/ID : | in | ||
Bleed-off line outlet : | yes/no | ||
Working Pressure: | psi | ||
WATER TANK | |||
Capacity | Bbls | ||
Centrifugal Pumps | No. | ||
Type/Size: | |||
Drive Motor HP: | HP | ||
RIG FORK LIFT | yes/no | |
Make | ||
Model | ||
Rated Capacity | lbs |
EXHIBIT B
PAYMENT PROCEDURES
1.
Upon execution of this Agreement, Escrow Agent shall establish a separate escrow account to hold the Down Payment. Escrow Agent shall fund periodic advances of the Down Payment to Xxxxx upon compliance with this procedure but not more than two times per week upon the presentation by Xxxxx to the Escrow Agent (with a copy to PV Exploration) of the following documents:
(a)
An application for payment that describes all costs incurred by Xxxxx during the applicable period in connection with the fabrication of the Rigs, including:
(i)
All wages paid for labor and personnel employed by Xxxxx in the performance of this Agreement;
(ii)
The cost of all equipment, materials, supplies and parts that are to be incorporated in the Rigs; and
(iii)
All payments made by Xxxxx to any subcontractors providing services in connection with the fabrication of the Rigs.
(b)
Copies of all invoices documenting the costs incurred under (a)(ii) and (a)(iii) above.
2.
Upon receipt of each progress payment hereunder, Xxxxx shall promptly pay its suppliers and subcontractors the amount to which such suppliers and subcontractors are entitled for materials and equipment supplied for, and/or work performed on, the Rigs. Xxxxx warrants that (i) the work, materials and equipment covered by any progress payment application shall be free and clear of all liens, claims, security interests and other encumbrances and (ii) no payment will be made to Xxxxx, or any suppliers or subcontractors, for any work, materials or equipment that shall be subject to an agreement under which an interest therein or a lien, claim, security interest or other encumbrance thereon is retained or otherwise imposed by Xxxxx or any such supplier or subcontractor.
3.
Xxxxx shall maintain books and records documenting the costs described in paragraph 1(a) above. PV Exploration shall have the right to review all such books and records at reasonable times during normal business hours.
4.
Escrow Agent is not responsible in any manner for the sufficiency, correctness, genuineness or validity of any of the invoices or supporting documents deposited with the Escrow Agent pursuant to this provision or for the form or execution thereof. Escrow Agent may rely and shall be protected in acting on any instrument believed by it to be genuine and to have been signed or presented by an authorized officer of Xxxxx. So long as Escrow Agent has acted in good faith, Escrow Agent shall have no liability for disbursement of funds from the escrow account to Xxxxx under the terms of these instructions.
M D XXXXX, INC.
By:
Title:
PV EXPLORATION COMPANY
By:
Title:
Western National Bank hereby joins in the execution of this Agreement for the sole purpose of evidencing its consent to act as escrow agent hereunder in accordance with the terms of this Exhibit B.
WESTERN NATIONAL BANK
By:
Name:
Title:
B-1
EXHIBIT C
ASSIGNMENT AND XXXX OF SALE
MD Xxxxx, Inc. (herein called "Seller"), for Ten Dollars and other good and valuable consideration (the receipt and sufficiency of which are hereby acknowledged), does hereby BARGAIN, SELL, ASSIGN, TRANSFER, SET OVER, and DELIVER unto PV Exploration Company, an Arkansas corporation (herein called "Buyer"), whose address is 0000 Xxxx Xxxxxx, Xxxxxxxxxxxx, Xxxxxxxx 00000, the following described properties, rights and interests:
(a)
the drilling rig and all the tanks, drilling structures, pumps, equipment and other personal property described on Exhibit A attached hereto and made a part hereof;
(b)
the benefit and the right to enforce all warranties and guaranties relating to the above-described properties; and
(c)
any and all rights, claims or causes of action that Seller may have against Seller's predecessor in title or any parties that have provided equipment, services or supplies that become part of the Properties, whether now existing or hereafter arising.
The properties, rights and interests described above are herein sometimes called the "Properties".
TO HAVE AND TO HOLD the Properties unto Buyer, its successors and assigns, forever.
Seller has good and marketable title to the Properties, free and clear of all liens, security interests, encumbrances, and other burdens.
Seller agrees to execute and deliver to Buyer, from time to time, such other and additional instruments, and to do all such other and further acts and things as may be necessary to more fully and effectively assign to Buyer the Properties.
This Assignment and Xxxx of Sale is made subject to that certain Sales Agreement between Seller and Buyer dated July 1, 2005 (the “Sales Agreement”). The Sales Agreement contains certain representations, exclusions, warranties, covenants and agreements between the parties, some of which may survive the delivery of this Assignment and Xxxx of Sale, as more particular provided for therein, but third parties may conclusively rely on this Assignment and Xxxx of Sale to vest title to the Properties in Buyer.
C-1
IN WITNESS WHEREOF this Assignment and Xxxx of Sale has been executed on , _____.
Seller
MD XXXXX, Inc.
By:
Xxxxxxx X. Xxxxx
President
C-2
EXHIBIT D
TESTING PROCEDURES
All Rigs and all components parts thereof shall be tested under loaded conditions (if permitted by manufacturer) for a period of not less than 48 continuous hours with satisfactory results before they are accepted. The test will include, but not limited to, the following general procedure with Xxxxx’x responsibility noted below (break-in conditions on new engines will be taken into consideration).
1.
The mud pumps to be operated at 117 SPM with 5-1/2” liners at 3000 psi while pumping water thru a choke back to the mud tanks (with pressure recorder).
2.
The pipe handler to be operated up and down (complete cycle as though picking up/laying down pipe) while handling an 8” drill collar.
3.
Make up and break out the 8” drill collar in a sub/short drill collar with the “Iron Roughneck”.
4.
Fluid (water) to be circulated across the Shale Shaker (requires screen to be installed).
5.
All solids equipment (desander, desilter, transfer/mixing pumps, xxxxxx, etc) to be running.
6.
All rig instrumentation (furnished by Xxxxx) and all rig lights to be operational.
7.
All third party instrumentation to be operational and functioning.
8.
All BOP’s to be connected to control panels and operational (minimum of 10 opening / closing cycles).
9.
All Drilling Air Compressors to be run thru a choke and meter run @ 2800 CFM @ 300 psi boosted to 500 psi.
10.
Rig Generator’s to run (alternating) and loaded while operating rig under test conditions.
In order to carry out the above testing requirements, Xxxxx will need to provide the following:
1.
24 hour access to yard.
2.
Fresh water to fill mud tanks and trucks to haul water to and from tanks during and after the testing period.
3.
Personnel to assist during testing period, ie: mechanic, electrician, welder, roustabout, etc.
4.
Diesel fuel.
5.
Eight (8) inch drill collar and sub.
6.
Adjustable choke / chokes to pump through (fluid and air) and pressure recorder.
7.
Tools as necessary.
8.
Forklift or other equipment to assist in testing.
PV Exploration will provide rig crew to run the rig during the test period with Xxxxx’x assistance.
D-1
EXHIBIT E
INSURANCE
A.
Amounts of Insurance – Xxxxx shall, at its own cost and expense, procure and maintain in full force and effect at all times throughout the term of this Agreement the following insurances (on an occurrence basis) for coverages at not less than the following limits of liability:
(i)
Workers’ Compensation and Employer’s Liability Insurance –
Minimum Limits:
Worker’s Compensation:
Statutory
Employer’s Liability:
U.S. $1,000,000
each accident
U.S. $1,000,000
disease each employee; and
U.S. $1,000,000
disease policy limit
(ii)
Commercial General Liability Insurance – This policy shall provide coverage against claims for bodily injury (including bodily injury and death), property damage (including loss of use) and personal injury, and shall include contractual liability insuring the indemnity obligations assumed by Xxxxx under the Agreement, products and completed operations coverage premises and operations coverage, broad form property damage coverage, independent contractors, separation of insureds, actions over indemnity coverage, sudden and accidental pollution liability coverage including clean up on or off the site which shall be a primary, non-contributory.
Minimum Limits:
U.S. $1,000,000
combined single limit each occurrence
U.S. $2,000,000
general aggregate, with such limits dedicated to the Project
U.S. $2,000,000
products and completed operation aggregate, with such limits dedicated to the Project
(iii)
Commercial Automobile Insurance – This policy shall include coverage for all owned, hired, rented, and non-owned automobiles and equipment.
Minimum Limits:
U.S. $1,000,000
combined single limit each occurrence
E-1
B.
Insurance Companies – All insurance required to be obtained by Xxxxx pursuant to this Agreement shall be from an insurer or insurers permitted to conduct business in the State of Texas and shall be rated with either and “A-;IX” or better by Best’s Insurance Guide Ratings or “A-“ or better by Standard and Poor’s.
C.
Subcontractor’s and Sub-subcontractor’s Insurance Requirements – Xxxxx shall ensure that each subcontractor and sub-subcontractor shall either be covered by the insurance provided by Xxxxx pursuant to this Agreement, or by insurance procured by such subcontractor or sub-subcontractor. Should a subcontractor or sub-subcontractor be responsible for procuring its own insurance coverage, Xxxxx shall ensure the each such subcontractor or sub-subcontractor shall procure and maintain insurance to the full extent required of Xxxxx under this Agreement and shall be required to comply with all of the insurance requirements imposed on Xxxxx hereunder, except that Xxxxx shall determine the limits of coverage required to be obtained by such subcontractors or sub-subcontractors in accordance with reasonably prudent business practices. All such insurance shall be provided for at the sole cost of Xxxxx or its subcontractors or sub-subcontractors. Xxxxx shall obtain a certificate of insurance from all subcontractors or sub-subcontractors evidencing proof of required coverages and provide copies thereof to PV Exploration.
D.
Primary Insurance – The insurance policies of Xxxxx and its subcontractors or sub-subcontractors shall state that such coverage is primary and non-contributory to any other insurance or self-insurance available to or provided by PV Exploration.
E.
Certificate of Insurance – Prior to the commencement of any work under this Agreement, Xxxxx shall provide a certificate of insurance reflecting all of the insurance required by Xxxxx, and primary/non-contributory insurance requirements contained in this Agreement.
E-2
EXHIBIT F
SPARE PARTS
SPARE / MISC. EQUIPMENT LISTS for a FIVE(5) RIG OPERATION | ||
XXXXXXX AND SUBSTRUCTURE: | ||
Xxxxxxx / Mast & Trailer | ||
Substructure | ||
DRAWWORKS AND ASSOCIATED EQUIPMENT | ||
Drawworks |
Slickline Unit | ||
XXXXXXX HOISTING EQUIPMENT | ||
Crown Block | ||
Traveling Block | ||
Hook | ||
Drilling Line | ||
Dead Line Anchor | ||
Rotating Table | ||
Top Drive | ||
POWER SUPPLY SYSTEMS: | ||
RIG POWER PLANT |
Diesel Engines | ||
Quantity: | ||
Make/Type : | ||
Maximum continuous power : | ||
At rotation speed of : | ||
Equipped with spark arrectors : | ||
Mufflers installed : | ||
AC - Generator | ||
Quantity: | ||
Make/Type : | ||
Continuous power : |
| |
At rotation speed of : | ||
Output volts : | ||
COMPRESSED AIR SYSTEM | ||
Primary | ||
Booster & Mist Pump | ||
Rig Air | ||
DRILLSTRING EQUIPMENT: | ||
TUBULARS | ||
Xxxxx Saver Sub |
Spiral-Wate Drill Pipe | ||
Quantity: | ||
Nominal Size OD: | ||
Weight: | ||
Range: | ||
Tool joint OD/ID: | ||
Type of Hardfacing: | ||
Internally Plastic coated: | ||
Connection type: | ||
Thread protectors: | ||
Drill Collars | ||
Quantity: | ||
OD body: | ||
ID body: | ||
Nominal length of each joint: | ||
Drill collar body (slick/spiral) | ||
Recess for “zip” elevator | ||
Recess for slips | ||
Stress relief pin groove | ||
Boreback on box | ||
Connection type | ||
Quantity: | ||
OD body: | ||
ID body: | ||
Nominal length of each joint: | ||
Drill collar body (slick/spiral) | ||
Recess for “zip” elevator | ||
Recess for slips | ||
Stress relief pin groove | ||
Boreback on box | ||
Connection type | ||
Crossover Subs | ||
Quantity: | ||
OD Size: | ||
ID Size: | ||
Top connection type: | ||
Type (pin/box): | ||
Quantity: | ||
OD Size: | ||
ID Size: | ||
Top connection type: | ||
Type (pin/box): | ||
Quantity: | ||
OD Size: | ||
ID Size: | ||
Top connection type: | ||
Type (pin/box): | ||
Quantity: | ||
OD Size: | ||
ID Size: | ||
Top connection type: | ||
Type (pin/box): | ||
Quantity: | ||
OD Size: | ||
ID Size: | ||
Top connection type: | ||
Type (pin/box): | ||
Quantity: | ||
OD Size: | ||
ID Size: | ||
Top connection type: | ||
Type (pin/box): |
Near Bit-Subs (Box-Box) | ||
Quantity: | ||
OD Size: | ||
ID Size: | ||
Top connection type: | ||
Bottom connection type: | ||
Bored for float valve: | ||
Float size: | ||
Quantity: | ||
OD Size: | ||
ID Size: | ||
Top connection type: | ||
Bottom connection type: | ||
Bored for float valve: | ||
Float size: | ||
Quantity: | ||
OD Size: | ||
ID Size: | ||
Top connection type: | ||
Bottom connection type: | ||
Bored for float valve: | ||
Float Size: | ||
HANDLING TOOLS | ||
Semi-Automatic DP Slips | ||
Drill Collar Slips | ||
Drill Collar Safety Clamps | ||
Bit Breakers | ||
Rotary Rig Tongs |
WELL CONTROL: | ||
Rams | ||
Rotating Head | ||
Kill Line Valves | ||
Choke Line Valves | ||
Accumulator Hydraulic Pumps | ||
Remote Control Panel | ||
Choke Manifold Components | ||
BOP Hoist System | ||
MUD SYSTEM: | ||
MUD Pumps | ||
Quantity: | ||
Transfer Pumps / Mixing Pumps | ||
Charging Pumps | ||
Standpipe Manifold | ||
Rotary Hose | ||
Mud Tanks | ||
Shale Shaker | ||
Mud Agitators | ||
Bulk System | ||
Mud Xxxxxx | ||
Cement Standpipe | ||
Desander | ||
Desilter | ||
PIPE BOOM PARTS | ||
MAKE-UP / BREAK-OUT MACHINE |