SUBCONTRACT #RF-07-SHGR-013 Solar-Powered Thermo-Chemical Production of Hydrogen {SHGR and Photoelectrochemistry (PEC) Between THE UNLV RESEARCH FOUNDATION
EXHIBIT
10.1
SUBCONTRACT
#RF-07-SHGR-013
Solar-Powered
Thermo-Chemical Production of Hydrogen {SHGR
and
Photoelectrochemistry (PEC)
Between
THE
UNLV RESEARCH FOUNDATION
0000
X. Xxxxxx Xxxx, Xxxxx 000
Xxx
Xxxxx, XX 00000
And
Altairnano
Technologies, Inc.
000
Xxxxxx Xxx
Xxxx,
XX 00000
This
AGREEMENT, which will be known as SUBCONTRACT #RF-07-SHGR-013, is by and
between
the UNLV
Research Foundation, hereinafter referred to as UNLVRF, and Altairnano
Technologies, Inc., hereinafter referred to as SUBCONTRACTOR.
WITNESSETH
THAT
WHEREAS,
UNLVRF has been awarded Grant Number DE-FG36-03GO13062 from the U.S. Department
of Energy (DOE) for a project entitled "High Efficiency Generation of Hydrogen
Fuels Using Solar Thermo-Chemical Splitting of Water (SHGR)"; and
WHEREAS,
SUBCONTRACTOR was proposed and has been approved for subcontracted effort under
the above referenced Grant;
NOW,
THEREFORE, in consideration of the mutual covenants herein provided, the parties
do agree
as
follows:
ARTICLE
1. SCOPE OF WORK
SUBCONTRACTOR
agrees to perform the work described in APPENDIX
A, SCOPE OF WORK, incorporated
herewith into this agreement. SUBCONTRACTOR shall neither assign, transfer,
nor
delegate any rights, obligations or duties under this Subcontract without prior
written consent of UNLVRF. UNLVRF may withhold consent for any
reason.
UNLV
Research Foundation
Universiry
of Nevada, Las Vegas • 0000 Xxxxxxxx Xxxxxxx • Xxx 000000 • Xxx Xxxxx, Xxxxxx
00000-0000
(000)
000.0000 • Fax: (000) 000-0000
ARTICLE
2. KEY PERSONNEL
UNLVRF:
Point
of
Contact Xxxx
Xxxxxx, Contract Officer UNLV Research Foundation 0000
X.
Xxxxxx Xxxx, Xxxxx 000
Xxx
Xxxxx, Xxxxxx 00000 (702) 871-6786
Xxxx.xxxxxx@xxxx.xxx
SUBCONTRACTOR:
Technical
Xx.
Xxxxx
Xxxxxxx, Chief Technical Officer
Altairnano Technologies, Inc.
000
Xxxxxx Xxx
Xxxx,
XX
00000
000-000-0000
xxxxxxxx@xxxxxxxx.xxx
Contractual Xx.
Xx
Xxxxxxxxx, Chief Financial Officer
Altairnano
Technologies, Inc.
000
Xxxxxx Xxx
Xxxx,
XX
00000
000-000-0000
xxxxxxxxxx@xxxxxxxxxx.xxx
ARTICLE
3. PERIOD OF PERFORMANCE
This
Subcontract shall be effective for the period January 12, 2007, through December
31, 2007, unless extended by mutual agreement of the parties through an
amendment to this Subcontract. Any requests for a no-cost extension should
be
addressed to and received by the UNLVRF Contractual Contact, as shown in Article
2, not less than ninety (90) days prior to the desired effective date of the
requested change.
ARTICLE
4. CONSIDERATION AND PAYMENT
The
total
amount to perform the work identified in APPENDIX
A, SCOPE OF WORK is
$455,450. The provisions of Grant DE-FG36-03GO13062 require cost-sharing by
the
grantee. Therefore, UNLVRF will reimburse SUBCONTRACTOR for costs incurred
in an
amount not to exceed $356,500. SUBCONTRACTOR will cost-share the balance of
estimated total project costs in an amount equaling at least $98,950 (refer
to
ARTICLE
6, COST-SHARING CONTRIBUTIONS).
There
is
a possibility that Congress will request a percentage of awarded contracts/
grants/cooperative agreements be deobligated, if required, to fund other
projects. If the Government notifies UNLVRF that they are decreasing and
deobligating the prime award DE-FG36-036013062, this Subcontract will be
modified to reduce the award and obligation by the same percentage. The scope
of
work will then be revised, as required.
APPENDIX
B, BUDGET DETAIL, provides
a detailed budget by Object Class Categories.
Payment Method.
UNLVRF
shall reimburse SUBCONTRACTOR for incurred allowable expenses not more often
than monthly. SUBCONTRACTOR's standard invoice, itemizing each task identified
in APPENDIX
A, SCOPE OF WORK, must
be
submitted when requesting payment.
Page
2 of
14
SUBCONTRACTOR'S
invoice must include Subcontract number,. current and cumulative costs, and
a
Certification as. to its truth and accuracy. Payment requests that do not follow
the above guidelines shall be returned
to the SUBCONTRACTOR,
Payments will be made
within thirty
(30)
days
of receipt
of payment requests. Payment requests and/or any questions concerning payments
-should be directed to:
Xxxxxxxxx
Xxxxxxx, Chief Financial Officer
UNLV
Research Foundation
0000
X,
Xxxxxx Xxxx, Xxxxx 000
Xxx
Xxxxx, Xxxxxx 00000
(000)
000-0000
xxxxxxxxx.xxxxxxx@xxxx.xxx
ARTICLE
6. COST-SHARING CONTRIBUTIONS
SUBCONTRACTOR
shall share in allowable and allocable costs resulting from the work performed
under this Subcontract. All cost sharing, including cash and third party in-kind
contributions, must be verifiable with the SUBCONTRACTOR'S records. Special
terms and conditions applicable to cost sharing can be found at 10 CFR 600.224.
Any cost sharing s)hall defray only the allowable costs of the project in
accordance with the statutes, regulations, applicable cost principles, and
other
terms and condition cited herein. UNLVRF shall not share any costs above and
beyond the amounts obligated in this Subcontract.
ARTICLE
7. FORCE MAJEURE
Neither
party shall be responsible to the other for failure to perform any of the
obligations imposed by this Subcontract, provided such failure shall be
occasioned by fire, flood, explosion, lightning, windstorm, earthquake,.
subsidence of soil, failure or destruction, in whole or in part, of machinery
or
equipment. or failure of supply of materials, discontinuity in the -Supply
of
power, government interference, civil commotion, riot, war, strikes, labor
disturbance, transportation difficulties, labor shortage or any cause beyond
its
reasonable control.
ARTICLE
8. ENTIRE AGREEMENT
This
Subcontract, together with all attachments, exhibits and other appendixes
hereto, constitutes the entire agreement between the parties and supersedes
all
previous agreements with respect to the subject matter hereof.
IN
WITNESSETH THEREOF
The
parties have executed this SUBCONTRACT #RF-07-SHGR-013:
Altaimano
Technologies, Inc.
By:
|
/s/
Xxxxxx Xxxxxxxxx
|
Date:
|
March
4, 2007
|
Name:
Xxxxxx Xxxxxxxxx
|
|||
Title:
Chief Financial Officer
|
|||
THE
UNLV RESEARCH FOUNDATION
|
|||
By:
|
/s/
Xxxxxx "Xxx" Xxxxxxxxx
|
Date:
|
March
6, 2007
|
Xxxxxx
"Bud" Xxxxxxxxx, Executive Director
|
Page
3 of
14
APPENDIX
A
UNLVRF
Subcontract #RF-07-SHGR-013
Altairnano
Technologies, Inc.
Scope
of Work
A. PROJECT
OBJECTIVES
The
primary project objective is to develop thin film metal oxide photoanode
material useful for photoelectrochemical (PEC) production of hydrogen Once
the
metal oxide composition is identified and a thin film anode developed, it can
be
used to produce hydrogen directly from water in stand-alone tandem cells or
multi-junction hybrid photoelectrochemical 1 photovoltaic cells using sunlight
as the energy source.
The
primary objective is sub-divided into 3 parts:
· |
Identify
a suitable metal oxide composition for the photoanode. No metal oxide
material suitable to the task is yet identified. (Tasks 1.2 and
1.3)
|
· |
Optimize
the photochemical efficiency of the metal oxide by varying chemical
composition, crystallite morphology, and thin film thickness. (Tasks
1.3
and 1.4)
|
· |
And
finally, develop synthesis methods and deposition techniques that
are
efficient, practical, and economically feasible for cost competitive
large
scale hydrogen production. (Tasks 2 and
3)
|
B. PROJECT
SCOPE
It
has
been deemed of interest to develop high-efficiency, low-cost,
photoelectrochemical (PEC) systems to produce hydrogen from water using sunlight
as the energy source. The main thrust of this work has been to develop
integrated tandem photoelectrodes or stand-alone multi-junction hybrid
photoelectrochemical 1 photovoltaic cells comprised of low-cost semiconducting,
catalytic thin films of various metal oxides. Numerous approaches involving
a
variety of materials and methods have been explored, but none to date have
successfully met both the efficiency and stability criteria. The high voltage
required to dissociate water (1.23 V), and the corrosiveness of aqueous
electrolytes have been the major technical hurdles.
Candidate
materials need to be active electrocatalysts that utilize the shorter
wavelengths of the solar spectrum and are stable in corrosive aqueous
electrolytes. They must be efficient, practical, and economically feasible
in
that they are produced from inexpensive precoursor materials, and can be
deposited easily on low cost substrates. Their stability must be demonstrated
in
aqueous electrolytes for the duration of the anticipated lifetime of the
product. Front photoanode coatings must also be deposited thin enough to allow
the longer wavelengths to pass through to a back cell thereby generating
electric current to drive the hydrogen and oxygen evolution reactions at the
respective electrodes.
Page
4 of
14
C. TASKS
TO BE PERFORMED
Task
1.3 Implementation of Low Temperature Plasma-Enhanced Chemical Vapor Deposition
(PECVD) Process
Based
on
trial depositions of iron oxide thin films by PECVD and the ease with which
the
desired depositions were achieved demonstrated the process will allow for more
consistent and efficient thin film depositions. Altair will implement this
process for the fabrication of selected metal oxide and chalcopyrite thin film
electrodes in collaboration with UNLV. UCSB, NREL and UH.
Once
the
PECVD process is optimized, Altairnano will produce doped Fe203
films at
low temperature for round-xxxxx electrode testing. Altairnano will determine
the
optimal iron, indium, gallium, silicon, and titanium 'dopant' precursors
suitable for producing films by the low temperature PECVD process. Selected
films will undergo characterization and testing established by the standardized
round-xxxxx testing methods
Subtask
1.3.2 Fabrication of Doped Iron Oxide (Fe203)
Electrodes by Ultrasonic Spray Pyrolysis (USP)
Altairnano
will continue to use the existing ultrasonic sonic spray pyrolysis equipment
to
deposit Fe203
films on
conducting substrates. The process will be used to evaluate the effects of
gallium, silicon, titanium, indium and various other 'dopants' on
photoelectrochemical performance of thin film electrodes. Films produced by
USP
will also be used to optimize the characterization and testing procedures for
round-xxxxx testing of metal oxide electrodes. Altairnano will collaborate
as
appropriate with UCSB in synthesis techniques for iron-based thin film
compounds.
Task
1.4 Characterization and Photoelectrochemical (PEC) Testing of Metal Oxide
Thin
Film Electrodes
Altairnano
will establish standardized characterization and photoelectrochemical
measurement techniques
to help initiate round-xxxxx standardized testing of PEC materials and devices
produced by
HNEI,
NREL, UC Santa Xxxxxxx, and Altairnano.
Subtask
1.4.1 Thin Film Microstructure Characterization
Characterizations
performed at Altairnano will include X-ray diffraction (XRD) for determining
phase purity, variable angle spectroscopic ellipsometry (VASE) for measuring
optical properties, and scanning electron microscopy (SEM) for examining the
surface morphology. Characterizations will be performed on sample materials
provided by both Altairnano (Fe203)
and
other metal oxides synthesized by SHGR-PEC participants.
Subtasks
1.4.3 and 1.4.4 Thin Film Opto-electronic and Photoelectrochemical
Testing
The
photochemical properties of electrodes will be determined using Altairnano's
Solar Simulator PEC
I-V
curve measurement system and Spectral Response/Quantum Efficiency measurement
system. Altairnano will fabricate and validate a new sample mount for the I-V
and Quantum efficiency measurements. New counter/reference electrode
combinations electrode will be validated for different electrolyte media. Once
the improvements to the measurement systems are completed Altairnano will
establish photoelectrochemical test protocols for round-xxxxx testing of films
provided by SHGR-PEC participants.
Page
5 of
14
Altairnano
will continue to make design improvements to the sample mount and test cell
for
the I-V and Quantum efficiency measurements. Altairnano will validate
counter/reference electrode combinations electrode for different electrolyte
media. Once the improvements to the measurement systems are completed Altairnano
will establish standards for simulated sunlight and develop new electrochemical
interface characterization protocols for round-xxxxx testing.
Task
5 Project Management and Reporting
Xx.
Xxxxx
Manev, Principle Scientist, at Altairnano will act as Principle Investigator
for
the project, directing the electrochemical testing of electrodes. Altairnano
Research Scientist, Xx. Xxxxx Xxxxxxx, Chief Technology Officer for Altairnano,
will maintain oversight of the project. Altairnano principle team member's
curriculum vitae are attached at the end of this document.
Altairnano
will submit quarterly progress reports, a final financial, and a final
Scientific/Technical reports for all tasks, in accordance with the Federal
Assistance Reporting Checklist, following the instructions included
therein.
Xx.
Xxxxxxx Xxxxx - Principle Investigator
Xx.
Xxxxx
joined Altair Nanotechnologies, Inc. about 8 months ago as Principal Scientist
in Altairnano's R&D facility based in Reno, NV. He has over 27 years
experience in the field of lithium cells, lithium ion batteries and
electrochemical sensors. He has a B.S. and a M.S. in Physics from Sofia
University and a PhD in electrochemistry from the Bulgarian Academy of Sciences.
He is a former professor from the Bulgarian Academy of Science and was head
of
it's Lithium Battery Department for nearly 10 years. Xxxxx was also manager
of
two projects for research and development of electrochemical cells for
measurement of moisture and oxygen in gas media. These investigations have
resulted in a development of electrochemical sensors and respectively in the
production of commercial electrochemical gas analyzers for measurement of
moisture and trace oxygen in inert, dry and reducing atmospheres. In 1995 he
joined the Lithium Division of FMC Corporation spending 4 years leading FMC's
projects in development of LiMn2O4
spinel
compounds used as positive electrodes in lithium ion batteries. He served 6
years with Delphi Corporation as a Research Engineer and Staff Research Engineer
in Delphi's lithium polymer battery development program. He has published over
90 papers and was author of more than 40 Patents, seven of them in the field
of
electrochemical sensors. He has presented numerous invited lectures at
international meetings and conferences. His work in the field of applied
electrochemistry has been recognized internationally. He was a member of the
Scientific Committee of the 9 International Meeting on Lithium Batteries (9
IMLB), Edinburgh, Scotland, July 12-17, 1998, Member of Scientific Committee
and
Session Chairman of 8 International Meeting on Lithium Batteries (8 IMLB) held
in Nagoya, Japan June 16-21 1996, Member of Scientific Committee of the 7
International Meeting on Lithium Batteries (7 IMLB) Boston, Massachusetts,
May
15-20, 1994, Member of Organizing Committee and Session Chairman of Tianjin
International Power Sources Symposium held in Tianjin, China, September 22-26,
1992 and Member of the editorial board of the scientific journal "Progress
in
Batteries & Battery Materials" published by ITE-JEC Press Inc, printed in
Japan.
Xx.
Xxxxx Xxxxxxx. - Vice President, Chief Technology Officer
Previously,
Xx. Xxxxxxx was Manager, Process Development for BHP Minerals' Center for
Minerals Technology in Reno, Nevada. Xx. Xxxxxxx began work at BHP Minerals
as a
principal process engineer. Xx. Xxxxxxx received his B.S. and M,S. degrees
in
metallurgical engineering from South Dakota School of Mines and Technology
in
Rapid City and his Ph. D. in materials science and mineral engineering from
the
University of California, Berkeley. Xx. Xxxxxxx has worked as a metallurgical
engineer at AMAX Extractive Research Laboratory, and he was the manager of
engineering at Bandgap Technology Corp.
Page
6 of
00
XXXXXXXX
X
UNLVRF
Subcontract #RF-07-SHGR-013
Altairnano
Technologies, Inc.
Budget
Detail
Object
Class Category
|
Total
Budget
|
Personnel
|
|
Federal
|
90,404
|
Cost
Share
|
25,093
|
Total
Personnel
|
115,497
|
-Fringe
|
|
Federal
|
34,173
|
Cost
Share
|
9,485
|
Total
Fringe
|
43,658
|
Travel
|
|
Federal
|
4,853
|
Cost
Share
|
1,347
|
Total
Travel
|
6,200
|
Equipment
|
|
Federal
|
25,126
|
Cost
Share
|
6,974
|
Total
Equipment
|
32,100
|
Total
Supplies
|
|
Federal
|
14,909
|
Cost
Share
|
4,138
|
Total
Supplies
|
19,047
|
Other
Direct Costs
|
|
Federal
|
0
|
Cost
Share
|
0
|
Total
Other Direct Costs
|
0
|
Direct
Costs
|
|
Federal
|
169,465
|
Cost
Share
|
47,037
|
Total
Direct Costs
|
216,502
|
Indirect
Costs
|
|
Federal
|
187,035
|
Cost
Share
|
51,913
|
Total
Indirect Costs
|
238,948
|
Total
Cost
|
|
Federal
|
356,500
|
Cost
Share
|
98,950
|
TOTAL
COST
|
455,450
|
Page
7 of
14
APPENDIX
C
UNLVRF
Subcontract #RF-07-SHGR-013
Altairnano Technologies,
Inc.
Reporting
Requirements
Reporting
Requirement
|
Frequency
|
No.
of Copies
|
Management
Reporting
|
||
1. Technical/Budget
Accomplishment Report1
|
Quarterly
|
1
|
2. Special
Status Report2
|
As
required
|
1
|
Scientific/Technical
Reporting (Reports/Products must be
|
||
submitted
with appropriate DOE F 241. DOE 241 forms are
|
||
available
at xxx.xxxx.xxx/xxxxxx.)
|
||
Final
Scientific/Technical Report (Form DOE F 241.3)3
|
Final
|
1
|
Closeout
Reporting
|
||
1.
Final Invention and Patent Report4
|
Final
|
1
|
2.
Property Certification4
|
Final
|
1
|
Other
Reporting
|
||
Other5
|
As
Required
|
1
|
___________________________
1
|
Quarterly
reports should summarize technical progress against tasks and milestones
and provide a budget accomplishment report (actual expenditures vs.
budget
plan). The report should be submitted NLT the 1&
of
the month 2
(for
the previous quarter's activities) to the UNLVRF Point of Contact,
as
shown in Article 2.
|
2
|
Provides
notice of problems, delays, or adverse conditions which materially
impair
the awardee's ability to meet the objectives of the award or developments
that have a significant favorable impact on the project. The report
must
include the remedial action to be taken to correct or resolve any
problem
or adverse condition.
|
3
|
This
form and instructions are available on E-link. If there is any patentable
material, protected data, or SBIR/STTR data in the report, the recipient
must, consistent with the data protection provisions of the grant,
clearly
identify patentable or protected data on each page of the report,
identify
such material on the cover of the report, and xxxx the appropriate
blocks
in Section K of the DOE F 241.3. Reports must not contain any proprietary
data (limited rights data), classified information, information subject
to
export control classification, or other information not subject to
release. Protected data is specific technical data, first produced
in the
performance of the award that is protected from public release for
a
period of time by the terms of the award agreement.
|
4
|
Patent
certification (OMB No. 1902-0121) and Financial Assistance Property
Certification (AA-88) are required. UNLVRF will provide detailed
closeout
reporting instructions, including appropriate forms, to the Subcontractor
by letter upon award expiration.
|
5
|
Three
copies of reports, reprints, conference papers, etc, must be submitted
to
UNLVRF for submittal to DOE as soon as possible after the event occurs
(10
CFR 605.19(a) (3)).
|
Page
8 of
14
APPENDIX
D
UNLVRF
Subcontract #RF-07-SHGR-013
Altairnano
Technologies, Inc.
Special
Terms and Conditions
SC-1
DEFINITIONS
UNLVRF
means the UNLV Research Foundation and all of its authorized representatives
acting in their professional capacities.
SUBCONTRACTOR
means Altairnano Technologies, Inc. and all of its authorized representatives,
successors, and permitted assigns.
Work
means all activities required by the Subcontract documents to be performed
by
the SUBCONTRACTOR.
SC-2
REPORTING REQUIREMENTS
SUBCONTRACTOR
shall provide technical and financial reporting in accordance with the
requirements and instructions set forth in APPENDIX
C, REPORTING REQUIREMENTS. Failure
to comply with the reporting requirements will be considered a material
noncompliance with the terms of this Subcontract. Noncompliance may result
in
the withholding of future payments, the suspension or termination of this
Subcontract, and/or the withholding of future agreements.
A
willful
failure to perform, or a history of failure to perform of this Subcontract
and/or other contractual documents, may also result in a debarment action to
preclude future agreements.
SC-3
INDEPENDENT CONTRACTOR
For
purposes of this Subcontract, SUBCONTRACTOR and its employees shall be
classified as an "Independent
Contractor" and not as employees of UNLVRF.
SC-4
SITE VISITS
DOE's
authorized representatives have the right to make site visits at reasonable
times to review project accomplishments and management control systems and
to
provide technical assistance, if required. Should such a site visit be
scheduled, SUBCONTRACTOR must provide reasonable facilities and assistance
for
the safety and conveniences of the government representatives in the performance
of their duties. All site visits and evaluations must be performed in a manner
that does not unduly interfere with or delay the work.
SC-5
SUBCONTRACT MONITORING REQUIREMENT
Under
the
provisions of OMB Circular A-133, UNLVRF is required to monitor federally funded
subcontractor activities. SUBCONTRACTOR must assure UNLVRF that it complies
with
applicable OMB circulars and that it will notify UNLVRF of completion of
required audits and of any adverse findings which impact this Subcontract.
Relevant OMB Circulars are available at:
httD://www.whitehouse,cov/omb/circulars/
SC-6
STATEMENT OF FEDERAL STEWARDSHIP
DOE
will
exercise normal Federal stewardship in overseeing the project activities
performed under Grant DE-FG36-036013062. Stewardship activities include, but
are
not limited to, conducting site visits; reviewing performance and financial
reports; providing technical assistance and/or temporary intervention in unusual
circumstances to correct deficiencies which develop during a project; assuring
compliance with terms and conditions;
and reviewing technical performance after project completion to insure that
the
grant's objectives are
accomplished.
Page
9 of
14
SC-7
UNALLOWABLE COSTS AND LOBBYING ACTIVITIES
Subcontractors
are cautioned to carefully review the allowable cost and other provisions
applicable to expenditures under their particular award instruments. If
financial assistance funds are spent for purposes or in amounts inconsistent
with the allowable cost or any other provisions governing expenditures in the
award instrument, the government may pursue a number of remedies against the
recipient, including, in appropriate circumstances, recovery of such funds,
termination of the award, suspension or debarment of the recipient from future
awards, and criminal prosecution for false statements. The UNLVRF is subject
to
the provisions of OMB Circular No. A-122, Cost Principles for Non-Profit
organizations.
All
cost
reimbursement sub-awards, including subcontracts, are subject to those Federal
cost principles applicable to the SUBCONTRACTOR. OMB Circulars are available
at
httl2a/www.whitehouse.govlomb/circulars.
Particular
care should be taken by the SUBCONTRACTOR to comply with the provisions
prohibiting the expenditure of funds for lobbying and related activities.
Financial assistance awards may be used to describe and promote the
understanding of scientific and technical aspects of specific technologies,
but
not to encourage or support political activities such as the collection and
dissemination of information related to potential, planned, or pending
legislation.
To
assist
the SUBCONTRACTOR in complying with the lobbying provisions applicable to this
agreement, the Department of Energy has developed a lobbying brochure entitled
"What You
Should
Know as
a
Federal Employee,
Contractor, Cooperative Agreement Participant, or Grantee, " which
provides an overview of lobbying policies. The brochure is available on the
DOE
financial Assistance Home Page at: http:/Iprofessionalspr,xxx.xxx/
Click on
"Regulations and Guidance" under "Financial Assistance
Regulations."
SC-8
PERMITS AND RESPONSIBILITIES
SUBCONTRACTOR
shall be responsible for obtaining any necessary licenses and/or permits and
for
complying with applicable federal, state, and municipal laws, codes, and
regulations in connection with the execution of the work hereunder. The
SUBCONTRACTOR shall take proper safety and health precautions to protect the
workers, the public, the environment, and property.
SC-9
NOTICE REGARDING THE PURCHASE OF AMERICAN-MADE EQUIPMENT AND
PRODUCTS
It
is the
sense of the Congress that, to the greatest extent practicable, all equipment
and products purchased with funds made available under Grant DE-FG36-03GO13062
should be American-made.
SC-10
PUBLIC DISCLOSURE
SUBCONTRACTOR
shall not make publicity releases in connection with this Subcontract without
prior review and approval of the UNLVRF. Proposed publicity releases shall
be
submitted to the UNLVRF Administrative Contact, as shown in Article 2, for
such
review and approval.
SUBCONTRACTOR
is encouraged to publish or otherwise make publicly available the results of
the
work conducted under this subcontract. An acknowledgement of Federal support
and
a disclaimer must appear in the publication of any material, whether copyrighted
or not, based on or developed under this subcontract as follows:
Acknowledgment:
"This
material is based upon work supported by the Department of Energy [National
Nuclear Security Administration] [add name(s) of other agencies, if application]
under Award Number DE-FG36-03GO13062."
Disclaimer:
"This
report was prepared as an account of work sponsored by an agency of the United
States Government. Neither the United States Government nor any agency thereof,
nor any of their employees, makes any warranty, express or implied, or assumes
any legal liability or responsibility for the accuracy, completeness, or
usefulness of any information, apparatus product, or process disclosed, or
represents that use would not infringe privately owned rights. References herein
to any specific commercial product, process, or service by trade name,
trademark, manufacturer, or otherwise does not necessarily constitute or imply
its endorsement,
Page
10
of 14
recommendation,
or favoring by the United States Government or any agency thereof. The views
and
opinions of authors expressed herein do not necessarily state or reflect those
of the United States Government or any agency thereof."
SC-11
NATIONAL SECURITY: CLASSIFIABLE RESULTS ORIGINATING UNDER AN
AWARD
This
award is intended for unclassified, publicly releasable research. Subcontractor
will not be granted access to classified information. DOE does not expect that
the results of the research project will involve classified information. Under
certain circumstances, however, a classification review of information
originated under this award may be required. The Department may review research
work generated under this award at any time to determine if it requires
classification.
Executive
Order 12958 (60 Fed. Reg. 19,825 (1995)) states that basic scientific research
information not clearly related to the national security shall not be
classified. Nevertheless, some information concerning (among other things)
scientific, technological, or economic matters relating to national security
or
cryptology may require classification. If you originate information during
the
course of this award that you believe requires classification under this
Executive Order, you must promptly notify the Technical point of contact
identified in Article 2 of this Subcontract for further
instructions.
If
you
originate information concerning the production or utilization of special
nuclear material (i.e., plutonium, uranium enriched in the isotope 233 or 235,
and any other material so determined under section 51 of the Atomic Energy
Act)
or nuclear energy, you must promptly notify the Technical point of contact
identified in Article 2 of this Subcontract for further
instructions.
If
DOE
determines any of the information requires classification, SUBCONTRACTOR agrees
that the Government/UNLVRF may terminate the award by mutual agreement in
accordance with 10 CFR 600-25(d). All material deemed to be classified must
be
forwarded to the DOE in a manner specified by DOE.
SC-12
SEVERABILITY
In
the
event any one or more of the provisions of this Subcontract shall, for any
reason, be held to be invalid, illegal, or unenforceable, then notwithstanding
such provision, the remainder of this Subcontract shall remain in full force
and
effect, and such term or provision shall be deemed stricken.
SC-13
COMPLIANCE WITH BUY AMERICAN ACT
By
accepting funds under this subaward, you agree to comply with Sections 2 through
4 of the Act of March 3, 1933 (41 U.S.C. 10a-10c, popularly known as the "Buy
American Act"). You should review the provisions of the Act to ensure that
any
expenditure made under this subaward is in accordance with it.
SC-14
INDEMNIFICATION
SUBCONTRACTOR
hereby acknowledges that UNLVRF is a separate nonprofit, educational, and
charitable corporate entity. It does not have the power to pledge State of
Nevada and or the University of Nevada, Las Vegas (UNLV) funds or credit.
Further, the State of Nevada and/or UNLV cannot assume any debts of UNLVRF,
and
the State or Nevada and/or UNLV shall not be liable for any debts or tort
liability arising from any contracts made between UNLVRF and third parties,
including, but not limited to, any debts of liability arising from this
Subcontract. Each party to this Subcontract shall bear responsibility for its
own negligent acts to the extent allowed by law.
DOE
shall
not be liable for harm or damages (to persons or property) incurred by the
UNLVRF or SUBCONTRACTOR in the performance of activities under this Agreement.
The UNLVRF and SUBCONTRACTOR shall maintain financial coverage for potential
liability.
Page
11
of 14
APPENDIX
E
UNLVRF
Subcontract #RF-07-SHGR-013
Altairnano
Technologies, Inc.
General
Terms and Conditions
GC-1 EXPLANATION
These
general terms and conditions do not restate all the provisions of applicable
statues and regulations, nor do the represent an exhaustive listing of all
requirements applicable to this grant. Rather, they highlight and are
consistent
with those requirements which are especially consistent with those requirements
which are especially
pertinent to research grants in general. They are emphasized by inclusion here
because: (1) they are invoked with high frequency: (2) their violation is a
matter of especially serious concern or (3) restating them in the research
context will allow them to be more easily understood by the research community.
In addition to these general terms and conditions, the SUBCONTRACTOR must comply
with all governing requirements, including the Special Terms and Conditions
identified in Appendix D.
GC-2 ORDER
OF PRECEDENCE
The
subcontract agreement, all documents listed therein, and subsequently issued
amendments are essential parts of the subcontract and a requirement occurring
in
one is binding as though occurring in all. In resolving conflicts,
discrepancies, errors or omissions the following order of precedence shall
be
used:
1. Special
Terms and Conditions
2. General
Terms and Conditions
3. 10
CFR
600
4. Other
documents, exhibits and attachments
5. Scope
of
Work
GC-3 ALLOWABLE
COSTSIAPPLICABLE COST PRINCIPLES
The
allowability of costs for work performed under this Subcontract will be
determined in accordance with the Federal
cost principles applicable to the Subcontractor in effect on the date of this
subaward, except as modified
by other
provisions of this Subcontract. The following cost principles are applicable
to
this Subcontract: OMB Circular A-21.
GC-4 LAWS
AND REGULATIONS
All
applicable Federal, State, and local laws, ordinances, statues, rules,
regulations, orders of decrees in effect at the time the Work under this
Subcontract is performed, shall apply to SUBCONTRACTOR and its employees and
representatives.
If
SUBCONTRACTOR
discovers
any discrepancy or inconsistency between this Subcontract and any law,
ordinance,
statute, rule, regulation, order, or decree, SUBCONTRACTOR
shall
report the same immediately, in
writing,
to the UNLVRF administrative contact, who will issue such further instructions
as may be necessary.
If
during
the term of the Subcontract there are changed or new laws, ordinances, statutes,
rules, regulations, orders or decrees not known or foreseeable at the time
of
signing this Subcontract which became effective and which affect the cost or
time of performance of this Subcontract, SUBCONTRACTOR shall immediately notify
UNLVRF in writing and submit detailed documentation of such effect in terms
of
both time and cost of performing the Subcontract.
GC-5
APPLICABLE LAW
SUBCONTRACTOR
agrees to comply with all relevant local, state, and federal statutes and
regulations. This Subcontract shall be governed exclusively by the laws of
the
State of Nevada.
Page
12
of 14
GC-6 CHANGE
OR ABSENCE OF THE DESIGNATED KEY PERSONNEL
GC-7 CHANGES
IN OBJECTIVES OR SCOPE
Any
change
in
the objective or scope of the Subcontract requires the prior approval of UNLVRF.
This includes changes in the phenomenon or phenomena under study and in the
methodologies or experiences if they are a specific objective of the research
work as stated in the Scope of Work.
GC-8 TRANSFER
OF SUBSTANTIVE PROGRAMMATIC EFFORT
None
of
the substantive effort of this Subcontract's scope of work may be transferred
to
another organization or person without prior approval of UNLVRF. This provision
does not apply to the procurement of equipment, supplies,
materials, or general support services; these services may, however, be subject
to other prior approval
requirements.
GC-9 INTEREST
AND OTHER FINANCIAL COSTS
Under
no
circumstances shall SUBCONTRACTOR be entitled to recover prejudgment interest
or
interest and other financial costs on any claims for extra costs.
GC-10 NOTICE
AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT
The
Subcontractor shall report to UNLVRF promptly and in reasonable written detail,
each notice or claim of patent or copyright infringement based on the
performance of this subcontract of which the Subcontractor has
knowledge.
In
the
event of any claim or suit against UNLVRF (and the Government) on account of
any
alleged patent or copyright infringement arising out of the performance of
this
subcontract or out of the use of any supplies furnished or work or services
performed under this subcontract, the Subcontractor shall furnish to UNLVRF,
when
requested by UNLVRF, all evidence and information in possession of the
Subcontractor pertaining to such
suit or
claim. Such evidence and information shall be furnished at the expense of UNLVRF
except where the Subcontractor has agreed to indemnify UNLVRF
(Government).
The
Subcontractor agrees to include, and require inclusion of, this clause in all
lower-tier subcontracts (at any tier) for supplies or services (including
construction and architect-engineer subcontracts and those for material,
supplies models, samples, or design or testing services) expected to exceed
the
simplified acquisition threshold at FAR 2.101.
GC-11 TERMINATION
Either
party may, at any time during the period of this Subcontract, terminate this
Agreement with or without cause, by giving thirty (30) days written notice.
Notice should be sent by registered or certified mail to the appropriate
Contractual Contact, as shown in Article 2. In the event of termination, the
parties agree to negotiate, in good faith, the payment of any work completed
prior to the date of Notice of Termination and the receipt of equipment, data,
reports, or other deliverables.
GC-12 PUBLIC
ACCESS TO INFORMATION
The
Freedom of Information Act, as amended, and the DOE implementing regulations
(10CFR1004) require DOE to release certain documents and records regarding
grants to any person who provides a written request. The intended use of the
information will not be a criterion for release. These requirements apply to
information held by DOE and do not require grantees or their subcontractors
to
permit public access to their records.
Page
13
of 14
Records
maintained by the DOE with respect to grants are subject to the provisions
of
the Privacy Act and the DOE implementing regulations 10 CFR Part 1004 if those
records constitute a "system of records" as defined in the Act and the
regulations. Generally, records maintained by grantees and their subcontractors
are not subject to these requirements.
GC-13 INTELLECTUAL
PROPERTY REQUIREMENTS
Nonprofit
organizations and education institutions are subject to the intellectual
property requirements at 10 CRF 600.136. Additional information can be found
at:
xxxx://Xx.xxx.xxx/xxxxxxxxx/xxxx
matrix.html.
GC-14 NOTICE
AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT
The
Subcontractor shall report to UNLVRF promptly and in reasonable written detail,
each notice or claim of patent or copyright infringement based on the
performance of this subcontract of which the Subcontractor has
knowledge.
In
the
event of any claim or suit against UNLVRF (and the Government) on account of
any
alleged patent or copyright infringement arising out of the performance of
this
subcontract or out of the use of any supplies furnished or work or services
performed under this subcontract, the Subcontractor shall furnish to UNLVRF,
when requested by UNLVRF, all evidence and information in possession of the
Subcontractor pertaining to such suit or claim. Such evidence and information
shall be furnished at the expense of UNLVRF except where the Subcontractor
has
agreed to indemnify UNLVRF (Government).
The
Subcontractor agrees to include, and require inclusion of, this clause in all
lower-tier subcontracts (at any tier) for supplies or services (including
construction and architect-engineer subcontracts and those for material,
supplies models, samples, or design or testing services) expected to exceed
the
simplified acquisition threshold at FAR 2.101.
Page
14
of 14