SALES CONTRACT
Date: December 17th, 1996
The Buyer: Plymouth Rubber Company, Inc.
Xxxxxx, Xxxxxxxxxxxxx 00000-0000
X.X.X.
Kleinewefers Xxxxxxxxxxxxxxxxx XxxX
Xxxxxxxxx Xxx. 00
D-81539 Munchen
FEDERAL REPUBLIC OF GERMANY
This Contract is made by and between the Buyer and the Seller; whereby the Buyer
agrees to buy and the Seller agrees to sell the under-mentioned commodity
according to the conditions stipulated as below:
1. Scope of Supplies & Services
1.1 Project Management and Basic Engineering Services as per Annex 5, Paras A
and B
1.2 1 (One) Complete High Precision Four Roll Calender Line dia. 650 x 2200
mm, *[__________] for the manufacture of soft PVC film and sheet as
described in detail in the technical specification as per Annex I to this
Contract and including Detail Engineering Services as described in Annex
5, para C and D of this contract.
1.3 Package of spare and wear parts for initial period of operation
1.4 Two calender spare rolls
*CONFIDENTIAL TREATMENT REQUESTED
SALES CONTRACT
(2)
2. Prices
2.1 Total price for scope of supply according to
technical specification *[_________]
2.2 Allocation for necessary spare and wear parts *[_________]
2.3 Calender spare rolls *[_________]
2.4 Total Contract Price for delivery FOB Northsea
port as per Incoterms 1990 *[_________]
3. Packing and Shipping Marks
3.1 Packing
By strong solid seaworthy wooden case
suitable for long distance ocean shipment or as far
as possible in container.
3.2 Shipping Marks The Seller shall xxxx on each package
with fadeless paint the package number, gross weight,
net weight, measurement and wordings: "KEEP AWAY FROM
MOISTURE". "HANDLE WITH CARE", "THIS SIDE UP", etc.
* CONFIDENTIAL TREATMENT REQUESTED
SALES CONTRACT
(3)
4. Time of Delivery
4.1 The commodities as per Article I will be ready for delivery FOB Northsea
port within 10 months of the date of effectiveness of this contract. FOB
Shipment will be completed when last container has been shipped. Spare
parts and minor non-essential items which will not hinder or delay
progress of work can be shipped later.
4.2 Ports of shipment are Hamburg or Bremen.
4.3 Part shipments are allowed.
5. Insurance
5.1 Insurance expenses will be covered by the Buyer.
5.2 The transport insurance will be valid for the transport CIF US port and
to warehouse.
6. Terms of Payment
6.1.1 15% of the total contract price as per Article 2.4 will be paid to
the Seller as advance payment within thirty (30) days after signing of
this Contract.
6.1.2 85% of the total contract price as per Article 2.4 will be paid to the
Seller out of an irrevocable Letter of Credit to be opened at the expense
of the Buyer with a first class bank and to be advised through and
confirmed by the Xxxxxxxx Xxxx XX, X-00000 Xxxxxxx, XXX.
6.1.3 The Letter of Credit mentioned above is to be opened within forty-five
(45) days after signing of this Contract. The validity of the Letter of
Credit should cover a period of at least two (2) months after the
appointed acceptance of the plant as per Article 6.2.3.
SALES CONTRACT
(4)
6.2 The Letter of Credit mentioned above will be payable to the Seller as
follows:
6.2.1 75% of the total contract price pro rata delivery against presentation of
the relevant shipping documents consisting of:
- commercial Invoices
- packing lists
- certificate of origin
- full set of bills of lading or
- instead of bills of lading warehouse receipt in case
shipment cannot be effected for reasons not attributable
to the Seller
6.2.2 10% of the total contract price against presentation of a
certificate signed by the Seller and the Buyer confirming that the
calender line was taken over by the Buyer after successful trial run
of the calender line.
6.2.3 The installment of 10% of the total contract price will be due for
payment to the Seller at the latest six (6) months after the date of the
xxxx of lading or the date of the relevant warehouse receipt as per
Article 6.2.1 in case the Seller confirms in writing that the trial runs
could not be completed successfully for reasons not attributable to the
Seller.
7. Technical Service
7.1 After delivery of the equipment as per Article I and receipt of the
Buyer's information, the Seller shall dispatch engineer(s) to Buyer's
factory for guiding machine installation, trial run and production. Any
expenses incurred from these services shall be borne by the Buyer.
7.2 The required number of supervisors, their qualification as well as the
daily rates, allowances and other conditions related to their assignment
are stipulated in Annex 2 to this Contract.
SALES CONTRACT
(5)
7.3 Payment shall be at actual cost against monthly invoices which are due
within thirty (30) days after date of issue.
8. Seller's Warranty
8.1 The Seller warrants that the commodity hereof is made of the best
materials with first class workmanship, brand new and unused, and
complies in all respects with the quality and specifications stipulated
in the contract and any defects or other faults that have been detected
or occurred within the warranty period shall be the responsibility of the
Seller at his own cost.
8.2 The warranty period will be eighteen (18) months counting from the date
of FOB shipment/date of warehouse receipt or twelve (12) months from the
date of the protocol as per Article 12 whichever will be earlier.
8.3 As a pecuniary security against the Seller's due performance of their
contractual obligations during the warranty period the Seller will
furnish a bank guarantee in the value of 5% of the total contract price.
This bank guarantee will be furnished on the date of signing the
acceptance certificate as per Article 12.3 and will be valid for twelve
(12) months. The bank guarantee will be issued by Xxxxxxxx Xxxx XX,
X-00000 Xxxxxxx, XXX.
8.4 Seller will not be held liable in case of improper or inadequate
treatment or handling of the equipment by the Buyer.
8.5 Wear and tear parts are excluded from warranty.
SALES CONTRACT
(6)
9. Force Majeure
9.1 The Seller shall not be held responsible for any delay or non-delivery of
the goods due to force majeure which might occur. The Seller shall advise
the Buyer immediately of the occurrence mentioned above within fourteen
(14) days thereafter, the Seller shall send by airmail to the Buyer for
their acceptance a certificate of the accident issued by the competent
government authority where the accident occurred as evidence thereof,
under such circumstances, the Seller, however, is still under the
obligation to take all necessary measures to hasten the delivery of the
goods. In case the accident lasts for more than sixteen (16) weeks, the
Buyer shall have the right to cancel the contract.
10. Delay of Delivery
10.1 If due to the responsibility of the Seller the equipment has not been
delivered at the relevant dates according to Article 4.1, the Seller
shall be obliged to pay the Buyer penalty of 0.5% of the contract price
as per Article 2.4 for every full week of delay, thereby excluding any
further demands. The total amount of penalty shall not exceed 5% of the
contract price.
SALES CONTRACT
(7)
11. Governing Law and Arbitration
This agreement shall be governed by and construed in accordance with the
laws of the State-Massachusetts.
Place of Jurisdiction is Norfolk - County / U.S.A.
ARBITRATION
Any disputes arising hereunder with respect to the fulfillment or
interpretation of any terms or conditions hereof shall be settled by an
amicable effort of the parties.
Either party may request that any such dispute which is not amicably
settled by such efforts of the parties shall be submitted to voluntary
binding arbitration according to the Commercial Arbitration Rules of the
American Arbitration Association (AAA). Each party shall appoint one
arbitrator and the third arbitrator, who shall act as Chairman, shall be
appointed by the American Arbitration Association.
The arbitration court shall also decide on the liability for costs
including the reimbursement of reasonable attorney fees.
The arbitration shall be performed in the English language, unless
otherwise agreed to by the parties.
SALES CONTRACT
(8)
12. Terms and Conditions to be met to issue the certificate of acceptance
12.1 After completion of the erection of the equipment under the supervision
of the Seller's personnel as per Article 7.1 trial runs will be carried
out in the presence of Seller's personnel to prove the capability of the
equipment stipulated in the technical specification and in accordance
with Annex 4.
12.2 In case during the trial runs the capability of the equipment was not
proven due to mechanical reasons the Seller is responsible for, the
Seller has the right to alter the equipment accordingly and repeat the
trial runs.
12.3 After completion of successful trial runs a certificate of acceptance
will be issued to this effect and will be signed by both parties.
12.4 In case a successful trial run cannot be carried out six (6) months after
date of xxxx of lading or warehouse receipt for reasons the Seller is not
responsible for, the certificate of acceptance is to be considered issued
upon expiry of the six (6) months mentioned above.
13. Limitation of Seller's Liability
13.1 Buyer and Seller will not be liable for indirect or consequential losses
or damages such as loss of profit, loss of production, etc.
SALES CONTRACT
(9)
14. Scope of Spare and Wear Parts
14.1 Till end of January 1997 the Seller shall submit a list of recommended
spare and wear parts with itemized prices.
14.2 Out of this list, Buyer and Seller shall jointly select the spare and
wear parts for the initial period of operation (1 1/2 to 2 years) up to
the allocated amount as per Art. 2.2.
14.3 These spare and wear parts shall be shipped together with the commodities
as per Art. 1.2.
15. General Conditions
15.1 Unless otherwise agreed in this Contract, Seller's General Conditions of
Supply attached to this Contract as Annex 3 shall apply.
16. Coming Into Force of Contract
16.1 This contract shall come into force at the date of Seller's receipt of the
down payment as per Article 6.1.1 and furnishing the L/C as per Article
6.1.2.
KLEINEWEFERS KUNSTSTOFFANLAGEN
Unternehmensbereich Munchen
Quotation: V 5416-4/96
Project: Plymouth Rubber Company ANNEX I
Scope of Contract: Status December 11, 1996 page 8
2.7.1 Drive of Roll Adjustment for Calender Rolls Nos. 1 and 2
Each consisting of:
2 Spur wheel worm gearings,
ratio i = 4000: 1
2 Pole-switchable AC brake motors
N = 0.91 / 4.1 kW at 40% relative duty cycle
n = 750 / 3000 rpm
Adjustment speed
(opening and closing) V = 2.25 mm/min
Resetting speed
(emergency opening) V = 9 mm/min
2.7.2 Drive of Roll Adjustment for Calender Roll No. 4
Consisting of:
2 Spur wheel worm gearings,
ratio i = 4000: 1
2 Pole-switchable AC brake motors
with preset speeds N = 4.1/0.91/0.25 kW
n = 3000/750/16.7 rpm
Adjustment speed
(opening and closing) V = 2.25 mm/min
Fine adjustment speed
(opening and closing) V = 0.05 mm/min
Resetting speed
(emergency opening) V = 9 mm/min
100% duty cycle by using control of thickness measuring and control
unit.
*CONFIDENTIAL TREATMENT REQUESTED
KLEINEWEFERS KUNSTSTOFFANLAGEN
Unternehmensbereich Munchen
Quotation: V 5416-4/96
Project: Plymouth Rubber Company ANNEX I
Scope of Contract: Status December 11, 1996 page 9
2.8 Ax Crossing of Calendar Roll No. 3
Ax crossing is executed by means of heavy duty spindles via pivot
joints and worm gears. Bearing housings are fixed by hydraulical
preloading.
Drive of ax crossing is effected by laterally flanged on gearing brake
motors. Each adjustment spindle has an individual drive motor. Motors
of each adjustment device can be switched on for uniform ax crossing of
the roll with reference to the centre line of the roll or individually
in order to obtain a unilateral cross axing of the roll.
Degree of ax crossing on each side of the roll is indicated by a scale
which is fitted to the calender frame.
Capacity of the gearing brake motors is 0.6 kW / 1000 rpm each.
Ax crossing is limited to max. +/- 25 mm at each side of the roll
with reference to the centre of the bearing. Adjustment speed
V = 3.6 mm/min.
2.9 Pre-Loading of Roll No. 3
Against Calender Frame
The pre-loading device mainly consists of:
- Hydraulic cylinders with maintenance-free high-performance hinged
bearing
- Heavy duty bearing housings with cylindrical antifriction bearings
- Suspension eyes for fitting the hydraulical cylinders to calender
roll No. 3 as well as supports provided at the calender frame.
Necessary hydraulic pressure is commonly adjustable for both sides at
the hydraulic unit (7.5 +/side).
KLEINEWEFERS KUNSTSTOFFANLAGEN
Unternehmensbereich Munchen
Quotation: V 5416-4/96
Project: Plymouth Rubber Company ANNEX I
Scope of Contract: Status December 11, 1996 page 10
2.9.1 Rollbending of Rolls Nos. 2 and 4 Against Calender Frame
Calender rolls Nos. 2 and 4 are provided with a device in order to
compensate the deflection of the calender roll effected by the
separating force in the calender nip.
The device mainly consists of:
- Hydraulic cylinders with maintenance-free high-performance hinged
bearing
- Heavy duty bearing housings with cylindrical antifriction bearings
- Suspension eyes for fitting the hydraulical cylinders to rolls Nos. 2
and 4 as well as supports provided at the calender frame.
Necessary hydraulic pressure is commonly adjustable for both sides or
each side independently by proportional valves which are controlled by
motor potentiometer.
2.9.2 Quick Release
In case of emergency, the roll adjustment of No. 2 and 4 calender roll
is hydraulically operated turning the threaded spindles. Nip opening
approx. 1.5 mm within less than 1s.
KLEINEWEFERS KUNSTSTOFFANLAGEN
Unternehmensbereich Munchen
Quotation: V 5416-4/96
Project: Plymouth Rubber Company ANNEX I
Scope of Contract: Status December 11, 1996 page 11
2.10 Recirculating Oil Lubrication
The calender is equipped with a complete recirculating oil lubrication
system, consisting mainly of:
1 Oil tank, contents approx. 350 litres
2 Oil pumps (one as stand-by), capacity 34 litres per minute at a
pressure rate of 16 bar drive effected by AC motor, N = approx. 2.2
kW
1 Oil filter
1 Shut-off valve
1 Relief valve
1 Differential pressure manometer with indicator for absolute as well
as differential pressure and maximum contact for differential
pressure
1 Pressure switch
1 Oil cooler with automatic and manually operated temperature control
(temperature of cooling water max. 16(deg)C
Immediately after leaving the oil cooler, the circulating oil medium is
divided into two streams. A part of approx. 6 1/min of the recooled oil
is directly lead back to the oil tank. This operation reduces
remarkably the temperature of the stored oil within the oil tank.
1 Oil flow control
1 Electric heating device with contact thermometers for heating up of
the oil before starting operation (4 x 0.9 kW heating capacity).
Scope of delivery includes pressure piping, pressure hoses connected to
all bearing housings as well as flow meters fitted to the pressure
pipes of main and rollbending bearings.
KLEINEWEFERS KUNSTSTOFFANLAGEN
Unternehmensbereich Munchen
Quotation: V 5416-4/96
Project: Plymouth Rubber Company ANNEX I
Scope of Contract: Status December 11, 1996 page 12
Each main bearing and each rollbending bearing is fitted with a
separate return pipe complete with flexible hose connection. The flow
back of the oil can be checked visually by inspection glasses. Each
return pipe fitted with testing equipment with thermometer.
A baffle with adjustable counterweight is installed as an additional
instrument for each flow of oil. Each baffle actuates a limit switch as
long as the oil flow runs as specified. In case of falling of the oil
flow, an optical signal is given via the limit switches.
The oil return line is equipped with fine mesh screens to separate
possible oil residues.
2.11 Hydraulic System
The hydraulic system includes the complete hydraulic unit as well as
all switches and control gears for operating the calender.
Operation of hydraulic system is as follows:
Oil is fed to the accumulator and to the different working cylinders
until the preset oil pressure is obtained (max. vol. 22 1/min) by means
of 2 pumps (1 as stand-by).
After obtaining this preset pressure via pressure switches, the
solenoid valve pump is switched for low pressure recirculation to
supply the system with leakage quantity. The pressure of system remains
constant. Difference of pressure for switching over to be preset at
pressure switch.
Hereby the heating up of hydraulic oil is kept at a low level whereas
the feeding of oil to the working pistons with the necessary pressure
is guaranteed.
In the event of a breakdown of the hydraulic system, the pressure is
releasable by a drain valve.
Drive capacity of motor N = 11 kW / 1,500 rpm
KLEINEWEFERS KUNSTSTOFFANLAGEN
Unternehmensbereich Munchen
Quotation: V 5416-4/96
Project: Plymouth Rubber Company ANNEX I
Scope of Contract: Status December 11, 1996 page 13
2.12 Central Greasing
The calender is equipped with a complete twin-circuit centralized
greasing system, consisting of:
1 Greasing pump for manual operation
1 Grease container with 4.0 kg contents as well as the necessary
distribution elements for the different greasing points.
Twin-circuit greasing system equipped with visual test devices. System
operates with two independent feeding pipes.
2.13 Stock Guides
The stock guides are mounted on top of the gap formed by calender rolls
Nos. 1 and 2. Support of the stock guides consisting of two
thick-walled hard-chrome plated cross beams which are fixed by means of
two supports each to the inside of the bearing housings of calender
roll No. 2.
Stock guides to be manually adjusted individually as well as commonly.
Stock guides are adjustable under load (minimum distance between stock
guides 500 mm).
The stock guides are
- executed of stainless steel, inner surface chrome-plated
- *[____________________]
- for cleaning purposes pneumatically tiltable from the rolls Nos. 1
and 2 by approx. 30(deg).
2.14 Installation
Scope of delivery includes all necessary limit switches and switch
rails for adjustment within the calender frame.
*CONFIDENTIAL TREATMENT REQUESTED
KLEINEWEFERS KUNSTSTOFFANLAGEN
Unternehmensbereich Munchen
Quotation: V 5416-4/96
Project: Plymouth Rubber Company ANNEX I
Scope of Contract: Status December 11, 1996 page 14
Further, all piping, pipe connections, pipe supports for oil
lubrication, central greasing as well as for the hydraulic system
within the calender are included in the scope of delivery.
2.15 Emergency Stop
In case of danger, switching-off of the 4 main motors of the calender
is effected by easily accessible red-white marked ropes or bars via
emergency switches as well as mushroom-type stop buttons in the control
panel.
In case of an emergency stop of the line, stand-still of the calender
is effected by electrical braking of the 4 drive motors. In accordance
with local requirements, the calender rolls will be stopped within a
roll surface travel (m) of 0.0175 x surface speed (m/min) of the
fastest calender roll. At the same time, the calender nip is opened by
moving off the calender rolls until limit switches are contacted. In
case of an emergency stop an acoustic signal is given.
By means of a key switch installed in the calender control panel, the
opening of the calender nip can be interrupted.
2.16 Auxiliary Motors
The scope of delivery includes all auxiliary AC motors serving pumps of
the hydraulic system, oil lubricant system, etc., further on the roll
adjustment and cross axis movement.
2.17 Access Platform
Access platform including stairs to be installed at the feeding side of
the calender for cleaning of the rolls and for operation are provided.
2.18 Hot Trim (Buyer's Contribution)
2.19 Hot Edge Trim Take-off (Buyer's Contribution)
KLEINEWEFERS KUNSTSTOFFANLAGEN
Unternehmensbereich Munchen
Quotation: V 5416-4/96
Project: Plymouth Rubber Company ANNEX I
Scope of Contract: Status December 11, 1996 page 15
3.0 POST CALENDER EQUIPMENT
General Technical Data:
-----------------------
*[____________________]
*[____________________]
*[____________________]
*[____________________]
The complete post calender equipment shall be equipped with an
electrical sequential control, ie. when changing the speed of any drive
of the post calender equipment, the subsequent drives change their
speeds in the same ratio.
All rolls of the post calender equipment have a roll surface width of
2200 mm.
Temperature accuracy on the roll surface is +/- 1.5 K up to 100 mm
distance from the edges.
All temperature controlled rolls are:
- fitted with rotary unions as well as with hoses for feeding and
backflow of the tempering medium
- made of steel, their surfaces are machine-ground, hard chromium
plated and matt finished (other type of finish could be agreed upon
later)
- are in double wall design for heating and cooling
- are equipped with helical heating channels to arrange for
counter-flow of the tempering medium.
As far as possible from point of view of design, drives and rotary
unions are fitted at the same side of the machine (improved access for
operating staff).
Minimum distance between rolls: 3 mm
*CONFIDENTIAL TREATMENT REQUESTED
KLEINEWEFERS KUNSTSTOFFANLAGEN
Unternehmensbereich Munchen
Quotation: V 5416-4/96
Project: Plymouth Rubber Company ANNEX I
Scope of Contract: Status December 11, 1996 page 16
Movability:
*[____________________]
*[____________________]
- For exchange of the embossing roller, the roller is manually movable
in vertical direction to the top.
- For exchange of the rubber roller, the embossing device is moved by
electrically driven spindles approx. 400 mm in horizontal direction.
This allows sufficient clearance for easy positioning of the
embossing roller. (Prior to this, the complete tempering and cooling
unit has to move back in horizontal direction.)
- Further, No. 2 and 4 pick-off rollers as well as No. 2, 4, 6, 8 and
10 tempering and cooling rollers are electrically adjustable in
vertical direction by approx. 270 mm. Thereby threading of film is
simplified.
- In case of not embossing, the complete tempering and cooling unit is
moved horizontally towards the take-off unit.
In this case, the embosser pick-off unit comes close to the take-off
unit and free film lengths in a critical temperature range are avoided.
*CONFIDENTIAL TREATMENT REQUESTED
KLEINEWEFERS KUNSTSTOFFANLAGEN
Unternehmensbereich Munchen
Quotation: V 5416-4/96
Project: Plymouth Rubber Company ANNEX I
Scope of Contract: Status December 11, 1996 page 17
3.1 Take-Off Unit
*[____________________]
*[____________________]
The rollers are located on the horizontal centre line level of No. 4
calender roll between the calender frames. The space between the
first take-off roller and the last calender roll is adjustable up to
min. 3 mm.
This kind of design guarantees a simple operation when inserting the
film and meets the corresponding safety regulations.
The equipment allows installation of rollers of different surface
roughness in series.
Based on samples of the possible range of roll finish, PRC will decide
which finish shall be chosen for these rolls.
This decision must be made prior to the dates when rolls will have to
be finished.
The complete take-off unit is driven by 3 drives. Each of the drives
consists of a DC motor with Eupex coupling, link shafts, distributor
gear, drive shafts and bevel gears.
The 3 drive circuits are divided as follows:
Circuit 1: Take-off rollers 1 and 2
Circuit 2: Take-off rollers 3 to 5
Circuit 3: Take-off rollers 6 to 10
The complete take-off unit is designed for thermoplastical stretching
of PVC film.
For heating and cooling of the rollers of the take-off unit up to a
maximum of 180(deg)C, 3 control circuits of the heating and cooling
units are provided.
The control circuits are divided as follows:
Circuit 1: for take-off rollers 1 and 2
Circuit 2: for take-off rollers 3 to 5
Circuit 3: for take-off rollers 6 to 10
*CONFIDENTIAL TREATMENT REQUESTED
KLEINEWEFERS KUNSTSTOFFANLAGEN
Unternehmensbereich Munchen
Quotation: V 5416-4/96
Project: Plymouth Rubber Company ANNEX I
Scope of Contract: Status December 11, 1996 page 18
3.2 Embossing Device
The film is inserted vertically into the embossing unit, wraps the
embossing roll and is subsequently guided to the embosser pick-off.
*[______________]
*[______________]
*[______________]
*[______________]
*[______________]
*[______________]
*[______________]
*[______________]
*[______________]
*[______________]
*[______________]
*[______________]
*[______________]
*[______________]
*[______________]
*[______________]
*[______________]
*[______________]
*[______________]
*[______________]
*[______________]
The bearing housings for the embossing roll are of tiltable design to
enable easy roll change. The bearing housings for the rubber counter
roll are also executed as tilting bearings.
* CONFIDENTIAL TREATMENT REQUESTED
KLEINEWEFERS KUNSTSTOFFANLAGEN
Unternehmensbereich Munchen
Quotation: V 5416-4/96
Project: Plymouth Rubber Company ANNEX I
Scope of Contract: Status December 11, 1996 page 19
The embossing roll is also hydraulically pressed against the rubber
roll. The hydraulic pressure against the rubber roll is effected via
the embossing roll and can be adjusted simultaneously on both sides or
on each side separately. *[____________]
*[____________]
Drive of the embossing unit is effected via the counter cooling roll.
1 drive: DC motor 15 kW
The embossing roll can be taken out by means of a hoist to be provided
by the Buyer.
To adjust the intended vertical feed of the film to the embossing nip,
the rubber roll can be adjusted manually via threaded spindle to obtain
an accurate inlet of the film.
3.3 Embosser Pick-Off Unit
Equipped with 4 rollers with a diameter of 157 mm for transmission of
the film from the embossing roll or from the last roller of the
take-off unit (in case of not embossing) to the tempering and cooling
unit.
The surfaces of the roller's of the embosser pick-off unit are
machine-ground and hard-chrome plated with a thickness of 40 (micro)m.
The final execution of the roller surface has yet to be defined.
These rollers are equipped with a drive consisting of DC motor with
coupling, distributor gear, drive shafts and slip-on gears.
3.4 Tempering and Cooling Unit
Consisting of:
Tempering and cooling device, equipped with 10 rollers with a diameter
of 257 mm.
The lifting device for easy and safe insertion of the film consists of
4 rotary xxxx spindles, 1 AC motor and 4 guides.
* CONFIDENTIAL TREATMENT REQUESTED
KLEINEWEFERS KUNSTSTOFFANLAGEN
Unternehmensbereich Munchen
Quotation: V 5416-4/96
Project: Plymouth Rubber Company ANNEX I
Scope of Contract: Status December 11, 1996 page 20
*[______________]
*[______________]
*[______________]
*[______________]
*[______________]
*[______________]
*[______________]
*[______________]
*[______________]
*[______________]
3.5 Base for Thickness Measuring and Control Unit
Support frame with 1 traverse to accommodate a thickness measuring and
control unit.
The frame is provided with idling guide rollers for guiding the film.
3.6 Pull Roll Unit
Installed after the thickness measuring equipment
2 driven rolls, dia. 257 mm
Rolls double-walled with helical channels. Rolls vertically arranged.
Rolls complete with coupling, cardan shaft, distributor gear and drive
unit, equipped with rotary joints and flexible hoses.
1 Drive circuit: DC motor 3.0 kW
Additionally equipped with 1 rubber counter roll which is pneumatically
pressed against the 1st roll to create a fixed point before winder.
Film passes rolls in S-wrap.
* CONFIDENTIAL TREATMENT REQUESTED
KLEINEWEFERS KUNSTSTOFFANLAGEN
Unternehmensbereich Munchen
Quotation: V 5416-4/96
Project: Plymouth Rubber Company ANNEX I
Scope of Contract: Status December 11, 1996 page 21
3.7 Inspection Unit
Installed independently behind pull roll unit for visual control of
films
Mainly consisting of:
o complete frame and idling support rollers
3.8 Installation
The scope of supply includes all necessary limit switches, switch rails
and all screw connections as well as pipes and tubes for the hydraulics
and pneumatics within the downstream equipment described above.
3.9 Emergency Stop
To switch off the drive motors in case of emergency, safety equipment
shall be provided at points of the post calender equipment to be
defined later.
In case of emergency stop, an acoustic signal is given. The roller
drives of the post calender equipment are stopped immediately by means
of electrical braking and at the same time all rollers of the take-off
unit, tempering and cooling unit open up to the limit switches.
The control panel shall be provided with indicators to show which of
the switches has become operative.
3.10 Auxiliary Motors
All AC motors for vertical and horizontal movements are included in the
scope of supply.
KLEINEWEFERS KUNSTSTOFFANLAGEN
Unternehmensbereich Munchen
Quotation: V 5416-4/96
Project: Plymouth Rubber Company ANNEX I
Scope of Contract: Status December 11, 1996 page 22
3.11 Safety Protection Provisions
Protective fences and covers at the operating side as well as limit
switches are included in the scope of supply.
The safety protection provisions meet the EC machine, directive
(89/392/ECC as adopted in the first amended directive 91/368/ECC) and
will be delivered with CE xxxx/declaration of conformity or
manufacturer's declaration.
Shielding of drive and heating side to be arranged by Buyer according
to design drawings of Seller.
KLEINEWEFERS KUNSTSTOFFANLAGEN
Unternehmensbereich Munchen
Quotation: V 5416-4/96
Project: Plymouth Rubber Company ANNEX I
Scope of Contract: Status December 11, 1996 page 23
4.0 THICKNESS MEASURING AND CONTROL EQUIPMENT
WITH CROSS PROFILE EVALUATION
Thickness gauge and control system with microprocessor electronics,
including one permanently scanning measuring head. The sensor is
incorporated in a scanner and is motor-driven over the entire sheet
width to provide continuous cross profile recording of thickness.
Contactless measurement.
Complete with various histogram displays on colour video monitor.
Control signals for automatic control of:
o scanning speed
o rollbending
o roll gap 3-4
o target value optimization
Data setting and control of the system are made via keyboard on the
central electronics. A battery-backed memory allows storage of
approximately 200 product data blocks under a specified product number.
4.1 Technical data:
Measuring range 0 - 800 (micro)m PVC
Measuring accuracy +/- 0.3%, but not better than +/-0.3 (micro)m
(+/-2-sigma (standard deviation)-range)
Measuring gap 9.5 mm
Radiation source Krypton 85
Radiation activity 11.1 GBq +/- 10%
Radiation half life 10.4 years
Power supply 230 V +/- 10%, 60 c/s +/- 1%, 10 A
Ambient conditions temperature max. 50 (deg)C
humidity max. 95%, without condensation
The monitor displays the figures 1 to 5, 7, 11, 16, 17 and 20 as shown in the
description "profile monitor MC 68 Ko2. K1 (Sub Annex 8.)" Figure 11 is in
addition prepared for each roll.
KLEINEWEFERS KUNSTSTOFFANLAGEN
Unternehmensbereich Munchen
Quotation: V 5416-4/96
Project: Plymouth Rubber Company ANNEX I
Scope of Contract: Status December 11, 1996 page 24
4.2 Scope of delivery:
4.2.1 Scanner BC-TE 1.260
Size IV, equipped with footing. Completely wired. Including warning
panels. With DC drive for a maximum scanning speed of 15 m/min.
4.2.2 Sensor BC-MK 1.0 Kr 9
Incorporated in item 4.2.1. Includes built-in source and pass line
error compensation
4.2.3 Control Desk BC-P 80
To be installed above cable duct. Includes air conditioner.
4.2.4 Central Unit BC-MC 68 K02
With microprocessor electronics on VME-bus for signal processing
including:
o Operator panel with foil-protected keyboard with LEDs to indicate the
selected function/entry
o Processing unit, including:
- analog input interface
- digital input interface
- digital output interface
- CPU with 68020-processor
- memory for product data, battery-backed
- (E2PROM) memory for default values of system
- real-time clock
- serial interface for printer
o power supply unit, including:
- 5 VDC
- +/- 12 VDC
- 24 VDC
KLEINEWEFERS KUNSTSTOFFANLAGEN
Unternehmensbereich Munchen
Quotation: V 5416-4/96
Project: Plymouth Rubber Company ANNEX I
Scope of Contract: Status December 11, 1996 page 25
4.2.5 Profile Monitor BC-PM 20 C
Colour monitor, screen size 20". For the various displays.
4.2.6 Set of Cables
For connection between scanner and desk, length 20 m.
4.2.7 Matrix Printer
Including interface and software for driver stages.
For separate installation. To print hard copies of monitor displays.
Printout is in black-and-white and made on command.
4.2.8 Cabinet
For printer. With plexiglass cover to protect printer from dust and
vapour, and storage area for extra paper.
4.3 Automatic Control
The control is adapted to line speed via pulse generator/counter as
well as via speed signal of calender and post calender train. Control
output signal is one unloaded contact for "more" and one for "less".
Each control loop can be selected separately. In case of troubles or
misoperation, the automatic control is interrupted and must be selected
again after elimination of disturbance.
4.3.1 Scanning Speed
The scanning speed is preset by the system in such a way that 25 or 33%
(selectable) of the net sheet width scanned by the sensor account for
one turn of last calender roll. Thus any influence on autocontrol
caused by eccentricity of calender roll is eliminated. The DC drive
includes soft start and stop ramps to prevent shocks.
KLEINEWEFERS KUNSTSTOFFANLAGEN
Unternehmensbereich Munchen
Quotation: V 5416-4/96
Project: Plymouth Rubber Company ANNEX I
Scope of Contract: Status December 11, 1996 page 26
4.3.2 Rollbending
Control input signal is the average value of center zone in combination
with the values of left and right zones.
4.3.3 Roll Gap 3-4
Control input signals are the average values of left and right zones,
each accounting for 25 or 33% (selectable) of net sheet width.
4.3.4 Target Value Optimization
Control input signal is the standard deviation of cross profile or a
multiple thereof. Complementary function to each of the above mentioned
control loops.
KLEINEWEFERS KUNSTSTOFFANLAGEN
Unternehmensbereich Munchen
Quotation: V 5416-4/96
Project: Plymouth Rubber Company ANNEX I
Scope of Contract: Status December 11, 1996 page 27
5.0 TWO-STATION TURRET WINDER WITH
AUTOMATIC WEB TRANSFER SYSTEM
5.1 Technical Specification
Material Web of semirigid and soft PVC film
Material thickness 2.36-23.6 mil (60-600) (micro)m
Material web width max. 70.8" (1800 mm) (trimmed)
Roller width 2200 mm
*[________________] *[______________]
*[______________]
Core length max. 2050 mm
Accuracy of cutting width +/-1 mm
Winding accuracy +/-1 mm (not including roll
changing procedure)
Number of winding stations 2
Core chucking method Indirect (with air shaft),
3", 4" and 6"
Roll diameter max. 1000 mm, approx. 600 mm for
core dia. 3" (when winding total width)
Thread-up speed 3 - 15 m/min
*[_______________] *[_____________]
Winding tension range 15 - 400 N
Winding direction Face of film (upper side) inside
Winding method a. with adjustable contact pressure
b. gap winding.
* CONFIDENTIAL TREATMENT REQUESTED
KLEINEWEFERS KUNSTSTOFFANLAGEN
Unternehmensbereich Munchen
Quotation: V 5416-4/96
Project: Plymouth Rubber Company ANNEX I
Scope of Contract: Status December 11, 1996 page 28
Automatic cut and transfer In manual or automatic mode with automatic
length counter, for square cut with no
foldover or core preparation.
Conditions for max. roll diameter in connection with shaft diameter
-------------------------------------------------------------------
Max. roll diameter
3" air shaft 600 mm
4" air shaft 800 mm
6" air shaft 1000 mm
Above figures are approximate values.
KLEINEWEFERS KUNSTSTOFFANLAGEN
Unternehmensbereich Munchen
Quotation: V 5416-4/96
Project: Plymouth Rubber Company ANNEX I
Scope of Contract: Status December 11, 1996 page 29
5.2 Machine Description
5.2.1 Pendulum Roller
(mounted above the length slitting unit)
The pendulum roller is balanced by an XX xxxxxx motor. In order to
control web tension between post calender equipment and winding
machine a pendulum roller loading can be set. It is provided for
the synchronisation between the DC drives located in front and
behind.
5.2.2 Shear Knife System
For the bilateral slitting of edges. The lower and the upper
knives are driven whereas the upper knife turns with advanced
speed because of its bigger diameter. Each pair of knives is
infinitely adjustable by means of a spindle and hand wheel.
Position of the knives can be read on a scale. To support the web,
two idler rollers are provided.
5.2.3 Blade Slitting
Three cutter heads are provided and each head is equipped with
seven industrial blades around its circumference. The change from
one blade to the other can be done during operation without losing
its slitting function. The cutter heads are infinitely adjustable.
5.2.4 Spreader Roller
The spreader roller is of the cord-expander type. Roller body of
aluminum, with profile grooves in which flexible plastic cords are
recessed. Incline of lateral disks can be adjusted individually.
The subsequent stretcher roller (curved roller with rubber cover)
ensures flat film passages and avoids neckdown of film web.
Edge trim strips and film web are separated of spreader roller
KLEINEWEFERS KUNSTSTOFFANLAGEN
Unternehmensbereich Munchen
Quotation: V 5416-4/96
Project: Plymouth Rubber Company ANNEX I
Scope of Contract: Status December 11, 1996 page 30
5.2.5 Suction Device
To suck off edge trims (Buyer's contribution).
Suction nozzle connection quoted as optional.
5.2.6 Pull Roll Unit
Pull roll unit, installed vertically, driven by DC motor. The
film passes in S-wrap contact without slip over.
Unit mainly consisting of:
2 rolls, and a pneumatically operated rubberized counter pressure
roll.
The arrangement of pull roll unit ensures that web is guided
properly and creates a fixed point.
6.2.7 Tension Measuring Roll
Installed behind pull roll unit, indicates applied web tension,
read out used as reference value for the control of winder
station.
Film is guided horizontally to the automatic cut and reel transfer
system.
5.2.8 Static Unloading Bar
In order to take off electrostatic loading of the PVC web an ionic
spray bar, make Simco, is mounted just in front of winding and
underneath the contact roll.
KLEINEWEFERS KUNSTSTOFFANLAGEN
Unternehmensbereich Munchen
Quotation: V 5416-4/96
Project: Plymouth Rubber Company ANNEX I
Scope of Contract: Status December 11, 1996 page 31
5.2.9 Automatic Cut and Reel Transfer System
Film square cut device, core fixing of film web without foldover,
guide and pressure rolls inclusive contact roller are executed as
one unit which is electromotively pivoted when actuated by PLC
electronic control. With increasing roll diameter, whole unit is
automatically racked back.
Unit allows operation of winder with adjustable contact pressure
or with preset gap (gap winding method). PLC control program
evaluates by yardage counting the
release of cross cutting process
- alternatively manual operation possible -
and initiates the indexing process.
Precise initial positioning of contact roll relative to the
oncoming core is automatically executed and verified additionally.
In case of gap winding, contact roll is moved via electronic
evaluation of finished roll diameter into the applicable position
which is retracted in accordance with increasing diameter of
finished roll.
Selector switch at operating panel allows changing of winding
method.
Static unloading device forms integral part of the system.
Knife bar of square cross cutting equipment is made with high
precision and is reinforced to assure a minimum of wear.
KLEINEWEFERS KUNSTSTOFFANLAGEN
Unternehmensbereich Munchen
Quotation: V 5416-4/96
Project: Plymouth Rubber Company ANNEX I
Scope of Contract: Status December 11, 1996 page 32
5.2.10 Two Station Turret Winder
Complete with operating panel and necessary display.
Mainly consisting of:
- Side frames,
- Indexing disks
Indexing of the disks effected by DC motor which is actuated by
PLC control system.
Disks carry the two winding stations which are individually driven
by DC motors.
The DC drive system secures a controlled winding operation and
indexing with high precision of positioning. In combination with
the automatically controlled indexing drive, winding motors are
operated with infinitely varying winding tension in direct
relation to the increasing roll diameter of finished roll, which
is realized by using a special software program together with PLC
control.
Machine equipped with pneumatically actuated core chucks at the
winding stations.
Core chucks are designed to accommodate alternative winding
shafts.
Software program allows to set variable speed during indexing such
as high speed during initial index, automatically switching to low
speed for precise positioning at the end of indexing cycle.
Standard position: All movements are automatically controlled
and executed.
Additionally: Operation can be manually operated.
All maintenance parts of the winder such as electrical devices
including solenoid valves, etc. are installed in a way to be
accessible and easy to exchange or maintain.
KLEINEWEFERS KUNSTSTOFFANLAGEN
Unternehmensbereich Munchen
Quotation: V 5416-4/96
Project: Plymouth Rubber Company ANNEX I
Scope of Contract: Status December 11, 1996 page 33
5.3 Electrical Equipment
Complete, including internal wiring of machine and control
cabinet. Operating elements and operating display located in a
separate panel installed in one of the side frames of the winder.
PLC control of drive system and KKA-special software program allow
a uniform operation of the two-station turret winder. Reel speed
and winding tension are automatically controlled allowing a
sensitive and high precision winding of web.
Length compensation system included to automatically compensate
for the variation in length of film web during indexing and web
transfer.
Control cabinet equipped with all necessary switchgear and control
units, contactors, fuses and PLC control. Wiring between machine
and control cabinet to be effected at site (Buyer's contribution).
PLC control system will be Siemens.
Following Data to be Met by Buyer
---------------------------------
Main supply voltage 3 x 575 V, PE/N, 60 cycles
DC drive voltage 480 V
Within the limits specified
---------------------------
Main fluctuation of voltage max. +- 5%
Main frequency fluctuations max. +- 2%
Load fluctuation max 20%
Temperature fluctuation max. +- 5(deg)C/h
Ambient temperature max. 40(deg)C
and humidity max. 65%
for the control panel
Ambient temperature max. 35(deg)C
and humidity max. 65%
for the control cabinet in a separate airconditioned room.
KLEINEWEFERS KUNSTSTOFFANLAGEN
Unternehmensbereich Munchen
Quotation: V 5416-4/96
Project: Plymouth Rubber Company ANNEX I
Scope of Contract: Status December 11, 1996 page 34
5. 4 Optionals
5.4.1 Suction Nozzle Connection
Suction nozzle connection to be connected to a Venturi nozzle air
transportation system (Buyer's contribution).
Both suction nozzle connections adjustable to desired web width.
5.4.2 Unloading Fork Arms
When rolls are wound on cores which are taken up by a winding
shaft, the unloading fork arms will support the shaft before the
chucking heads will be opened. The fork arms are actuated by
electric motor and will swing the finished roll to a defined
position outside the winding machine. There the winding roll will
be supported by the roll cart, and after retracting the forks in
the upper part of the device, the winding shaft can be removed
manually.
5.4.3 Winding Shafts
Pneumatic expansion shaft with hardened connection ends, equipped
with profiled clamping units. Toothed connection end at drive
side.
Pneumatic shaft 3" paper core, 3 pcs.
5.4.4 Oscillating Web Guide
The oscillating guide roll combines two movements, providing a
better traverse motion effect; an axial shift and at the same time
a tilting of the roll.
KLEINEWEFERS KUNSTSTOFFANLAGEN
Unternehmensbereich Munchen
Quotation: V 5416-4/96
Project: Plymouth Rubber Company ANNEX I
Scope of Contract: Status December 11, 1996 page 35
6.0 HEATING AND COOLING PLANT
Following energies or equipment are available or have to be
provided by the Buyer:
o Chilled water as specified 5 bar, max. 10(deg)C
o Compressed air 6 bar
Thermal Oil:
o Operating temperature 280/255(deg)C
o Feed temperature, max. 300(deg)C
6.1 1 Thermal Oil Boiler Plant
(Buyer's contribution)
Compact design, ready to operate, designed for heating operation
without overpressure, complete with outer heat protection
insulation, heated by light oil burner, modulating control
- operating temperature 280/255(deg)C
- feed temperature, max. 300(deg)C
- operating voltage AC 575 V, 3-phase, 60 cycles
- heat output 600 kW
- thermal oil filling Mobiltherm 603 (recommended)
Including the following auxiliaries:
1 Main thermal oil circulation pump, made of globular graphite cast
iron with special shaft seal without cooling, including AC motor,
coupling and coupling protection as well as accessories for
installation.
1 Thermal oil circulation pump, as above, serving as a spare pump
(permanently installed)
1 Set of accessories for installation, comprising:
- gas separator
- shut-off valves, with bellows seal
- dirt catcher
- drain valves
KLEINEWEFERS KUNSTSTOFFANLAGEN
Unternehmensbereich Munchen
Quotation: V 5416-4/96
Project: Plymouth Rubber Company ANNEX I
Scope of Contract: Status December 11, 1996 page 36
- venting valves
- safety valve
- control thermostat
- safety thermostat
- flue gas thermostat
- flow detector
- pressure gauge
- thermometer
- support frame with internal piping
1 Measuring and switching unit for the heating unit, consisting of
the control and supervision devices for control of the heater and
of the main circulation pumps, as e.g.:
1 feed temperature controller, designed as electronic controller
with adjustment of set value and indication of temperature
- measuring range 0 to 399(deg)C
- Input Pt 100 DIN
1 temperature indicator for the return temperature of the thermal
oil
- measuring range 0 to 399(deg)C
- Input Pt 100 DIN
2 pump control units
miscellaneous indicating lamps
1 Thermal oil expansion vessel, designed as container without
overpressure, with all necessary connecting sockets, inserts,
internal piping, quick drain valve, drain valve, hydrometer for
indication of contents, as well as built-in electrical filling
level supervision
1 Filling and draining arrangement with changeover valves
(electrical filling pump)
1 Drain tank, designed as welded horizontal cylindrical vessel
without overpressure, sufficient to receive the filling volume of
the largest plant section that can be shut off, container complete
with all necessary inserts and connecting sockets, fittings, and
measuring devices.
KLEINEWEFERS KUNSTSTOFFANLAGEN
Unternehmensbereich Munchen
Quotation: V 5416-4/96
Project: Plymouth Rubber Company ANNEX I
Scope of Contract: Status December 11, 1996 page 37
6.2 Chilled Water Plant with Accessories (Buyer's contribution)
1 Chilled water plant with following technical details:
Cooling power 650 kW
Chilling medium to the consumer water + 10/+ 15(deg)C
Volume flow 110 m(3)/h
Requirements to be met by the water
The water must be absolutely clear and free from suspended matter
or mechanical impurities and with no Xxxxxxx effect created by
colloids being stated. The water must be softened and degassed,
and shall meet the below specified requirements:
Carbonates n.n.
Total hardness less than 0,03 mval/kg
Oxygen mg/kg
Fixed carbon dioxide (CO(2)) less than 25 mg/kg
Free carbon dioxide (CO(2)) n.n.
Oil content less than 1 mg/ltr.
pH value 8,5-9,5
Iron content (Fe) less than 0,05 mg/kg
Copper content (Cu) less than 0.01 mg/kg
Potassium permanganate consumption (KMnO(4)) less than 10 mg/kg
Otherwise free from all the usual heavy metals.
1 Chemical dosing unit, consisting of:
1 Watermeter controlled dosing unit for
addition of chemicals to alkalify the water
and to produce a protective layer
1 Timer controlled dosing unit for addition of algicid
Remark: In any case customer shall supply:
-------
Fuel storage facilities
Chimney arrangement
KLEINEWEFERS KUNSTSTOFFANLAGEN
Unternehmensbereich Munchen
Quotation: V 5416-4/96
Project: Plymouth Rubber Company ANNEX I
Scope of Contract: Status December 11, 1996 page 38
6.3 Heating and Cooling Control Units
The heating and cooling plant is designed for the following:
Cir- Rolls Feed Temp. Circ. medium 0il/Water
cuit (deg)C oil water quantity
No. min.max. m(3)/h per
circuit
------------------------------------------------------------------------------
1 Calender roll No. 1 140-220 x 50
2 Calender roll No. 2 140-220 x 50
3 Calender roll No. 3 140-220 x 50
4 Calender roll No. 4 140-220 x 50
5 Take-off roll No. 1-2 45-180 x 10
6 Take-off roll No. 3-5 45-180 x 15
7 Take-off roll No. 6-10 45-180 x 20
8 Embossing roll 25-100 x 20
9 Rubber roll and counter roll 25 x 10
10 Embosser pick-off roll No. 1-4 25-100 x 15
11 Tempering roll No. 1-3 25-100 x 15
12 Tempering roll No. 4-6 25-100 x 15
13 Tempering roll No. 7-10 25- 60 x 20
14 Strip roll No. 11-12 15 x 10
KLEINEWEFERS KUNSTSTOFFANLAGEN
Unternehmensbereich Munchen
Quotation: V 5416-4/96
Project: Plymouth Rubber Company ANNEX I
Scope of Contract: Status December 11, 1996 page 39
6.3.1 Thermal Oil Heating and Cooling Control Units
- directly heated with thermal oil from the thermal boiler -
*[_____] Units servicing: *[________________]
*[_____] Units servicing: *[________________]
Each unit consisting of:
- Cooler with cooling water counter flow
- Hot oil circulation pump, complete with AC motor,
coupling and sealing ring
- Straight way control valve complete with motor, used as
heating control valve
- Three-way control valve complete with motor, used as
cooling control valve
- Set of accessories such as: Stop and check valves, drain
and vent valves, thermometer, manometer, dirt catcher
- Steel profile base frame
All elements fitted to the base frame forming a compact unit
including internal piping and electrical wiring onto
terminal block.
*CONFIDENTIAL TREATMENT REQUESTED
KLEINEWEFERS KUNSTSTOFFANLAGEN
Unternehmensbereich Munchen
Quotation: V 5416-4/96
Project: Plymouth Rubber Company ANNEX I
Scope of Contract: Status December 11, 1996 page 40
6.3.2 Warm Water Heating and Cooling Control Units
- Heated with thermal oil -
5 Units servicing: 1 x Embossing roll
1 x Embosser pick-off rolls 1-4
3 x Tempering rolls 1-3/4-6/7-10
Each unit consisting of:
- Heat exchanger as warm water heating unit using thermal oil
as primary energy
- Cooler with cooling water counter flow
- Three-way control valve complete with motor, used as
heating control valve
- Three-way control valve complete with motor, used as
cooling control valve
- Warm water circulation pump, complete with AC motor
- Set of accessories such as: Stop and check valves, drain
and vent valves, thermometer, manometer, dirt catcher
Steel profile base frame
All elements fitted to the base frame forming a compact unit
including internal piping and electrical wiring onto terminal
block.
KLEINEWEFERS KUNSTSTOFFANLAGEN
Unternehmensbereich Munchen
Quotation: V 5416-4/96
Project: Plymouth Rubber Company ANNEX I
Scope of Contract: Status December 11, 1996 page 41
6.3.3 Cooling Water Control Unit
1 Unit servicing: Rubber roll of embossing unit and
counter roll
1 Unit servicing: Pull rolls 11-12
Consisting of:
1 Cooling water circulation pump, complete with AC motor
1 Electric straight-way control valve
1 Set of accessories such as:
stop and check valves, drain and vent valves, thermometer,
manometer
- Steel profile base frame
All elements fitted to the base frame forming a compact unit
including internal piping and electrical wiring onto terminal block.
KLEINEWEFERS KUNSTSTOFFANLAGEN
Unternehmensbereich Munchen
Quotation: V 5416-4/96
Project: Plymouth Rubber Company ANNEX I
Scope of Contract: Status December 11, 1996 page 42
6.4 Expansion and Feeding Unit for Warm Water System
Consisting of:
1 Feed- and make-up water vessel, fabricated in steel plate, complete
with: Water level indicator, shut-off valves, thermometer
1 Feed water pump, constructed as piston pump, complete-with AC motor,
valves and all other required accessories
1 Pressure and expansion unit for the following heating and cooling
units:
1 x Embossing roll
1 x Embosser pick-off rolls 1-4
3 x Tempering rolls 1-3/4-6/7-10
Unit complete with all required accessories
All elements fitted to the base frame, forming a compact unit, including
internal piping and electrical wiring onto terminal block.
6.5 Auxiliary Parts
1 Separate feeding pump with connection valve and accessories for
filling of the rolls when exchange of rolls takes place resp. for
first filling of the plant, fitted to the base frame of feeding
vessel
1 Chemical dosing device equipped with solvent container and chemical
pump
KLEINEWEFERS KUNSTSTOFFANLAGEN
Unternehmensbereich Munchen
Quotation: V 5416-4/96
Project: Plymouth Rubber Company ANNEX I
Scope of Contract: Status December 11, 1996 page 43
6.6 Electrical Control of Heating and Cooling Plant
Temperature control of calender and post calender train is
effected by a Stored Program Control (PLC) system and software
controller.
Temperature alterations are actuated via controllers with fixed
time delay, e.g. sensible parts (rolls) are protected against
larger temperature drops. Set value alteration is guided by the
PLC in dependence of time and course of actual value
(e.g. 1(deg)C per minute).
All set values, all actual values and all monitored data are
shown on different monitor readings.
The PLC control type Siemens S5-135U with approx. 480 digital
inputs, approx. 380 digital outputs and approx. 16 analogue
channels is provided for the control of the heating and cooling
circuits as well as for the feeding and pressurizing equipment
and includes
14 Temperature control circuits with energizing of the electric
servo drives. Monitoring and operating is effected at the
control panel.
All elements of the PLC system as well as all power switching
devices are fitted in a rack designed for free-standing
arrangement in an electric control room.
KLEINEWEFERS KUNSTSTOFFANLAGEN
Unternehmensbereich Munchen
Quotation: V 5416-4/96
Project: Plymouth Rubber Company ANNEX I
Scope of Contract: Status December 11, 1996 page 44
7.0 ELECTRICAL EQUIPMENT
7.1 General
The electrical scope of supply includes the AC and DC drives
including necessary cabinets, control desk with actuation and
indicating instruments for calender and downstream units as
described.
7.1.1 General Supply Requirement
Environment temperatures:
Motors 40(deg)C
Electr. cabinets 30(deg)C
for the control racks in a separate airconditioned room
Humidity F according to DIN 40040
Mains data secondary voltage 3 x 000 X, 00 Xx, XXX
+- 5%
Customer's contribution main trafo
Frequency tolerance +- 2%
AC drive voltage:
squirrel-cage motors 575 V
DC drive voltage:
Rectifier supply 480 V
DC motors 480 VDC - regenerative
480 VDC - non-regenerative
Control voltages 110 V, 60 Hz; 24 VDC
Signal lamps 24 VDC
Valve solenoids 24 VDC
Enclosures:
Electric cabinets IP 23
Main control panel IP 54
Machine control panel IP 54
DC motors IP 54/IP 23R
KLEINEWEFERS KUNSTSTOFFANLAGEN
Unternehmensbereich Munchen
Quotation: V 5416-4/96
Project: Plymouth Rubber Company ANNEX I
Scope of Contract: Status December 11, 1996 page 45
Painting:
Cabinets RAL 2004 orange
Motors RAL 2004 orange
Panels RAL 2004 orange
7.2 Scope of Electrical Supply
7.2.1 General Features
- On/Off command for the entire plant for common start/stop after
a monitor-based preselection of DC drives and support units.
- Maximum torque emergency deceleration of the regenerative DC
drives
-Set point presetting for speed of calender line by monitor system
and hardware-panel.
- Speed regulation between two drives results in a rotational
speed xxxxxxxxx of +- 0.2%, related to max. speed. All drives
integrated ahead or behind drive of No. 4 calender roll are
directly related as reference input to the nominal value of the
master drive.
- The speed setpoints are calculated by software program in the
PLC and transferred digitally to each DC-drive.
- Adjustment of ratios is effected via push buttons.
- Friction ratios can be preset. The relative speed accuracy of
the DC drives shall reach +- 0.5%
- Separate electrical equipment of the winder station including
own PLC and user control facilities.
KLEINEWEFERS KUNSTSTOFFANLAGEN
Unternehmensbereich Munchen
Quotation: V 5416-4/96
Project: Plymouth Rubber Company ANNEX I
Scope of Contract: Status December 11, 1996 page 46
7.2.2 Control Cabinets
The control plant consists of control cabinets, ready assembled
meeting the UL-standard, suitable for easy transportation and
wired up to the terminals,
Containing:
For power supply: Circuit breaker isolation switch
and fuses for several control
voltage potentials
For actuating power switches: Main fuse and 110-V-device
For actuating
coupling relays: Main fuse and 24-V-main device
For each DC motor: Circuit breaker, main contactor
with control to PLC, fast fuses
for electronic, switching on
excitation and converter by
coupling relays with damping
diode, field strength control,
thyristor control unit with
inductance coil.
The thyristor control units within the calender line and winder
are regenerative types and able to feed back braking energy to the
mains.
For plant control: Xxxxxxxx XXX xx Xxxxxxx
X0-000X-xxxx for the heating
plant, calender line and winder.
For all AC drives of calender
and downstream unit: Reversing and non-reversing
contactors with circuit breakers
and overload circuit breakers, in
case of pole-changeable motors
additionally equipped with pole-
changeable reversing contactors.
KLEINEWEFERS KUNSTSTOFFANLAGEN
Unternehmensbereich Munchen
Quotation: V 5416-4/96
Project: Plymouth Rubber Company ANNEX I
Scope of Contract: Status December 11, 1996 page 47
7.2.3 Control Desk
Made of steel sheet, independent and selfsupporting design,
completely assembled, internal wiring to terminals, cable ducting
from below, forced cooled and mainly equipped with:
- Hardware panel for fast and often used functions
- Emergency stop button for complete line
- Two monitor systems for any further control operation
- Monitor for the thickness measuring and controlling unit
- Result printer for thickness measuring unit
- Fault message protocolling printer
3 Remote control panels (1 panel for feeding belt system, 1 panel
for individual handling of the calender and 1 panel installed at
downstream units, also for individual handling, several machine
integrated winder-panels).
KLEINEWEFERS KUNSTSTOFFANLAGEN
Unternehmensbereich Munchen
Quotation: V 5416-4/96
Project: Plymouth Rubber Company ANNEX I
Scope of Contract: Status December 11, 1996 page 48
7.2.4 Drive Circuits
a) Design
- DC motor with pulse encoder for speed data transfer
- Regenerative current rectifier for all drives.
- Set value presetting by touch-screen selection at monitor
system or push buttons at hardware panels.
- Calculation and display of draw value by PLC.
- Output of set values by a drive-bus to the rectifier.
- Actual value monitoring at control panel by the monitors and
a display at the remote panel of the downstream line.
b) Kind of protection and enclosure
- DC drives up to 10 kW: IP 54
- DC drives up from 10 kW: IP 23 prepared for being forced
cooled by Buyer's cooling air network.
- AC drives: IP 54, self-cooling
- The enclosure of the remote control panel is IP 54.
- The enclosure of the control cabinets is IP 54.
7.2.6 Automation System
Consisting of:
PLC Equipment
1 PLC Simatic S5-135 U for the calender line
1 PLC Simatic S-5-135 U for the heating system
1 PLC Simatic S5-135 U for the Winder
KLEINEWEFERS KUNSTSTOFFANLAGEN
Unternehmensbereich Munchen
Quotation: V 5416-4/96
Project: Plymouth Rubber Company ANNEX I
Scope of Contract: Status December 11, 1996 page 49
including all expansion facilities to compute the necessary
process and operator signals to process heating, calender line,
post calender and winder.
Including link between heating- and calender PLC's
Including bus link to any DC- and AC-inverter-drive.
Operating Equipment
Main operator panel, consisting of:
combined hardware (for fast or often used operations) and monitor
equipment, consisting of:
1 hardware panel
2 color monitor units (20") incl. keyboard and touch-screen
facility
including firmware licences, communication-processor cards and
links to PLC 135-U-frame-bus.
3 remote machine panels
Hardware equipment (buttons, digital displays etc.)
1 color monitoring and operating system (man-machine interface)
With LCD-display within the winder main panel linked to the winder
PLC
Several hardware panels round the winder station
KLEINEWEFERS KUNSTSTOFFANLAGEN
Unternehmensbereich Munchen
Quotation: V 5416-4/96
Project: Plymouth Rubber Company ANNEX I
Scope of Contract: Status December 11, 1996 page 50
7.3 *[____________________________]
*[____________________________]
*[____________________________]
*[____________________________]
*[____________________________]
*[____________________________]
Standard PC software package
Batch recipe handling in relation to
*[____________________________]
*[____________________________]
*[____________________________]
*[____________________________]
Change batch recipe handling (within definable limits)
Actual value transfer (out of PLC)
*[____________________________]
*[____________________________]
*[____________________________]
*[____________________________]
*[____________________________]
*[____________________________]
*[____________________________]
*[____________________________]
*[____________________________]
*CONFIDENTIAL TREATMENT REQUESTED
KLEINEWEFERS KUNSTSTOFFANLAGEN
Unternehmensbereich Munchen
Quotation: V 5416-4/96
Project: Plymouth Rubber Company ANNEX I
Scope of Contract: Status December 11, 1996 page 51
*[____________________________]
*[____________________________]
*[____________________________]
*[____________________________]
*[____________________________]
*[____________________________]
*[____________________________]
*[____________________________]
*[____________________________]
*[____________________________]
*[____________________________]
*[____________________________]
*[____________________________]
*CONFIDENTIAL TREATMENT REQUESTED
ANNEX 2
CONDITIONS FOR THE SUPERVISION
OF ERECTION AND COMMISSIONING
For the supervision of erection, commissioning and test runs by the specialists
of the Seller, the following conditions will apply:
1.0 Price
1.1 For the services to be rendered by the Seller in connection with
the installation and commissioning of the equipment, a budget
price of
*[______________________] *[______________________]
*[______________________] *[______________________]
*[______________________] *[______________________]
*[______________________]
is agreed by the Buyer and the Seller.
This budget is formed on the basis of the time schedule chart
(Annex 7) showing the number and qualification of required
specialists and their assumed duration of assignment which is
estimated by Seller according to his experience.
1.2 The duration of assignment of specialists can change depending on
the scheduling and performance of work on the part of the Buyer.
The Seller will charge only for the actual services rendered by
his personnel on the basis of the rates as per Article 2.0
considering the conditions as per Article 3.0 to 6.0.
1.3 The budget price is valid considering the following services to be
rendered by the Buyer:
1.3.1 Buyer will provide labour and facilities as per para 5.0.
1.3.2 Buyer will provide free of charge to Seller:
- accommodation of adequate standard for Seller's personnel
- transport facilities for Seller's staff to and from site as well
as for private requirements, if any.
1.3.3 The weekly working time per expert will not exceed 45 hours. Extra
hours spent will be paid extra outside the allocated budget
according to rates as stipulated under para 2. The time for going
from flat to site and back is not considered as working time.
1.4 The budget price is calculated on basis of the estimated
requirement of Seller's specialists and their duration of
assignment.
2.0 Rates
2.1.0 Hourly Rates
2.1.1 Normal working hours
For each working hour, travel and waiting time up to 45 hours per
week or e.g. hours per day, the following rates will be charged:
*[______________________] *[______________________]
*[______________________] *[______________________]
*[______________________] *[______________________]
* CONFIDENTIAL TREATMENT REQUESTED
ANNEX2
(2)
2.1.2 Extra rates
a) for overtime exceeding 45 hours/week
b) for night work
c) for Sundays and holidays
*[__________________________]
2.2.0 Travelling Costs
Travelling costs and out of pocket expenses will be invoiced at
actuals. The budget price contains the travelling costs for trips
from Germany to USA and back.
2.2.1 *[_____________] *[___________________________]
*[_____________]
3.0 Settlement of Payment
3.1 The representative of the Buyer shall certify all working hours
done per week including the required travel time and possible
waiting times on a time sheet. A copy of the same sheet remains
with the Buyer, whereas another copy is attached to the invoice.
Extra rates are invoiced according to the certified working hours.
Should the time sheets not be certified in due time or are not
certified at all, invoicing will be made according to the Seller's
records.
3.2 The Seller will charge the Buyer by issuing monthly bills
according to the time sheets as per Art. 3.1 and relevant
vouchers. These bills are due for payment within 30 days after
their receipt by transferring the amounts to the Seller's account
with Dresdner Bank, Krefeld.
4.0 Illness and Accident
4.1 The Buyer shall provide at his own cost the required preventive
measures against accidents. Particular instruction of Seller's
personnel is additionally requested when special care is required
with regard to the Buyer's works or when specific regulations must
be observed. The Seller's personnel is entitled to reject jobs
when safety is not guaranteed.
4.2 The Buyer grants the necessary help and assistance in case of
accident or illness of Seller's personnel. For the duration of an
eventual incapacity to work, the Buyer shall continue to pay the
agreed allowances. In case of hospitalization the allowances
shall be reduced accordingly. The Buyer bears all costs incurred
for a repatriation due to illness or accident, as well as the
travel expenses for the person being sent in replacement.
*CONFIDENTIAL TREATMENT REQUESTED
ANNEX 2
(3)
5.0 Buyer's Duties
5.1 The Buyer shall help to provide for all required visa for entering
and leaving the country, as well as for residence and work permits
or any other permit which might be necessary for Seller's
personnel.
5.2 When starting the work, the place of work shall be perfectly clean
and plane. Before starting erection, the foundations for the
equipment shall be ready to take up the full load, to resist
static and dynamic stresses and strains and to assure that
vibrations are not transferred. Access roads to the site shall be
available and shall be suitable even for heavy transport trucks
and lifting tackle, if required. In case of indoor work,
the respective building shall be weather-proof in order to enable
work under normal working conditions and to assure that the
equipment is preserved in good condition.
5.3 The Buyer shall make available on site and at his own cost and
risk:
5.3.1 All labour and manpower necessary for erection and commissioning
and for carrying out the performance tests and trial runs
5.3.2 All tools and auxiliary material required for erecting and
start-up as well as transport and lifting appliances and other
equipment
5.3.3 Electric power (480/110 V three-phase current, 60 Hz), compressed
air, water, heating and sufficient lighting, including also all
required connections leading up to the actual place of work and,
if required, up to the accommodation and stores
5.3.4 All required consumables, lubricants and raw materials.
5.3.5 Within reach of the place of work (maximum 50 m), adequate, dry,
lighted and lockable rooms for storing parts, equipment, materials
and tools, as well as adequate work and social rooms, sanitary
installations and first-aid facilities; furthermore the Buyer
shall take the same measures and actions which would be taken to
protect his own labour and/or property.
6.0 Miscellaneous
6.1 All taxes, fees, charges, social insurance premiums and the like,
payable by the Seller or the Seller's personnel during contract
performance outside the Federal Republic of Germany, shall be
borne by the Buyer.
6.2 Besides operating and maintenance instructions for equipment
supplied by the Seller, the working crew is not entitled to make
any binding statements on behalf of the Seller.
ANNEX 3
GENERAL CONDITIONS
FOR THE SUPPLY OF PLANT AND EQUIPMENT
I. Supporting Documentation and Scope of Supply
(1) All supporting documents submitted with the quotation e.g.
diagrams, drawings, weights, data etc., are for information purposes only and
are not binding unless expressly stated as such. These documents remain the
exclusive property of KKA. They may not be transmitted or communicated to a
third party without KKA's written consent and shall only be used in connection
with this respective contract.
(2) The full scope of supply is specified in KKK's written
quotation and/or acknowledgement of order respectively. Modifications in the
plant design which constitute a technical improvement but do not result in a
price increase are permissible. The equipment is supplied in accordance with the
applicable Standards and Codes valid in the Federal Republic of Germany at the
time the offer is made.
II Prices
The prices shall be governed by the provision agreed by the
contracting parties.
III. Payment
(1) All payments shall be made without any deduction whatsoever
directly to the bank specified by KKA, in accordance with the agreed terms of
payment.
(2) The equipment shall not pass into the possession of the
Purchaser until all payments have been received. In the event that the validity
of this title retention is linked to special prerequisites or national
regulations in the country of destination, it is the responsibility of the
Purchaser to ensure that these conditions are fulfilled.
(3) The retention of payments on the grounds of asserted
counterclaims made by the Purchaser and offsetting payments in connection with
such claims is permitted only insofar that KKA has accepted such claims in
writing. For claims made by the Purchaser on the grounds of defective equipment
and accepted in writing as such by KKA, payments may only be withheld to an
extent considered reasonable by KKA. If the fulfillment of a KKA obligation upon
which a payment depends is delayed through no fault of KKA, the payment shall be
made on the date originally specified in the Contract.
(4) If the Purchaser is in arrears with the contractual payments,
KKA may postpone the fulfillment of its own obligations until such payments have
been made or may set a time limit for payment. If after expiration of the time
limit payment has still not been made, KKA may terminate the Contract. If KKA
terminates the Contract, KKA shall be entitled to compensation for all
expenditures incurred and for work carried out up to the date of cancellation.
If the Purchaser is responsible for the delay in payment, KKA shall be entitled
to compensation representing the full contract value, less saved expenditures.
IV. Delivery
(1) The delivery time is deemed to be kept when the equipment is
ready for shipment ex works within the agreed time and, if KKA shall provide for
shipment ex works, when the equipment is transferred to the shipping agent.
(2) The agreed time of delivery shall only be binding provided
that all required documents are made available by the Purchaser in due time,
that technical clarification and approval of plans and drawings are obtained in
due course, and that the agreed terms of payment and other obligations are
fulfilled. if these prerequisites are not fulfilled, the time of delivery shall
be extended as is reasonable having regard to all the circumstances of the case.
(3) Part deliveries are permitted.
(4) Under unforeseen circumstances, e.g. acts of God, war, riot,
strike, production of substandard equipment and upset manufacturing conditions
or other circumstances beyond KKA's circumstances beyond KKA's control, there
shall be granted an extension of the delivery time as long as these
circumstances will affect performance of the Contract.
(5) Should a delay in delivery be caused by KKA with verifiable
damage to the Purchase resulting directly from late delivery, then the Purchaser
is entitled to a fair compensation excluding any other rights, if delivery was
delayed by more than 6 weeks. After these 6 weeks, the penalty for late delivery
shall amount to 0.5 percent for each full week but shall not exceed 5 percent
of the value of the equipment which was delayed in delivery. The respective
compensation shall be offset with the last payment.
(2)
V. Passing of Risk
(1) Unless otherwise provided, the risk for material supplies
including or without installation shall pass to the Purchaser on the date of
shipment.
(2) In the event that shipment of the material is postponed on
request of the Purchaser or for reasons for which KKA cannot be blamed, the risk
shall pass upon giving notice in writing to the Purchaser that the material is
ready for shipment. KKA shall, for the account of the Purchaser, effect the
insurance if desired by the Purchaser.
VI. Incoterms
Where no other indication is given, the Rules of the
Interpretation of Trade Terms (incoterms) in force at the date of conclusion of
the Contract shall be applied.
VII. Erection
In addition, the General Conditions for the Erection of KKA
Equipment shall apply to all Contracts covering the supply of equipment
including erection and commissioning.
VIII. Taking Delivery
The Purchaser shall take delivery even in the event that part of
the equipment is defective, provided that this defect does not prevent proper
operation. Taking delivery by the Purchaser does not release the Supplier from
his guarantee obligation.
IX. Guarantee
(1) In case of faults which are not covered by the Performance
Guarantee specified under para (2) of this article, KKA undertakes to remedy any
defect resulting from faulty design, materials or workmanship either by
repairing the defective part free of charge or by replacing it by a new one
which is delivered ex works. Upon replacement, the defective part shall again
become the property of KKA
KKA's liability is limited to defects which occur within 6 months
after first commissioning of the supplied equipment, with notice being given by
the Purchaser immediately after the defect appeared. If plant operation is
interrupted for reasons for which KKA is liable, the guarantee period of those
parts which caused the stoppage shall be extended accordingly by the shut-down
period.
For repaired or replaced parts KKA shall assume liability to the
same extent as for the originally supplied equipment, however not longer than 3
months after expiration of the guarantee period of the originally supplied
equipment.
(2) KKA shall be liable for non-performance of guaranteed
performance and consumption data only in so far as non-performance is verifiably
attributable to KKA, any required reconditioning work shall then be made by KKA
free of charge. Upon satisfactory guarantee tests or, if such guarantee tests
are not made, after acceptance of the equipment by the Purchaser, all KKA
liabilities concerning performance and consumption data are fulfilled.
(3) If KKA fails to remedy a defect as defined in art. IX para (1)
or (2) within a reasonable period of time, or if the reconditioning work does
not bring about the desired result, the Purchaser is entitled to a reasonable
price reduction accordingly.
(4) If shipment, erection, commissioning, guarantee tests or
acceptance of the plant are delayed for reasons for which KKA is not liable,
KKA's liabilities according to para (1) or (2) expire 12 months after
notification of readiness of shipment, at the latest.
(5) KKA's liabilities only cover faults which occur under the
contractually defined operating conditions while the equipment is being
correctly used and which are directly attributable to causes dating back to the
period before passing of risk.
Any defects which are attributable to chemical or electrical
effects, normal wear, improper arrangement or bad plant maintenance by the
Purchaser, or attributable to non-compliance with the operating instructions are
not covered by KKA's liabilities.
(6) The Purchaser shall schedule a reasonable period of time which
allows the Supplier to repair the defective parts or to replace them
respectively. KKA shall be released from all liabilities if the Purchaser does
not allow a sufficient period of time.
KKA is released from its liability if the Purchaser or third
parties undertake modifications on the equipment to carry out maintenance work
prior to KKA's approval.
(3)
(8) In the event that KKA shall supply drawings or other documents
or data for work which shall be carried out on the part of the Purchaser, KKA
shall be liable for such services only in so far as a special remuneration was
paid for these services. If such a remuneration is paid, KKA guarantees correct
and faultless performance according to the state of the art and that the
eventually agreed performance and consumption data are reached.
KKA's liability is limited to free-of-charge engineering services
which are required to remedy eventual defects which occurred within 6 months
after first plant commissioning and not later than 12 months after having
rendered the respective services with notification being given by the Purchaser.
(9) Any additional claims by the Purchaser or liabilities of KKA
beyond those described above under art. IX, paras (1-8) are explicitly excluded
and waived by the Purchaser unless otherwise agreed and confirmed by KKA in
writing.
X. Impossibility of Contract Performance
(1) If due to unforeseen circumstances as specified in art. IV.
para (4). It is impossible for KKA to assure performance of the Contract in
full or in part, the Purchaser is entitled to terminate the Contract in case of
complete impossibility, whereas in case of partial impossibility the Purchaser
is entitled to an appropriate price reduction. In case of termination of the
Contract by the Purchaser, KKA is entitled to an adequate compensation for the
services and work carried out so far.
If impossibility of performance occurs during a delay in
acceptance or for reasons for which the Purchaser is liable, the Purchaser shall
pay the contract price less the expenditures saved by KKA due to impossibility
of performance.
(2) KKA is entitled to terminate the Contract on the grounds of
unforeseen circumstances as defined in art. IV, para (4) which render contract
performance completely or partly impossible. KKA is then entitled to a
compensation covering the expenditures and services rendered so far.
XI. Taxes, Fees, Charges
All taxes, fees and charges imposed on the supplies outside the
Federal Republic of Germany shall be paid by the Purchaser. In the event that
the authorities in the country of destination directly impose these taxes, fees
and charges on KKA, then KKA will be refunded accordingly by the Purchaser.
XII. Plant Visits
(1) If confidentiality is not expressly stipulated and no other
interests of the Purchaser are impaired, KKA is entitled, after notification in
due time, to visit the plant during operation to be informed on the obtained
operating results and to show the plant to potential customers.
(2) The Purchaser is not allowed to open the plants supplied by
KKA to visitors of competitive firms without the written consent of KKA.
XII. Arbitration and Applicable Law
(1) The Contract shall be governed by the law of the Federal
Republic of Germany.
(2) Any dispute arising out of the Contract shall be settled in
Krefeld. KKA reserves itself the right to take legal action at the Purchaser's
place of jurisdiction.
XIV. Transferability of Rights
The Purchaser and KKA may transfer their contractual rights to a
third party only after mutual consent in writing.
XV. General
(1) In addition to the rights granted under the Contract and the
General Conditions, the Purchaser is not entitled to claim any further rights,
particularly claims for financial or other damage which is not directly
attributable to the supplied equipment.
(2) If peremptory rules prohibit the application of individual
contractual provisions, this does not affect the validity of all other
provisions.
(3) Sub-agreements or opposed conditions on the part of the
Purchaser are valid only upon the written consent of KKA.
KLEINEWEFERS KUNSTSTOFFANLAGEN
ANNEX 4
CONDITIONS TO BE FULFILLED FOR TAKING OVER
As a prerequisite for issuance of taking-over certificate by the Buyer, the
Seller has to provide the following evidence:
1. Each piece of equipment must be brand new and has to perform faultlessly
and in accordance with the data as per technical specification.
2. The plant as a whole has to show its reliability regarding faultless
mechanical and electrical operation and its suitability to produce soft
PVC film and sheet according to the performance data of the technical
specification; provided the Buyer will adjust formulations which allow the
production of these PVC films and sheets.
3. *[________________]
*[_________________________]
*[_________________________________]
*[_____________] *[______________]
*[_____________] *[______________]
*[_____________] *[______________]
*[_____________] *[______________]
*[_____________] *[______________]
*[_____________] *[______________]
*[_____________________________________________________________]
*[_____________________________________________________________]
b. Race Tracking (banana effect)
max. deviation 2.5 cm at 5 m film length and 200 (micro)m thickness,
measured in the middle of the length of the chord between the two
final points
4. The evidence as per paras 1 and 2 above shall be shown during a period of
3 weeks from the date on which the plant starts to produce with an option
to extend by one other week if requested by Buyer.
5. If conditions for taking over are fulfilled the Buyer will issue the
certificate of acceptance within maximum two weeks.
* CONFIDENTIAL TREATMENT REQUESTED.
EXHIBIT A
TO
ANNEX4
Amendment to Paragraph 3(a)
The gauge accuracy of cross profile and longitudinal profile is calculated as
square root of square of deviation of cross profile + square of deviation of
longitudinal profile (true running characteristic of calender rolls):
The square root of [C squared + 2L squared]2 + (2L)2
equals SA (C,L)
C= deviation of cross profile
L = true running of roll
SA = standard deviation
*[__________________________________________________________]
*[__________________________________________________________]
*[__________________________________________________________]
*[__________________________________________________________]
*[__________________________________________________________]
*[__________________________________________________________]
*[__________________________________________________________]
*CONFIDENTIAL TREATMENT REQUESTED
ANNEX 5
SCOPE OF ENGINEERING SERVICES
A. Project Management & Monitoring Services
1. Direct dialogue with third vendors to clarify questions, requirements,
schedules, etc.
2. Definition of battery limits between all involved vendors.
3. Procurement assistance to Buyer for equipment to be purchased from
third vendors with
- enquiry specification
- technical clarification
- comparison of bids with classification of bidders
4. Monitoring of all schedules with third vendors concerning
- shipment
- installation
- commissioning
- acceptance tests
5. Site management with coordination of all procedures as per para 4.
ANNEX 5
(2)
B. Basic Engineering Services
covering the complete production plant
1. Civil Design Drawing
1.1 Civil outline drawings comprising:
- film produciton line
- energy and utility supply systems
- platforms, stairs, walkways, elevators
- stores for raw materials and finished products
- electrical-mechanical workshop, laboratory, changing rooms, etc.
1.2 Foundation drawings with statical and dynamical load figures
1.3 Definition of requirements concerning
- location of cranes, hoists, elevators, etc.
2. Basic Engineering
2.1 Overall equipment layout drawings
2.2 Definition of requirements concerning energy, media, utilities, with
- quantities
- condition
- points of taking over (inlet/outlet)
2.3 Technical data and design criteria for vapour hoods and ventilation
ducts, ventilators etc. for extruder and calender fumes
2.4 Specification of requirements for pipes, valves, cables, etc. to be
procured by the Buyer.
2.5 Specification of requirements of
- skilled and unskilled labour
- tools, hoists, consumption materials for installation
to be provided by the Buyer for installation of equipment and start-up.
ANNEX 5
(3)
C. Detail Engineering
covering Seller's own scope of supply
1. Final arrangement and equipment layout drawings
2. Individual equipment assembly drawings
3. Electical diagrams and power distribution diagrams
4. Detailed operating and maintenance instructions
5. Lubrication schedule with definition of
- lubricants
- oils
- greases
6. Detailed list of spare and wear parts with item numbers and schedules
for easy identification of parts
D. Training of Staff
1. During erection but especially during mechanical testing prior to
start-up
2. During initial operation, when plants run with product
ANNEX 6
Limitation of Scope of Supply/Exclusions
The following supplies and services are not included in the scope of supply and
shall have to be contributed by the Buyer:
1.0 Energy and Operational Supplies
1.1 All supply lines (cables, pipes, fittings, filters, valves etc.) for
electrical energy, pressurized air and water, as well as feed and return
lines for hot water and thermal oil from Buyer's main supply point to the
main connecting points of plant and machinery.
1.2 All electrical power stations and transformers for high and low voltage
supply as well as isolating transformers for individual drives.
1.3 All units and equipment for emergency power supply. KKA to specify
requirements.
1.4 All auxiliary equipment for the production, preparation, cleaning and
conditioning of process media as well as all equipment to keep the
required energy at a constant level.
1.5 All oil fillings for gears, as well as all initial fillings of special
cooling or heating media in individual cooling or heating circuits of
calender rolls, cooling rolls, etc.
2.0 Mounting and Foundations
2.1 Provision of all foundations for equipment and machinery.
2.2 All supports and baseframes to take storage tanks, pipe lines as well as
operator's platforms, steel structures, walkways, stairs, ladders,
railings, covers for stationary and mobile parts of the plant, any
openings in platforms, walls and ceilings except where elsewhere
specified.
2.3 All ducts, supports, bridges and trenches above and below floor level for
cables, wiring, as well as fixing rails.
2.4 All equipment for air conditioning, ventilation, vapour and dust exhaust
system, heating and lighting facilities, clock and alarm system.
3.0 Erection and Commissioning
3.1 All cost for the installation of the equipment and mechanical as well as
electrical start-up of the plant (except supervision of erection and
commissioning where elsewhere specified).
3.2 All erection tools, workshop equipment, welding and auxiliary equipment
such as lifting tools, ropes and other transport and storage facilities.
Offloading and storing, preservation of all equipment stored at site
against climatic and mechanical influences, watching of the site and of
all goods stored on its premises as well as the insurance thereof.
3.3 All transport and packing facilities for intermediate and end products as
well as facilities for the removal or recycling of waste.
3.4 All cost for process of start-up at site as well as the raw materials
required for start-up and acceptance tests.
4.0 Local Safety Regulations
4.1 All protection and safety facilities according to local rules and
regulations for earthing, lightening protection, safety guards,
fire extinguishing equipment, etc.
ANNEX 7
Project: Plymouth Rubber Company
Project No.: V 5416-3/96
Time Schedule for Delivery,
Erection and Start-up for
Calendar Line after Coming
Into Force of Contract
Construction and Preassembly
ready for delivery FOB Northsea port 10 months (months 1-10)
Packaging and Shipping 1 month (month 11)
Shipping Time and Customs Clearance 1 month (month 12)
Chief Supervisor - Mechanical 22 men weeks labor
Material Handling, Mixer, Calender
Chief Supervisor - Electrical 10 men weeks labor
(commissioning AC; DC; and operation)
Start-up Specialist - Electrical 5 men weeks labor
(commissioning and operation PLC)
Start-up Specialist - Winder 3 men weeks labor
(commissioning AC; DC; PLC and operation)
Start-up Specialist - Thickness Gauge 1 men weeks labor
Supervisor
Heating & Cooling System 8 men weeks labor
Start-up Manager
(operation with material) 3 men weeks labor
Material handling; Extruder; Calender Operator
Total 52 men weeks labor
Standby for operation with material
11/12/96
ANNEX 8 - page 1
Profile monitor / data viewing screen
MC 68 K02.K1
DESCRIPTION:
Various data presentations are displayed on the monitor, in combination with a
scanning measuring sensor. Different screen displays can be selected as required
by the application.
The programme for the monitor screen display is stored on EPROM. When the unit
is switched on, the programme is immediately loaded and started by means of an
autostart command.
After interrogation of the parameters preset on the measurement system, both the
horizontal and vertical scales for the profile representation are computed and
displayed correspondingly. The utilization of the viewing screen is thereby
optimized; that is, for a shorter traversal path of the measuring sensor the
horizontal scale is spread; the vertical scale is likewise spread for smaller
tolerance values.
The profile is displayed in the form of a histogramme. The bars are drawn during
the scan; hence, the actual value is indicated immediately after computation of
the measured values. The position of measurement is indicated by a xxxx which is
displayed in synchronism with the motion of the measuring head.
If the measured values exceed the preset tolerance limits, the bars which lie
outside the tolerance range are identified by a different colour. Thus, an
inadmissible deviation is easily recognizable even from a greater distance.
In addition to the histogramme bars, further information is presented
graphically and numerically; this information is described by means of the
following figures.
ANNEX 8 - page 2
MONITOR DISPLAYS
MC 68KO2.K1
Figure 1 LIST of contents
betacontrol p. 1 list of contents tu. 24.01.1991 14:55:34
-----------------
1 list of contents
2 basic settings
3 products
4 product parameters
6 measured values
6 single profiles
7 averages
8 roll profile
9 long. profile
10 trend
11 product analysis
12 order record
13 rejects record
14 shift record
15 roll record
16 error messages
17 system parameters
200ff test patterns
All available monitor screen displays are listed for the measuring and control
system. The individual screen displays are selected with the use of the
[Display] function block.
ANNEX 8 - page 3 figure 2
betacontrol p. 2 basic settings tu. 05.03.1991 17:15:57
--------------
Operation hours: total auto manual
h:min:sec 21:44:52 0:37:14 21:07:38
code basic settings
time (hhmm) 0
date (ttmmjjjj) 0
start of shift in minutes after 0 o'clock 360
length of shift in minutes (greater than 60 minutes) 480
print error messages (0/1) 0
print roll profile (0/1) 0
print shift record (0/1) 0
print order record (0/1) 0
print roll record (0/1) 0
optimize set value (factor: neg. = -tol. pos. = +tol. O=off) 0
This screen display includes the elapsed time counter with three different
ranges. The following times are indicated:
1. Total elapsed operating time
2. Time elapsed during automatic operation, for which at least one control
loop must be in automatic mode.
3. Time elapsed during manual operation
Moreover, various parameters which are largely independent of the product, that
is, which remain constant despite different products, can be set on this
display. The following parameters are indicated for the present measuring and
control system:
[code basic settings]
The code number must be entered in this line; only with correct entry of the
code number, a change in the basic settings is possible.
[time (hhmm)]
The current time is entered in hours and minutes.
[date (ttmmjjjj]
The current time is entered as day, month, and year.
[start of shift in minutes after 0 o'clock]
The beginning of the shift is entered for the shift after 0 hours - as a rule,
the beginning of the morning shift.
[length of shift in minutes (greater than 60 minutes)]
The duration of the shift including breaks is entered.
[print error messages (0/1)]
After occurrence of a fault, the message is printed in clear text immediately
upon entry of [1]
[(print roll profile (0/1)]
After the roll change signal, the profile of the last roll is printed upon entry
of <1>
[print shift record (0/1)]
Upon entry of [1], the record is printed after pressing of the [shift
changeover] key. If the associated parameters for the shift beginning and
duration have been preset, the record is printed automatically at the end of
the shift.
[print order record (01)]
Upon entry of [1], the record is printed either by pressing of the [order
changeover] key or by changing of the order number.
[print roll record (0/1)]
Upon entry of [1], the roll record is printed automatically after 200 individual
rolls.
Attention!
After printing, all records and the roll profile screen display are reset and
restarted.
[optimize set value]
The factor X is entered for optimizing the set value. In the case of positive
factors, optimizing is performed at the positive tolerance limit. For a factor
of 0, no optimization is performed.
The following applies for positive factors: Wo = W + OT - (2S * [X])
The following applies for negative factors:
Wo = W - UT + (2S * [X])
Wo denotes the optimized set value
W denotes the set value
UT denoted the lower tolerance limit
OT denotes the upper tolerance limit
[X] denotes the absolute value of the factor
S denotes the standard deviation of the last
single profile.
ANNEX 8-page 4 figure 3
betacontrol p. 3 products tu. 05.O3.1991 17:16:05
--------
0 1 2 3 4
5 6 7 8 9
10 11 12 13 14
15 16 17 18 19
20 21 22 23 24
25 26 27 28 29
30 31 32 33 34
35 36 37 38 39
40 41 42 43 44
45 46 47 48 49
50 51 52 53 54
55 56 57 58 59
60 61 62 63 64
65 66 67 68 69
70 71 72 73 74
75 76 77 78 79
80 81 82 83 84
85 86 87 88 89
90 91 92 93 94
95 96 97 98 99
100 101 102 103 104
105 106 107 108 109
110 111 112 113 114
115 116 117 118 119
120 121 122 123 124
125 126 127 128 129
130 131 132 133 134
135 136 137 138 139
140 141 142 143 144
145 146 147 148 149
150 151 152 153 154
155 156 157 158 159
160 161 162 163 164
165 166 167 168 169
170 171 172 173 174
175 176 177 178 179
180 181 182 183 184
185 186 187 188 189
190 191 192 193 194
195 196 197 198 199
200
All existing product numbers under which the corresponding product parameters
and data records have been stored in the memory are listed. The battery-backed
data memory has a capacity of about 200 product data records for standard
systems. The memory capacity depends on the length of the product data records
(the number of lines in a data record) and may therefore be smaller with
comprehensive systems.
ANNEX 8-page 5 Figure 4
betacontrol p. 4 product parameters tu. 05.03.1991 17:16:09
------------------
memory full actual next
product parameters not existent not existent
product # existent existent
product number 100 100
order number 111 111
target my 74.0 74.0
plus tolerance my 1.0 1.0
minus tolerance my 1.0 1.0
heating side deviation my 1.0 1.0
center deviation my 1.0 1.0
drive side deviation my 1.0 1.0
specific weight g/cm3 1 1
correction value 1 1
foil width net mm 1800 1800
scanning width mm 1900 1900
This screen display also includes relevant,client-specific product parameters
for reasons associated with measurements or as desired. These parameters can be
stored under a freely selectable product number in the battery-backed data
memory and are thus available at any time.
The display is conveniently subdivided into two columns.
1. [actual] column
The values of the instantaneously valid data record are indicated here.
2. [next] column
The next data record is presented here. This data record can be entered
or transferred either by means of the keyboard or, as an extension, from a
host computer system through an interface RS 232.
The entries for the product and order numbers may consist of a maximum of 15
alphanumeric characters; all other entries may comprise a maximum of 15 numeric
digits The corresponding line is selected for the entry by pressing the cursor
keys, and the line is displayed in blue. Every entry must be terminated by
pressing the [Enter] key.
ATTENTION!
After completion of the entries, the product number
must be reentered before storing of the product data
record in the memory or
transfer from the [next] column to the [actual] column. For
reasons of security, this number is deleted during alterations in a
data record, in order to avoid possible errors
in storing the data record, for
example, overwriting of a data
record which is still valid.
Figure 5
ANNEX 8-page 6
betacontrol p. 5 measuring values tu. 05.03.1991 17:19:17
----------------
actual value 55.5 my
deviation +0.1 my
meas. position 964 mm
In this screen display, the present values are indicated for the actual value,
the deviation, as well as the position of the measuring sensor.
ANNEX 8-page 7 Figure 6
betacontrol p. 6 my single profiles tu. 05.03.1991 17:20:06
---------------
target 55.5 average value 0.0
correction value 1.000 product # 100 opt. target 74.0
1. 2" sigma 0.2 order# 111 max / min +0.2/-0.2
haul-off m/min 24.7 calender m/min 23.2 cross axis in mm 0.0
2. - Chart depicts histogramme line largely at 0.0 and with some reading
slightly below that to about -0.4
3. - Chart depicts histogramme line largely at 0.0, with a few readings
slightly above at about + 0.1 and a few readings below at about -0.1
4. - Chart depicts histogramme line largely at 0.0 and with some readings
slightly below that to about -0.3
1. In the headlines of the screen display, data derived from the product
parameters as well as diverse profile-specific and process-specific
information are indicated
The following three single profiles are presented:
2. = third from the last passage
3. = second-to-last passage
4. = present passage
After completion of the last profile, the individual histogrammes are shifted
upward by one position
The finished sheet width, the position of the measuring head, and the three-zone
mean value lines are indicated by bar graphs in different colours.
The scaling is referred to the finished sheet width only
ANNEX 8-page 8 Figure 7
betacontrol p. 7 my averages tu. 05.03.1991 17:24:06 average value -02
--------
target 74.0
1. correction value 1.000 product # 100 opt. target 74.0
2 " s
tandard dev. 0.3 order # 111 max. / min 0.0/-0.5
haul-off m/min 24.6 calender m/min 23.2 cross axis in mm 0.0
new trend old
2. Trend line Chart depicts histogramme line with readings largely between
+0.1 and -0.6
(siding average over 4 scans)
3. Sliding average Chart depicts histogramme line with readings largely
between 0.0 and -0.2
single profile
4. Single profile chart depicts histogramme line with readings largely
between 0.0 and -0.2
1. In the headlines of the screen display, data derived from the product
parameters as well as profile-specific and process-specific information are
indicated.
2. Trend plot with max/min deviation and overall average per scan A. maximum
of 400 scans can be plotted. After completion of the last passage, the
graph is shifted to the right, by one position; the passage situated
farthest to the right is thereby deleted.
3. Cross profile averaged over X single profiles (X = max 20) The preset
number of single profiles for averaging is indicated above the graph.
4. Present single profile with three-zone average. The zone width is 25/50/25
percent, or each one-third of the finished sheet width. The zone averages
are indicated numerically above the graph.
ANNEX 8-page 9 Figure 8
betacontrol p. 8 my roll profile tu. 05.03.1991 17:25:25
------------
target 74.0 average value -0.1
correction value 1.000 product # 100 opt. target 74.0
2" standard dev. 0.3 order # 111 max / min + 0.3/-0.5
1.
roll number 1 start time 14:17:35
scans 32 roll length m 138 averages 0.0- 0.2 - 0.2
roll width mm 1800 roll weight kg 18 2" sigma 0.2 0.2 0.3
2. Long profile chart depicts histogramme line with reading largely
between +0.2 and -0.4
3. Cross profile chart depicts histogramme line with readings largely
between +0.2 and -0.3
1. In the headlines of the screen display, data derived from the product
parameters as well as roll-specific information are indicated.
The following two histogrammes are presented:
2. Longitudinal profile over a maximum of 400 single passages The scaling
depends on the number of single passages and the machine speed.
3. Cross profile of the current roll The finished sheet width is scaled and
plotted.
The roll profile is reset to [0] on command. This command can also be issued
through an external input, for example, from the winder during [roll change].
By means of a corresponding entry in the [basic settings] picture, an
automatic printout can be preselected before resetting.
ANNEX 8-page 10 Figure 9
betacontrol p. 9 my long. profile tu. 05.03.1991 17:22:30
-------------
target 74.0 average value -0.2
1. correction value 1.000 product # 100 opt. target 74.0
2" standard dev. 0.2 order # 111 max / min + 0.2/ - 0.4
haul-off m/min 24.6 calender m/min 23.3 cross axis in min 0.0
fixed position 602
2. Long profile chart depicts histogramme line with readings largely
between +0.1 and -0.3
1. In the headlines of the screen display, data derived from the product
parameters as well as diverse profile-specific and process-specific
information are indicated. In the line labelled [Fixed position], the
desired measuring position can be preset. After termination of the entry
with the [Enter] key, the measuring head automatically moves to the preset
position and automatically starts the graphical presentation.
2. This longitudinal profile is recorded in the direction of sheet travel with
the measuring sensor stationary.
3. The horizontal scaling is mathematically determined from the machine speed
and the number of measured values to be presented.
ANNEX 8-page 11 Figure 10
betacontrol p. 8 my trend tu. 05.03.1991 17:25:34
-----
target 74.0
1. correction value 1.000 product # 100 opt. target 74.0
haul-off m/min 24.7 order # 111 cross axis in mm 0
calender m/min 23.2
drive side
2. Drive side chart depicts histogramme line with readings largely
between 0.0 and -0.4
center
3. Center chart depicts histogramme line with readings largely
between 0.0 and -0.2
heating side
4. Heating side chart depicts histogramme line with readings largely
between 0.0 and -0.1
1. In the headlines of the screen display data derived from the product
parameters as well as diverse profile-specific and process-specific
information are indicated.
2. The trend plot for the zone average [drive side] encompasses a maximum of
400 scans. The average value is indicated numerically above the graph.
3. The trend plot for the zone average [center] encompasses a maximum of 400
scans. The average value is indicated numerically above the graph.
4. The trend plot for the zone average [heating side] encompasses a maximum of
400 scans. The average value is indicated numerically above the graph.
ANNEX 8-page 12 figure 11
betacontrol p. 11 my product analysis tu. 05.03.1991 17:20:33
----------------
target 74.0 average value -0.1
correction value 1.000 product # 100 +tol/-tol + 1.0/ - 1.0
2" sigma dev. 0.3 order # 111 max / min + 0.6/-1.1
1.
automatic mod. gap haul-off bending cross axis
% age part 50.1 50.3 50.6 50.6
measurements within tolerance 99.2 start time mo 01.06.1992 7:36:02
measurements smaller - tolerance 0.8 roll length m 276
measurements larger +Toleranz 0.0
2. Product analysis chart depicts Gaussian curve with a high point of 12.0%
at a sigma of 0.0 and corresponding low points of 0.1% at a sigma of +3.0
and -3.0.
1. In the headlines of the screen display, data derived from the product
parameters as well as production-specific information are indicated.
2. The values measured for the entire production per order are plotted
graphically as a Gaussian curve. On the basis of the scaling ((micro)m or
g/m(2)and sigma), a direct relationship is evident between the standard
deviation and current production.
The [product analysis] is always referred to a particular order; that is, with
the [Reset product analysis] signal or upon entry of a new order number, the
screen display is reset and restarted.
ANNEX 8-page 13 Figure 12
betacontrol p. 12 my order record tu. 05.03.1991 17:31:51
customer order # 1234 start mo. 01.06.1992 7:32:24
lg- lg+
product less greater
number roll width lg.ok than than wght. stop target
no. mm m m m kg min my
---------------------------------------------------------------------
400 1 1800 120 0 0 12 0 74.0
400 2 1800 119 1 0 12 0 74.0
400 3 1800 120 0 0 12 0 74.0
---------------------------------------------------------------------
total 3 359 1 0 36 0
Figure 12 - continued
ave 2sigma
my my
-------------
73.9 0.3
73.8 0.3
73.8 0.3
--------------
In the headlines of the screen display, various order-specific data as well as
the quality criteria for the individual rolls of the order are indicated. In
the line entitled [Customer], the name of the client can also be entered.
The record includes all individual rolls manufactured under the specified order
number, together with the associated quality data.
Individual rolls whose quality data cannot satisfy the desired quality criteria
are deleted from this record and documented in a rejection list.
Individual rolls are eliminated in the following manner:
1. The corresponding individual roll is selected by means of the cursor keys.
(The line is emphasized in colour).
2. After pressing of the [Enter] key, the data on this roll are deleted from
the record and transferred to a rejection list.
This record is reset and restarted with the [Order change] signal as well as
upon alteration of the order number. Moreover, a printer output can be specified
by entry in the basic settings before resetting of the record.
If the number of individual lines exceeds 200, the record is automatically
cleared and then resumed with the subsequent data. With the appropriate entry
[Printout order record] in the basic settings, the partial record is printed
before resetting.
ANNEX 8-page 14 Figure 13
betacontrol p. 13 my rejects record tu. 05.03.1991 17:31:55
--------------
customer order # 1 start mo. 01.06.1992 7:33:51
lg- lg+
product less greater
number roll width lg.ok than than wght. stop target
no. mm m m m kg min my
-----------------------------------------------------------------------------
400 4 1800 1 0 119 12 0 74.0
400 5 1800 2 0 118 12 0 74.0
-----------------------------------------------------------------------------
total 2 3 0 237 24
Figure 13 - continued
avge 2sigma
my my
-------------------------------------
75.5 0.4
76.2 0.5
This sceen display lists all individual rolls eliminated from the order record
and the associated data.
If an individual roll has been incorrectly designated as a reject, it can
be subsequently reentered into the order record. For this purpose, the procedure
is the same as that for the deletion of the individual roll from the order
record. This record is automatically printed with the order record.
ANNEX 8-page 15 Figure 14
betacontrol p. 14 my shift record tu. 05.03.1991 17:32:01
------------
shift leader ? start 7:34:19
lg- lg+
product less greater
number number width lg.ok than than wght. stop target avge
of rolls mm m m m kg min my my
-----------------------------------------------------------------------------
200 4 1800 400 0 0 40 0 74.0 73.8
300 1 1800 50 0 0 5 0 74.0 73.8
400 5 1800 600 0 0 60 0 74.0 73.8
-----------------------------------------------------------------------------
total 10 1050 0 0 105 0
Figure 14 - continued
2sigma
my
--------
0.3
0.2
0.3
--------
This screen display presents a list of all rolls manufactured during a shift,
with reference to the product number and width; that is, rolls of the same width
and with an identical product number are cumulatively added automatically. The
record is extended by an additional line only if either of these two values
changes. The name of the shift xxxxxxx can also be entered.
The last line of the record indicates the sum total of all individual rolls
produced during this shift, with length and weight as well as down time.
If the number of individual lines exceeds 200, the record is automatically
cleared and then resumed with the subsequent data. With the appropriate entry,
the partial record is printed before resetting.
* CONFIDENTIAL TREATMENT REQUESTED
ANNEX 8-page 16 Figure 15
betacontrol p.15 my ROLL RECORD tu. 24.01.1991 14:36-01
-----------
order number product number roll width length weight
no. mm m kg
-------------------------------------------------------------------------
111 100 1 l800 100 10
111 100 2 1800 100 10
222 200 1 1800 250 25
222 200 2 1800 250 25
333 300 1 1800 200 20
444 400 1 1800 300 30
444 400 2 1800 300 30
444 400 3 1800 300 30
444 400 4 1800 300 31
444 400 5 1800 300 31
-------------------------------------------------------------------------
Figure 15 - continued
target average 2sigma
my my my
------------------------
74.0 73.9 0.3
74.0 73.8 0.3
74.0 73.8 0.3
74.0 74.5 0.1
74.0 73.8 0.2
74.0 73.9 0.3
74.0 73.8 0.3
74.0 73.8 0.3
74.0 74.5 0.1
74.0 74.5 0.1
------------------------
This screen display presents a list with a maximum of 200 individual rolls and
the associated quality data. After every [roll change] signal, the data for the
finished roll are entered into the record.
If the number of individual lines exceeds 200, the record is automatically reset
and the information is deleted. With the appropriate entry in the [basic
settings], the data are printed before deletion.
--------------------------------------------------------------------------------
16
ANNEX 8-page 17 Figure 16
betacontrol p. 16 error messages tu. 24.01.1991 14:36:01
--------------
error with control interrupt error without control interrupt
---------------------------- -------------------------------
machine off + tolerance exceeded
source not open sensor in calibration pos.
scanning off haul-off max
cross axis max
--------------------------------------------------------------------------------
Various error messages are indicated in the screen display. If a malfunction
occurs, the corresponding line is emphasized in red.
The display is subdivided into two columns:
1. Malfunctions which result in a control interruption:
Indication Possible cause
---------- --------------
machine off Shutdown of production plant
source not open Actuation of [measurement off];
sticking of radiation source shutter;
defective limit switch
scanning off Automatic mode of scanning device off;
worn slip clutch;
no directional pulses from position detector;
defective limit switch;
incorrect parameter setting.
tolerance exceeded twice Insufficieny of set tolerance limits;
insufficient quality of measured material;
incorrect setting of control parameters.
17
ANNEX 8-page 18 Figure 16
2. FAULTS OF A GENERAL NATURE:
Indication Possible cause
---------- --------------
+tolerance exceeded Incorrect setting of upper tolerance limit;
excessive material thickness;
control failure.
-tolerance exceeded Incorrect setting of lower tolerance limit;
insufficient material thickness;
control failure.
Persistence of measuring head Triggering of calibration process;
at calibration position actuation of automatic calibration process.
bending max/min Attainment of one of the preset limit values
for bending control;
check on parameter setting necessary;
adjustment signals not emitted (in the
corresponding control direction).
haul-off max/min Attainment of one of the preset limit values
for haul-off control;
check on parameter setting necessary;
adjustment signals not emitted (in the
corresponding control direction).
cross axis min Attainment of one of the preset limit values
for cross axis;
check on parameter setting, if appropriate;
adjustment signals not emitted.
cross axis max Attainment of one of the preset limit values
for cross axis;
check on parameter setting, if appropriate;
adjustment signals not emitted.
18
ANNEX 8-page 19 Figure 17
betacontrol p.17 SYSTEM PARAMETERS tu. 24.01.1991 14:55:36
-----------------
3 code number eeprom picture(input) ?
257 threshold for smoothing algorithm G04 1000
258 auto calibration yes/no (1/0) 0
259 calibration interval (in X # 10 min) 12
280 distance machine center - calibration position in mm 975
283 average value calculation from X scans 4
284 number of pixels for bar width in trend diagram 15
285 number of pixels for bar spacing in trend diagram 15
294 longitudinal profiles interpretation every x measured values 10
295 width of center zone in % (33% or 50%) of scanning width 0
308 diameter of the last calender roll in mm 600
309 Vc min for synchronization of scanning speed in 0.1 m/min 100
310 Vc hysteresis without new synchronization (in %) 6
313 scanning speed vmaxmanu in mm/min 7500
314 scanning speed vautosoll in mm/min 7500
375 first dead time 6
376 second dead time 0
377 third dead time 0
378 control action after X min 99999
379 gear backlash gap left minus in 0.1 seconds 0
380 gear backlash gap left plus in 0.1 seconds 0
381 control amplification gap left 10
382 dead zone gap left (in % of tolerance) 2
383 gear backlash gap right minus in 0.1 seconds 0
384 gear backlash gap right plus in 0.1 seconds 0
385 control amplification gap right 10
386 dead zone gap right (in % of tolerance) 2
387 gear backlash haul-off minus in 0.1 seconds 0
388 gear backlash haul-off plus in 0.1 seconds 0
389 control amplification haul-off 10
390 dead zone haul-off (in % of tolerance) 2
391 control range haul-off + (in % of haul-off speed) 2
392 control range haul-off - (in % of haul-off speed) 2
393 gear backlash bending minus in 0.1 seconds 0
394 gear backlash bending plus in 0.1 seconds 0
395 control amplification bending 10
396 dead zone bending (in % of tolerance) 2
397 bending pressure convex max (in X # 0.1 bar) 0
398 bending pressure convex: min (in X # 0.1 bar) 0
399 bending pressure concave max (in X # 0.1 bar) 0
400 bending pressure concave min (in X # 0.1 bar) 0
401 bending pressure limit value concave at 5V on A/D-converter
(in 0.1 bar) O=digital 0
402 gear backlash axis crossing minus in 0.1 seconds 0
403 gear backlash axis crossing plus in 0.1 seconds 0
404 control amplification axis crossing 10
405 dead zone axis crossing (in % of tolerance) 2
406 axis crossing min in millivolt 0
407 axis crossing max in millivolt 0
408 end value axis crossing in 0.1 mm 0
442 bending pressure limit value convex at 5V on A/D-converter
(in 0.1 bar) 0
443 limit pressure for switchover bending / CAC (in X # 0.1 bar) 0
Diverse parameters are entered for matching the measurement system to the
machine configuration. Several pages may be required as dictated by the
particular version.
19
ANNEX 8-page 20 TEST PATTERNS FIGURE 200ff
betacontrol p.207 PICTURE XX. 0 XXXXXXX XX. 0 tu.24.01.1991 14:36:01
control: entered parameters, time last control action
Loop #0 Letzter Regelimpuls 50
Regelverstaerkung 10 Letzte Regelrichtung plus
Regelschwelle plus 0 Regelschwelle minus 0
Loop #1 Letzter Regelimpuls 47
Regelverstaerkung 10 Letzte Regelrichtung plus
Regelschwelle plus 0 Regelschwelle minus 0
Loop #2 Letzter Regelimpuls 12
Regelverstaerkung 10 Letzte Regelrichtung plus
Regelschwelle plus 0 Regelschwelle minus 0
Loop #3 Letzter Regelimpuls 000
Xxxxxxxxxxxxxxxxxx 00 Xxxxxx Xxxxxxxxxxxxx -
Xxxxxxxxxxxxx plus 0 Regelschwelle minus 0
Loop #4 Letzter Regelimpuls 0
Xxxxxxxxxxxxxxxxx 00 Xxxxxx Xxxxxxxxxxxxx -
Xxxxxxxxxxxxx plus 0 Regelschwelle minus 0
Tzt# 0 Tzt Xxxx. Lauft Totzeitvorg. 6 Tzt Zaehler 5
Tzt# 2 Tzt Xxxx. Noch x Trav Totzeitvorg. 0 Tzt Zaehler 31
Regelfehler:
These test patterns are employed for self-diagnosis of the system. Several pages
are required, as dictated by the particular version.