EXHIBIT 10.12
ELECTRIC SERVICE AGREEMENT
This Agreement is made by and between Otter Tail Power Company ("Otter
Tail"), a division of Otter Tail Corporation, duly established and existing
under the laws of the State of Minnesota, having its principal office at 000
Xxxxx Xxxxxxx Xxxxxx, Xxxxxx Xxxxx, Xxxxxxxxx, 00000, and Northern Lights
Ethanol, LLC ("Northern"), duly established and existing under the laws of the
State of South Dakota, having its principal place of business at 0000 Xxxx
Xxxxxx Xxxxxx, Xxxxxxx, Xxxxx Xxxxxx, 00000.
A. Northern is to be the owner and operator of an ethanol manufacturing
facility adjacent to the Big Stone Power Plant, near Big Stone City, South
Dakota, herein referred to as the "facility.
B. The Northern owners and developers of the facility desire to contract
for electrical service for its facility at a capacity level of approximately
4500 kW.
C. Otter Tail is willing to render such service to Northern in accordance
with the terms and conditions to this Agreement.
For the reasons recited above and in consideration of the covenants and
agreements hereinafter stated, the parties agree as follows:
SECTION ONE. SERVICE
Otter Tail shall sell and deliver and Northern shall take and pay for all
electric service required by Northern for its own use under the terms and
conditions specified in this Agreement.
SECTION TWO. RATES
A. The electric service provided for in this Agreement shall be sold,
delivered, purchased, received, and paid for under the terms and conditions of
this Agreement, together with Appendix A, Otter Tail's Large General Service
rate; Appendix B, Otter Tail's General
Rules and Regulations; and Appendix C, Fuel Adjustment Clause; each of which are
attached and are on file with and approved by the South Dakota Public Utilities
Commission and now in force or as may be modified from time to time by the South
Dakota Public Utilities Commission. Any change or modification to this Agreement
must be approved by the South Dakota Public Utilities Commission.
B. The minimum demand to be billed shall be in accordance with the
provisions of Appendix A. Billing for the minimum demand shall begin when
Northern determines its project to be commercially operable and requests Otter
Tail to begin service under this Agreement.
SECTION THREE. CHARACTER OF SERVICE
Otter Tail will deliver firm electric service of approximately 7,500 kVa
capacity, three-phase, 480 volts (secondary voltage), 60 hertz, alternating
current and shall be primary metered at a single point at 13,800 volts. Otter
Tail will furnish the necessary equipment and facilities to serve the electrical
load of the facility.
SECTION FOUR. POINTS OF DELIVERY
The electric service provided for under this Agreement shall be delivered
by Otter Tail and received by Northern at the point of connection between
Northern's and Otter Tail's equipment, namely, at the electrical transition
cabinets furnished by Northern at the secondary voltage side of the distribution
transformers furnished by Otter Tail. All electrical equipment furnished by
Otter Tail at the point of delivery shall be suitable for the purposes set forth
in this Agreement, and shall be installed and maintained by Otter Tail in
conformity with the requirements of the National Electric Safety Code, the
properly constituted local authorities, and Otter Tail's rules and regulations
as filed with the South Dakota Public Service Commission.
SECTION FIVE. METERING
Otter Tail will install and maintain metering instruments for the facility
as follows:
A. Otter Tail shall furnish and install all necessary meters to measure
the electricity furnished by Otter Tail to Northern's facility.
B. Otter Tail shall be responsible for all the repair, replacement, and
preventative maintenance of meters it installs or has installed. Northern shall
be responsible for all repair, replacement, and preventative maintenance of
meters it installs, if any.
C. Otter Tail, at its expense, shall be responsible for the testing and
calibration of all meters under paragraph A of this Section. Northern shall
provide access to Otter Tail personnel during reasonable hours as necessary and
required to accomplish the inspection, testing, calibration, and operation of
Otter Tail's metering equipment. If requested by Northern, Otter Tail shall
provide a minimum of one week notice to Northern of its planned tests of meters
and shall permit a representative of Northern to be present at all times the
meters are being tested. In addition, Otter Tail will test any or all of such
meters as may reasonably be requested by Northern. Reasonable costs for such
requested test shall be paid by Northern unless any of the meters are found to
be inaccurate in excess of 2%, in which case Otter Tail shall pay for such
tests.
D. Adjustments shall be made in meter readings and xxxxxxxx for errors in
a meter reading within six (6) months of the discovery of an error.
SECTION SIX. REGULATORY AUTHORITIES
This Agreement shall be filed with the South Dakota Public Utilities
Commission for its approval and is made subject to all applicable rules,
regulations, and orders of the South Dakota Public Utilities Commission.
SECTION SEVEN. EFFECTIVE DATE AND TERM
This Agreement shall become effective as of the day established in Section
Two B, and shall continue in force from year to year until cancelled by twelve
months written notice by either party hereto.
SECTION EIGHT. NO RESALE
Northern agrees not to resell any electric capacity and energy furnished
under this Agreement.
SECTION NINE. BILLING AND PAYMENT
Meters serving the project shall be read by Otter Tail monthly. Based on
these readings, Otter Tail shall xxxx Northern for the electric capacity and
energy used in the billing period ending with the meter reading. The bills will
be computed by application of Appendix A. The billing shall be sent to Northern
at the address set forth in the beginning of this Agreement or other address
designated by Northern. Northern shall pay Otter Tail the amount due in
accordance with the provisions of Appendix A and shall make payment as provided
under the provisions of the General Rules and Regulations, Appendix B.
SECTION TEN. NORTHERN'S LINES, MACHINERY AND APPARATUS
Northern shall, at its own risk and expense, furnish, install, and keep in
good and safe condition all electric lines, machinery and apparatus which may be
required for receiving electric capacity and energy from Otter Tail at the point
of delivery as described in Section Four, and for distributing and utilizing
such capacity and energy.
SECTION ELEVEN. INTERRUPTION OF POWER SUPPLY
Otter Tail may temporarily interrupt or reduce deliveries of power and
energy if Otter Tail determines that such interruption or reduction is necessary
or desirable in case of system
emergencies, or in order to install equipment in, make replacements within, make
investigations and inspections of, or perform other maintenance work on
Northern's facilities or the transfer system. Except in case of emergency, in
order that Northern's operations will not be unreasonably interfered with, Otter
Tail shall give 48 hours advance notice to Northern of any such interruption or
reduction, the reason for such interruption or reduction, and the probable
duration of such interruption or reduction to the extent of Otter Tail's
knowledge of the situation. To the extent possible, Otter Tail will coordinate
any outage with Northern. Otter Tail shall make available the use of temporary
facilities or equipment to minimize the effect of any such interruption or
reduction to the extent reasonable and appropriate.
SECTION TWELVE. FORCE MAJEURE AND FORCED OUTAGE
A. In the event Otter Tail shall be wholly or partially prevented
delivering the electric capacity and energy contracted for herein, or in case
the service of such capacity and energy shall be interrupted, or in case
Northern shall be prevented from receiving, using, and applying the same by
reason of or through strikes, stoppages of labor, riots, fire, flood, invasion,
terrorism, insurrection, accident, the order of any court judge, or civil
authority, changes in federal, state, or other governmental laws, agency orders,
decrees, restraints or regulations, act of God, or any cause reasonably beyond
its control and attributable to its neglect, then and in such event Otter Tail
shall not be obligated to deliver such electric capacity, energy and service
under and pursuant to this Agreement during such period, and shall not be liable
for any damage or loss resulting from such interruption or suspension, and
Northern shall not be obligated or liable to pay for such capacity, energy or
service not delivered, furnished, or supplied during such period.
B. In any and all such events the party suffering such interruption or
suspension shall be prompt and diligent in removing the cause of such
interruption or suspension. Either party
whose plant shall suspend operation by reason of accident to its machinery,
plant or system, shall proceed at once to repair the same within a reasonable
time, and, failing to do so, the limit or exemption from liability as fixed in
this section shall not apply, and the party so failing shall be liable to the
other as though no such limit or exemption had been fixed.
SECTION THIRTEEN. INDEMNIFICATION AND HOLD HARMLESS
A. Northern shall indemnify, defend, and save harmless Otter Tail from
any liability, loss, or expense arising from or growing out of injury to
persons, including death, or property damages incurred by persons other than the
parties, which may occur on the electric system of Northern and on its side of
the point of delivery unless such loss is due to the negligence of Otter Tail.
B. Otter Tail shall indemnify, defend and save harmless Northern from any
liability, loss, or expense arising from or growing out of injury to persons,
including death, or property damages for persons other than the parties, which
may occur on the electric system of Otter Tail and on its side of the point of
delivery unless such loss is due to the negligence of Northern.
C. If such loss or injury is not due to the negligence of either party or
is due to the equal negligence of both parties, any damages recovered therefore
shall be borne by the parties equally. If either party is required to satisfy
any claim or judgment recovered for such damages, such party shall have the
right of contribution against the other party.
SECTION FOURTEEN. ASSIGNMENT
Neither Otter Tail nor Northern shall voluntarily assign its rights nor
delegate its duties under this Agreement, or any part of such rights or duties,
without the written consent of the other party. Such consent shall not
unreasonably be withheld. This Agreement shall inure to and bind the parties'
successors and assigns.
SECTION FIFTEEN. SEVERAL OBLIGATIONS
Otter Tail and Northern shall each be individually and severally liable for
its own obligations under this Agreement.
SECTION SIXTEEN. WAIVER
Any waiver at any time by either party of its rights with respect to a
default under this Agreement, or with respect to any other matters arising in
connection with this Agreement, shall be in writing and shall not be deemed a
waiver with respect to any subsequent default or other matter.
SECTION SEVENTEEN. NOTICE
Any notice provided for or concerning this Agreement shall be in writing
and shall be deemed sufficiently given when sent by certified or registered mail
if sent to the respective address of each party as set forth in the beginning of
this Agreement.
SECTION EIGHTEEN. EASEMENT AND ACCESS
Northern shall grant to Otter Tail, during the period of this Agreement,
easements of rights-of-way for the construction, extension, maintenance, and
repair or removal of electric lines, either overhead or underground, which are
or may become necessary to provide the electric service described herein,
including the necessary fixtures and apparatus in connection therewith. Further
right-of-way, when necessary, shall be granted Otter Tail to place position, and
locate the butts of its main poles, pole structures, or underground wires, over,
across, or under Northern's property in such manner and location as the parties
may mutually agree. Otter Tail shall be given the right-of-way, ingress and
egress, at all reasonable times for the purpose of the right-of-way granted and
shall have the right to cut down and trim all trees as reasonably necessary to
keep the
wires of its electric lines clear, so as to be maintained in accordance with
Otter Tail's standards of construction and maintenance.
SECTION NINETEEN. OWNERSHIP OF OTTER TAIL LINES AND EQUIPMENT
The title and ownership of electric lines, related equipment, and metering
equipment owned and installed by Otter Tail on Northern property shall be and
remain the personal property of Otter Tail and shall not become part of the
estate of Northern.
SECTION TWENTY. REMOVAL OF OTTER TAIL LINES AND EQUIPMENT
Otter Tail shall have the right, exercisable within a reasonable time after
the expiration or termination of this Agreement, to remove its electric lines,
related equipment, metering equipment, and other appliances and fixtures from
the Northern property.
SECTION TWENTY-ONE. ENTIRE AGREEMENT
All previous communications between the parties hereto, either verbal or
written, with reference to the subject matter of this Agreement are hereby
abrogated, and this Agreement, as duly accepted and approved, constitutes the
sole agreement related to the sale and delivery of electric capacity and energy
by Otter Tail to Northern. No modifications of this Agreement shall be binding
upon the parties or either of them unless such modifications shall be in
writing, duly accepted in writing by Northern and executed by an officer of
Otter Tail, except for the provisions for rate change as provided under Section
Six hereof and Appendix A.
SECTION TWENTY-TWO. CHOICE OF LAW
This agreement shall be construed and interpreted in accordance with the
laws of the State of South Dakota, excluding any choice of law or rules, which
may direct the application of laws of another jurisdiction.
SECTION TWENTY-THREE. GOVERNANCE OF AGREEMENT OVER REGULATIONS
Where there are differences between the Agreement and the appended General
Rules and Regulations, the Agreement shall govern.
SECTION TWENTY-FOUR. REMEDIES FOR DEFAULT
In the event Northern shall fail to comply with or shall violate the
provisions of this Agreement, or if Northern shall fail to pay for electric
service provided by Otter Tail pursuant to the terms of its General Rules and
Regulations, and such failure or violation is not remedied or prompt and full
performance is not accomplished by Northern within thirty (30) days after
written notice of such failure or violation is given by Otter Tail, Otter Tail
may pursue any remedies at law and those under its General Rules and
Regulations, including the right to disconnect service to Northern's premises.
SECTION TWENTY-FIVE. INVALID PROVISIONS
The invalidity of any portion of this Agreement will not and shall not be
deemed to affect the validity of any other provision. In the event that any
provision of this Agreement is held to be invalid, the parties agree that the
remaining provisions shall be deemed to be in full force and effect as if they
had been executed by both parties subsequent to the expungement of the invalid
provision.
SECTION TWENTY-SIX. PARAGRAPH HEADINGS
The titles to the paragraphs of this Agreement are solely for the
convenience of the parties and shall not be used to explain, modify, simplify,
or aid in the interpretation of the provisions of this Agreement.
SECTION TWENTY-SEVEN. EQUIPMENT INSTALLED BY NORTHERN
All electrical equipment on the premises of Northern or connecting
Northern's premises with Otter Tail service, furnished by Northern, shall be
suitable for the purpose set forth in this Agreement, and shall be installed and
maintained by Northern at all times in conformity with the requirements of the
National Electric Safety Code, the properly constituted local authorities, and
Otter Tail's rules and regulations as filed with the South Dakota Public
Utilities Commission.
In Witness whereof, the parties have caused this Agreement to be executed
this 26th day of September, 2001.
NORTHERN LIGHTS ETHANOL, LLC OTTER TAIL POWER COMPANY
By: /s/ Xxxxxx Xxxxxxxx By: /s/ Xxxx Xxxxxxxxx
-------------------------------- --------------------------------
Its: Chairman Its: V.P. Otter Tail Corporation
------------------------------- -------------------------------
APPENDIX A
Large General Service, tariff C-02S
OTTER TAIL POWER COMPANY Section No. 3, Volume I
Fergus Falls, Minnesota 5th Revised Sheet No. 30
ELECTRIC RATE SCHEDULE Cancelling 4th Rev. Sheet No. 35.1
Rate Designation C-02S, Page 1 of 2
================================================================================
LARGE GENERAL SERVICE
Rate Zones 1 & 9
Primary Service 42-602
Secondary Service 42-603
APPLICATION OF SCHEDULE: This schedule is applicable upon request for single and
three-phase electric service supplied through one meter. This rate is not
applicable for energy for resale, nor for municipal streetlightlng. Emergency,
supplementary or standby service will be supplied only in accordance with the
terms applying to such service.
All equipment to be served must be of such voltage and electrical
characteristics that it can be served from the circuit provided for the main
part of the load and the electricity used properly measured by the meter
ordinarily installed on such a circuit. If the equipment to be served is such
that this is impossible, the, customer must provide any necessary transformers,
auto transformers or other devices suitable for connection to the circuit
provided by the Company.
Intermittent and highly fluctuating loads requiring a separate service line or
separate transformer may be served through a separate meter, on this rate, with
a separate billing.
RATE: Customer Charge $25.50 plus
Demand: Primary Secondary
Service Service
------------------- -------------------
First 100 kw of billing demand $6.75/kw $7.05/kw
Excess kw of billing demand $4.85/kw $5.15/kw
PLUS:
Energy: kwh Charge 3.362 cents/kwh 3.415 cents/kwh
All Over 360 kwh per
kw of billing demand 2.449 cents/kwh 2.498 cents/kwh
MONTHLY MINIMUM CHARGE: The demand charge, computed in accordance with the terms
of this rate.
DETERMINATION OF BILLING DEMAND: The billing demand shall be the maximum kw as
measured by a suitable demand meter for any period of 15 consecutive minutes
during the months for which the xxxx is rendered adjusted for excess reactive
demand, but not less than the greater of:
xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
XXXXX XXXXXX PUBLIC EFFECTIVE for service rendered on and
UTILITIES COMMISSION after November 1, 1987 in SD.
Approved: October 30, 1987
Docket No. F-3691
Xxx X. Xxxxxx, Corporate Secretary
OTTER TAIL POWER COMPANY Section No. 3, Volume I
Fergus Falls, Minnesota 5th Revised Sheet No. 30
ELECTRIC RATE SCHEDULE Cancelling 4th Rev. Sheet No. 35.1
Rate Designation C-02S, Page 2 of 2
================================================================================
LARGE GENERAL SERVICE (continued)
DETERMINATION OF BILLING DEMAND: (Continued)
80 kw or
25% of the first 500 kw
50% of the next 500 kw
75% of the excess kw of billing demand established during the
preceding 11 months
ADJUSTMENT FOR EXCESS REACTIVE DEMAND: The billing demand shall be increased by
one kw for each whole 10 kvar of reactive demand in excess of 50% of the
measured demand in kw.
METERING: If it is impractical or impossible to measure the demand and the
energy used with one meter or metering equipment, Otter Tail may, at its option,
install separate meters and combine the readings of such meters before applying
the rate. If this is done, no allowance shall be made for diversity but all
demands and consumptions shall be added together to determine the totals on
which billing will be made.
EMERGENCY, SUPPLEMENTARY OR STANDBY SERVICE: Emergency, supplementary or standby
service will be provided only subject to individual negotiation, in each
instance.
PAYMENT: Bills will be due ten days after the billing date: net payment will be
accepted through the 21st day. On the 22nd day after billing an account with an
unpaid balance of $5.00 or more (after allowance for any EMP credit) will be
considered late and a late payment charge will apply. The late payment charge
shall be 1.5% of the unpaid balance plus a collection charge of $2.00, except
that a customer with at least 12 successive payments of regular bills prior to
the 22nd day after the billing date shall not be billed a late payment charge.
Where a customer is disconnected for nonpayment of a xxxx, a reconnection charge
will be made; the charge will the Customer Connection Charge as provided for in
Rate M-61S, or any amendments or superseding provisions applicable thereto, plus
direct labor costs for reconnection outside of regular business hours.
A $10.00 charge will be made subsequent to a customer's check being
returned from the bank because of nonsufficient funds.
CONTRACT PERIOD: Otter Tail reserves the right to require a contract with the
customer in cases of unusual service requirements.
FUEL ADJUSTMENT CLAUSE: The energy charges under this schedule are subject to a
Fuel Adjustment Clause as provided for in Rate M-60S, or any amendments or
superseding provisions applicable thereto.
REGULATIONS: General Rules and Regulations govern use under this schedule.
ADJUSTMENT FOR MUNICIPAL PAYMENTS: Bills under this rate schedule may be subject
to adjustment for certain payments to municipalities as provided in the General
Rules and Regulations.
xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
XXXXX XXXXXX PUBLIC EFFECTIVE for service rendered on and
UTILITIES COMMISSION after November 1, 1987 in SD.
Approved: October 30, 1987
Docket No. F-3691
Xxx X. Xxxxxx, Corporate Secretary
APPENDIX B
General Rules and Regulations
[not reproduced]
APPENDIX C
Fuel Adjustment Clause, tariff M-60S
OTTER TAIL POWER COMPANY Section No. 3, Volume I
Fergus Falls, Minnesota 5th Rev. Sheet No. 98-Super. 52
ELECTRIC RATE SCHEDULE Cancelling 4th Revised Sheet No. 52
Rate Designation M-60S, Page 1 of 1
================================================================================
FUEL ADJUSTMENT CLAUSE
There shall be added to or deducted from the monthly xxxx the amount per
kilowatthour (rounded to the nearest 0.001 cents) that the average cost of fuel
is above or below 1.5460 cents per kilowatthour. The average cost of fuel per
kilowatthour for the current period shall be calculated from data covering
actual costs from the most recent three-month period as follows:
Energy costs from actual months 1, 2 and 3 plus unrecovered (or less over
recovered) prior cumulative energy costs plus (or minus) the carrying charge,
divided by the associated energy (reduced for average system losses) associated
with retail sales for actual months 1, 2 and 3 equals the cost of energy amount.
The applicable adjustment will be applied month to month on a uniform billing
cycle to each customer's xxxx at the earliest practical date following the
three-month period. The cost of fuel shall be determined as follows:
1. The expense of fossil fuel, as recorded in Account 151 of the FERC's
Uniform System of Accounts for Public Utilities and Licensees, used in
the Company's generating plants.
2. The utility's share of the expense of fossil fuel, as recorded in
Account 151, used in jointly-owned or leased plants.
3. The net energy cost of energy purchases when such energy is purchased
on an economic dispatch basis, exclusive of capacity or demand
charges.
4. The actual identifiable fossil and nuclear fuel expense associated
with energy purchased for reasons other than identified in 3 above.
5. Less the fossil fuel-related costs recovered through intersystem
sales, including the fuel costs related to economy energy sales and
other energy sold on an economic dispatch basis.
Where, for any reason, billed system sales cannot be coordinated with fuel
costs, sales may be equated to the total of:
1. Net generation
2. Purchases and net interchange in, less
3. Intersystem sales, less
4. Losses on system retail sales
A carrying charge or credit will be included to determine the monthly fuel
adjustment factor. The carrying charge or credit will be determined by applying
one-twelfth (1/12) of the overall rate of return granted by the Commission in
the most recent rate decision to the recorded deferred fuel cost balance of the
latest fuel adjustment calculation.
SOUTH DAKOTA PUBLIC EFFECTIVE for service rendered on and
UTILITIES COMMISSION after November 1, 1987 in SD.
Approved: October 30, 1987
Docket No. F-3691