EXHIBIT 10.09
SWNMT Amendment #6
TEXAS-NEW MEXICO POWER COMPANY
Subject: SWNMT LETTER AGREEMENT - AMENDMENT #6
Public Service Company of New Mexico ("PNM"), Texas-New Mexico Power Company
("TNMP") and El Paso Electric Company ("EPE") (herein individually the "Party"
and collectively the "Parties") are parties to the Southwest New Mexico
Transmission Project Participation Agreement "SWNMT Agreement", dated April 11,
1977, and amended and supplemented at various times by the Parties. Section
10.0 of the SWNMT Agreement sets forth the terms and conditions under which the
Parties may interconnect facilities and/or equipment with the Southwest New
Mexico Transmission ("SWNMT") Project.
This SWNMT Letter Agreement - Amendment #6 sets forth the terms and conditions
under which the Parties agree to the interconnection of TNMP's Xxxxxxx 345-115
kV autotransformer and associated equipment and agree to supplement the SWNMT
Agreement.
Texas-New Mexico Power Company formally notified the Parties by letter dated
March 5, 1993, of its plans to install a second 345-115 kV 200 MVA
autotransformer at Xxxxxxx Substation. The facilities and particulars for the
installation were identified in that letter. The letter specifically stated,
"For the immediate future, this second autotransformer shall be considered a de-
energized spare for TNMP's existing Xxxxxxx 345-115 kV, 200 MVA
autotransformer". Additionally, the March 5, 1993 letter explained the location
and rationale behind the proposed installation plans. The letter also indicated
that in the future, the second autotransformer would be electrically
interconnected on a continuous basis to the 345 kV bus in accordance with the
original plans for expansion of the Xxxxxxx 345 kV Substation.
With the above being known, TNMP requests that the other Parties (PNM and EPE)
approve interconnection of the second 345-115 kV, 200 MVA autotransformer in its
final configuration (the "New Autotransformer") at the Xxxxxxx 345 kV
Substation. Such an interconnection will require the installation of one (1)
345 kV circuit breaker, two (2) 345 kV motor operated disconnects, and one (1)
345 kV circuit-switcher (collectively, the "Related Equipment").
I. In connection with such approval, the Parties agree:
a) TNMP will be responsible for all design, construction and equipment costs
for interconnecting the New Autotransformer, installing the Related
Equipment, moving of the phases of the existing strain bus, bus work,
protective relaying and other necessary items directly associated with this
project.
2
SWNMT Amendment #6
TEXAS-NEW MEXICO POWER COMPANY
b) TNMP will interconnect the New Autotransformer and Related Equipment to the
SWNMT facilities in the manner displayed in the drawings attached to and
incorporated into this Letter Agreement (refer to drawing numbers: Xxxxxxx
0, 0 and 3). TNMP shall submit its interconnection design plans to the
SWNMT Project Coordinating Committee for review and approval prior to the
interconnection to SWNMT.
c) i) The New Autotransformer shall be wholly owned by TNMP, shall not be
part of the SWNMT, and shall be for the sole use of TNMP.
ii) TNMP shall be the sole owner of the Related Equipment and any other
equipment installed by TNMP for the interconnection of the New
Autotransformer, and such Related Equipment shall not be part of the SWNMT
facilities. Notwithstanding the foregoing, the 345 kV circuit breaker and
345 kV motor operated disconnect shall be controlled by EPE acting in its
role as Operating Agent of the SWNMT facilities. The 345 kV circuit-
switcher will remain under the control of TNMP.
iii) TNMP shall be responsible for the cost of operating and maintaining
the equipment associated with this interconnection.
iv) TNMP shall be responsible for the cost of installing sufficient
equipment such that the line flows (MW and MVAR) over the New
Autotransformer will be sent to EPE's Energy Management System (EMS) for
SCADA purposes. The above line flows will be made available to PNM at the
Xxxx Substation.
v) TNMP shall be responsible for the cost of installing sufficient
equipment such that operating status indications for the 345 kV circuit
breaker and 345 kV motor operated disconnect for SCADA purposes and
operating status indication for the 345 kV circuit-switcher for SCADA and
control purposes will be sent to EPE's EMS. The above operating status
indications will be made available to PNM at the Xxxx Substation.
II. In consideration of the Parties granting the interconnection of the New
Autotransformer to the SWNMT facilities as proposed, TNMP hereby agrees to the
following:
a) TNMP shall cooperate with EPE in performance of EPE's responsibilities as
Operating Agent and with EPE and PNM as SWNMT participants to minimize the
potential for unforeseen difficulties resulting from TNMP's planned
interconnection to the SWNMT facilities.
3
SWNMT Amendment #6
TEXAS-NEW MEXICO POWER COMPANY
b) The installation of the New Autotransformer and Related Equipment will not
(i) increase TNMP's firm transmission rights into the Southern New Mexico
Transmission system above the firm transmission rights of 110 MW as
delineated in Amendment #5 of the SWNMT Agreement, or (ii) in any way limit
TNMP from pursuing additional transmission rights in the event such
transmission rights become available on the SWNMT Project at a future date
pursuant to the SWNMT Agreement.
c) Metering shall be at the 115 kV level and such metered amounts will be
adjusted as appropriate to account for losses in the New Autotransformer.
d) TNMP shall ensure that with the interconnection of the proposed facilities,
the two future positions planned for terminations of the Xxxxxxxx-Xxxxxxx-
Xxxx 345 kV #2 line as part of the SWNMT shall not be compromised.
e) TNMP will make available, at its cost, two communication channels for the
Xxxxxxxx-Xxxxxxx-Xxxx 345 kV #2 line when the line is constructed.
f) TNMP will provide first response activities regarding SWNMT facilities in
the Xxxxxxx Switchyard.
g) TNMP will perform the routine inspections and maintenance for the SWNMT
facilities at Xxxxxxx Substation, with the exception of the relaying and
communication facilities. Records of these activities shall be kept in
accordance with the requirements of EPE as Operating Agent.
III. In the event of a conflict between this Amendment #6 and the SWNMT
Agreement, as amended in Amendments #1 through #5, the provisions of this
Amendment #6 shall control. The remaining terms and conditions of the SWNMT
Agreement, as amended in Amendments #1 through #5, shall remain in full force
and effect, as if fully set forth in this letter.
If the forgoing terms and conditions are acceptable to the Parties, please so
indicate by signing this Letter Agreement and returning one original to TNMP.
/s/ Xxxxx X. Xxxxx
---------------------------------
Texas-New Mexico Power Company
4
SWNMT Amendment #6
TEXAS-NEW MEXICO POWER COMPANY
Accepted and agreed to this 17th day of June, 1999.
/s/Xxxxx Xxxxx
-------------------------------------
Public Service Company of New Mexico
/s/Xxxx X. Xxxxx
-------------------------------------
El Paso Electric Company
5
SWNMT Amendment #6
TEXAS-NEW MEXICO POWER COMPANY
Explanation of Diagrams to SWNMT Letter Agreement - Amendment #6
Exhibit 10.09 also includes three diagrams of the facilities at Xxxxxxx
Substation. The first diagram shows the existing 345 kV Ring Bus. The second
diagram is a 345 kV One Line Diagram showing the new autotransformer. The third
diagram is a 345 kV Partial One Line/Relay Diagram showing the relay detail.
6