Hydrocarbons recovered, extracted, or otherwise removed from the Gas after the Delivery
Point, including, but not limited to, plant condensate (sometimes referred to as pentanes
plus, heavier than butanes or, natural gasoline), and all commercial non-hydrocarbon
substances recovered, extracted, or otherwise removed from the Gas in the Gathering
System or the Plant.
hydrocarbon stream remaining after the recovery, extraction, and removal of Plant
Products, and after reduction for Gas used for Process Fuel, Process Flare, and other
incidental losses.
Where:
7.2 If any of the Gas delivered by Producer hereunder should fail to meet the quality
specifications set forth in this Article VII, Processor may elect to accept and process
such Gas, or elect to accept, but treat and/or condition, such Gas prior to gathering or
processing. The acceptance of Gas not meeting the quality specifications set forth in Article
VII shall not be deemed a waiver of Processor’s right to reject such Gas at any later time, and
Processor shall be entitled, at any time and from time to time,
7.4 Processor shall have the right to invoice Producer for treating and/or conditioning the
non-conforming Gas, or Processor may elect to deduct the fees from payments to be made by Processor
to Producer. The fees noted in Paragraph 7.3 shall be in effect until April 1, 1995, at
which time the fee will be adjusted up or down in accordance with the adjustment methodology used
for compression fees in Paragraph 4.2.
ARTICLE IX
MEASUREMENT AND METER TESTING
9.1 The unit of volume for measurement of Gas delivered hereunder shall be 1,000 cubic feet
of Gas at a base temperature of 60 degrees Fahrenheit and at an absolute pressure of 14.65 psia and
saturated with water vapor. All fundamental constants, observations, records, and procedures
involved in determining the quantity of Gas delivered hereunder shall be in accordance with the
standards prescribed in Report No. 3 of the American Gas Association, as now and from time to time
amended or supplemented. It is agreed that for the purpose of measurement and computations
hereunder, the atmospheric pressure shall be assumed to be 14.7
9.9 If Producer shall notify Processor, or if Processor shall notify Producer, at any time that a
special test of any meter is desired, the parties shall cooperate to secure an immediate
verification of the accuracy of such meter and joint observation of any adjustments. All tests of
Processor’s measuring equipment shall be made at Processor’s expense, except that the Producer
shall bear the expense of tests made at its request if the inaccuracy found is less than two
percent. Expense as used herein shall be limited to actual costs of Processor as the result of
testing and shall not include any costs incurred by Producer as the result of witnessing said
testing.
9.10 If during any month less than three MMCF of Gas is delivered to a Delivery Point, (except for
reasons of Force Majeure), then Processor shall charge a meter fee applicable to any such Delivery
Point equal to $200.00. Such fee shall be deducted from the compensation otherwise due Producer
under this Agreement; or, at Processor’s election, Producer may be invoiced for such
10.3 Allocation of Process Fuel. The allocation of Process
Fuel attributable to each Delivery Point shall be determined as
follows:
10.4 Allocation of Process Flare. The allocation of Process Flare attributable to each
Delivery Point shall be determined as follows:
10.5 Allocation of Gains or Losses. Gains or losses, if any, will be allocated to the
Producer(s) through the allocation process described in Paragraph 10.6(b) where all Net
Theoretical BTU’s of Residue Gas [as defined in Paragraph 10.6(a)] are allocated to a
particular Delivery Point.
10.6 Allocation of Residue Gas. The allocation of Residue Gas attributable to each Delivery
Point and of proceeds attributable thereto shall be determined as
follows:
ARTICLE XI
DISPOSITION OF PRODUCER’S PORTION OF PLANT PRODUCTS
11.1 On behalf of Processor, Operator shall have the right to sell all Plant Products
removed or extracted from the Facilities after Gas is delivered at the Delivery Point. Operator
shall sell the Plant Products at the Plant Tailgate, and Producer shall have no right to take the
Plant Products in kind at the Plant Tailgate. The price received by Operator for the Plant Products
f.o.b. Plant Tailgate will be net of costs and any losses incurred by the purchaser for
transporting, fractionation, treatment, storage, upgrade, line losses, measurement, commission,
brokerage, marketing fees, exchange differentials, and fractionator retainage. The sum of all these
costs for Plant Products which are transported by pipeline shall not exceed 6.1 cents per gallon
for 1994 and will be subject to fluctuations thereafter. This limitation shall not apply to Plant
Product transported other than by pipeline.
11.2 Operator shall notify Producer of the purchaser of the Plant Products, and Producer may,
subject to the following conditions, enter into a separate agreement with the purchaser to take in
kind purity Plant Products after fractionation at Mont Belvieu, Xxxxxx County, Texas, which are
equivalent to 80% of the Plant Products allocable to Producer at the Plant Tailgate, less costs
(excluding the marketing fee) and any losses that occur between Plant Tailgate and delivery of
purity Plant Product at Mont Belvieu.
Either of the parties may designate a further or different address by giving written notice
to the other party.
ARTICLE XXIV
ASSIGNMENT
24.1 This Contact shall extend to and be binding upon and inure to the benefit of the heirs,
executors, administrators, successors, and assigns, of the respective parties hereto, but no
transfer of or succession to the interest of either party hereunder, wholly or partially, shall
affect or bind the other party until it shall have been furnished with the original instrument or
with the proper proof that the claimant is legally
End of Exhibit D Balancing Agreement provisions.
Except as amended herein, the Agreement remains in full force and effect as
originally executed, and the parties hereto do hereby adopt and ratify and confirm same.
IN WITNESS WHEREOF, each of the paries hereto has executed this Agreement on the
date of its acknowledgment hereof.
Except as amended herein, the Agreement remains in full force and effect as
originally executed, and the parties hereto do hereby adopt and ratify and confirm same.
EXHIBIT 10.7 Brookeland Gas Facilities Gas Gathering and Processing Agreement Between UNION PACIFIC RESOURCES COMPANY and UNION PACIFIC RESOURCES COMPANY Jasper County, Texas Dated September 1, 1993
Brookeland Gas Facilities Gas Gathering and Processing Agreement TABLE OF CONTENTS
I. | Definitions | 3 | ||||
II. | Commitment of Processing Rights | 9 | ||||
III. | Reservations of Parties | 10 | ||||
IV. | Delivery Point and Pressure | 11 | ||||
V. | Regulation of Production | 16 | ||||
VI. | Quantity | 17 | ||||
VII. | Quality | 18 | ||||
VIII. | Tests | 22 | ||||
IX. | Measurement and Meter Testing | 23 | ||||
X. | Allocation Procedure | 28 | ||||
XI. | Disposition of Producer’s Portion of Plant Products | 34 | ||||
XII. | Processing Payment | 35 | ||||
XIII. | Disposition of Producer’s Portion of Residue Gas | 36 | ||||
XIV. | Accounting and Payments | 37 | ||||
XV. | Warranty | 39 | ||||
XVI. | Taxes | 40 | ||||
XVII. | Indemnity | 41 | ||||
XVIII. | Force Majeure | 42 | ||||
XIX. | Unprofitable Operations and Rights of Termination | 44 | ||||
XX. | Term | 45 | ||||
XXI. | Regulatory Bodies | 46 | ||||
XXII. | Arbitration | 47 | ||||
XXIII. | Notices and Payments | 48 | ||||
XXIV. | Assignment | 49 | ||||
XXV. | Miscellaneous | 50 |
Brookeland Gas Facilities Gas Gathering and Processing Agreement THIS AGREEMENT, made as of the 1st day of September, 1993, by and between UNION PACIFIC RESOURCES COMPANY, a Delaware corporation, the Operator, and SONAT EXPLORATION COMPANY, a Delaware corporation, the Owners of the Facilities, hereinafter referred to collectively as “Processor,” and UNION PACIFIC RESOURCES COMPANY, hereinafter referred to as “Producer.” WITNESSETH, THAT: WHEREAS, the Processor has agreed to construct and operate a Gas Gathering System; and WHEREAS, the Processor is constructing and will operate a Gas Plant; and WHEREAS, the Producer owns or controls Gas production from various xxxxx on the lands within the Contract Area and desires to have the Processor gather the Gas for processing in the Plant; and WHEREAS, the Processor is willing to gather and process such Gas for the Producer; NOW, THEREFORE, the parties agree as follows: ARTICLE I DEFINITIONS 1.1 For the purpose of this Agreement, certain terms and expressions herein used are defined as follows:
a. | “Btu” shall mean one British thermal unit, which is the quantity of heat required to raise one pound |
3
avoirdupois of pure water from 58.5 degrees Fahrenheit to 59.5 degrees Fahrenheit at a constant pressure of 14.73 pounds per square inch absolute.
b. | “Component” shall mean those hydrocarbon and non-hydrocarbon molecular constituents which are definable by industry standards and procedures. Such Components as used in this Agreement shall be: |
N2 | - | Nitrogen | ||||
C02 | - | Carbon Dioxide | ||||
H2S | - | Hydrogen Sulfide | ||||
Cl | - | Methane | ||||
C2 | - | Ethane | ||||
C3 | - | Propane | ||||
ic4 | - | Iso-butane | ||||
nC4 | - | Normal Butane | ||||
ic5 | - | Iso-pentane | ||||
nc5 | - | Normal Pentane | ||||
C6+ | - | Hexanes and Heavier Compounds |
c. | “Contract Area” shall mean that area as outlined on Exhibit “A,” as amended from time to time. | ||
d. | “Day” shall mean a period of 24 consecutive hours beginning and ending at seven o’clock a.m. Central Time. | ||
e. | “Delivery Point” is defined as the inlet flange of Processor’s metering facilities located at or near the well or such other point as may be mutually agreed upon. Each Delivery Point will be listed on Exhibit “B” to this Agreement; and Exhibit “B” will be amended from time to time to reflect the addition or deletion of Delivery Points. | ||
f. | “Facilities” shall mean the Plant and Gathering System. |
4
g. | “Gas” shall mean natural gas, including casinghead gas produced with crude oil, gas from gas xxxxx produced in association with crude oil (associated gas) , and gas from condensate xxxxx (non-associated gas), and shall include any inerts or impurities contained therein. | ||
h. | “Gathering system” shall mean, but not be limited to, the Gas gathering pipelines, fuel gas pipelines, dehydration facilities, compression facilities, junctions, heaters, meters, separators, electric power lines, communications cables, roads, and other related facilities and equipment from the inlet flange of the pipeline metering facility installed up to the inlet flange of the block valve upstream of the inlet header at the Plant inlet, necessary to gather and transport Gas from the Delivery Point(s) to the Plant and shall include any expansion of the Gathering System as provided in Paragraph 4.5. | ||
i. | “Liquefiable Hydrocarbons” shall mean ethane, propane, iso-butanes, normal butanes, iso-pentanes, normal pentanes, hexanes and heavier, and incidental methane, or any mixtures thereof, which can be recovered or extracted in the Gathering System or the Plant and sold as Plant Products. |
5
j. | “MCF” shall mean 1,000 standard cubic feet of gas. | ||
k. | “Month,” “billing month,” “period,” and “accounting period” shall mean the period beginning at seven o’clock a.m. on the first day of a calendar month and ending at seven o’clock a.m. on the first day of the next succeeding calendar month. | ||
l. | “MMBtu” shall mean 1,000,000 Btu. | ||
m. | “Plant” shall mean, but not be limited to, all tanks, machinery, equipment, fixtures, appliances, pipe, valves, fittings, and materials of any nature or kind whatsoever; including appropriate storage, compression, metering, shipping, dehydration, and delivery facilities for Plant Products; all buildings and structures of any kind whatsoever located, or to be located, on the site or sites, at which the processing and recompression facilities of Processor are located; all easements pertaining to such rights-of-way, the site or sites, and the operation of the Plant, and any and all other facilities and appurtenances located, or to be located, on or away from such site or sites deemed by Processor to be necessary for the successful operation of the Plant, including inlet compression, if any, but not including the Residue Redelivery Facility. | ||
n. | “Plant Products” shall mean all Liquefiable |
6
o. | “Plant Tailgate” shall mean the point of interconnect between the Plant and the Residue Redelivery Facility located at the downstream flange of the block valve which is downstream of the Residue Gas meter and emergency shutdown valve. | ||
p. | “Process Fuel” shall mean the MMBTU’s of Gas consumed at the Plant for fuel which shall include, but not be limited to, fuel used for Gas conditioning and treating; recovery, extraction, and removal of Plant Products; and the recompression of the Residue Gas. | ||
q. | “Process Flare” shall mean any MMBTU’s of Gas dispersed or lost at the Plant as flare which shall include, but not be limited to, flare dispersed or lost in the Gas conditioning and treating; recovery, extraction, and removal of Plant Products; and the recompression of Residue Gas. | ||
r. | “Residue Gas” shall mean that hydrocarbon and non- |
7
s. | “Residue Redelivery Facility” shall mean the Residue Gas pipeline and associated equipment operated by Union Pacific Texas Gas Pipeline, Inc. (“UPTGPI”) that are located at the Plant Tailgate and are used to deliver Residue Gas to the Residue Redelivery Point(s). | ||
t. | “Residue Redelivery Point(s)” shall mean the point(s) of interconnect between the Residue Redelivery Facility and the facilities of third party pipeline (s) to which the Residue Gas is delivered and which point(s) are shown on Exhibit “C,” attached hereto and made a part hereof in full. | ||
u. | “SCF” or “standard cubic foot of gas” shall mean the amount of Gas necessary to fill a cubic foot of space when the Gas is at a pressure of 14.65 pounds per square inch absolute and a temperature of 60 degrees Fahrenheit. |
8
ARTICLE II COMMITMENT OF PROCESSING RIGHTS 2.1 Subject to the terms and provisions hereof and as of the date hereof, Producer agrees to deliver for processing to Processor at the Delivery Point(s) the total volume of Gas owned or controlled by Producer lawfully produced from xxxxx now or hereafter drilled on the lands within the Contract Area shown on Exhibit “A” or lands pooled therewith excluding Gas reserved or utilized by Producer in accordance with the terms of Article III. Any transfer by Producer of its right, title, or interest in Producer’s Gas to a third party, whether by farmout, contract, or otherwise, shall be made specifically subject to this Agreement. Producer will notify any person to whom Producer transfers all or a portion of its right, title, or interest in Producer’s Gas that such Gas is dedicated pursuant to the terms of this Agreement to be gathered and processed in the Facilities; and Producer shall obtain such third party’s agreement to continue delivering such Gas to Processor during the term of and in accordance with this Agreement. Producer will notify Processor of any such transfer within 10 days of the effective date. Failure of Producer to so notify Processor will not impair Processor’s rights under this Agreement. 2.2 Gas shall be delivered after mechanical separation by Producer for the removal of free water and free liquid hydrocarbons, but shall not otherwise be processed by Producer for the removal of Liquefiable Hydrocarbons.
9
2.3 Processor agrees that subject to the provisions hereof, it will take and gather Gas from the Delivery Points and will cause such Gas to be processed in the Plant for the recovery of Plant Products. Processor also agrees to deliver at the Plant Tailgate to Producer or Producer’s nominee Producer’s share of Residue Gas as determined under the provisions of Paragraph 10.6. ARTICLE III RESERVATIONS OF PARTIES 3.1 Producer reserves all liquid hydrocarbons, oil, or condensate removed by Producer by means of mechanical gas-liquid separators (including heater-treaters), drips, and/or lines from the Gas prior to delivery to Processor. If mechanical cooling is performed by Producer to meet the temperature specifications of this Agreement, Producer shall not reduce the temperature of the Gas below 110 degrees Fahrenheit. 3.2 Producer reserves all Gas that may be required for cycling, repressuring, pressure maintenance, and gas lift operations with respect to oil reservoirs on the premises committed hereunder; provided, however, Gas used in such operations shall be subject to the terms of this Agreement (to the extent that such Gas can be economically saved) and delivered to Processor, subsequent to the cessation of such operations. 3.3 Producer reserves Gas for above ground development and operation of premises covered hereby.
10
3.4 Producer may at any time, without liability to Processor, clean out, deepen, re-work, plug back, shut-in, use for injection, or abandon any well within the Contract Area or use any methods for the production of oil or gas that meet current industry standards. 3.5 Producer hereby specifically reserves the right to introduce Gas, water, or any other extraneous substances into a well covered hereby or into the formation(s) from which said well is producing when, in the exclusive judgment of Producer, the introduction of such substances is desirable in the operation of such well for the production of oil or gas; provided, that if Producer’s operations under this paragraph create a condition which, in the exclusive judgment of Processor, (i) makes the taking and utilization of Gas therefrom unprofitable to Processor, or (ii) tends to endanger the Plant or property of Processor or the lives of Processor’s employees, then Processor reserves the right to discontinue taking Gas from the particular Delivery Point to which the well is connected so long as such condition continues to exist. 3.6 Producer expressly reserves the right to deliver or furnish to Producer’s lessor Gas as required to satisfy the terms of Producer’s oil and gas leases. ARTICLE IV DELIVERY POINT AND PRESSURE 4.1 Producer, at its own expense, shall construct, equip, maintain, and operate all facilities (including, but not limited to, all necessary separation, dehydration, and/or compression)
11
necessary to deliver Producer’s Gas to Processor at the Delivery Point at such pressure as is required and sufficient to enter Processor’s Delivery Point, but not to exceed 1,075 psig. 4.2 If the Processor provides compression for the Producer’s Gas other than Plant recompression, the Processor shall provide or cause to be provided each stage of compression for an initial fee of 6.16¢ per MCF per stage, and Producer will provide its pro rata share of fuel required for operating such compressor(s), in order that Gas dedicated hereunder will meet the pressure requirements at the Plant inlet. Commencing April 1, 1995, and each April 1st thereafter, the compression fee set forth herein will be adjusted upward or downward, in proportion to the percentage increase or decrease in the average hourly earnings of crude petroleum and Gas production workers for the last calendar year, compared to the previous calendar year, as shown by the “Index of the Average Hourly Earnings of Crude Petroleum and Gas Production Workers” as published by the Bureau of Labor Statistics of the United States Department of Labor. 4.3 The fuel used for inlet compression will be handled according to Paragraphs 10.1 or 10.6(c) depending on the source of the fuel. 4.4 Processor, at its own expense, shall construct, equip, maintain, and operate all meters and facilities necessary to measure Producer’s Gas at the Delivery Point(s); 4.5 As of the effective date, Processor has installed the initial portion of a Gathering System with a number of pipelines,
12
trunklines, and laterals in the Contract Area as shown in Exhibit “A.” It is expected that Processor will expand the Gathering System to handle new xxxxx which will be connected to additional Delivery Points within the Contract Area. To expeditiously handle expansion of the Gathering System, the Processor and Producer agree to the following terms:
a. | Producer shall provide written notice to Processor of Producer’s intent to drill a well or xxxxx on lands within the Contract Area or lands pooled therewith and request that Processor initiate the construction of necessary pipelines and related facilities to connect the Delivery Point(s) for the well or xxxxx to the existing Gathering System (hereinafter “pipeline expansion”). Processor shall notify Producer of the estimated costs of the right-of-way portion of the pipeline expansion, and if those costs exceed $40,000, Producer shall have ten days from receipt of notice to make a written election for Processor to proceed with the pipeline expansion or to rescind its request for the pipeline expansion. If Producer elects to proceed with the pipeline expansion, Processor may decline to construct the pipeline expansion if it determines that it would not be profitable to do so. In such event, Producer may construct the pipeline expansion at its sole cost. The pipeline |
13
expansion must meet all Processor’s specifications, and Processor will be responsible for the meter station and connection to the Gathering System. The Processor may, at its election, acquire the ownership of the pipeline expansion installed by the Producer by reimbursing Producer for the actual pipeline expansion costs with no allowance for inflation or depreciation. Producer agrees to execute all assignments or contracts deemed necessary to accomplish the transfer to Processor of title to the pipeline expansion, including rights-of-way and easements. In the event neither Processor nor Producer elect to construct the necessary pipeline expansion to connect the Delivery Point to the existing Gathering System, then this Agreement shall terminate as to the Gas from the well or xxxxx to be connected to that Delivery Point. | |||
b. | If Producer timely elects to proceed with pipeline expansion where right-of-way costs exceed $40,000 or the estimated cost does not exceed $40,000, and Processor has agreed to construct the pipeline expansion, Processor shall cause commencement of construction as soon as practicable after the later of right-of-way acquisition or commencement of drilling of the well. |
14
c. | Producer shall guarantee reimbursement to Processor of the total actual cost associated with each pipeline expansion (including, but not limited to, the costs of right-of-way, construction, and materials) according to the following calculations: |
R | = | C — ($0.215 * V) |
R | = | Amount to be reimbursed. | ||||
C | = | Pipeline expansion cost. | ||||
V | = | The volume of Gas, in thousands of cubic feet (MCF), delivered by the Producer to Processor from the Delivery Point through the pipeline expansion; provided that if more than one Delivery Point utilizes the pipeline expansion, or any portion thereof, the Volume used in the calculation will be determined by summing the prorated volumes of all Gas from Delivery Points using the pipeline expansion. To determine the prorated volumes from each Delivery Point, the volume of Gas from each Delivery Point will be multiplied by a fraction, the numerator of which is the length in feet of the pipeline expansion utilized by such Delivery Point, and the denominator is the total length of the pipeline expansion. The sum of all these prorated volumes using the pipeline expansion will be the volume used in the calculations. |
1) | Reimbursement will be due only when the value of “R” is positive. | ||
2) | Any reimbursement due Processor from Producer shall be paid by Producer within 30 days of the first of the following to occur: |
15
(i) the date that the well is determined to be a dry hole or is plugged or abandoned; (ii) the date that the well has delivered no Gas for a period of 180 consecutive days; (iii) two years from the date of initial production from the well; or (iv) the date of termination of this Agreement. ARTICLE V REGULATION OF PRODUCTION 5.1 It is understood and agreed by the parties hereto that in order for Processor to maintain maximum efficiency in the Facilities, and in order to prevent flaring and/or bypassing of Gas, it will be necessary to maintain a uniform rate of flow of Gas to the Facilities from all sources during each 24 hour period. Therefore, Producer agrees that it will cooperate with Processor in regulating the flow rate of Producer’s Gas and in establishing a producing schedule to deliver on a best efforts basis the Gas at a uniform and continuous flow rate.
16
ARTICLE VI QUANTITY 6.1 Subject to Gathering System and Plant capacity, Processor shall take and process that volume of Gas legally allowed to be produced which is attributable to the interest owned or controlled by Producer in xxxxx drilled on lands within the Contract Area or lands pooled therewith; provided, after processing, Producer or Producer’s nominee will accept the Residue Gas attributable to Producer. 6.2 If insufficient Plant capacity exists to process all the Gas, the Plant processing capacity will be prorated for all Gas, without undue discrimination, and the Gas unable to be processed will be bypassed ratably during the period that processing capacity is not available in the Plant, provided that such unprocessed volumes of Gas, together with all other volumes of Gas owned by third parties which are bypassed around the Plant will not, in Processor’s sole opinion, cause the commingled Gas and Residue Gas to fail to meet the quality specifications set forth by the third party pipelines at the Residue Redelivery Point(s) listed on Exhibit “C.” 6.3 Recognizing that the Plant may not have sufficient capacity to process all Gas produced from the Contract Area, Processor shall have the right, but not the obligation, to expand the Plant or build a new Gas processing plant at a different location, and in such event, Producer’s Gas, or a portion thereof, may be processed by Processor in the expanded Plant or the new Gas
17
processing plant in accordance with the terms of this Agreement. 6.4 Notwithstanding the above, Processor reserves the right to operate the Plant and Gathering System in the manner it deems necessary, in its sole judgment. ARTICLE VII QUALITY 7.1 Processor shall not be obligated to receive and process Gas delivered hereunder that fails to meet the following specifications:
a. | Commercial in quality and free from any foreign materials such as dirt, dust, iron particles, crude oil, dark condensate, and free water, and other similar matter; and substances which may be injurious to pipelines or which may interfere with the processing, transmission, or commercial utilization of said Gas; | ||
b. | the Gas delivered hereunder shall not exceed a temperature of 120 degrees Fahrenheit at the Delivery Point(s) to Processor; | ||
c. | The Gas delivered hereunder shall not contain more than: |
(i) | One-fourth grain of hydrogen sulfide, or five grains of total sulfur, or one grain mercaptan per 100 cubic feet; |
18
(ii) | five parts per million by volume of oxygen; | ||
(iii) | five and one-half percent by volume of carbon dioxide; | ||
(iv) | two percent by volume of nitrogen; | ||
(v) | seven and one-half percent by volume of a combined total of inerts, including, but not limited to, carbon dioxide and nitrogen Components; or | ||
(vi) | seven pounds of water per million cubic feet. |
d. | No diluents such as carbon dioxide, air, or nitrogen shall be added to the Gas; | ||
e. | The Gas shall contain no carbon monoxide, halogens, or unsaturated hydrocarbons, and no more than 400 parts per million of hydrogen; and | ||
f. | The Gas shall contain no less than 1,050 Btu and 2.1 GPM ethane and heavier hydrocarbons. |
19
to decline to accept proffered deliveries of Gas not meeting the quality specifications set forth herein. 7.3 If Processor elects to accept but treat and/or condition the non-conforming Gas prior to gathering and processing, the Processor shall advise the Producer of such election, and the Producer shall have a maximum of 30 days to advise Processor if it will treat and/or condition its own Gas. If Producer does not elect to treat and/or condition or fails to make such election within the specified time, then the Processor shall have the right to proceed and the following shall apply:
a. | If for any reason the Gas delivered hereunder fails to comply with the quality specifications for temperature as described in Paragraph 7.1(b) above, the Processor shall have the right, but not the obligation, to treat non-conforming Gas in order that it will comply with the temperature specifications. In the event Processor exercises its right to treat non-conforming Gas, Processor shall receive a fee for performing said treating in accordance with the following: |
Temperature (°F) | Fee | |
Less than or equal to 120°F | No Fee | |
Between 120°F and 160°F | 3¢/MCF | |
Equal to or greater than 160°F | Rejected |
b. | If for any reason the Gas delivered hereunder fails to comply with the quality specifications for carbon dioxide (CO2) as described in Paragraph 7.1(c) above, the |
20
Processor shall have the right, but not the obligation, to treat non-conforming Gas in order that it will comply with the CO2 specifications. In the event Processor exercises its right to treat non-conforming Gas, Processor shall receive a fee for performing said treating in accordance with the following schedule: |
CO2 MOL % | FEE | |
under 5.5% | No Fee | |
5.5%-6% | $.0675/Mcf | |
6%-7% | $.0775/Mcf | |
7%-8% | $.0875/Mcf | |
over 8.0% | $.1000/Mcf |
c. | If for any reason the Gas delivered hereunder fails to comply with the quality specifications for water content as described in Paragraph 7.1(c) above, the Processor shall have the right, but not the obligation, to treat non-conforming Gas in order that it will comply with the water content specifications. In the event Processor exercises its right to treat non-conforming Gas, Processor shall receive a fee for performing said treating of $0.03/MCF. |
21
ARTICLE VIII TESTS 8.1 a. Processor shall procure or cause to be procured a sample of Gas at each Delivery Point and analyze the samples by chromatographic analysis to determine the Component content (mole percent), specific gravity, the BTU content, and the Plant Product content (expressed in gallons per MCF) thereof. b. The individual Plant Products contained in the commingled stream of Plant Products delivered from the Plant each month shall be determined from a chromatographic analysis of a spot sample or a sample taken from a continuous sampling device. The results of the chromatographic analysis shall be applied to the commingled stream of Plant Products to determine the volume of each individual Plant Product delivered from the Plant. c. Tests provided for in Subparagraphs (a) and (b) of this Paragraph 8.1 shall be made by Processor using its own equipment or by an independent testing service at least once in each calendar quarter. All such tests shall be made in accordance with approved engineering practices. Representatives of Producer shall be entitled to witness such tests, and Producer shall be given at least ten days written notice in advance of tests to be made concerning Producer. 8.2 Physical constants required for making calculations hereunder shall be taken from the Gas Processors Association Physical Constants Publication No. 2145-93 (as it may be hereafter amended from time to time). Physical constants for the hexanes and
22
heavier hydrocarbons portion of hydrocarbon mixtures shall be assumed to be the same as the physical constants for hexane. The heat content per gallon of each liquid hydrocarbon Component shall be determined by multiplying the cubic feet per gallon of such liquid hydrocarbon Component by the heat content per cubic foot thereof. Said physical constants, adjusted to 14.65 psia, with the heat content per gallon as calculated, are now as follows:
Cubic Feet | BTU Per | BTU Per | ||||||||||
Component | Per Gallon | Cubic Ft. | Gallon | |||||||||
Methane | 59.321 | 1006.8 | 59,724 | |||||||||
Ethane | 37.594 | 1764.1 | 66,320 | |||||||||
Propane | 36.489 | 2508.2 | 91,521 | |||||||||
Iso-Butane | 30.735 | 3241.7 | 99,634 | |||||||||
Normal Butane | 31.891 | 3252.1 | 103,713 | |||||||||
Iso-Pentane | 27.466 | 3988.4 | 109,545 | |||||||||
Normal Pentane | 27.759 | 3996.4 | 110,936 | |||||||||
Hexanes Plus | 24.456 | 4741.0 | 115,946 |
23
psia regardless of the atmospheric pressure at which the Gas is measured and that the Gas obeys the Ideal Gas Laws as to variations of volume with pressure and specific gravity, including the deviation from Xxxxx’x law, shall all be made by Processor in accordance with applicable rules, regulations, and orders promulgated by the Railroad Commission of Texas pursuant to the Standard Gas Measurement Law of Texas. It is also agreed that the Processor may apply a uniform correction factor for water vapor if the Processor deems necessary. 9.2 Processor shall install, maintain, and operate a measuring station located at each Delivery Point. Said measuring station(s) shall be so equipped with orifice meters, recording gauges, or other types of meter or meters of standard make and design commonly acceptable in the industry, and of suitable size and design, as to accomplish the accurate measurement of Gas delivered hereunder. The changing and integration of the charts (if utilized for measurement purposes hereunder) and calibrating and adjusting of meters shall be done by Processor. At Processor’s election, electronic gas measuring equipment may be used. 9.3 Processor shall measure or cause to be measured the volume of Plant Products in gallons. 9.4 Producer may, at its option and expense, install check meters for checking Processor’s metering equipment; and the same shall be so installed as not to interfere with the operation of Processor’s Facilities.
24
9.5 The temperature of the Gas flowing through the meter shall be determined by the continuous use of a recording thermometer or device installed by Processor so that it will properly record the temperature of the Gas flowing through the meter. 9.6 The specific gravity of the Gas flowing through the meter shall be determined by methods commonly accepted in the industry. Specific gravities so determined will be used in calculating Gas deliveries until the next specific gravity test is made. 9.7 Each party shall have the right to be present at the time of any installing, reading, sampling, cleaning, changing, repairing, inspecting, testing, calibrating, or adjusting done in connection with the other’s measuring equipment used in measuring deliveries hereunder. The records from such measuring equipment shall remain the property of their owner, but upon request, each will submit to the other its records and charts, together with calculations therefrom subject to return within 30 days after receipt thereof. If meters utilizing charts are used to measure Gas hereunder, then the charts shall be kept on file for a period of two years, or such longer period as may be required by law. In addition, any other measurement data shall also be kept for the same time period. Each party, during each of the first three production months, and after that at least quarterly, or more often if necessary, shall calibrate the meters and instruments installed by it or cause the same to be calibrated. Processor shall give the Producer ten days notice in advance of such tests so that the
25
latter may, at its election, be present in person or by its representative to observe adjustments, if any which are made. 9.8 If the metering equipment is found to be inaccurate by two percent or more, registration thereof and any payment based upon such registration shall be corrected at the rate of such inaccuracy for any period of inaccuracy which is definitely known or agreed upon, or if not known or agreed upon, then for a period extending back one-half of the time elapsed since the last day of the calibration, not exceeding, however, 90 days. If, however, the metering equipment is on a well that averaged more than five MMCFD for the production month, the factor shall be one percent or more in lieu of two percent or more. Unless conclusively determined that Processor’s measurement equipment is inaccurate by two percent or more, or one percent or more, as applicable, Processor’s measurement shall be deemed to be correct for all purposes hereunder, and no adjustment shall be made to the previous volumes. Following any test, any metering equipment found to be inaccurate to any degree shall be adjusted immediately to measure accurately. If for any reason any meter is out of service or out of repair so that the quantity of Gas delivered through such meter cannot be ascertained or computed from the readings thereof, the quantity of Gas so delivered during such period shall be estimated and agreed upon by the parties hereto upon the basis of the best available data using the first of the following methods which is feasible.
26
a. | By using the registration of any check measuring equipment of Producer, if installed and registering accurately; | ||
b. | By correcting the error if the percentage of error is ascertainable by calibration, test, or mathematical calculation; or | ||
c. | By estimating the quantity of deliveries during preceding periods under similar conditions when the meter was registering accurately. |
27
amount payable 30 days after receipt. 9.11 The parties hereto recognize and acknowledge that technological advances may occur over the term of this Agreement which may render certain measurement devices obsolete, or less accurate, or less efficient than that which may be available. In such event, Processor may, with Producer’s approval, substitute or utilize such available measurement equipment in lieu of any measurement equipment described above in this Article IX. 9.12 If for any reason Producer’s Gas is delivered to the Processor at the Delivery Point with pulsations that affect the accuracy of the measurement, the Producer shall be responsible for installing necessary pulsation dampeners, or other devices, to eliminate or reduce the pulsations to an acceptable level determined by the Processor. ARTICLE X ALLOCATION PROCEDURE 10.1 Adjusted Gas Volume. The “Adjusted Gas Volume” for each Delivery Point shall be the measured Gas volume delivered at that Delivery Point, less any volumes of Gas which are allocated to that Delivery Point and which are removed or utilized in operations conducted after the Delivery Point and before the Plant inlet which are necessary to move Gas through the Gathering System or to make the Gas acceptable at the Plant inlet, including, but not limited to, fuel for compression, dehydration, treating, or conditioning operations or Gas utilized for gas lift operations. Hereinafter,
28
Gas utilized as fuel for such operations or removed from the Gathering System for gas lift operations is referred to as Gathering System Fuel. The Gathering System Fuel attributable to a Delivery Point shall be determined by multiplying the total volume of Gathering System Fuel consumed in such operations by a fraction, the numerator of which is the Gas volume measured at the Delivery Point, and the denominator of which is the total Gas volume measured at all Delivery Points utilizing such operations. If no Gathering System Fuel is attributable to a Delivery Point, then the Gas volume measured at the Delivery Point will be the Adjusted Gas Volume. Allocations of Plant Product, Process Fuel, Process Flare, and Residue Gas attributable to each particular Delivery Point shall be made using such “Adjusted Gas Volume” for each such Delivery Point. 10.2 Allocation of Plant Products. The allocation of Plant Products attributable to each Delivery Point shall be determined as follows:
a. | The Adjusted Gas Volume for a Delivery Point shall be multiplied by its Liquefiable Hydrocarbon content, by Component, expressed in gallons per MCF (gpm) and by its BTU/gallon factor, in accordance with Paragraph 8.2, to arrive at the theoretical BTUs, by Component, for Gas delivered from such Delivery Point. | ||
b. | The Plant Products attributable to a particular Delivery Point shall be determined by multiplying |
29
the total gallons actually saved and sold of each Component of Plant Products from all Delivery Points by a fraction, the numerator of which is the theoretical BTUs of that Component attributable to a particular Delivery Point, and the denominator of which is the total theoretical BTU, by Component, attributable to all Delivery Points. |
a. | Processor shall determine the MMBTU’s of Process Fuel used by the Plant by multiplying the Process Fuel volume by the weighted average heating value of the Residue Gas. | ||
b. | The Process Fuel attributable to a Delivery Point shall be determined by multiplying the total Process Fuel, expressed in MMBTU, by a fraction, the numerator of which is the Adjusted Gas Volume for that Delivery Point multiplied by its BTU content to arrive at the “Gross Theoretical BTU Content” attributable to such Delivery Point, and the denominator of which is the sum of all Adjusted Gas Volumes for all Delivery Points multiplied by their respective BTU content to arrive at the “Total Gross Theoretical BTU Content”. |
30
a. | Processor shall determine the MMBTU’s of Process Flare, if any, by multiplying the Process Flare volume hereof by the weighted average heating value of the Residue Gas. | ||
b. | The Process Flare attributable to a Delivery Point shall be determined by multiplying the total Process Flare, expressed in MMBTU, by a fraction, the numerator of which is a the Adjusted Gas Volume for that Delivery Point multiplied by its BTU content to arrive at the “Gross Theoretical BTU Content” attributable to such Delivery Point, and the denominator of which is the sum of all Adjusted Gas Volumes for all Delivery Points multiplied by their respective BTU content to arrive at the “Total Gross Theoretical BTU Content”. |
31
a. | Theoretical BTU’s of Residue Gas. Adjusted Gas Volume shall be multiplied by its BTU content to arrive at the “Gross Theoretical BTU Content” attributable to such Delivery Point. This “Gross Theoretical BTU Content” attributable to such Delivery Point shall then be reduced by deducting therefrom (i) the total BTU’s contained in the Plant Products allocated to that Delivery Point, pursuant to Paragraph 10.2 above, (ii) the total BTU’s of Process Fuel required for recompression of and the extraction of Plant Products attributable to that Delivery Point, and (iii) the total BTU’s of Process Flare attributable to that Delivery Point. For example, the number of BTU’s attributable to Plant Products to be deducted, for each Delivery Point, shall be determined by converting the allocated gallons of Plant Products at each Delivery Point to their respective equivalents in BTU’s by multiplying the individual Component gallons by the BTU/Gallon Liquid Ratio Factor as set forth in Article VIII hereof. The resultant difference in BTU’s obtained by deducting the BTU’s of Plant Products, Process Fuel, and Process Flare from the “Gross Theoretical BTU Content” shall be considered the “Net Theoretical BTU’s of Residue Gas” attributable to such Delivery |
32
Point. | |||
b. | The BTU’s of Residue Gas attributable to an Adjusted Gas Volume for a Delivery Point shall be determined by multiplying the total BTU’s of Residue Gas actually saved and sold at the Residue Redelivery Point attributable to all the Gas delivered to the Plant by a fraction, the numerator of which is the “Net Theoretical BTU’s of Residue Gas” attributable to a particular Delivery Point, and the denominator of which is the total “Net Theoretical BTU’s of Residue Gas” attributable to all Delivery Points. At a particular Delivery Point, any allocation of proceeds for Residue Gas to the Producer shall be made on this basis. | ||
c. | If BTU’s of Residue Gas are consumed or used for fuel for any operations other than Process Fuel, then the BTU’s of Residue Gas, so allocated to a particular Delivery Point, shall be reduced by the BTU’s of Residue Gas consumed or used by that Delivery Point in those operations, such as fuel, for gathering and inlet facilities, other than Gathering System Fuel, if its source is Residue Gas. |
33
34
11.3 Producer shall notify Operator that it has exercised its right to take in kind purity Plant Products within 30 days of execution of this Agreement or 30 days after the start-up of the Plant Products pipeline, whichever occurs later; however, Producer may not begin taking in kind until the month after 60,000 barrels of Plant Product have been shipped by pipeline. If Producer fails to timely notify Operator of its election to take in kind, Operator shall pay Producer in accordance with the provisions of Article XII until it receives notice of an election to take in kind in accordance with the following terms. Producer may give Operator notice of its election to take in kind annually, on or before 90 days prior to January 1 of the next calendar year. The election shall become effective as of January 1, shall remain in effect for one calendar year, and shall apply to all purity Plant Products. Producer’s election to take in kind purity Plant Products at Mont Belvieu shall be at Producer’s sole cost, risk, and expense. ARTICLE XII PROCESSING PAYMENT 12.1 Processor shall retain 20% of the BTUs of Residue Gas available for sale which are attributable to Producer’s Gas; and 20% of the proceeds received by Operator for the Plant Products attributable to Producer’s Gas. Subject to Producer’s right to take in kind purity Plant Products from the purchaser in accordance with the provisions of Article XI, Processor shall remit to Producer 80% of the amount derived by summing the results of
35
multiplying the respective gallons of each Plant Product allocated to Producer pursuant to Paragraph 10.2 by the price per gallon received by Operator for such Plant Product f.o.b. Plant Tailgate. Processor shall have the right to deduct from the amount to be remitted to Producer any amounts due Processor by Producer pursuant to the terms of this Agreement. ARTICLE XIII DISPOSITION OF PRODUCER’S PORTION OF RESIDUE GAS 13.1 Processor will deliver Producer’s portion of Residue Gas to the Residue Redelivery Facility at the Plant Tailgate. Processor agrees to deliver Producer’s Residue Gas at a pressure sufficient to enter the Residue Redelivery Facility, but in no event shall Processor be obligated to deliver Residue Gas at a pressure which exceeds the higher of plant discharge pressure or 750 psig. Producer and Processor will separately contract with the Residue Redelivery Facility regarding the redelivery of their respective shares of Residue Gas to the various Residue Redelivery Point(s). Producer and Processor understand there will normally be some inventory gains and losses caused by balancing of Residue Gas among the Residue Redelivery Points pipelines; however, Processor shall not be required to bear any costs resulting from such inventory or balancing.
36
ARTICLE XIV ACCOUNTING AND PAYMENTS 14.1 Processor shall furnish to Producer on or before the 25th day of each month a report or statement disclosing information necessary to enable Producer to make reasonable and accurate statistical and accounting entries upon its books concerning all phases of this Agreement related to the preceding month, including an allocation statement of Residue Gas delivered for Producer’s account to its Residue Gas purchaser. 14.2 Each party shall have the right during reasonable hours to examine books, records, charts, and original test data of the other party to the extent necessary to verify the accuracy of any statement, charge, credit, computation, test, or delivery made pursuant to any provision hereof. If any such examination reveals any inaccuracy in any such statement, charge, credit, computation, test, or delivery, the necessary adjustment shall be promptly made. 14.3 Processor shall pay to Producer monthly, on or before the 45th day after the end of the production month, the sums due under Article XII for Producer’s Plant Products marketed by Processor during the preceding month less the amount of any taxes actually paid by Processor which are applicable to such quantities. This payment shall be made irrespective of the interest, title, or lien of any royalty or mineral owner or any third party or parties in and to the Gas delivered by Producer to Processor hereunder, the Plant Products, or Residue Gas derived therefrom, or proceeds accruing from the sale thereof. Payments not made within the
37
specific time period shall accrue interest at two percent over the prime loan rate in effect at the end of each business day as described by the Chase Manhattan Bank of New York; provided that there shall be no obligation to pay interest if a payment is not timely made because Processor does not have sufficient information from Producer to make the payment. 14.4 Producer shall be responsible for the payment of all royalties due on Residue Gas and Plant Products. Producer shall indemnify and hold Processor harmless from all claims, actions, causes of action or damages, liability, or obligations arising out of or related to the payment of the lessor’s royalty or any other burden or encumbrance affecting Producer’s Gas. 14.5 Notwithstanding any change in ownership of Producer’s properties, Processor shall never be required to make payments or to give notices required under the provisions of this Agreement to more than one party, and, in the event the Producer’s properties shall ever be owned by more than one party, Processor may withhold (without interest) further payments and notices until all of the owners of Producer’s properties have designated one party to act for them in all respects relating to said properties and this Agreement, including the rendering of bills, the submission of charts, and the receipt of payments and notices hereunder. 14.6 Processor, at its election, may deduct from its payment to Producer sums, if any, due to Processor under the terms of this Agreement.
38
14.7 All accounting records and documents directly related to this Agreement prepared by either party hereto shall be retained for a period of not less than two years following the end of the calendar year of their origination. The parties further agree that all matters relating to the accounting hereunder for any calendar year shall be considered correct and not subject to further audit or legal challenge after two years following the end of the calendar year. ARTICLE XV WARRANTY 15.1 Producer warrants the title to all Gas and all Components thereof which shall be delivered by Producer to Processor hereunder, the right to enter into this Agreement with reference to such Gas, and that such Gas is free from all liens and adverse claims; and agrees, if notified thereof by Processor, to indemnify Processor against all suits, action, debts, accounts, damages, costs, and expenses arising from and out of any adverse legal claims of any and all persons whomsoever to or against such Gas and against the Plant Products derived therefrom. Producer agrees to make settlement for all royalties, overriding royalty interests, and/or production payments due and payable on the Gas delivered to Processor hereunder, the Plant Products extracted and saved therefrom, and the sale and disposition of the Reside Gas thereof, all in accordance with the terms of the leases from which Gas processed hereunder is produced, applicable instruments of title,
39
and all amendments thereto; and Producer agrees to hold Processor harmless from any and all claims or demands of mineral or royalty owners and third party claimants as to their respective portions of such Gas delivered hereunder. 15.2 If Producer’s title is questioned, Processor may withhold payments of proceeds due hereunder without interest up to the amount of the claim until title is free from such questions or until Producer furnishes a bond satisfactory to Processor conditioned to save Processor harmless, or other surety satisfactory to Processor. 15.3 Producer also represents and warrants that it has full authority to receive payment for the sum of all Gas delivered hereunder. ARTICLE XVI TAXES 16.1 Producer shall pay or cause to be paid all production, severance and ad valorem taxes, assessments, and other charges levied or assessed against the Gas delivered by Producer hereunder, and against Producer’s portion of the Plant Products, against Producer’s Residue Gas, and against the sale thereof, and all taxes and statutory charges levied or assessed against any of Producer’s properties, facilities, or operations. 16.2 Processor shall pay all taxes and statutory charges levied or assessed against its Plant, operations, and that portion of the Plant Products derived from Producer’s Gas which accrue to
40
Processor under the provisions of Article XII hereof. ARTICLE XVII INDEMNITY 17.1 Each of the parties hereto assumes full responsibility and liability for the maintenance of its respective properties and agrees to indemnify and save the other party harmless from all liability and expense on account of any and all damages, claims, taxes, actions, including injury to or death of persons and damage to or destruction of property arising from any act or omission or accident in connection with control or possession of the Gas by, or the installation, presence, maintenance, and/or operation of the property and equipment of, the indemnitor. 17.2 Producer agrees to defend, indemnify, and hold Processor harmless from all claims, actions, damages, liability, expenses, including wrongful death, personal injury, or property damage arising out of or in connection with (i) Producer’s ownership and control of the Gas prior to the time the Gas passes through the Delivery Point(s); (ii) after the Residue Gas leaves the Plant Tailgate; and (iii) the ownership and operation of any xxxxx and facilities installed by Producer above the Delivery Point(s), whether or not required under the terms of this Agreement. 17.3 Processor agrees to defend, indemnify, and hold Producer harmless from all claims, actions, damages, liability, or expense, including wrongful death, personal injury, or property damage arising out of or connected with the operation of the Gathering
41
System or Plant. 17.4 As between the parties hereto, and as to liability, if any accruing to either party hereto, or to any third party, Producer shall be solely liable for and in control and possession of the Gas deliverable hereunder and shall bear the risk of loss until the Gas is delivered to Processor at the Delivery Point. Processor shall be solely liable for and in control and possession of the Gas and the Plant Products and shall bear the risk of loss until Processor has delivered Residue Gas to Producer at the Plant Tailgate and delivered Plant Products to Union Pacific Fuels, Inc. at the Plant Tailgate, whereupon Producer shall again be in control and possession thereof and bear the risk of loss of the Residue Gas, and Union Pacific Fuels, Inc. shall be in control and possession of and bear the risk of loss of the Plant Products. 17.5 Neither Producer nor Processor shall have any responsiblity with respect to Gas deliverable or delivered hereunder, Plant Products derived therefrom, and Residue Gas, or on account of anything which may be done, happen, or arise with respect thereto, during such time as said Gas, Plant Products, and Residue Gas are in control and possession of the other party as hereinabove provided. ARTICLE XVIII FORCE MAJEURE 18.1 In the event any party hereto is rendered unable, wholly or in part, by force majeure to carry out its obligations under
42
this Agreement, other than the obligation to make payments due hereunder, it is agreed that on such party giving notice and full particulars of such inability by telephone and in writing to the other party as soon as possible after the occurrence of the cause relied on, then the obligations of the party giving such notice, so far as they are affected by such force majeure, shall be suspended during the continuance of any inability so caused, but for no longer period, and such cause shall, as far as possible, be remedied with all reasonable dispatch. The term “force majeure” as employed herein shall mean acts of God; strikes; lockouts; or other industrial disturbances; acts of the public enemy; wars; blockades; insurrections; riots; epidemics; landslides; lightning; earthquakes; fires; storms; floods; washouts; arrests and restraints of governments and people; civil disturbances; explosion, breakage, or accidents to machinery, plant facilities, or lines of pipe; the necessity for making repairs to or alterations of machinery, plant facilities, or lines of pipe; freezing of xxxxx or lines of pipe; partial or entire failure of xxxxx; and the inability of either Producer or Processor to acquire, or the delays on the part of either Producer or Processor in acquiring, at reasonable cost and after the exercise of reasonable diligence: (a) any servitude, rights-of-way grants, permits, or licenses; (b) any materials or supplies for the construction or maintenance of facilities; (c) any permits or permissions from any governmental agency if such are required; and any other causes, whether of a kind herein enumerated or otherwise,
43
not within control of the party claiming suspension and which by the exercise of due diligence such party is unable to prevent or overcome. It is understood and agreed that the settlement of strikes or lockouts shall be entirely within the discretion of the party having the difficulty and that the above requirements that any force majeure shall be remedied with all reasonable dispatch shall not require the settlement of strikes or lockouts by acceding to the demands of the opposing party when such course is inadvisable in the sole discretion of the party having the difficulty. ARTICLE XIX UNPROFITABLE OPERATIONS AND RIGHTS OF TERMINATION 19.1 If, in the opinion of Processor, the processing of Gas from any well or xxxxx, or any Delivery Point, under this Agreement, is or becomes uneconomical due to its volume, Plant Product content, government regulations, or any other cause, Processor shall not be obligated to process or may cease processing the Gas therefrom so long as such condition exists. Processor agrees that in its determination of uneconomical processing, the same criteria shall be used for Producer’s Gas as for all other Gas being processed through Processor’s Plant. In the event that Processor refuses to process such Gas, Producer may dispose of the Gas not processed as it sees fit; provided that Processor at any time thereafter shall have the right to process all Gas refused, if refused for reason or reasons resulting from an act of Producer or
44
lack of action on the part of Producer, conditioned upon Processor giving Producer at least two months’ notice of its election so to do. 19.2 In the event Processor should at any time hereafter elect to permanently discontinue the operation of the Plant, Processor or Producer shall have the option, exercised solely at its discretion, of terminating this Agreement in its entirety upon 120 days advance written notice of such termination notice to the other party. 19.3 Nothing herein shall be construed to require Producer to drill any well or to continue to operate any well which a prudent operator would not in like circumstances drill or continue to operate. 19.4 It is agreed that Processor shall not be obligated to expand any Facilities in order to provide capacity hereunder. ARTICLE XX TERM 20.1 This Agreement shall be effective from the date hereof and shall continue in full force and effect for the life of the oil and gas leases or mineral interests of Producer within the Contract Area, or any extension or renewal thereof, or for so long as Processor continues the operation of its Facilities.
45
ARTICLE XXI REGULATORY BODIES 21.1 This Agreement and the provisions hereof shall be subject to all laws, order, rules, regulations, and directives of the United States, the State of Texas, and of any duly constituted governmental body, agency, commission, legislature, or court having jurisdiction herein. Nothing contained herein shall be construed as a waiver of any right to question or contest any such law, order, rule, regulation, or directive in any forum having jurisdiction in the premises. Producer and Processor have entered into this Agreement with the understanding, and in reliance on the fact, that this Agreement and/or performance of this Agreement are not and will not be subject to the jurisdiction or regulation of the Federal Energy Regulatory Commission (“FERC”) and/or any other local, state, or federal governmental authorities or entities including, without limitation, any public utility or common carrier authorities or entities. If this Agreement and/or performance of this Agreement becomes subject to such jurisdiction and/or regulation, this Agreement shall automatically terminate unless both Producer and Processor agree, in writing, within 30 days of the effective date of the attachment of any such jurisdiction and/or regulation, that this Agreement shall continue after such effective date. 21.2 If the price for Gas delivered hereunder to be paid Producer by Processor or to be paid Processor by Processor’s Gas purchaser is a price which, under the Natural Gas Policy Act of
46
1978, requires an affirmative determination by a jurisdictional agency, then Producer shall file with the appropriate jurisdictional agency prior to initial deliveries of Gas hereunder the material required (including, but not limited to, FERC’s form No. 121) to establish Producer’s or Processor’s right to be paid such price. If Producer fails to make such filing, then Processor shall also retain and withhold from payment otherwise due Producer hereunder an amount equal to the aggregate loss of Processor’s margin as a result of Producer’s failure to make such filing. ARTICLE XXII ARBITRATION 22.1 Any controversy between the parties arising under this Agreement not resolved by agreement shall be determined by a board of arbitration upon notice of submission given either by Processor or Producer, which request shall also name one arbitrator. The party receiving such notice shall, within ten days thereafter, by notice to the other, name the second arbitrator, or failing so to do, the party giving notice of submission shall name the second. The two arbitrators so appointed shall name the third, or failing so to do within ten days, then upon the written application of either party, such third arbitrator may be appointed by the American Arbitration Association. The arbitrators selected to act hereunder shall be qualified by education, experience, and training to pass upon the particular question in dispute. The arbitrators so appointed shall promptly hear and determine (after giving the
47
parties due notice of hearing and a reasonable opportunity to be heard) the questions submitted and shall render their decision within 60 days after appointment of the third arbitrator. If within said period a decision is not rendered by the board or a majority thereof, new arbitrators may be named and shall act hereunder at the election of either Processor or Producer in like manner as if none has been previously named. The decision of the arbitrators, or of a majority thereof, made in writing shall be final and binding upon the parties hereto as to the questions submitted and the parties will abide by and comply with such decision. The expenses of arbitration shall be borne equally by the parties, except that each party shall bear the compensation and expenses of its counsel, witnesses, and employees. ARTICLE XXIII NOTICES AND PAYMENTS 23.1 Any notice, request, demand, statement, or xxxx provided for in this Agreement shall be in writing and delivered by hand, mail, or telecopy. All such written communications shall be effective upon receipt by the other party at the address of the parties hereto as follow:
Producer | ||||
Statements: | Union Pacific Resources Company | |||
Attn: Manager, | ||||
Austin Chalk Accounting | ||||
X.X. Xxx 0 | ||||
Xxxx Xxxxx, Xxxxx 00000-0000 |
48
Payments: | Union Pacific Resources Company | |
X.X. Xxx 000000 | ||
Xxxxxx, Xxxxx 00000-0000 | ||
Contractual: | Union Pacific Resources Company | |
Attn: General Manager — Austin Chalk | ||
X.X. Xxx 0 | ||
Xxxx Xxxxx, Xxxxx 00000-0000 | ||
Processor | ||
Statements: | Union Pacific Resources Company | |
Attn: Manager, Austin Chalk Accounting | ||
X.X. Xxx 0 | ||
Xxxx Xxxxx, Xxxxx 00000-0000 | ||
Payments: | Union Pacific Resources Company | |
X.X. Xxx 000000 | ||
Xxxxxx, Xxxxx 00000-0000 | ||
Contractual: | Union Pacific Resources Company | |
Attn: Manager, Natural Gas Operations | ||
X.X. Xxx 0 | ||
Xxxx Xxxxx, Xxxxx 00000-0000 |
49
entitled to such interest. ARTICLE XXV MISCELLANEOUS 25.1 No waiver by either party of any one or more defaults in the performance of any provision of this Agreement shall operate or be construed as a waiver of any default or future defaults, whether of a like or different character. 25.2 No modifications of the terms and provisions of the Agreement shall be made except by the execution of written agreements. This Agreement contains the entire agreement between the parties and there are no oral promises, agreements, or warranties affecting it. 25.3 The descriptive headings of the provisions of these general provisions are formulated and used for convenience only and shall not be deemed to affect the meaning or construction of any such provisions. 25.4 This Agreement supersedes and replaces any other contract(s) or agreements(s) which may exist between the parties covering the processing of the Gas dedicated hereunder. 25.5 Nothing in this Agreement is intended to create a partnership or joint venture under state law or to render the parties hereto jointly and severally liable to any third party. Each of the parties elects to be excluded from the provisions of Subchapter K, Chapter 1 of Subtitle A, of the Internal Revenue Code of 1986 pursuant to the provisions of Article 761(a) of such code
50
and from any similar provisions of state law. Processor shall timely file such evidence of this election as may be required under applicable law. 25.6 Should any section, paragraph, subparagraph, or other portion of this Agreement be found invalid as a matter of all in a duly authorized court, or by a duly authorized government agency, then only that portion of the Agreement shall be invalid. The remainder of the Agreement which shall not have been found invalid shall remain in full force and effect. 25.7 This Agreement shall be interpreted, construed, and governed by the laws of the State of Texas. 25.8 This Agreement was prepared jointly by the parties hereunder and not by either party to the exclusion of the other. 25.9 Producer recognizes and acknowledges Processor’s proprietary interest in this Agreement, and Producer agrees not to divulge any of the contents hereof to any other person, firm, corporation, or other entity. Producer agrees to be responsible for enforcing the confidentiality of this Agreement and agrees to take such action as necessary to prevent any disclosure by any of its agents or employees.
51
IN WITNESS WHEREOF, the parties hereto have executed this Agreement in several originals as of the date first above written.
UNION PACIFIC RESOURCES COMPANY | UNION PACIFIC RESOURCES COMPANY | |||||||||
By: | /s/ Xxxxxx X. Xxxxxx | By: | /s/ X. X. Xxxxxx | |||||||
Xxxxxx X. Xxxxxx | X. X. Xxxxxx | |||||||||
Attorney-in-Fact | Attorney-in-Fact | |||||||||
PROCESSOR | PRODUCER | |||||||||
52
EXHIBIT “B” to the Brookeland Gas Facilities Gas Gathering and Processing Agreement between UNION PACIFIC RESOURCES COMPANY and UNION PACIFIC RESOURCES COMPANY September 1, 1993
Delivery Point | Survey | API # | ||||
Xxxxxx Unit Well No. 1 | Lutcher & Xxxxx A-1152 | 00-000-00000 | ||||
Xxxxxx Unit A Well No. 1 | H. & T. C.R.R. A-230 | 00-000-00000 | ||||
Gulf States Utilities Well No. 1 | Lutcher & Xxxxx A-1139 | 00-000-00000 | ||||
Champion International Xxxx Xxxx Xx. 0 | Xxxxxxx & Xxxxx X-0000 | 00-000-00000 | ||||
Champion International Xxxx X-00 Xxxx Xx. 0 | Xxxxxxx Xxxxxxxx A-20 | 00-000-00000 | ||||
Champion International Xxxx X-0000 Xxxx Xx. 0 | Xxxxxxx & Xxxxx X-0000 | 00-000-00000 | ||||
Champion International Xxxx Xxxx Xx. 0 | X. & X. X.X.X. X-000 | 00-000-00000 | ||||
Xxxxxx Xxxxxxxx Xxxxxxxxxxxxx Xxxx X-000 Xxxx Xx. 0X | X. X. Xxxxx A-610 | 00-000-00000 | ||||
Champion Well No. 1H | X. Xxxxx A-777 | 00-000-00000 | ||||
Champion International Xxxx X-00 Xxxx Xx. 0 | Xxxxxxx Xxxxxxxx A-20 | 00-000-00000 | ||||
Hall Unit Well No. 1 | Xxxxxxx Xxxxxxxx A-20 | 00-000-00000 | ||||
Arco Fee Unit, Well #1 | H. & T.C.R.R., Survey #69 A-231 | 00-000-00000 | ||||
Arco Fee A Well #1 | H. & T.C.R.R. A-245 | 00-000-00000 | ||||
Arco Fee A-1006 Well #1 | Xxxx X. Xxxxx Survey #70 A-1006 | 00-000-00000 | ||||
Areo Fee X-000 Xxxx #0 | X. & T.C.R.R. Survey #189 A-205 | 00-000-00000 | ||||
Arco Fee X-000 Xxxx #0 | X. & T.C.R.R. Survey #171 A-248 | 00-000-00000 | ||||
Arco Fee Xxxx X-000 Xxxx #0 | X. & X.X.X.X. Xxxxxx #000 A-208 | 00-000-00000 |
EXHIBIT “C” to the Brookeland Gas Facilities Gas Gathering and Processing Agreement between UNION PACIFIC RESOURCES COMPANY and UNION PACIFIC RESOURCES COMPANY September 1, 1993 Residue Redelivery Point(s) Point of interconnect with the mainline of Tennessee Gas Pipeline in East Texas in survey H & T. CRRCO. A-246, Jasper County, Texas
Exhibit “A” Brookeland Gas Facilities Gas Gathering and Processing Agreement
A Subtldloiy at Union Poo BROOKELAND JASPER AND XXXXXX . PLANT AND GATHERING SYSTEM / NW; 31o 17,0.00” N / 9-1o 17’ 0.00” W SE: 30o 53 10000 0 10000 SCALE 1 : 192000 5000 0 500 |
EXHIBIT “D” to the Brookeland Gas Facilities Gas Gathering and Processing Agreement between RME PETROLEUM COMPANY and the predecessor of DUKE ENERGY FIELD SERVICES, LP dated as of September 1, 1993 This Exhibit “D” is attached to and made a part of that certain Brookeland Gas Facilities Gas Gathering and Processing Agreement dated September 1, 1993, as amended, between RME Petroleum Company (“RME”) and the predecessor of Duke Energy Field Services, LP (“DEFS”), regarding the gathering and processing by DEFS, as processor or buyer, of gas produced and supplied by RME, as producer or seller (“Agreement”). From time to time, the quantities of gas confirmed and delivered by DEFS to the Tennessee Gas Pipeline Company Redelivery Point (“Delivered Quantities”) are greater or less than the quantities of gas to which RME is actually entitled at the tailgate of the Brookeland Processing Plant, resulting in over- or under-deliveries relative to Receipt Quantities; and The Parties desire to implement a balancing agreement in order to facilitate more efficient gas scheduling and accounting at the Brookeland Processing Plant and at the Redelivery Point as defined in the Agreement; Therefore, in consideration of the premises and mutual covenants contained herein, the Parties agree as follows: 1. COMMITMENT. In accordance with the requirements of the Agreement, RME shall make nominations, and DEFS shall confirm nominations and make deliveries at the Redelivery Point. The Parties intend that the quantity of gas actually delivered each day at the Redelivery Point will equal RME’s full entitlement of producer’s share of all gas owned and controlled by RME and gathered to the Brookeland Processing Plant for processing or for bypass. This full entitlement quantity is less (a) the MMBtu’s of gas attributable to gas returned for RME’s gas lift and lease operations, (b) the MMBtu’s of gas attributable to RME for fuel for compression, dehydration, treating, or conditioning, and (c) the MMBtu’s attributable to RME’s gas for process fuel, flare, shrinkage, and gains and losses (“Receipt Quantities”). Any imbalance created when the Receipt Quantities are different than the Delivered Quantities will be the “Imbalance,” which will be the responsibility of the Parties to eliminate pursuant to this Exhibit D. Any Imbalance shall be eliminated as soon as practicable, using the same Redelivery Point to the greatest extent feasible, pursuant to the terms and conditions of this Exhibit.
2. REDELIVERY POINT. Subject to the downstream pipeline’s capacity allocation rules, and to the extent pipeline capacity is available, the Redelivery Point for RME’s redelivered gas shall be the existing pipeline interconnect to Tennessee Gas Pipeline Company in Xxxxxx Xxxxxx, Xxxxx, Xxxxx Xx. 000000. DEFS will use reasonable efforts to deliver at the required pipeline inlet pressure and quality specifications of the applicable pipeline that may be used as a Redelivery Point. DEFS shall not be required to install any additional facilities to accommodate RME’s redelivered Gas disposition. 3. NOMINATION PROCESS. Estimated operating quantities flowing at the Brookeland Processing Plant inlet and at the Redelivery Point will be used on a daily basis during any current period to determine the estimated Imbalance, with nomination adjustments to be made during that current period by RME to attempt to maintain or achieve an Imbalance of zero at the Redelivery Point. The Parties will cooperate in order to minimize the daily over and under deliveries. In this regard, the Parties’ gas marketing operations and scheduling personnel will be in contact each business day, or more frequently if needed, in order to balance Receipt Quantities of gas with Delivered Quantities of gas to the greatest extent feasible. 4. IMBALANCES. Any cumulative Imbalance remaining at the end of a month will be eliminated using the following cash-out procedure. (a) If the total Delivered Quantities of gas at the Redelivery Point for the month exceed the total Receipt Quantities for that month (“Excess Redeliveries”), then RME or its designee will purchase the Excess Redeliveries for that month. The purchase price for each MMBtu of the Excess Quantities shall be equal to the monthly average of the midpoint for Tennessee under the South-Corpus Christi area as listed in Gas Daily’s Daily Price Survey (the “Cashout Price”). (b) If the total Delivered Quantities at the Redelivery Points for the month are less than the total Receipt Quantities for that month (“Excess Receipts”), then DEFS or its designee shall purchase the Excess Receipts for the month. The purchase price for each MMBtu of the Excess Receipts will be the Cashout Price. (c) DEFS will make the imbalance and Cashout Price calculations and will render an invoice or statement to RME by the 25th of each month following the month of production. The party owing an Imbalance cash-out payment for a month shall make that payment not later than the last day of the month following the month of production. If the owing party fails to remit the full amount payable by it when due, interest on the unpaid portion shall accrue at a rate equal to the lower of (i) the then effective prime rate of interest published under “Money Rates” by The Wall Street Journal, plus two percent per annum from the date due until the date of payment; or (ii) the maximum applicable lawful interest rate. 5. TERM. This Exhibit is effective as of September 1, 2001, and will remain in effect for a term coterminous with that of the Agreement except as stated below. Either party may invoke a renegotiation of the terms of this Exhibit upon at least 30 days advance written notice, with any agreed resulting changes to be effective as of the first of the month following the notice period. If no renegotiation has been agreed within 60 days of the date of a notice under the preceding sentence, then either party may cancel this Exhibit and thereby delete it from the Agreement upon 30 days advance written notice to the other Party, effective as of the end of a month. Notwithstanding any termination of this Exhibit or the Agreement, the Parties agree to reconcile and eliminate any remaining Imbalance pursuant to the terms and conditions of this Exhibit and the Agreement within 30 days of termination of this Exhibit. If the remaining Imbalance is not resolved
- 2 -
within 30 days following termination of this Agreement, it will be reduced to zero pursuant to the cash-out provisions set forth in Section 4. 6. FORCE MAJEURE. If an event of force majeure as defined in the Agreement occurs affecting DEFS’ ability to receive gas hereunder, then RME’s gas volume will be reduced by a percentage equal to the overall system reduction for gas in each priority category. DEFS will use reasonable efforts to notify RME promptly of any reduction and to restore gas volumes equitably to RME as soon as the force majeure event is corrected. 7. ADDRESSES AND NOTICES. Either party may give notices to the other party or parties by first class mail prepaid, by overnight delivery service, or by facsimile at the following addresses or other addresses furnished by either Party by written notice. Notices to RME Petroleum Company:
Notices to RME — General: | RME Petroleum Company | |
(Commercial) | X.X. Xxx 0000 | |
Xxxxxxx, XX 00000-0000 | ||
Phone: (000) 000-0000 | ||
Fax: (000) 000-0000 | ||
Notices to RME — operations, imbalances, | RME Petroleum Company | |
Nominations, and revisions: | c/o Gas Control — Marketing Field Services | |
0000 Xxxxxxxxxx Xxxxx | ||
Xxx Xxxxxxxxx, XX 00000-0000 | ||
Phone: (000) 000-0000 | ||
Fax: (000) 000-0000 | ||
Payments to RME via wire transfer: | RME Petroleum Company | |
Bank of America (Dallas, TX) | ||
Account #: 1252625601 | ||
ABA#: 000000000 | ||
Notices to DEFS — General: | Duke Energy Field Services, LP | |
(Commercial and Accounting) | 0000 Xxxxxxxxxx, Xxxxx 0000 | |
Xxxxxxx, XX 00000 | ||
Fax: (000) 000-0000 | ||
Marketing Operations, imbalances, nominations | Duke Energy Field Services, LP | |
and revisions: | Marketing Operations — Brookeland Plant | |
0000 Xxxxxxxxxx, Xxxxx 0000 | ||
Xxxxxxx, XX 00000 | ||
Phone: (000) 000-0000 | ||
Fax: (000) 000-0000 | ||
Payments to DEFS via wire transfer: | Chase Manhattan Bank | |
Credit to Duke Energy Field Services, LP | ||
ABA#: 021 000 021 | ||
Account #: 000-0-000000 |
- 3 -
Payments to DEFS via check: | Duke Energy Field Services, LP P. O. Xxx 000000 Xxxxxxx, XX 00000-0000 |
- 4 -
Amendment to Brookeland Gas Facilities Gas Gathering and Processing Agreement #80-29.2 WITNESSETH, THAT: WHEREAS, UNION PACIFIC RESOURCES COMPANY, hereinafter referred to as “Processor”, and UNION PACIFIC RESOURCES COMPANY, hereinafter referred to as “Producer” are parties to a Gas Gathering and Processing Agreement, hereinafter referred to as the “Agreement”, dated September 1, 1993, covering the gathering and processing of gas produced from certain xxxxx delivering gas to Processor’s Gas Facilities (Facilities) in Jasper, Newton, and Sabine Counties, Texas and Xxxxxx Xxxxxx, Louisiana; and WHEREAS, Producer and Processor desire to amend the Agreement as described herein. NOW THEREFORE, in consideration of the premises and covenants herein contained, Producer and Processor agree that effective July 1, 1998:
1. | Article 4.2 is deleted in its entirety and replaced by the following: | |
“4.2 If the Processor provides compression for the Producer’s Gas (other than Plant recompression), the Processor shall provide or cause to be provided each stage of compression for an initial fee of $0.05 per MCF per stage, and Producer will provide its pro rata share of fuel required for operating such compressor(s), in order that Gas dedicated hereunder will meet the pressure requirements at the Plant inlet. Commencing April 1, 1999, and each April 1st thereafter, the compression fee set forth herein will be adjusted upward or downward, in proportion to the percentage increase or decrease in the |
1
average hourly earnings of crude petroleum and Gas production workers for the last calendar year, compared to the previous calendar year, as shown by the “Index of the Average Hourly Earnings of Crude Petroleum and Gas Production Workers” as published by the Bureau of Labor Statistics of the United States Department of Labor.” |
2. | Paragraph 7.1 .c (iii) is deleted in its entirety and replaced by the following: “(iii) six percent by volume of carbon dioxide;” | |
3. | The first sentence of Article 7.3.(b) is deleted and replaced by the following: “If for any reason the commingled stream of all Gas delivered at the Plant inlet hereunder exceeds five and one-half percent by volume of carbon dioxide (CO2), the Processor shall have the right, but not the obligation, to treat non-conforming Gas.” | |
4. | Article 12.1 shall be deleted in its entirety and replaced by the following: “12.1 For Gas produced from xxxxx spud before July 1, 1998 Processor shall retain 20% of the BTU’s of Residue Gas available for sale which are attributable to Producer’s Gas; and 20% of the proceeds received by Operator for Plant Products attributable to Producer’s Gas. For Gas produced from xxxxx spud after July 1, 1998 Processor shall retain 15% of the BTU’s of Residue Gas available for sale which are attributable to Producer’s Gas; and 15% of the proceeds received by Operator for Plant Products attributable to Producer’s Gas. Subject to Producer’s right to take in kind purity Plant Products from the purchaser in accordance with the provisions of Article XI, Processor shall remit to Producer 80% or 85%, depending on well spud date, of the amount derived by summing the results of multiplying the respective gallons of each Plant Product allocated to Producer pursuant to Paragraph 10.2 by the price per gallon received by |
2
Operator for such Plant Product f.o.b. Plant Tailgate. Processor shall have the right to deduct from the amount to be remitted to Producer any amounts due Processor by Producer pursuant to the terms of this Agreement.” |
5. | The following Article 25.10 is added: “25.10 Processor, each month, shall notify Producer of its intent to recover or reject ethane at the Plant in the following month. Processor will reject ethane when Processor’s expected value of ethane as part of Residue Gas at the Plant Tailgate exceeds Processor’s expected value of ethane as a Plant Product at the Plant Tailgate. Processor reserves the right to alter its decision to recover or reject ethane at any time in the event of significant price changes. Should Processor alter Plant operations during a month Producer will be notified as soon as practical.” |
UNION PACIFIC RESOURCES COMPANY | UNION PACIFIC RESOURCES COMPANY | |||||||||
By: | /s/ [ILLEGIBLE] | By: | /s/ X. Xxxxxxxxx | |||||||
Its: | Business Unit Manager | Its: | Attorney-in-Fact | |||||||
“Producer” | “Processor” |
3
Amendment to Brookeland Gas Facilities Gas Gathering and Processing Agreement #80-29.2 WITNESSETH, THAT: WHEREAS, UNION PACIFIC RESOURCES COMPANY, hereinafter referred to as “Processor”, and UNION PACIFIC RESOURCES COMPANY, hereinafter referred to as “Producer” are parties to a Gas Gathering and Processing Agreement, hereinafter referred to as the “Agreement”, dated September 1, 1993, covering the gathering and processing of gas produced from certain xxxxx delivering gas to Processor’s Gas Facilities (Facilities) in Jasper, Newton, and Sabine Counties, Texas and Xxxxxx Xxxxxx, Louisiana; and WHEREAS, by Amendment dated December 1, 1995 (the “Amendment”), Processor and Producer amended the Agreement by deleting and replacing Paragraph 13.1 thereof and by adding a new Paragraph 13.2; and WHEREAS, Producer and Processor desire to further amend the Agreement by rescinding the Amendment as more particularly described herein. NOW THEREFORE, in consideration of the premises and covenants herein contained, Producer and Processor agree that effective July 1, 1998:
1. | The version of Paragraph 13.1 contained int the Amendment shall be deleted in its entirety and replaced by the version contained in the original Agreement, which reads as follows: |
“13.1 Processor will deliver Producer’s portion of Residue Gas to the Residue |
1
Redelivery Facility at the Plant Tailgate. Processor agrees to deliver Producer’s Residue Gas at a pressure sufficient to enter the Residue Redelivery Facility, but in no event shall Processor be obligated to deliver Residue Gas at a pressure which exceeds the higher of Plant discharge pressure or 750 psig. Producer and Processor will separately contract with the Residue Redelivery Facility regarding the redelivery of their respective shares of Residue Gas to the various Residue Redelivered Point(s). Producer and Processor understand there will normally be some inventory gains and losses caused by balancing of Residue Gas among the Residue Redelivered Points pipelines; however, Processor shall not be required to bear any costs resulting from such inventory or balancing.” |
2. | Paragraph 13.2 that was add to the Agreement by the Amendment is hereby deleted in its entirety. |
2
IN WITNESS WHEREOF, each of the paries hereto has executed this Agreement on the date of its acknowledgment hereof.
PROCESSOR | ||||
UNION PACIFIC RESOURCES COMPANY | ||||
By: | /s/ X. Xxxxxxxxx | |||
Its: | Attorney-in-Fact | |||
PRODUCER | ||||
UNION PACIFIC RESOURCES COMPANY | ||||
By: | /s/ [ILLEGIBLE] | |||
Its: | General Manager | |||
Austin Chalk Business Unit |
3
Amendment to Brookeland Gas Facilities Gas Gathering and Processing Agreement #80-29.2 THIS AGREEMENT, dated February 1, 1998, by and between UNION PACIFIC RESOURCES COMPANY, a Delaware corporation, the Operator, hereinafter referred to as “Processor”, and UNION PACIFIC RESOURCES COMPANY, hereinafter referred to as “Producer”. WITNESSETH, THAT: WHEREAS, Producer and Processor are parties to a Gas Gathering and Processing Agreement, hereinafter referred to as the “Agreement”, dated September 1, 1993, covering the gathering and processing of gas produced from certain xxxxx delivering gas to Processor’s Gas Facilities (Facilities) in Jasper, Newton, and Sabine Counties, Texas and Xxxxxx Xxxxxx, Louisiana; and WHEREAS, Producer has acquired from Texaco Exploration and Production Inc. (Texaco) interest in a gas gathering system and xxxxx dedicated to Texaco’s Brookeland Gas Processing Plant; and WHEREAS, Processor has acquired 100% of Texaco’s Brookeland Gas Processing Plant; and WHEREAS, Processor desires to operate and maintain the gas gathering system Producer acquired from Texaco, cancel the Texaco Brookeland Gas Processing Plant gas processing agreements between Producer and Processor, and amend the Agreement to include the interest in the xxxxx Producer acquired from Texaco; and Producer agrees. NOW THEREFORE, in consideration of the premises and covenants herein contained, the Producer and Processor agree that effective February 1, 1998: I. All contracts and agreements, including but not limited to those specified on Exhibit “1” attached hereto and hereby made a part of, related to the Texaco Brookeland Gas Processing Plant between Producer and Processor are terminated. II. Exhibit “A” of the Agreement shall be amended to increase the Contract Area by moving the Northern boundary in Texas 10 miles North of its present position.
III. Exhibit “B” of the Agreement shall be amended to include Producer’s interest in xxxxx on Exhibit “X-x”, attached hereto and hereby made a part of this Amendment. IV. The Agreement shall be amended by the addition of the following paragraph 25.10: 25.10 It is Producer’s intent to convey to Processor, Producer’s interest in all gas metering and gathering assets located in Xxxxxx, Xxxxxx, and Xxxxxx Counties, Texas which Producer acquired January 1, 1998 from Texaco Exploration and Production Inc. (the “Texaco Gathering System”). Until such conveyance, Producer and Processor agree, Processor shall have complete control of the Texaco Gathering System and at its own expense, shall operate, maintain, and when appropriate, abandon the Texaco Gathering System. In addition, Processor shall be liable for any claim, demand, or cause of action arising out of the operation of the Texaco Gathering System.” Except as amended herein, the Agreement remains in full force and effect as originally executed, and the parties hereto do hereby adopt and ratify and confirm same. IN WITNESS WHEREOF, the parties hereto have executed this Agreement in several originals, as of the date first written above.
UNION PACIFIC RESOURCES COMPANY | ||||
as Processor | ||||
By: | /s/ X. Xxxxxxxxx | |||
Attorney-In-Fact | ||||
UNION PACIFIC RESOURCES COMPANY | ||||
as Producer | ||||
By: | /s/ [ILLEGIBLE] | |||
Attorney-In-Fact |
EXHIBIT “1” Terminated Contracts
UPRC# | Date | Type | Parties | |||||
80-29.5 | 6/22/94 | Gas Processing | Producer - | Union Pacific Resources Company | ||||
Processors - | Texaco Exploration and Production, Inc.* | |||||||
Maersk NGL, Inc.* | ||||||||
80-29.11 | 11/27/95 | Gas Gathering & Processing | Gatherer - | Union Pacific Resources Company | ||||
Producer - | Texaco Exploration and Production, Inc.* | |||||||
80-29.12 | 8/1/95 | Gas Purchase/Processing | Producer - | Torch Energy Marketing, Inc.* | ||||
Processor - | Texaco Exploration and Production, Inc.* | |||||||
80-29.13 | 12/1/95 | Gas Purchase/Processing | Producer - | Union Pacific Resources Company | ||||
Processor - | Texaco Exploration and Production, Inc.* | |||||||
80-29.14 | 1/1/96 | Gas Purchase/Processing | Producer - | Union Pacific Resources Company | ||||
Processor - | Texaco Exploration and Production, Inc.* | |||||||
80-29.16 | 7/7/93 | Gas Purchase/Processing | Producer - | Maersk Energy, Inc* | ||||
Processor - | Texaco Exploration and Production, Inc.* | |||||||
80-29.17 | 7/26/93 | Gas Purchase/Processing | Processor - | Maersk NGL, Inc* | ||||
Producer - | Texaco Exploration and Production, Inc.* | |||||||
80-29.18 | 3/15/96 | Gas Purchase/Processing | Producer - | Bexco Operating, Inc.* | ||||
Processor - | Texaco Exploration and Production, Inc.* |
UPRC# | Date | Type | Parties | |||||
80-29.19 | 7/7/93 | Gas Balancing | Producer - | Various* | ||||
Processor - | Texaco Exploration and Production, Inc.* | |||||||
80-50.7 | 11/1/95 | Gas Gathering & Redelivery | Gatherer - | Union Pacific Resources Company | ||||
Producer - | Texaco Exploration and Production, Inc.* | |||||||
80-60.3 | 7/8/92 | Gas Treating | Producer - | Arco Oil and Gas Company* | ||||
Treater - | Texaco Exploration and Production, Inc.* | |||||||
80-60.4 | 4/1/95 | Gas Treating | Producer - | Arco Oil and Gas Company* | ||||
Treater - | Texaco Exploration and Production, Inc.* |
* | Denotes original party later succeeded by Union Pacific Resources Company |
EXHIBIT “X-x”
Well Name | County | Operator | API # | WINS | ||||||||||
Arco A-360 #1 | Jasper | UPR | 4224130612 | 42052 | ||||||||||
* | Arco AMI Fee A-378 # 1 H | Sabine | Texaco | 4240330365 | 40917 | |||||||||
Arco Fee A-15 #1 (APO 300%) | Jasper | UPR | 4224130633 | 42284 | ||||||||||
* | Arco Fee A-418 # 1 H | Sabine | Texaco | 4240330381 | 42353 | |||||||||
Arco Fee “A” No. 1 | Jasper | UPR | 4224130531 | 22398 | ||||||||||
Black Stone Xxxxxxxx X-00 # 0 (XXX 000%) | Jasper | UPR | 4224130639 | 43335 | ||||||||||
Black Stone Minerals A -342 # 1 (excluded) | Jasper | UPR | 4224130625 | 42327 | ||||||||||
Black Stone Minerals Unit A-8 90 #1 (pref right) | Xxxxxx | Xxxxx | 4235130650 | 45046 | ||||||||||
* | Xxxxx-Xxxxxx Unit A-1166 #1 (pref right) | Xxxxxx | Texaco | 4235130590 | 45047 | |||||||||
* | Xxxxx-Xxxxxx Unit A-567 # 1 (pref right) | Xxxxxx | Texaco | 4235130613 | 45048 | |||||||||
* | Xxxxxxxx X-000 # 0 (xxxx xxxxx) | Xxxxxx | Texaco | 4235130599 | 45049 | |||||||||
Champion International Xxxx X-000 # 0 X (xxxx xxxxx) | Xxxxxx | Texaco | 4235130574 | 23154 | ||||||||||
* | Champion Xxxx X-0 000 # 0 (excluded, pref right) | Xxxxxx | Texaco | 4235130626 | 45050 | |||||||||
* | Champion Unit # 1 H (pref right) | Xxxxxx | Texaco | 4235130568 | 45051 | |||||||||
Xxxx Xxxxxxxxx # 1 H | Jasper | UPR | 4224130614 | 42080 | ||||||||||
Xxxxxx Xxxxx X-0 000 #0 (xxxx xxxxx) | Xxxxxx | Xxxxx | 4235130647 | 45052 | ||||||||||
Xxxxxx Xxxxx A-148 #1 | Xxxxxx | UPR | 4235130616 | 23067 | ||||||||||
* | X. X. Xxxxx Unit 1 #1 -H | Sabine | Texaco | 4240330370 | 40913 | |||||||||
Xxxxxx A-522 #1 | Jasper | UPR | 4224130635 | 43056 | ||||||||||
* | Xxxxx Bros. Unit #1 (pref right) | Xxxxxx | Texaco | 4235130578 | 45053 | |||||||||
XXX X-000 # 0 (xxxx xxxxx) | Xxxxxx | Xxxxx | 4235130598 | 23874 | ||||||||||
XXX X-000 # 0 (xxxx xxxxx) | Xxxxxx | Xxxxx | 0000000000 | 23695 | ||||||||||
GSU No. 1 (pref right) | Xxxxxx | Xxxxx | 4235130549 | 21941 | ||||||||||
Xxxxx Unit No: 1-H | Xxxxxx | UPR | 4235130632 | 42352 | ||||||||||
Xxxxx Unit A-93 # 2 (pref right) | Xxxxxx | Xxxxx | 4235130649 | 45054 | ||||||||||
* | Xxxxx, X.X. Xxxx 0 # 0-X (excluded) | Sabine | Texaco | 4240330415 | 41095 | |||||||||
* | Xxxxx, X.X. # l (excluded) | Sabine | Texaco | 4240330414 | 40828 | |||||||||
Xxxxxxxx Estate Unit # 1 (excluded) | Jasper | UPR | 4224130619 | 42078 | ||||||||||
* | Xxxx, R. E. 1 # 1-H | Sabine | Texaco | 4240330368 | 40910 | |||||||||
* | Xxxx, R. E. 2 # 1-H | Sabine | Texaco | 4240330372 | 41129 | |||||||||
* | Xxxx, R. E. 3 # 1 -H (excluded) | Sabine | Texaco | 4240330412 | 40741 | |||||||||
Xxxxxxxx, X.X. # 1 -H | Jasper | Texaco | 4224130611 | 40867 | ||||||||||
Temple Industries Xx. 0 -X | Xxxxxx | XXX | 0000000000 | 00000 | ||||||||||
Xxxxxx Xxxxxx Et Al A-41 #1 | Jasper | UPR | 0000000000 | 42079 | ||||||||||
Temple Inland Forest A-41 #1 | Jasper | UPR | 4224130634 | 42756 | ||||||||||
* | Texaco AMI Xxxx 0 # 0 -X | Xxxxxx | Xxxxxx | 4235130546 | 40908 | |||||||||
* | Texaco AMI Unit 2 # 1-H | Xxxxxx | Texaco | 4235130551 | 40915 | |||||||||
* | Xxxxxx XXX Xxxx 0 #1-H | Xxxxxx | Texaco | 4235130597 | 40919 | |||||||||
* | Texaco AMI Unit 5 # x-X | Xxxxxx | Texaco | 4235130573 | 40909 | |||||||||
* | Texaco Fee AM I #1-H | Xxxxxx | Texaco | 4235130531 | 40920 | |||||||||
* | Texaco Fee AM I # 3-H | Xxxxxx | Texaco | 4235130555 | 40918 | |||||||||
* | Texaco Fee Brookeland 1 H | Xxxxxx | Texaco | 0000000000 | 45061 | |||||||||
Texaco Fee Brookeland 5 H | Xxxxxx | Texaco | 4235130543 | 45062 | ||||||||||
* | Texaco Fee Brookeland 7 H | Xxxxxx | Texaco | 4235130545 | 45063 | |||||||||
* | Texaco Fee Brookeland 9 H | Xxxxxx | Texaco | 4235130556 | 45055 | |||||||||
* | Texaco Fee Unit 2 No. 2-H | Xxxxxx | Texaco | 4235130565 | 45056 | |||||||||
* | Texaco Fee Unit 3 #1H | Xxxxxx | Texaco | 0000000000 | 45065 | |||||||||
Texaco Fee Unit 3 #1-H | Xxxxxx | Texaco | 0000000000 | 45057 | ||||||||||
Texaco Fee Xxxx 0 # 0-X | Xxxxxx | Texaco | 0000000000 | 45058 | ||||||||||
* | Texaco Fee Xxxx 0 # 0-X | Xxxxxx | Texaco | 0000000000 | 45059 | |||||||||
Texaco Fee “A” No. 1 | Xxxxxx | UPR | 0000000000 | 24103 | ||||||||||
Texaco Fee “B” No. 1 | Xxxxxx | UPR | 4235130530 | 24105 | ||||||||||
Texaco Fee “C” No. 1 | Xxxxxx | UPR | 4235130533 | 24106 | ||||||||||
Texaco Fee “D “ No. 1 | Xxxxxx | UPR | 4235130542 | 24107 | ||||||||||
Tonahill, M.T . Unit A-41 #1 | Jasper | UPR | 4224130587 | 42071 | ||||||||||
* | USA A-482 #1 (excluded) | Sabine | Texaco | 4240330417 | 41624 | |||||||||
Proved Undeveloped | Prod. Start Dt. | |||||||||||||
Martindale McGraw A -33 #1 | 10/01/97 | |||||||||||||
Pearl A-340 #1 | 01/01/98 | |||||||||||||
Xxxx A-33 #1 | 05/01/98 | |||||||||||||
Texaco AMI #4 | 05/01/98 | |||||||||||||
Texaco AMI Xxxx 0 #0-X XX | 00/00/00 | |||||||||||||
Xxxxxx XXX Xxxx 0 #1-H RE | 03/01/98 | |||||||||||||
Texaco Fee AMI #1 -H RE | 06/01/98 |
Amendment to Brookeland Gas Facilities Gas Gathering and Processing Agreement THIS AGREEMENT, dated as of December 1, 1995, by and between UNION PACIFIC RESOURCES COMPANY, a Delaware corporation, the Operator, of the Facilities, hereinafter referred to as “Processor”, and UNION PACIFIC RESOURCES COMPANY, hereinafter referred to as “Producer”. WITNESSETH, THAT: WHEREAS, Producer and Processor are parties to a Gas Gathering and Processing Agreement, hereinafter referred to as the “Agreement”, dated September 1, 1993, covering the gathering and processing of gas produced from certain xxxxx delivering gas to Processor’s Gas Facilities (Facilities) in Jasper, Xxxxxx and Xxxxxx Counties, Texas and Xxxxxx Xxxxxx, Louisiana; and WHEREAS, Producer and Processor desire to amend the Agreement as hereinafter written; and NOW THEREFORE, in consideration of the premises and covenants herein contained, the Producer and Processor agree that effective December 1, 1995, the Agreement will be amended as follows: I. Exhibit “A” shall be amended by the addition of the Contract Area set forth on Exhibit “A” attached to this Amendment. All references in the Agreement to Exhibit “A” shall now be deemed to include the attached Exhibit “A”.
-1-
II. ARTICLE XIII paragraph 13.1 of the Agreement shall be amended by the addition of the following: Producer shall have no right to take its proportionate share of Residue Gas in kind. Processor shall pay Producer the net proceeds from the sale of Residue Gas attributable to Producer. Such net proceeds shall be determined by multiplying Producers portion of Residue Gas by the weighted average index price. Using the Inside F.E.R.C. Gas Market Report First of the Month Publication the weighted average index price shall be equal to the sum of eighty percent (80%) of the Tennessee Gas Pipeline Zone Zero Texas index price plus twenty percent (20%) of the Xxxx Gateway Pipeline Texas Index Price. III. Article XIII of the Agreement shall be amended by the addition of the following paragraph 13.2: 13.2 In the event that Inside F.E.R.C.’s Gas Market Report fails to report said price(s) or ceases publication in its entirety, then Processor and Producer shall mutually agree, within thirty (30) Days thereafter on a substitute price(s) or publication (whichever the case may be) upon which to deem “the weighted average index price” to be. Such substitute price (s) or
-2-
publication as adjusted will reflect the spot market price of gas in the producing area subject to this Agreement. IV. Article XVI of the Agreement shall be amended by the addition of the following paragraph 16.3: 16.3 The price paid under Articles XII and XIII of this Agreement include reimbursement for state severance taxes paid by Producer and Processor under this Article XVI of this Agreement. V. Exhibit “C” shall be amended by the addition of a point of interconnect set forth on Exhibit “C” attached to this Amendment. All references in the Agreement to Exhibit “C” shall now be deemed to include the attached Exhibit “C”. Except as amended herein, the Agreement remains in full force and effect as originally executed, and the parties hereto do hereby adopt and ratify and confirm same.
-3-
IN WITNESS WHEREOF, the parties hereto have executed this Agreement in several originals, as of the date first above written.
UNION PACIFIC RESOURCES COMPANY | ||||||
as Processor | ||||||
By: | /s/ Xxxxxx X. Xxxxxx | |||||
Xxxxxx X. Xxxxxx | ||||||
Attorney-in-Fact | ||||||
UNION PACIFIC RESOURCES COMPANY | ||||||
as Producer | ||||||
By: | /s/ X. X. Xxxxxx | |||||
X. X. Xxxxxx | ||||||
Attorney-in-Fact |
- 4 -
EXHIBIT “C” to the Brookeland Gas Facilities Gas Gathering and Processing Agreement between UNION PACIFIC RESOURCES COMPANY and UNION PACIFIC RESOURCES COMPANY September 1, 1993 Residue Redelivery Point (s) 1)Point of interconnect with the mainline of Tennessee Gas Pipeline Company in east Texas in H.&T. C. XX Xxxxxx X-000, Xxxxxx Xxxxxx, Xxxxx 0)Xxxxx of interconnect with the mainline of Xxxx Gateway Pipeline Company in east Texas in H. &T. C. RR Survey A-245, Jasper County, Texas Amendment dated December 1, 1995
- 5 -
TERMINATION OF PROCESSING CONTRACT This instrument is entered into by and between UNION PACIFIC RESOURCES COMPANY, as operator of the Brookeland Gas Facilities (referred to herein as “Processor”) and UNION PACIFIC RESOURCES COMPANY, as operator of certain oil and gas properties located in the vicinity of the aforementioned gas facilities (referred to herein as “Producer”). Recitals i. Processor and Producer have heretofore entered into that certain Gas Gathering and Processing Agreement dated September 1, 1993 (the “Producer Processing Agreement”) covering the gathering and processing of natural gas owned or controlled by Producer at Processor’s Brookeland Gas Facilities. Pursuant to the Producer Processing Agreement, an area of dedication was created within which any interest owned by Producer (or which might be acquired by Producer in the future) within such area would be subject to the Producer Processing Agreement. ii. On November 1, 1995, Torch Energy Marketing, Inc. (“Torch”) and Processor entered into a similar Gas Gathering Agreement (the “Torch Processing Agreement”) pursuant to which Torch dedicated the gas produced from certain identified properties to be processed at Processor’s Brookeland Gas Facilities. iii. Subsequent to the foregoing, Producer acquired all of Torch’s interest in certain oil and gas leases (the “Torch Leases”) more particularly described in that certain purchase agreement effective January 1, 1996 which Leases were subject to the Torch Processing Agreement. NOW, THEREFORE, for $10.00 and other good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, the parties agree as follows: 1. The Torch Processing Agreement is hereby terminated with respect to the Torch Leases. 2. The Torch Leases shall hereafter be subject to the Producer Processing Agreement. EXECUTED this 15th day of March, 1999.
PROCESSOR: | PRODUCER: | |||||||||
UNION PACIFIC RESOURCES COMPANY | UNION PACIFIC RESOURCES COMPANY | |||||||||
By: | /s/ [ILLEGIBLE] | By: | /s/ X. Xxxxxxxxx | |||||||
Its: | Attorney-in-Fact | Its: | Attorney-in-Fact |
Amendment to Brookeland Gas Facilities Gas Gathering and Processing Agreement THIS AGREEMENT, dated as of March 7, 1994, by and between UNION PACIFIC RESOURCES COMPANY, a Delaware corporation, the Operator, and SONAT EXPLORATION COMPANY, a Delaware corporation, the owners of the Facilities, hereinafter referred to collectively as “Processor,” and UNION PACIFIC RESOURCES COMPANY, hereinafter referred to as “Producer”. WITNESSETH, THAT: WHEREAS, Producer and Processor are parties to a Gas Processing Agreement, hereinafter referred to as the “Agreement”, dated September 1, 1993, covering the gathering and processing of gas produced from certain xxxxx delivering gas to Processor’s Gas Facilities in Jasper and Xxxxxx Counties, Texas; and WHEREAS, Producer is delivering Producer’s Gas to Processor at the Delivery Point at such pressure as is required and sufficient to enter Processor’s Delivery Point, but not to exceed 1,075 psig. NOW THEREFORE, in consideration of the premises and covenants herein contained, the Producer and Processor agree that effective as of the date of April 1, 1994, Article 4.1 in the Agreement shall be deleted in its entirety, and the following is substituted therefor: 4.1 Producer, at its own expense, shall
- 1 -
construct, equip, maintain, and operate all facilities (including, but not limited to, all necessary separation, dehydration, and/or compression) necessary to deliver Producer’s Gas to Processor at the Delivery Point at such pressure as is required and sufficient to enter Processor’s Delivery Point, but not to exceed 1,250 psig. Except as amended herein, the Agreement remains in full force and effect as originally executed, and the parties hereto do hereby adopt and ratify and confirm same. IN WITNESS WHEREOF, the parties hereto have executed this Agreement in several originals, as of the date first above written.
UNION PACIFIC RESOURCES COMPANY | ||||||
as Operator for Processor | ||||||
By: | /s/ Xxxxxx X. Xxxxxx | |||||
Xxxxxx X. Xxxxxx | ||||||
Attorney-in-Fact | ||||||
“Processor” | ||||||
UNION PACIFIC RESOURCES COMPANY | ||||||
as Producer | ||||||
By: | /s/ [ILLEGIBLE] | |||||
“Producer” |