FIFTH AMENDMENT (EXTENSION TO THE LEASE)
Exhibit 10.4
FIFTH AMENDMENT (EXTENSION TO THE LEASE)
THIS Amendment (hereinafter referred to as the “Fifth Amendment”), dated the 18th day of April 2024, is entered into by ACCURIDE INTERNATIONAL INC., a California corporation (hereinafter referred to as “Landlord”) and RXSIGHT, Inc., a Delaware corporation, (hereinafter referred to as “Tenant”). The parties agree as follows:
Agreement dated August 31st, 2015 (the “Original Lease”), as amended by that certain First
Amendment to the Lease dated November 23rd, 2015, as amended by that certain Second
Amendment to the Lease dated December 22nd , 2015 , as amended by that certain Third
Amendment to the Lease dated January 18th, 2016, as amended by that certain Fourth Amendment to the Lease dated November 12th, 2016, (The Original Lease, as so amended, is herein collectively referred to as the “Lease”) for certain premises containing approximately 21,498 rentable square feet located at 000 Xxxxxxxx Xxxxx 000, Xxxxx Xxxxx, XX and 20,608 rentable square feet located at 000 Xxxxxxxx Xxxxx 000, Aliso Viejo Ca as more particularly described in the Lease as the Premises.
“This section left intentionally blank”
-1-
Months |
Rate/SF |
Rate/Month |
*01-12: |
$1.540 |
$64,843.24 Plus NNN |
13 – 24: |
$1.594 |
$67,112.75 Plus NNN |
25 – 36: |
$1.650 |
$69,461.70 Plus NNN |
37 – 48: |
$1.707 |
$71,892.86 Plus NNN |
49 – 60: |
$1.767 |
$74,409.11 Plus NNN |
61 – 72: |
$1.829 |
$77,013.43 Plus NNN |
73 – 76: |
$1.893 |
$79,708.90 Plus NNN |
*Abated Base rent in months 2,11 and 12
In addition to the base rent, Tenant shall be responsible for the Triple Net expenses as per the
existing Lease.
IN WITNESS WHEREOF, the parties hereto have caused this Fifth Amendment to be executed on or as of the day and year above written.
“Landlord”: |
|
“Tenant”: |
||
|
|
|
||
ACCURIDE INTERNATIONAL INC. a California Corporation |
|
a Delaware Corporation |
||
|
|
|
||
By: |
Xxxxxxx X. Xxxxxx |
|
By: |
/s/ Xxx Xxxxx |
|
|
|
Title: |
President &CEO |
Date: |
4/18/2024 |
|
Date: |
4/18/2024 |
-2-
“This section left intentionally blank”
Attachment A
WORK LETTER EXAMPLE
(Tenant Improvements)
000 Xxxxxxxx, Xxxxx 000, Xxxxx Xxxxx, XX
The tenant improvement work (“Tenant Improvements”) shall consist of the work required to complete certain improvements to the Premises based on a working floor drawing attached as Exhibit B. Tenant shall contract with a general contractor, identified as X.X. Xxxxxx & Associates, Inc. to construct the Tenant Improvements. The Tenant Improvements work shall be undertaken and prosecuted in accordance with the following requirements:
-3-
Work Letter (Continued)
“This section left intentionally blank”
-4-
Tenant Improvement-CV-2A |
Attachment C |
X. X. Xxxxxx & Associates, Inc. |
100 Columbia, Suite 100 |
|
Schedule of Values |
Aliso Viejo, CA 92656 |
|
Job No. 2362 |
blank |
|
08/29/16 |
CSI |
Item Description |
Count |
Unit |
Unit Cost |
Item Values |
01030 |
General Conditions |
|
|
|
70,048.80 |
01000 |
Building Permit Fees |
1 |
Allowance |
12,500.00 |
12,500.00 |
01027 |
Electrical Engineering |
1 |
Lot |
18,000.00 |
18,000.00 |
01028 |
Mechanical Engineer |
1 |
Lot |
8,000.00 |
8,000.00 |
01032 |
Printing & copying |
1 |
Allowance |
750.00 |
750.00 |
01523 |
Scissor / boom lifts-rentals |
1 |
Each |
1,200.00 |
1,200.00 |
01560 |
Dispose 4-ft flourescent tubes removed |
1 |
Lot |
496.32 |
496.32 |
01566 |
Debris disposal-dumpsters |
3 |
Each |
800.00 |
2,400.00 |
02070 |
Demo-walls 254' @ 9.5' |
3,420 |
Sq. Ft. |
2.00 |
6,840.00 |
02070 |
Demo-additional per 09/14 plan-130 In.ft. |
1,260 |
Sq. Ft. |
2.00 |
2,520.00 |
02070 |
Demo wall cladding of X-frame, remove nailer |
6 |
Man hours |
39.48 |
236.88 |
02071 |
Demo-acoustic ceilings |
5,384 |
Sq. Ft. |
0.75 |
4,038.00 |
02072 |
Demo-existing 2x4 flourescent fixtures |
117 |
Each |
9.00 |
1,053.00 |
02073 |
Demo-existing carpet, vct-break rm, wall base |
8,493 |
Sq. Ft. |
0.45 |
3,821.85 |
02074 |
Demo sheet vinyl & cove base-rest rooms |
475 |
Sq. Ft. |
1.00 |
475.00 |
02075 |
Demo existing toilet partitions |
1 |
Lot |
200.00 |
200.00 |
02076 |
Demo & abandon existing plumbing drains |
12 |
Man hours |
47.53 |
570.36 |
02080 |
Conc cut, demo & dispose - sink installs |
60 |
Sq. Ft. |
13.00 |
780.00 |
02081 |
Conc cut, demo-undergound elect & piping |
14 |
Sq. Ft. |
13.00 |
182.00 |
03030 |
Replace concrete-sink install |
60 |
Sq. Ft. |
18.00 |
1,080.00 |
03031 |
Replace concrete-underground elect &piping |
14 |
Sq. Ft. |
18.00 |
252.00 |
03034 |
Conc slab crack-grind open & fill w/ Sika |
280 |
|
2.35 |
658.00 |
06200 |
Install mid-span support-Chem Lab ceiling |
1 |
Lot |
488.15 |
488.15 |
06400 |
Cabinetry-relocate/modify existing |
1 |
Allowance |
2,000.00 |
2,000.00 |
06410 |
Cabinetry-new Saron counter top |
28 |
Sq. Ft. |
48.00 |
1,344.00 |
07210 |
Insulation-R19 faced-Existing @ mezz-repair |
1 |
Lot |
1,638.25 |
1,638.25 |
07211 |
Insulation-R11 |
1 |
Lot |
1,098.25 |
1,098.25 |
07212 |
Insulation-R-30 at roof of CV-2A only |
1 |
Lot |
13,650.00 |
13,650.00 |
07215 |
Insulation-R13-in partition walls |
3,360 |
Sq. Ft. |
1.15 |
3,864.00 |
07216 |
R-19 insulation in 6" walls-Chem Lab |
1,080 |
Sq. Ft. |
1.45 |
1,566.00 |
07217 |
R-30 insulation in ceiling of Chem Lab |
900 |
Sq. Ft. |
1.85 |
1,665.00 |
07700 |
Roof repair work |
4 |
Lot |
750.00 |
3,000.00 |
08331 |
Repair 2 roll-up doors at Warehouse |
2 |
Each |
1,208.00 |
2,416.00 |
08500 |
Metal window frame & install-5-0x4-0 ea |
6 |
Each |
392.20 |
2,353.20 |
08501 |
Window w/ Pyran fire safety glass-1-hr rating |
1 |
Allowance |
750.00 |
750.00 |
08801 |
Door-stain birch-frame-side lite-8 ft-hrdwre-ins |
4 |
Lot |
950.00 |
3,800.00 |
08802 |
Doors-6-0x8-0, stain grade, hardware, install |
4 |
Each |
1,100.00 |
4,400.00 |
08803 |
Install doors saved for re-use |
14 |
Lot |
150.00 |
2,100.00 |
08804 |
Door-3-0x8-0, stain grade, hardware, installed |
4 |
Lot |
800.00 |
3,200.00 |
08805 |
Replace door access hardware to match CV1 |
22 |
Each |
130.00 |
2,860.00 |
08806 |
Kick plates-stainless-installed |
14 |
Each |
44.57 |
623.98 |
08807 |
Door closers-installed |
8 |
Each |
155.00 |
1,240.00 |
09104 |
Frame & drywall - H=10-ft, per 9/14 plan |
1 |
Lot |
28,600.00 |
28,600.00 |
09105 |
Frame & drywall-ceiling Chem Lab-9/14 plan |
900 |
Sq. Ft. |
11.12 |
10,008.00 |
09107 |
Drywall-recessed boxes for lights 1-hr |
16 |
Each |
95.00 |
1,520.00 |
09108 |
Frame & drywall-combo fire/smoke dampers |
7 |
Each |
250.00 |
1,750.00 |
09109 |
Drywall furring & details at A-frame exposed |
1 |
Allowance |
975.00 |
975.00 |
09110 |
Drywall-cut patch-finish-T24 outlets |
9 |
Each |
375.00 |
3,375.00 |
1 of 3
Cost of Tenant Improvements (Continued)
-5-
Tenant Improvement-CV-2A |
Attachment C |
X. X. Xxxxxx & Associates, Inc. |
100 Columbia, Suite 100 |
|
Schedule of Values |
Aliso Viejo, CA 92656 |
|
Job No. 2362 |
blank |
|
08/29/16 |
CSI |
Item Description |
Count |
Unit |
Unit Cost |
Item Values |
09115 |
Backing supports-2 rows-in walls-Rm 154 |
60 |
Ln. Ft. |
5.50 |
330.00 |
09512 |
T-bar grid-new-office area-standard tile |
2,564 |
Sq. Ft. |
3.74 |
9,589.36 |
09513 |
T-bar & Gridstone-148,148,150,153,154,155 |
2,000 |
Sq. Ft. |
4.65 |
9,300.00 |
09514 |
Replace ceiling tile w/ matching CV-1 tile |
2,976 |
Sq. Ft. |
1.56 |
4,642.56 |
09515 |
Install hard washable ceiling tile in Rest Rms |
500 |
Sq. Ft. |
2.65 |
1,325.00 |
09666 |
Vinyl ESD flooring - Rm 153 Hardware Dev |
580 |
Sq. Ft. |
7.92 |
4,593.60 |
09675 |
Sheet vinyl-Rm 154 - Upgraded material |
900 |
Sq. Ft. |
9.34 |
8,406.00 |
09676 |
Sheet vinyl-Rest Rooms-Coved-Upgrade mtl |
500 |
Sq. Ft. |
8.20 |
4,100.00 |
09677 |
VCT flooring - NIC - by others |
1 |
Lot |
1.00 |
1.00 |
09678 |
Carpet tile - NIC - by others |
1 |
Lot |
1.00 |
1.00 |
09678 |
Vinyl-rubber wall base - NIC - by others |
1 |
Lot |
1.00 |
1.00 |
09910 |
Finish new & existing doors-stain-clear coat |
29 |
Each |
75.00 |
2,175.00 |
09966 |
Vinyl ESD floor-buff & polish-ESD procedure |
1 |
Lot |
575.00 |
575.00 |
09970 |
FRP-replace in rest rooms |
1 |
Lot |
2,100.00 |
2,100.00 |
09990 |
Painting-interior-walls-all except Rm 154 |
18,324 |
Sq. Ft. |
0.88 |
16,125.12 |
09991 |
Painting-interior-Rm 152-Epoxy |
1,080 |
Sq. Ft. |
1.70 |
1,836.00 |
09992 |
Painting-ceiling of Rm 152-Epoxy |
900 |
Sq. Ft. |
1.97 |
1,773.00 |
09995 |
Paint west stair shaft & drywall repair |
1 |
Allowance |
750.00 |
750.00 |
09996 |
Detail painting-A frame exposed |
1 |
Lot |
400.00 |
400.00 |
10400 |
Signage-code required only |
1 |
Lot |
420.00 |
420.00 |
10520 |
Fire extinguisher cabinets |
4 |
Each |
262.00 |
1,048.00 |
10600 |
Toilet partitions-new-stainless |
1 |
Lot |
9,017.00 |
9,017.00 |
10800 |
Toilet accessories-new |
1 |
Lot |
4,887.00 |
4,887.00 |
11000 |
Assist CV installations of equipment-Allow |
40 |
CrewHours |
90.51 |
3,620.40 |
12512 |
Louver blinds-installed |
76 |
Each |
131.00 |
9,956.00 |
12526 |
Remove & replace window films |
1 |
Lot |
1.00 |
1.00 |
15310 |
Nitrogen-extend existing & 5 points of service |
1 |
Allowance |
4,500.00 |
4,500.00 |
15315 |
Compressed air-extend exist-10 points svc |
1 |
Allowance |
6,500.00 |
6,500.00 |
15316 |
Clean water-extend to sinks in labs |
1 |
Allowance |
1,800.00 |
1,800.00 |
15401 |
New condensate piping |
1 |
Allowance |
1,000.00 |
1,000.00 |
15405 |
Dig trenches & backfill-sink drains, electrical |
1 |
Lot |
1,000.00 |
1,000.00 |
15449 |
Underground sewer pipe explore & video |
1 |
Lot |
750.00 |
750.00 |
15450 |
Plumbing per plans P-1 & P-2 dated 7/20/16 |
1 |
Allowance |
17,500.00 |
17,500.00 |
15451 |
Install CV's sink &disposer-ice mkrCoffee Bar |
1 |
Allowance |
1,500.00 |
1,500.00 |
15455 |
Replace toilets, lavs, urinals-install hands free |
1 |
Lot |
10,629.00 |
10,629.00 |
15456 |
Repair trap primers-R/Rs |
1 |
Allowance |
1,400.00 |
1,400.00 |
15620 |
Hvac-air balance & report-per unit |
1 |
Lot |
4,995.00 |
4,995.00 |
15650 |
Hvac-pads for new compressors |
2 |
Each |
1,500.00 |
3,000.00 |
15800 |
Hvac-Rm 154-Chem Lab-negative press-16x |
1 |
Allowance |
30,000.00 |
30,000.00 |
15801 |
Hvac-Rm 128-Optics Lab-positive pressure |
1 |
Allowance |
10,000.00 |
10,000.00 |
15802 |
Hvac-Balance of areas - 5 existing machines |
1 |
Allowance |
20,000.00 |
20,000.00 |
15803 |
Install 2 Labconco exhaust fans & systems |
1 |
Allowance |
25,000.00 |
25,000.00 |
15865 |
Combo fire & smoke dampers-Rm 154 1-hr |
7 |
Each |
650.00 |
4,550.00 |
15883 |
Install HEPA filter units, HEPA units NIC |
6 |
Allowance |
800.00 |
4,800.00 |
15900 |
Fire sprinklers-adjust head locations |
1 |
Lot |
12,644.00 |
12,644.00 |
16400 |
Electricl-demo safe-off |
1 |
Lot |
2,000.00 |
2,000.00 |
16401 |
Electrical-distributed power outlets & data |
1 |
Lot |
31,055.35 |
31,055.35 |
16408 |
Electrical-add 0-000-000 panels w/ feeders |
1 |
Lot |
2,471.65 |
2,471.65 |
2 of 3
Cost of Tenant Improvements (Continued)
-6-
Tenant Improvement-CV-2A |
Attachment C |
X. X. Xxxxxx & Associates, Inc. |
100 Columbia, Suite 100 |
|
Schedule of Values |
Aliso Viejo, CA 92656 |
|
Job No. 2362 |
blank |
|
08/29/16 |
CSI |
Item Description |
Count |
Unit |
Unit Cost |
Item Values |
16413 |
Emergency power-175 amp transfer switch |
1 |
Lot |
2,532.60 |
2,532.60 |
16414 |
Emer power-panel, xfmr,disconnect, feeders |
1 |
Allowance |
6,737.55 |
6,737.55 |
16415 |
Install grounding xxxx in CV-2A IT room |
1 |
Lot |
455.00 |
455.00 |
16416 |
Power to 2 new hvac units-H-8 & H-25 |
1 |
Lot |
2,863.85 |
2,863.85 |
16417 |
Power to 2 Labconco exhaust hoods & fans |
1 |
Lot |
5,747.17 |
5,747.17 |
16474 |
Replace deteriorated seal-tite-roof hvac units |
1 |
Lot |
2,876.98 |
2,876.98 |
16475 |
Install power/data/video in conc floor-Rm 130 |
1 |
Assembly |
1,593.83 |
1,593.83 |
16476 |
Install power & data in floor box |
1 |
Lot |
887.00 |
887.00 |
16511 |
Light fixtures-Exit |
9 |
Each |
125.00 |
1,125.00 |
16512 |
Light fixtures-2x4 LED |
105 |
Each |
131.00 |
13,755.00 |
16514 |
Install 2x4 LED fixtures on Emer circuit |
23 |
Lot |
211.27 |
4,859.21 |
16515 |
Install 2x4 LED fixtures |
98 |
Lot |
270.20 |
26,479.60 |
16600 |
Install overhead quad outlets on flex cords |
6 |
Allowance |
270.00 |
1,620.00 |
16650 |
Install power to HEPA filter units |
6 |
Allowance |
300.00 |
1,800.00 |
16720 |
Fire alarm system-B occupancy |
1 |
Lot |
18,983.00 |
18,983.00 |
16721 |
Fire alarm system 1-hr conditions & ducts |
1 |
Lot |
9,704.00 |
9,704.00 |
16723 |
Fire alarm system-conduit install |
1 |
Allowance |
2,500.00 |
2,500.00 |
15930 |
Title 24 contol zones-lighting only |
1 |
Lot |
23,478.85 |
23,478.85 |
16931 |
T-24 power outlets & controls |
1 |
Lot |
9,467.35 |
9,467.35 |
|
|
|
|
|
667,921.07 |
|
|
|
|
|
|
17100 |
Contractors Contingency |
|
|
2.00% |
13,358.42 |
|
|
|
|
|
|
17200 |
Contractors Overhead & Profit |
|
|
8.00% |
54,502.36 |
|
|
|
|
|
|
17300 |
Contractor's Insurance |
|
|
1.50% |
11,036.73 |
|
|
|
|
|
|
Total Cost Per Agreement and Plans |
|
|
|
746,818.58 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3 of 3
-7-
_________________________________________________________
At the termination of the lease
-8-