Instrument of Agreement – SAG & Ball Mills
Supplier:
|
Purchaser: | |
Lihir Gold Limited (incorporated in PNG) | ||
ATTN: FLSmidth Minerals Pty Limited |
||
ABN: 85 000 000 000
|
ARBN 000 000 000 | |
TEL No: 00 0000 0000 |
||
FAX No: 00 0000 0000 |
||
Delivery Place:
|
Invoice to: | |
Refer Section 2, Appendix C of these contract
|
Lihir Gold Limited | |
Documents
|
X.X Xxx 000 | |
Xxxx Xxxxxxx | ||
National Xxxxxxx Xxxxxxxx 000 | ||
Xxxxx Xxx Xxxxxx | ||
Delivery Date:
|
Contract Price: | |
Refer Section 2, Appendix C. Final Delivery Date
|
AUD excluding GST, as detailed in | |
is Weeks from 29th February 0000
|
Xxxxxxxx A of these Contract Documents | |
Payment Terms: |
||
21 Days after receipt of approved invoice |
Page 1 of 4
1.0 | Contract Price | |
The price stated herein is made up of a fixed fee component, and a variable component as detailed in Appendix A of these documents. The contract price is not subject to escalation and is exclusive of Goods and Services Tax and Value Added Tax (as applicable). | ||
2.0 | Delivery Address and Instructions | |
The address for delivery shall be as stated on the face of the Instrument of Agreement (“delivery place”). Lihir Gold Limited. Lihir Island. | ||
Prior to delivery, the Supplier must notify the Purchaser of their readiness for inspection at least fourteen (14) days prior to the event. | ||
3.0 | Payment Terms | |
Supplier shall issue invoices in accordance with the Payments Schedule General Conditions AS/NZS 4911-2003 and Special Condition SC24. All invoices must clearly reference the Instrument of Agreement number. | ||
4.0 | Correspondence | |
All correspondence, excluding invoices associated with this Instrument of Agreement, must be addressed to the Purchasing Manager, or as nominated by the purchaser from time to time. | ||
The email address for electronic issue of correspondence is: xxxx@xxxxxxx.xxx; and copied to the purchasing managers email address. Email correspondence shall be as detailed below: | ||
The purchaser will send emails to the supplier with the subject line starting with: MOPU-1001-L-aaa xxxxxxx. | ||
Where MOPU is the project name, 1001 is the xxxxx package number, L means from the purchaser, aaa is a consecutive number (starting at 001), and xxxxxxx is the normal subject text. | ||
For emails from the supplier to the Purchaser, the subject line of the email would typically be, for the first email, MOPU-1001-C-001 xxxxxxx. Where the C means from supplier, 001 is first email, and xxxxxx is the subject matter for the email. | ||
For each email the supplier sends to the purchaser, the supplier should check the last email sent TO the purchaser, and use the next consecutive number. That is, the purchaser’s numbering may not line up with the suppliers. | ||
NOTE: ALL CORRESPONDENCE MUST REFERENCE APPLICABLE INSTRUMENT OF AGREEMENT NUMBER. | ||
5.0 | Provision of Facilities to Company at Supplier’s Premises | |
Supplier shall afford all reasonable access and facilities to the Purchaser and/or its representative(s) for the purpose of expediting, inspection and testing of the Equipment and review of documents required under the Instrument of Agreement. | ||
Purchaser reserves the right to nominate representative(s) to be situated at Supplier’s works to co-ordinate and manage Purchaser’s interests. | ||
For witness and/or inspections, Supplier must notify the Purchaser of its readiness for inspection at least five (5) days prior to the event. |
Page 2 of 4
6.0 | Publicity And Advertising | |
No advertising, publicity material or other literature in relation to the Equipment or Instrument of Agreement or Purchaser shall be published by Supplier without prior written approval from Purchaser. Supplier shall not place or permit to be placed its name, logos or any other marks including advertising material, on the Equipment other than marking permitted by Purchaser. | ||
7.0 | Reporting | |
Monthly and when requested by the Purchaser, the Supplier shall submit to the Purchaser a report on the progress of the work. The report will provide sufficient information to allow the Purchaser to monitor progress of the work and retain confidence that the agreed issue dates of documentation, delivery of all the equipment/materials and fabrication progress is being maintained. | ||
The report shall include the following subjects as a minimum: |
• | Executive Overview | ||
• | Engineering Progress | ||
• | Sub-contract status | ||
• | Critical Item status | ||
• | Any items of concern | ||
• | Costing summary update | ||
• | QA / QC issues | ||
• | Updated manufacturing schedule |
The Purchaser may from time to time request a progress review meeting with the Supplier. The location of these meetings may vary between the Suppliers or Purchaser’s offices. The Purchaser shall not be liable for any costs incurred by the Supplier associated with these meetings. | ||
8.0 | Attachments |
1. | This Section 1 – Instrument of Agreement; | ||
2. | Section 2 – Appendices; | ||
3. | Section 3 – Special Conditions of Contract; | ||
4. | Section 4 – General Conditions of contract for the supply of equipment without installation (AS/NZS 4911:2003) , including Part A to the General Conditions. | ||
5. | Section 5 – Scope Specification; | ||
6. | Section 6 – Technical references. |
Page 3 of 4
Signed for and on behalf of Lihir Gold Limited by: | ||||||
/s/ Xxxxx Xxxxx | Dated: 8th May 2008 | |||||
Authorised Representative | ||||||
Name
|
XXXXX XXXXX | |||||
Title
|
MANAGER — CONSTRUCTION | |||||
Signed for and on behalf of Supplier: | ||||||
/s/ Xxxx Xxxxxxx | Dated: 8/5/08 | |||||
Authorised Representative | ||||||
Name
|
XXXX XXXXXXX | |||||
Title
|
Regional Sales Director | |||||
Page 4 of 4
Fee Description | Amount (AUD) | |||
Services (Part 1) |
||||
Bradken Royalty (Part 2) |
||||
Contribution Fee (Part 2) |
||||
Part 1 & 2 Total |
Percentage of Part | Actual Amount | |||||||
Milestone Description | 1 & 2 pricing | (AUD) | ||||||
1 | Upon Execution of Contract |
|||||||
2 | Delivery of Certified GA and Foundation Arrangement
Drawings |
|||||||
3 | Despatch of shell plate and receipt of material certificates |
|||||||
4 | Receipt of Major castings
(Rough Condition) |
|||||||
4(i) | Ball Mill Heads |
|||||||
4(ii) | Ball Mill Trunnions |
|||||||
4(iii) | SAG Mill Heads |
|||||||
4(iv) | SAG Mill Trunnions |
|||||||
5 | Despatch of gear plates and receipt of certificates |
|||||||
6 | Delivery of all Equipment and Documentation to specified
points of delivery |
|||||||
Total Amount Due for Parts 1 & 2 (Excluding Deposit paid at LOI) |
||||||||
CUSTOMER: |
Lihir | |
PROJECT: |
Lihir 3 | |
LOCATION: |
PNG | |
PROPOSAL NO: |
280254 | |
MILL TYPE: |
SAG mill | |
MILL SIZE: |
28’ x 14.5’ | |
QUANTITY: |
1 |
Page 1 of 7
CUSTOMER: |
Lihir | |
PROJECT: |
Lihir 3 | |
LOCATION: |
PNG | |
PROPOSAL NO: |
280254 | |
MILL TYPE: |
SAG mill | |
MILL SIZE: |
28’ x 14.5’ | |
QUANTITY: |
1 |
Page 2 of 7
Date for Purchase | ||||||||
Order to Sub | ||||||||
supplier (weeks | Date for Delivery | |||||||
Item of | INCOterms | after reference | (weeks after reference | |||||
Equipment | Delivery Place | 2000 | date) | date) | ||||
Shells
|
Durban | FAS | ||||||
SAG Heads and
Trunnions
|
Newcastle NSW | Ex Works | ||||||
Gears and Pinions
|
Perth WA | Ex Works | ||||||
Ball Mill
Trunnions
|
European Export Port | FAS | ||||||
Bearings
|
TBA | FAS or Ex Works | ||||||
Lube Systems
|
NSW | Ex Works | ||||||
Base Plates
|
TBA | FAS or Ex Works | ||||||
Load Cells
|
Canada | FAS | ||||||
Gear Guards
|
TBA | FAS or Ex Works | ||||||
Sole Plates
|
TBA | FAS or Ex Works | ||||||
Structural
Fasteners
|
Perth | Ex Works | ||||||
Trommels
|
TBA | FAS or Ex Works | ||||||
Feed Chutes
|
TBA | FAS or Ex Works | ||||||
Trunnion Liners
|
TBA | FAS or Ex Works |
Notes: | ||
1. | Items marked TBA are yet to be confirmed. If manufactured off shore the terms will be FAS, if Australia the terms will be Ex Works. | |
2. | Risk passes in accordance with INCOterms 2000 definition. |
After Market Technology Group Australia |
||
Rev | Date | Revision Description | By | Checked | Approved | |||||
ACN 000 000 000
ABN 85 000 000 000
00-00 Xxxxxxxx Xxxx Xxxxxxx Xxxx
XXXXXXXXX XXX Xxxxxxxxx 0000
Tel: x000 0000 0000 Fax: x000 0000 0000
E-MAIL: xxxxxxxxx@xxxxxxxxxxx.xxx.xx
Standard Specification STD – SP01 | After Market Technology Group | |
Australia |
AS
|
1627.0 – 1997 | Metal Finishing – Preparation and Pretreatment of Surfaces. | ||
AS/NZS 3750.0 – 1995 | Paints for Steel Structures. | |||
AS
|
2700.S – 1996 | B12 Royal Blue. |
Page 2 of 8
Standard Specification STD – SP01 | After Market Technology Group | |
Australia |
1.0
|
General. | |
1.1
|
The surface preparation and coating procedures outlined in this standard specification are intended for the surface protection of machinery fabricated and assembled by the Contractor in their workshops or the workshops of their sub-contractors. | |
1.2
|
All damaged areas shall be made good before packing and despatch. | |
1.3
|
The Contractor shall furnish all equipment, materials including coatings, tools and services unless specifically excluded in the contract. | |
1.4
|
The Contractor shall use only coatings and/or coating systems approved by the Principal. |
Page 3 of 8
Standard Specification STD – SP01 | After Market Technology Group | |
Australia |
2.0 | Limits of Work. |
2.1 | The Contractor shall carry out all work to achieve the degree of surface preparation specified. | ||
2.2 | Weld margins of approximately 75 mm width shall be left uncoated at the edge of any section to be site welded. | ||
2.3 | The mating surfaces of all friction type joints shall be free of all topcoats. |
Page 4 of 8
Standard Specification STD – SP01 | After Market Technology Group | |
Australia |
3.0 | Handling of Painted Items. |
3.1 | To reduce the damage to the coating, at least five days drying time shall be allowed for hardening before the machinery is handled. | ||
3.2 | The Contractor shall obtain the Principals approval for any handling prior to the minimum period specified in 3.1 above | ||
3.3 | Special care shall be taken during loading and transporting of the coated machinery to ensure damage to the coating is avoided. | ||
3.4 | If slings are used for lifting, these shall be cushioned to prevent damage. | ||
3.5 | The Contractor shall repair all areas of coating damaged during packing and loading prior to despatch. |
Page 5 of 8
Standard Specification STD – SP01 | After Market Technology Group Australia |
4.1 | Surface preparation and/or painting shall not be carried out in wet or excessively hot, humid or windy conditions or in the presence of water spray or harmful industrial fumes, dusts or sprays. | ||
4.2 | The coating shall not be applied when the steel surface temperature is below the dew point, resulting in condensation of moisture. | ||
4.3 | Cleaning of surfaces of contaminants i.e. oil and grease if necessary and/or if instructed by the Engineer prior to surface preparation shall be in accordance with AS 1627.1 – 1989 Cleaning using liquid solvents and alkaline solutions. | ||
4.4 | To ensure the durability of the coating system is not impaired, the Contractor shall thoroughly familiarise himself with and carry out all aspects of the manufacture’s requirements and directions for the mixing and application of the approved coatings. | ||
4.5 | In cases where abrasive blast cleaning and painting operations are carried out in the same area, the blasting work shall only be carried out when the paint film has dried to the extent where the abrasive does not adhere to or damage the coated surface. |
Standard Specification STD – SP01 | After Market Technology Group Australia |
5.1 | Preliminary cleaning shall be carried out in accordance with AS 1627.1 – 1989 Cleaning using liquid solvents and alkaline solutions. | ||
5.2 | Steel surfaces of machinery shall be abrasive blast cleaned in accordance with the whole procedure laid down in AS 1627.4 – 1989 Abrasive blast cleaning Section 3. | ||
5.3 | The standard of surface preparation shall be to AS 1627.9 – 1989 Pictorial surface preparation standards for painting steel surfaces, Class 2-1/2 as described in Clause 1.1. Unless otherwise noted in this specification. | ||
5.4 | The profile height shall be 40 to 70 um (micrometers) measured in accordance with AS 1627.4 – 1989 Abrasive blast cleaning. | ||
5.5 | The surfaces’ shall be cleaned after blasting and damp areas shall be thoroughly dried with clean rags or dry air. | ||
5.6 | Blast cleaned surfaces shall not be left uncoated for a period, which will allow discolouration of the steel to occur. Should it not be possible to coat the surfaces within this period then the surface shall be reblasted and cleaned as described in 5.2 above. | ||
5.7 | The Contractor shall remove all weld spatter, weld slag and any other contaminants prior to the application of the coating system. |
Standard Specification STD – SP01 | After Market Technology Group Australia |
6.1 | Unless otherwise specified on drawings or directed by the Engineer all machinery shall receive the coating system described below. | ||
6.2 | Machinery Steel Surfaces Atmospheric. |
6.2.1 | Primer Coating. | ||
Primer shall be a two-component epoxy primer for the protection of steel surfaces to AS/NZS 3750.13 – 1997 Epoxy Zinc Phosphate Primer. | |||
Prepared according to the manufacture’s instructions as contained in the requisite data sheet. Applied by spray at 150 um wet-film-thickness (75 um dft) onto the clean, dry abrasive blast cleaned surface. Allow drying overnight before subsequent top coating. | |||
6.2.2 | Top Coating. | ||
Top coating shall be a two-component full gloss epoxy paint, intended for the protection of iron and steel structures against exterior corrosion in sever industrial and marine environments to AS/NZS 3750.10 – 1994 Full Gloss Epoxy . | |||
Prepared according to the manufacture’s instructions as contained in the requisite data sheet. Applied by airless spray at 250 um wet-film-thickness (175 um dft) onto the clean, dry previously prime panted surface. Allow drying overnight before subsequent handling. | |||
6.2.2 | Damaged Coatings. | ||
Any damaged paint on the machinery caused by handling or other means shall be made good, by the Contractor, using the surface preparation procedure as detailed in section 5.0 and the coating system procedure as detailed above. | |||
6.2.3 | Appearance of Finished Coating. | ||
When fully dry, the film applied in each coat shall be free of sagging, blisters, craters, pinholes and other defects. | |||
All overspray, paint splatter, drips, spillage, mud, dirt or other deposits shall be cleaned off the finished surface or otherwise made good to the Engineer instructions. | |||
Touch up procedures shall be at least as good as the original paint work and the “touch up” colour shall be visually compatible with the original colour. | |||
6.2.4 | Finish Colour. | ||
The Principals standard finish colour is AS 2700.S – 1996 B12 Royal Blue for all machinery unless otherwise directed by the Engineer. |
PROJECT QUALITY PLAN LIHIR GOLD-SAG & BALL XXXXX- 280254 |
PURCHASER:
|
LIHIR GOLD LIMITED | |
DRAFT INSTRUMENT OF AGREEMENT:
|
MOPU-1001-L-011 | |
PROJECT NAME:
|
LIHIR MOPU PROJECT SAG & BALL XXXXX. | |
FLSM PROJECT:
|
280254 | |
DESCRIPTION:
|
Design, supply, fabricate/manufacture, inspect and test, protective treat, deliver, and supervise the installation and commissioning of SAG & BALL XXXXX |
PREPARED BY Xxxxx Xxxxxx
|
TITLE | QA/QC | DATE: 22/4/08 | |||||
APPROVED BY Xxxxxx Xxxxx
|
TITLE | Project Manager | DATE 23/4/08 |
APPROVAL | ||||||||||
QPRev | Date | QP Issue | Con/Uncon | APPROVAL | Client (if applic) | |||||
0 |
1 of 15 |
PROJECT QUALITY PLAN LIHIR GOLD-SAG & BALL XXXXX- 280254 |
SECTION |
||||||
1
|
Quality Plan Controls | Rev. 0 | (4 pages) | |||
Cover Page (indicating issue status and controlled/uncontrolled copy). | ||||||
Contents Page | ||||||
Quality Plan Distribution Register Revision Status and Control | ||||||
2
|
Introduction | Rev. 0 | (2 pages) | |||
Introduction and Scope of Work Project Quality Policy Statement | ||||||
3
|
Organisation | Rev. 0 | (3 pages) | |||
Project Organisation Structure | ||||||
Project Organisation Chart (Attach A) | ||||||
Roles of Key Personnel | ||||||
4
|
Technical Specifications | Rev. 0 | (1 page) | |||
5
|
QMS AS/NZS ISO 9001:2000 | Rev. 0 | (2 pages) | |||
6
|
Sub-Contracted Work/Sub-Suppliers | Rev. 0 | (1 Page) | |||
Attachment A-Proj Org Chart | Rev. 0 | (1 page) | ||||
Attachment B-Proj ITP (PITP) | Rev. 0 | (1 page) |
2 of 15 |
PROJECT QUALITY PLAN LIHIR GOLD-SAG & BALL XXXXX- 280254 |
Quality | Distribution | Rev | Controlled or | |||||||
Plan No. | Position Issued | Date | Status | Uncontrolled Copy | ||||||
01
|
Project Manager – FLSM | 0 | (Master Copy) Controlled |
|||||||
02
|
Quality Assurance – FLSM | 0 | Controlled | |||||||
03
|
Lihir Gold | 0 | Controlled | |||||||
04
|
Project Manager – FLSM | 0 | Controlled | |||||||
05
|
Project Co-Ordinator – FLSM | 0 | Controlled |
3 of 15 |
PROJECT QUALITY PLAN LIHIR GOLD-SAG & BALL XXXXX- 280254 |
Date | Section | Page(s) | Details of Revision | Approved | ||||
23/4/08
|
All | All | Initial FLSM approval of preliminary Project Quality Plan | A XXXXX |
4 of 15 |
PROJECT QUALITY PLAN LIHIR GOLD-SAG & BALL XXXXX- 280254 |
Purchaser:
|
Lihir Gold Limited. | |
Supplier:
|
FLSmidth Minerals Pty Ltd (FLSM) | |
Sub-Supplier:
|
A supplier of goods or services to FLSM | |
Organisation:
|
Section 3 of this project quality plan indicates the proposed FLSM organisation for the project and summarises the roles of those responsible for the effective functioning of project quality management. | |
Quality Standard:
|
Quality Standard for implementation of the Scope of Work shall be the AS/NZS ISO 9001-2000. | |
Inspection and Test Plans (ITPs):
|
FLSM will ensure that product quality is achieved. The responsibility will not be passed on to another party. Nomination of FLSM witness and hold points on ITPs, plus a quality surveillance program directly involving FLSM representatives will ensure that we control product quality. | |
ITPs will identify all required manufacturing codes, inspection and test specifications and required acceptance criteria and will include where nominated Purchaser witness/hold activity points. | ||
Sub-Contracted Work:
|
Items of FLSM’s supply will be sub-contracted as per Section 6 of this Quality Plan. | |
Buyer Right of Access:
|
Purchaser and its Representatives shall have entitlement to access the work at FLSM/sub-supplier premises, at mutually agreed and pre-arranged times. |
5 of 15 |
PROJECT QUALITY PLAN LIHIR GOLD-SAG & BALL XXXXX- 280254 |
XXXXXX XXXXX
|
23rd April, 2008 | |
Project Manager
|
DATE |
6 of 15 |
PROJECT QUALITY PLAN LIHIR GOLD-SAG & BALL XXXXX- 280254 |
7 of 15 |
PROJECT QUALITY PLAN LIHIR GOLD-SAG & BALL XXXXX- 280254 |
- | Project Reporting (Internal and with the client) | |
- | Scheduling and Planning | |
- | Cost Control | |
- | Project Administration and Contractual Compliance | |
- | Resources Allocation (Labour and Equipment) | |
- | Project Quality Assurance/Quality Control | |
- | Procurement | |
- | Manufacture | |
- | Site Installation and Commissioning | |
- | Safety |
- | Establish reliable sources of supply | |
- | Issue inquiries and evaluate Subcontractor tenders | |
- | Coordinate the negotiation, authorisation and letting of purchase orders. | |
- | Ensure the expediting and timely delivery of material to the final point of destination. |
8 of 15 |
PROJECT QUALITY PLAN LIHIR GOLD-SAG & BALL XXXXX- 280254 |
- | Coordination of sub-suppliers for the installation of the equipment and related activities at site. He will actively participate in the planning and coordination of resources and equipment for this site activity. |
- | Liaison with the Client representatives with regard to safety, quality, overall coordination and contractual site schedule commitments. |
- | Ensuring compliance with site safety requirements. |
- | Ensuring that the standard of workmanship complies with the specification, that specified inspections and tests are conducted and that records are maintained to substantiate conformance to Contract quality requirements. |
- | Check the complete installation to confirm that all equipment has been installed in accordance with the drawings and suppliers recommendations | |
Develop the commissioning and safety guidelines, inspection and testing schedules and commissioning reports Commission the equipment in accordance with the agreed commissioning program |
9 of 15 |
PROJECT QUALITY PLAN LIHIR GOLD-SAG & BALL XXXXX- 280254 |
DOCUMENT | TITLE | REV. | ||||
MOPU-1001-0A M-018ANI
|
SAG MILL Technical Reference Sheet | — | ||||
MOPU-1001-0A M-018SP
|
SAG MILL GM2001-Equipment Specification No M018 | 1 |
DOCUMENT | TITLE | REV | ||||
MOPU-1001-0A M-019ANI
|
BALL MILL Technical Reference Sheet | — | ||||
MOPU-1001-0A M-019SP
|
BALL MILL GM2002-Equipment Specification No M019 | 1 |
ED No. | Title | |
40.100.001 Rev 2
|
Visual Acceptance Criteria for As-Cast Surfaces | |
40.726.000 Rev 13
|
Manufacturing and Inspection Procedure for Mill Shells | |
40.726.005 Rev 6
|
Procedure for Manufacture and Inspection of Ductile Iron Mill Heads | |
40.726.003 Rev 3
|
Procedure for Use of Hole-Templates | |
40.726.009 Rev 2
|
Inspection Procedure for Critical Fasteners | |
40.736.003 Rev 3
|
Approved Gear Tooth Inspection Methods | |
40.736.007 Rev 3
|
Hardness Testing of Gear Blanks. | |
40.736.009 Rev 3
|
Magnetic Particle Inspection of Finished Gear Teeth. | |
40.736.013 Rev 3
|
Specification for Pinion Forgings | |
40.736.018 Rev 2
|
Magnetic Particle Inspection of Finished Pinions from Alloy Steel Forgings | |
70.736.002 Rev 2
|
Mech-Tensioner (MT) Jackbolt Tightening & Loosening Procedure | |
90.726.008 Rev 1
|
Painting Systems for Grinding Xxxxx and Scrubbers. |
10 of 15 |
PROJECT QUALITY PLAN LIHIR GOLD-SAG & BALL XXXXX- 280254 |
QUALITY STD | ||||||
NO. | ISO 9001-2000 | DESCRIPTION | REQUIREMENT | |||
1
|
Sect 5 | Management Responsibility (Ref FLSM QMS Proc No 3.0 Management Responsibility) | Section 3 of this Quality Plan provides for the proposed Project Organisation. Management reviews will be conducted of Project executive summaries. Management will thus be able to implement required corrective action if the need arises to ensure the proper operation of the project controls system. | |||
2
|
Sect 4. | Quality Management System (Ref FLSM QMS Procs No 2.0 Quality Management System and 6.1 Internal Quality Audits) | Quality management system requirements based on AS/NZS/ISO9001:2000 will be implemented during the project. FLSM’s project quality system will consist of Project Quality Plan, Quality System Procedures, Work Instructions, Controlled Data, Quality Records. | |||
3
|
Section 7.2.2 | Review of Requirements Related to the Product (Ref FLSM QMS Proc No 5.0 Contract Review) | Review of Purchaser RFQ and Purchase Order to be performed in accordance with the requirements of FLSM’s quality management system. Record of contract review to be maintained on tender and contract files. Resolve any conflicts or ambiguities with the Purchaser. | |||
4
|
Section 7.3 | Design and Development (Ref FLSM QMS Proc No 5.1 Design and Development Control) | Design control will be in accordance with the requirements of FLSM’S quality management system. Equipment design will meet the requirements of the relevant Technical Specifications, apart from any mutually agreed exceptions. | |||
5
|
Section 4.2.3 | Control of Documents (Ref FLSM QMS Proc No 2.1 Document Control) | Document and data control will be in accordance with the requirements of FLSM’s quality management system. [Hard copy or electronic media] Drawings and documentation will be submitted to the Purchaser in accordance with Section 9 of Equipment Specification No M018 Rev 1 and Section 9 of Equipment Specification No M019 Rev 1. | |||
6
|
Section 7.4 | Purchasing (Ref FLSM QMS Proc No 5.3 Purchasing) | Purchasing will be performed in accordance with the requirements of FLSM’s quality management system. | |||
7
|
Section 7.5.4 | Customer Property (Ref FLSM QMS Proc No 5.7 Customer Supplied Property) | Where relevant, Purchaser-supplied property (incl intellectual property) will be managed in accordance with the requirements of FLSM’s quality management system. | |||
8
|
Section 7.5.3 | Identification and Traceability (Ref FLSM QMS Proc No 5.6 Product Identification and Traceability) | Traceability, where required by the contract will be implemented for product supplied in accordance with Purchaser-approved Inspection and test plans |
11 of 15 |
PROJECT QUALITY PLAN LIHIR GOLD-SAG & BALL XXXXX- 280254 |
QUALITY STD | ||||||
NO. | ISO 9001-2000 | DESCRIPTION | REQUIREMENT | |||
9
|
Section 8 | Product Realisation [Ref FLSM QMS Procs Nos 5.0-5.11 (incl)] | Product realisation will be in accordance with Section 4.9 AS/NZS/ISO9001-2000-Master project file, project plan/schedules, project quality plan, PITP/ITPs, MDR, contract financial controls, controls for revision and distribution of project documents, progress review and reports and project close out. | |||
10
|
Section 8.2.4 | Monitoring and Measurement of Product (Ref FLSM QMS Procs No 6.2 Inspection and Testing and 6.3 Inspection and Test Plans) | Monitoring and measurement of product will be conducted in accordance with the requirements of FLSM’s quality management system and the approved inspection and test plans as well as Section 5 of Equipment Specification No M018 Rev 1 and Section 5 of Equipment Specification No M019 Rev 1 | |||
11
|
Section 7.6 | Control of Monitoring and Measuring Devices (Ref FLSM QMS Proc No 5.9 Control of Inspection, Measuring and Test Equipment) | Control of Monitoring and Measuring devices will be implemented in accordance with the requirements of FLSM’s quality management system. | |||
12
|
Section 7.5.3 | Identification and Traceability (Ref FLSM QMS Proc No 6.4 Inspection and Test Status) | Inspection status of product will be implemented in accordance with the requirements of FLSM’s quality management system. | |||
13
|
Section 8.3 | Control of Non-Conforming Product (Ref FLSM QMS Proc No 6.5 Control of Non- Conforming Product) | Non-conforming product, if applicable, will be identified, segregated and dispositioned in accordance with the requirements of FLSM’s quality management system and in accordance with the requirements of the contract | |||
14
|
Sections 8.5.2 & 8.5.3 | Corrective and Preventive Action (Ref FLSM QMS Proc No 6.6 Corrective and Preventive Action) | Corrective and Preventive actions will be implemented, as required, in accordance with the requirements of FLSM’s quality management system for the dispositioning of non-conformances. | |||
15
|
Section 7.5.5 | Preservation of Product (Ref FLSM QMS Proc No 5.8 Handling, Storage, Packaging, Preservation and Delivery | Preservation of Product will be implemented in accordance with the requirements of FLSM’s quality management system and in accordance with Section 6 of Equipment Specification M018 Rev 1 and Section 6 of Equipment Specification M019 Rev 1. Expediting will be conducted in accordance with the requirements of the contract and FLSM’s approved Manufacturing and Supply Schedule. | |||
16
|
Section 4.2.4 | Control of Records (Ref FLSM QMS Proc No 2.2 Records Management) | Records Management will be implemented in accordance with the requirements of FLSM’s quality management system and in accordance with the requirements of Drawings and Data Requirements. |
12 of 15 |
PROJECT QUALITY PLAN LIHIR GOLD-SAG & BALL XXXXX- 280254 |
Item | Sub-Supplier | Location | ||
Mill-Shells
|
DCD-Dorbyl | Johannesburg,RSA. | ||
SAG Mill Heads & Trunnions
|
GCF/Xxxx Xxxxxxxxx | Xxxxxxxxx, XXX. | ||
Gears & Pinions
|
Xxxxxxx | Perth, WA | ||
Ball Mill Trunnions
|
Ferry-Capitain | France | ||
Bearings
|
XXX | XXX | ||
Xxxxxxxxxxx Xxxxxxx
|
Xxxxx-Xxxxxxx | Xxxxx Xxxx, XXX. | ||
Base Plates
|
XXX | XXX | ||
Xxxx Xxxxx
|
Xxxx | Xxxxxx | ||
Gear Guards
|
XXX | XXX | ||
Xxxx Xxxxxx
|
XXX | XXX | ||
Structural Fasteners
|
Donhad | Perth, WA | ||
Trommels
|
XXX | XXX | ||
Xxxx Xxxxxx
|
XXX | XXX | ||
Trunnion Liners
|
TBA | TBA |
13 of 15 |
For
ATTACHMENT b- PROJECT INSPECTION AND TEST PLAN | Page 1 of 1 |
PURCHASER: LIHIR GOLD LIMITED
|
FLSM PROJECT NO: 280254 | |
DRAFT INSTRUMENT OF AGREEMENT : MOPU-1001-L-011
|
EQUIPMENT DESCRIPTION: MAJOR | |
PROJECT DESCRIPTION: LIHIR MOPU PROJECT SAG & BALL XXXXX
|
ITEMS OF SUPPLY FOR SAG AND BALL | |
TECHNICAL SPECIFICATION: LGL EQUIPMENT SPECIFICATION No M018 Rev 1 SAG MILL GM2001 AND
|
XXXXX EQUIPMENT NUMBERS: 1326-GM2001 (SAG MILL); 1326-GM2002 |
|
LGL EQUIPMENT SPECIFICATION No M019 Rev 1 BALL MILL GM2002.
|
(BALL MILL) |
ITEM | PREFERRED | |||||||||
NO. | EQUIPMENT | SUPPLIER | SUB-SUPPLIER | FLSM | LIHIR | |||||
1
|
Gears and Pinions | Xxxxxxx | Insp/test in accordance with manufacturing ITPs | DR, S, WP & HP in accord with fabrication, forging and machining ITPs | SpecGM2001Rev 1-Sect 5. Spec GM2002 Rev 1-Sect 5. |
|||||
0
|
Xxxx Xxxxxx | XXX-Xxxxxx | Insp/test in accordance with manufacturing ITP. | DR, S, WP & HP in accord with manufacturing ITP. | Spec GM2001 Rev 1-Sect 5. Spec GM2002 Rev 1-Sect 5. |
|||||
3
|
SAG Mill Heads and Trunnions | GCF/Xxxx Australia | Insp/test in accordance with casting and machining ITPs | DR, S, WP & HP in accord with casting/machining ITPs |
Spec GM2001 Rev 1-Sect 5 Spec GM2002 Rev 1-Sect 5 |
|||||
4
|
Ball Mill Trunnions | Ferry-Capitain | Insp/test in accordance with casting and machining ITPs | DR, S, WP & HP in accord with casting/machining ITPs. | Spec GM2001 Rev 1-Sect 5 Spec GM2002 Rev 1-Sect 5 |
|||||
5
|
Mill Lubrication Systems. | Bosch-Rexroth (NSW) | Insp/test in accordance with manufacturing ITP. | DR, S,WP & HP in accord with manufacturing ITP-witness function test. | ||||||
6
|
Trommels | TBA | Insp/test in accordance with manufacturing ITP | DR, S, WP & HP in accord with manufacturing ITP |
||||||
7
|
Base Plates | TBA | Insp/test in accordance with manufacturing ITP | DR, final inspection in accordance with . manufacturing ITP | ||||||
8
|
Gear Guards | TBA | Insp/test in accordance with manufacturing ITP | DR, final inspection in accordance with . manufacturing ITP | ||||||
9
|
Sole Plates | TBA | Insp/test in accordance with manufacturing ITP | DR, final inspection in accordance with manufacturing ITP |
||||||
10
|
Feed Chutes | TBA | Insp/test in accordance with manufacturing ITP | DR, S,, WP & HP in accord with manufacturing ITP |
||||||
PITP DOC REV 0 | DATE: 23/4/2008 | LIHIR APPROVAL: | ||||||||
PREPARED BY: K Xxxxxx | DATE: 23/4/2008 | |||||||||
APPROVED BY: Xxxxxx Xxxxx | DATE: 24/4/2008 | DATE: TBA | ||||||||
SUPPLIED TO LIHIR: | DATE: 24/4/2008 |
SPECIAL CONDITIONS OF CONTRACT
FOR THE SUPPLY OF EQUIPMENT
SC1
|
INTERPRETATION AND CONSTRUCTION OF CONTRACT | |
SC2
|
NATURE OF CONTRACT | |
SC4
|
EVIDENCE OF CONTRACT | |
SC5
|
SERVICE OF NOTICES | |
SC6
|
CONTRACT DOCUMENTS | |
SC8
|
INTELLECTUAL PROPERTY RIGHTS | |
SC11
|
QUALITY ASSURANCE | |
SC12
|
SUPPLIERS INDEMNITY | |
SC13
|
INSURANCE | |
SC18
|
TESTING | |
SC19
|
DELIVERY | |
SC20
|
RISK IN AND OWNERSHIP OF THE EQUIPMENT | |
SC22
|
DEFECTS LIABILITY | |
SC23
|
VARIATIONS | |
SC24
|
PAYMENTS | |
SC29
|
GENERAL LIMITATION OF LIABILITY | |
SC30
|
WAIVER OF CONDITIONS | |
SC31
|
WARRANTY | |
SC32
|
TAX | |
SC33
|
CANCELLATION OF CONTRACT | |
SC34
|
PERFORMANCE WARRANTY |
Page 1 of 13
FOR THE SUPPLY OF EQUIPMENT
1. | Section 1 — Instrument of Agreement; | ||
2. | Section 2 — Appendices; | ||
3. | Section 3 — Special Conditions of Contract; | ||
4. | Section 4 — General Conditions of contract for the supply of equipment without installation (AS/NZS 4911:2003), including Part A to the General Conditions. | ||
5. | Section 5 — Scope Specification; | ||
6. | Section 6 — Technical references; and | ||
7. | Other Specifications. |
(a) | all information data, documents, plans, specifications or other material (including commercially sensitive information and technical know-how) directly or indirectly disclosed or made available by or on behalf of the Purchaser to the Supplier; |
Page 2 of 13
(b) | all notes and other records prepared by the Supplier based on or incorporating the information referred to in paragraph (a); and | ||
(c) | all copies of the information and those parts of the notes and other records referred to in paragraphs (a) and (b) above. |
Page 3 of 13
Page 4 of 13
a) | any equipment, construction aids or methods provided by the Supplier; and | ||
b) | any invention, process, technology, method, know-how or other information developed by the Supplier. |
Page 5 of 13
Page 6 of 13
Page 7 of 13
• | committed cost, | ||
• | budget cost, | ||
• | forecast cost to complete, | ||
• | variance, | ||
• | tally of variance. |
Page 8 of 13
• | Sheels, trunnions and heads | ||
• | Structural fasteners connecting the above components. |
(a) | “Tax” means any tax, levy, royalty, rate, duty, fee, impost, or other charge imposed by any governmental, semi-governmental, or other body authorised by law whether in PNG or Australia to impose such Tax. Without limiting the generality of the foregoing, Tax includes any withholding tax (including foreign contractor withholding tax), goods and services tax, value added tax, petroleum resource rent tax, any tax respecting environmental effects including a carbon tax. |
(a) | The Seller shall reimburse the Purchaser for the amount of the Purchaser’s liability for any Tax (excluding Income Tax) levied by the Australian or PNG government in respect of any supply made by the Seller under this Contract. | ||
(b) | Any consideration to be paid or provided for a supply made under or in connection with the Contract is expressed inclusive of all Tax, other than GST, in force at the Completion Date. | ||
(c) | Should the Purchaser be required to withhold any amounts on account of any Tax (excluding Income Tax) levied by the Australian or PNG government, the corresponding withheld amount will be taken as a reduction in the consideration to be paid or provided. |
(a) | For the purposes of Clause SC32.3: | ||
“Adjustment Note” means an adjustment note as that term is defined in the GST Law or a credit or debit note as those terms are defined in the PNG GST Act, as applicable; | |||
“Consideration” has the meaning given by the GST Law; | |||
“Goods” has the meaning given to that term by the GST Law or the PNG GST Act, as applicable; | |||
“GST” means GST as that term is defined by the GST Law or the goods and services tax referred to in sections 6 and 8 of the PNG GST Act, as applicable; | |||
“GST Amount” means, in relation to a Taxable Supply, the amount of GST payable in respect of that Taxable Supply; |
Page 9 of 13
“GST Group” has the meaning given by the GST Law; | |||
“GST Law” has the meaning given by the A New Tax System (Goods and Services Tax) Xxx 0000 (Cth); | |||
“Input Tax Credit” means an input tax credit as that term is defined in the GST Law or a credit for input tax as that term is defined in the PNG GST Act, as applicable and a reference to an Input Tax Credit entitlement of a Party includes, as applicable: |
- | An input tax credit for an acquisition made by that Party but to which another member of the same GST Group is entitled; or | ||
- | A credit for input tax for a supply which is made to that Party but which is deemed by the PNG GST Act to be made to the representative member or a group of companies; |
“PNG GST Act” means the Goods and Services Tax Xxx 0000 (PNG); | |||
“Recipient” has the meaning given to that term by the GST Law or the PNG GST Act, as applicable; | |||
“Tax Invoice” has the meaning given by the GST Law or the PNG GST Act, as applicable; | |||
“Taxable Supply” means a taxable supply as that term is defined in the GST Law (excluding the reference to section 84-5 of the A New Tax System (Goods and Services Xxx 0000 (Cth)) or a supply upon which goods and services tax is imposed by the PNG GST Act, as applicable. | |||
(b) | Any consideration to be paid or provided for a supply made under or in connection with the Contract, unless specifically described in the Contract as “GST inclusive”, does not include an amount on account of GST. | ||
(c) | The Seller will make all reasonable endeavours to ensure the supply of the Equipment is GST-free under GST Law. In this regard, the Seller warrants that it will export the Equipment within 60 days of the earlier of receiving any consideration for the supply or issuing an invoice for the supply and that it will hold sufficient documentary evidence to substantiate the export of the Equipment within the 60 day timeframe. | ||
(d) | Despite any other provision in the Contract, if a party (“Supplier”) makes a supply under or in connection with the Contract on which GST is imposed to any extent (not being a supply the consideration for which is specifically described in the Contract as “GST inclusive”): |
I. | The consideration payable or to be provided for that supply under the Contract is increased by, and the recipient of the supply (“Recipient”) must also pay to the Supplier, an amount equal to the GST payable by the Supplier on that supply; | ||
II. | The amount by which the GST exclusive consideration is increased must be paid to the Supplier by the Recipient at the same time as the GST exclusive consideration is payable or to be provided; and | ||
III. | Notwithstanding any other provision of the Contract, the Recipient is not required to pay any amount unless it has received a valid tax invoice (or valid adjustment note) for that taxable supply. |
(e) | Notwithstanding the above provisions, the Purchaser is only required to gross up a payment under Clause SC32.3(d) if and to the extent that the Purchaser is entitled to claim a corresponding Input Tax Credit. |
(a) | If a payment to a party under the Contract is a reimbursement or indemnification, calculated by reference to a loss, cost or expense incurred by that party, then the payment must be reduced by the amount of any input tax credit to which that party is entitled for that loss, cost or expense. That party is assumed to be entitled to a full input tax credit unless it proves, before the date on which the payment must be made, that its entitlement is otherwise. |
(a) | If, at any time, an adjustment event arises in respect of any supply made by a party under the Contract, a corresponding adjustment must be made between the parties. Payments to give effect |
Page 10 of 13
(a) | This clause SC32 shall survive on completion or termination of the Contract. |
(a) | the fixed and variable portions of the contract (Costs) of that proportion of the Works completed but not paid for by the Principal to the Supplier when this Contract was terminated; | ||
(b) | subject to the Supplier taking all reasonable steps to mitigate such Costs, the cost of materials and equipment reasonably ordered by the Supplier and which the Supplier is liable to accept, but only if such materials and equipment will become the Principal’s property; | ||
(c) | subject to the Supplier taking all reasonable steps to mitigate such Costs, the recovery of such other fixed and variable portions reasonably and necessarily incurred by the Supplier prior to the date of termination in the expectation of completing the Works (including subcontract break fees) and not included in any other payment by the Principal to the Supplier. |
• | That the equipment and machinery to be furnished by the Supplier shall be erected under the advice of Supplier personnel. That all equipment, machinery, and components not furnished by Supplier are properly sized, installed, and satisfactorily operating. | ||
• | That the start-up, preliminary operational period, and acceptance tests take place under the advice of Supplier personnel. | ||
• | That the constituents of the materials to be ground are within the specification limits and/or do not adversely affect performance and operation. | ||
• | That the mill system is properly controlled and operated in accordance with Supplier’s recommendations and that the Purchaser shall maintain and permit Supplier access to comprehensive daily records of performance data (including power draw, pulp density, feed particle size distribution and ore SG). |
Page 11 of 13
Page 12 of 13
Page 13 of 13
(To be typed on Bank Letterhead)
1. | 4pm (local time in the place of the Office) on the ####### (the “Expiry Date”); | ||
2. | your delivery of a notice to HSBC that the Guarantee is no longer required; | ||
3. | the date this Guarantee is returned to HSBC at its office at ######## (the “Office”); or | ||
4. | the date of payment to you by HSBC of the whole of the Guaranteed amount (or such lesser sum as you may require). |
a) | be in writing; | ||
b) | be or purport to be signed by you or for you and on your behalf; | ||
c) | state that the notice or demand is made pursuant to this Guarantee; and | ||
d) | if a demand, state the amount required to be paid under this Guarantee. |
Page 1 of 2
a) | Bank cheque; | ||
b) | by telegraphic transfer to any account you nominate in writing for this purpose; or | ||
c) | by such other method which HSBC agrees with you. |
Dated at:
|
this | day of | 2 | |||||||||||||||
Signed by:
|
) | |||||||||
(Bank Stamp) | ||||||||||
In the presence of:
|
) | |||||||||
Page 2 of 2
1 | DELIVERY DOCKETS / PACKING LISTS — FOR ORDERS FROM ORIGINS OTHER THAN THAT OF VENDOR PREMISES |
1.1 | Original Delivery Dockets / Packing Lists to be placed inside the carton, where possible Values to be written against each line item. | ||
1.2 | A copy of the Delivery Dockets / Packing Lists to be placed inside a sealed waterproof document envelope and stapled / glued / nailed to the outside of the carton / crate. Where possible Values to be written against each line item. | ||
1.3 | A copy of the Shippers Letter of Instruction (SLI attached) must be completed by the supplier and forwarded to the consolidator (Xxxxxx & Xxxxx) by email prior to delivery pick up. |
2 | CARRIER’S CONSIGNMENT NOTES |
2.1 | Carrier’s Consignment Notes must be correctly completed, and show the following: |
2.1.1 | Receiver as Lihir Gold Limited (PNG) C/- Xxxxxx & Xxxxx Banyo consolidator. | ||
2.1.2 | Freight payable by Lihir Gold Limited ex works or supplier (FAS) from point of origin to consolidation point unless otherwise stated on the Lihir Gold Limited Purchase Order. | ||
2.1.3 | Appropriate minesite order number must be noted on all packages and documents. | ||
2.1.4 | Description, e.g. quantity pallets, carton, package etc., each to have individual weight and dimensions. | ||
2.1.5 | Consolidator Address. Xxxxxx & Xxxxx, 000 Xxxxxxxx Xxxx. Xxxxx. XXX 0000 Phone Number (00) 0000 0000 |
3 | MARKINGS |
3.1 | All packages are to be addressed, marked and numbered to the Site as follows: | ||
LIHIR GOLD LIMITED MAIN WAREHOUSE LIHIR ISLAND PAPUA NEW GUINEA ORDER NO. ************ |
|||
PACKAGE 1 OF 2 (2 of 2 etc.) |
Page 1 of 9
3.2 | Each package is to be marked with its own individual weight. |
4 | PACKAGING |
4.1 | CARDBOARD CARTONS:- To be of good quality to withstand road transport with a net content to be of a suitable manageable weight. All cartons must be securely taped crossways, top and bottom. Items outside this realm must be packed in wooden crates. | ||
4.2 | WOODEN CRATES/BOXES — LIGHT DUTY (Diagram A):- To be of good quality pine timber with hardwood base with steel strengthening bands. Net content weight not to exceed 200 kg. | ||
4.3 | WOODEN CRATES — HEAVY DUTY (Diagram B):- To be of good quality pine timber with hardwood base with steel strengthening bands. Net content weight not to exceed 400 kg. | ||
4.4 | WOODEN OPEN CRATES — HEAVY DUTY (Diagram C):- To be of good quality pine timber with hardwood base with steel strengthening bands. Net content weight not to exceed 600 kg. | ||
4.5 | WOODEN PALLET CRATES — EXTREME DUTY (Diagram D):- To be of good quality pine timber with hardwood base with steel strengthening bands. The overall quality of this crate must be commensurate with the weight of the contents to ensure safe handling and protection of the cargo. | ||
4.6 | STEEL DRUMS:- To be of export quality and non returnable drums. | ||
4.7 | BUNDLING OF LOOSE ITEMS (Diagram E):- For items such as steel pipe, steel shapes, timber etc. All items are to be segregated by length and size in packs not exceeding 2,000 kg. Each pack to be single Order Number and of one products type bundled with 25mm wide heavy duty steel strapping spaced at a maximum of 1,500mm intervals and have a minimum of two lengths of timber with a minimum dimension Of 100mm x 50mm to form an integral base. | ||
4.8 | PACKING:- All internal packing used for the supply of items to the minesite must be biodegradable ie. no bubblewrap, polystyrene etc. Note: Any non biodegradable packing used may be returned to the seller with all associated freight costs to seller’s account. | ||
4.9 | SAMPLE TYPES OF BOXES/CRATES — GENERAL SPECIFICATION |
GROSS WEIGHT | ||
STEEL STRAPPING | DIAGRAM | |
TO 200 KG
|
A | |
200-400 KG
|
B | |
OVER 400 KG
|
C |
Page 2 of 9
DIAGRAM A
|
DIAGRAM B | DIAGRAM C | ||
DIAGRAM D
|
DIAGRAM E | |
5 | PALLETISING |
5.1 | Pallets are to be non returnable for all site and of export quality. They are to be of suitable construction to withstand 2,000 kg horizontal breaking force. Pallets to be no greater than 1150mm x 1150mm in dimension. | ||
5.2 | Cartons packed on pallets must be shrinkwrapped and a 6mm piece of ply placed on top prior to shrinkwrapping. | ||
5.3 | Plastic pails and tins are to have a piece of 6mm ply placed in between each layer plus a 6mm top ply and then shrink wrapped. Packing of pallets containing Pails/Tins is to be as follows: |
10 LITRE TINS NO MORE THAN 3 LAYERS
20 LITRE TINS NO MORE THAN 2 LAYERS
ABOVE 20 LITRE SINGLE LAYER ONLY
5.4 | STEEL DRUMS ARE TO BE STRAPPED TOGETHER WITH STEEL STRAPPING. |
Page 3 of 9
6 | SPECIAL ADDITIONAL INSTRUCTIONS FOR AIR FREIGHT ORDERS |
6.1 | Individual cartons/packages should be of a suitable manageable weight and must not exceed 30kg. The size of the carton were possible should not be larger than 300mm x 300mm x 300mm and ultimately not larger than 750mm x 750mm x 500mm. | ||
Note: If either the weight or size exceeds the above, the seller is to contact Site Purchasing or Expediting for further instructions. | |||
6.2 | In addition to all standard requested markings the words “AIRFREIGHT ORDER” must clearly be Marked in bold print next to the order number. | ||
6.3 | Separate Delivery Dockets/Packing Lists are not acceptable. A copy of the Original Invoice is to be used as the Delivery Dockets/Packing list. Two copies Original Invoices are to be attached to the outside of the main package (use of a sealed waterproof document envelope is required) and a copy of the Original Invoice is to be placed inside the same package. | ||
6.4 | It is the responsibility of the seller to duly
complete a Hazardous Goods declaration (DGs),
should the seller not be licensed to do so,
arrangements should be made through a licensed
agent.
The seller has a duty of care to disclose
all DGs at time of dispatch. Note: It is important that all DGs be consigned separately with all appropriate paperwork completed. |
7 | HAZARDOUS GOODS |
7.1 | All markings on the outside of containers and packing shall be in accordance with the “Australian Dangerous Goods Code”. All packaging shall be in accordance with aforementioned code. | ||
(Note: It is the responsibility of the seller to duly complete a Hazardous Goods declaration and supply a Material Safety Data sheet (MSDS) and a Emergency Procedure guide (EPG).) | |||
7.2 | All vessels / containers for the transport of dangerous goods are to be in satisfactory condition for transport via road, rail, sea or air. |
8 | FUMIGATION CERTIFICATES |
8.1 | Where required a certificate of fumigation is to be supplied to comply with Australian and Papua New Guinea Quarantine Inspection Services requirements relative to the country of supply. |
9 | CONTACT DETAILS |
LIHIR GOLD LIMITED — LIHIR ISLAND — PAPUA NEW GUINEA | |||
CONSOLIDATOR DETAILS | |||
XXXXXX + XXXXX 000 Xxxxxxxx Xxxx Xxxxx XXX, 0000 Xxxxxxxxx |
|||
Contacts |
Xxxx Xxxxxx Operations Manager Queensland | ||||
Phone | (00) 0000 0000 Switch | |||
(00) 0000 0000 Direct |
Page 4 of 9
Email Address | xxxx.xxxxxx@xxxxxx-xxxxx.xxx | |||
Xxxxxxx Xxxx Projects Supervisor | ||||
Phone | (00) 0000 0000 Switch | |||
(00) 0000 0000 Direct | ||||
(00) 0000 0000 Fax | ||||
Email Address | Xxxxxxx.xxxx@xxxxxx-xxxxx.xxx |
Page 5 of 9
XXXXXX + XXXXX |
LGL Supply Department | ||||
Main Warehouse | ||||
Lihir Island, New Ireland Province, | ||||
Papua New Guinea | ||||
P.O. Number: | ||||
Piece of | ||||
Weight: KGS | ||||
Dims L W H (cms) |
Page 6 of 9
MULTIMODAL DANGEROUS GOODS FORM This form meets the requirements of SOLAS 74, Chapter VII, regulation 5 and MARPOL 73/78, Annex III, regulation 4. |
||||
NOTE: When this form is used as a container/vehicle
packing certificate only, not a combined document, a dangerous goods declaration signed by
the shipper or supplier must have been issued/received to cover each dangerous goods
consignment packed in the container. |
||||
1.1.1 The container/vehicle packing certificate is not required for tanks. |
* | DANGEROUS GOODS: You must specify — proper shipping name, hazard class, UN No., packing group (where assigned) marine pollutant and observe the mandatory requirements under applicable national and international governmental regulations. For the purposes of the IMDG Code see 5.4.1.1. (see note 1 on reverse). | |
† | For the purpose of the IMDG Code, see 5.4.2 (see also note 2 on reverse) AMSA 250 (10.01) |
Page 7 of 9
- | the proper shipping name and, if applicable, the words “EMPTY UNCLEANED” or “RESIDUE — LAST CONTAINED” before or after the proper shipping name for empty packagings, including portable containers or bulk packagings, which contain the residues of dangerous goods, or the word “WASTE” before the proper shipping name for waste dangerous goods (other than radioactive materials) being transported for disposal or for processing for disposal. Where salvage packaging has been used, the words “SALVAGE PACKING” should be added after the description of the goods; | |
- | the class, the division (if assigned), and the compatibility group (for goods of Class 1); or the subsidiary hazards, if any, such as ‘flammable’, ‘oxidizing agent’, ‘corrosive’, for goods of Class 2; | |
- | the letters ‘UN’ followed by the UN number shown for the goods in the IMDG Code (except for consignments identified as “dangerous goods in limited quantities of class/classes .....” as permitted by 3.4.5 of the Code), followed by the packing group, where assigned; | |
- | if applicable, the minimum flashpoint if 61oC or below (in oC closed cup (c.c.)), any subsidiary hazards not communicated by the proper shipping name, the identification “MARINE POLLUTANT” or “SEVERE MARINE POLLUTANT”, and the recognized chemical name where special provision 274 applies as per the dangerous goods list see 3.1.2.8.1 of the Code; and | |
- | the control and emergency temperatures, if applicable, for a class 4.1 self-reactive substance or a class 5.2 organic peroxide. | |
The proper shipping name, Class, UN number, and packaging group (where assigned) should always appear in that order. Other items may appear in any order. See section 5.4.1.2 of the Code. |
- | The container/vehicle was clean, dry and apparently fit to receive the goods. | |
- | If the consignments include goods of Class 1, other than division 1.4, the container is structurally serviceable in conformity with 7.4.6. of the IMDG Code. | |
- | No incompatible goods have been packed into the container/vehicle unless specially authorized by the Competent Authority. | |
- | All packages have been externally inspected for damage and only sound packages packed. | |
- | Drums have been stowed in an upright position, unless otherwise authorized by the Competent Authority. | |
- | All packages have been properly packed and secured in the container/vehicle. | |
- | When materials are transported in bulk packagings the cargo has been evenly distributed in the container/vehicle. | |
- | The packages and the container/vehicle have been properly marked, labeled and placarded. Any irrelevant xxxx, labels and placards have been removed. |
Note 3 | Extra information is needed for certain goods of Class 1, 4.1, 5.2, 6.2, 7 and 8. See 5.4.1 of the Code. | |
Note 4 | In certain circumstances special certificates are required. See 5.4.4 of the Code. | |
Note 5 | Transport documents associated with the carriage of cargo transport units under fumigation must show the date of fumigation, the type and amount of the fumigant used, and give instructions for the disposal of residual fumigant, including fumigation devices, if used. See 5.5.2 of the Code. |
Page 8 of 9
Page 9 of 9
GENERAL CONDITIONS OF CONTRACT
FOR THE SUPPLY OF EQUIPMENT
AS/NZS 4911 — 2003
Page 1 of 8
Annexure to the
Joint Australian/New Zealand Standard
General conditions of contract for the supply of equipment without installation
AS/NZS 4911 — 2003
and, subject to any amendments to be incorporated into the Contract, is to be
attached to these General Conditions of Contract and shall be read as part of
the Contract.
Item | ||||||||||
1 |
Purchaser | |||||||||
(clause 1) | Lihir Gold Limited | |||||||||
ARBN 069 803 998 | ||||||||||
ABN | Lihir Gold Ltd is Registered in PNG | |||||||||
2 |
Purchaser’s address | Lihir Gold Limited | ||||||||
X.X Xxx 000 | ||||||||||
Xxxx Xxxxxxx | ||||||||||
National Xxxxxxx Xxxxxxxx 000 | ||||||||||
Xxxxx Xxx Xxxxxx | ||||||||||
3 |
Supplier | FLSmidth Minerals Pty. Ltd. | ||||||||
(clause 1) | ||||||||||
ABN | 85 000 221 590 | |||||||||
4 |
Supplier’s address | 24 to 00 Xxxxxxxx Xxxx | ||||||||
Xxxxxxx Xxxx XXX 0000 | ||||||||||
Xxxxxxxxx | ||||||||||
5 |
Stated purpose of the | Refer Contract Sections 5 & 6 – Scope of Work, and | ||||||||
Equipment | Technical references | |||||||||
(clause 1 – definition of | ||||||||||
acceptable) | ||||||||||
6 |
a) Date for delivery | |||||||||
(clause 1 and subclause | ||||||||||
19.1) | ||||||||||
OR | ||||||||||
b) Period of time for | Refer Section 2, Appendix C. Final Delivery Date is | |||||||||
delivery (clause 1 and | Weeks from 29th February 2008. | |||||||||
subclause 19.1) | ||||||||||
7 |
Delivery Place | Refer to Section 2, Appendix C | ||||||||
(clause 1 and subclause | ||||||||||
19.1) | ||||||||||
8 |
Mode of delivery (clause | Refer to Xxxxxxx 0, Xxxxxxxx X | ||||||||
0 and subclause 19.1) | ||||||||||
9 |
Governing law | |||||||||
(page 4,clause 1 (h)) | Victoria, Australia | |||||||||
If nothing stated, the law of the jurisdiction where the delivery place is | ||||||||||
located | ||||||||||
10 |
a | ) | Currency | Australian Dollars |
Page 2 of 8
(page 4,clause 1 (g)) | ||||||||||
If nothing stated, the currency where the delivery place is located | ||||||||||
b | ) | Place for payments | ||||||||
(page 4,clause 1 (g)) | ||||||||||
If nothing stated, the Purchaser’s address | ||||||||||
c | ) | Place of business of bank | ||||||||
(page 3,clause 1 (d)- | ||||||||||
definition of security) | If nothing stated, the place nearest the Purchaser’s address | |||||||||
11 |
Limits of quantities to be | Upper Limit – Not applicable | ||||||||
supplied and delivered | ||||||||||
(clause 2.2) | Lower Limit - Not applicable | |||||||||
12 |
Supplier’s security | |||||||||
a | ) | Form | ||||||||
(clause 3) | Unconditional Bank Guarantee with terms to Purchasers | |||||||||
satisfaction. | ||||||||||
b | ) | Amount or maximum | ||||||||
percentage of contract | 10%, in the form of two bank guarantees of 5% each | |||||||||
sum | ||||||||||
(clause 3) | ||||||||||
c | ) | If retention moneys, | ||||||||
percentage to be retained | NIL % of the limit in Item 12(b) | |||||||||
from payment of each | ||||||||||
invoice | If nothing stated, 10% of the limit in item 12(b) | |||||||||
(clause 3 and subclause | ||||||||||
24.1) | ||||||||||
d | ) | Time for provision | ||||||||
(except for retention | Within 14 days after date of Contract signing. | |||||||||
moneys) | ||||||||||
(clause 3) | If nothing stated, within 28 days after date of acceptance of tender | |||||||||
e | ) | Additional security for | ||||||||
Equipment not delivered | ||||||||||
(subclauses 3.4 and 24.2) | ||||||||||
f | ) | Supplier’s security upon | ||||||||
acceptance is reduced by | 50 % of amount held | |||||||||
(subclause 3.4) | ||||||||||
If nothing stated, 50% of amount held | ||||||||||
13 |
Purchaser’s security | |||||||||
a | ) | Form | ||||||||
(clause 3) | Not applicable | |||||||||
b | ) | Amount or maximum | ||||||||
percentage of contract | NIL % | |||||||||
sum | ||||||||||
(clause 3) | If nothing stated, nil | |||||||||
c | ) | Time for provision | ||||||||
(clause 3) | Not applicable | |||||||||
If nothing stated, within 28 days after date of acceptance of tender | ||||||||||
d | ) | Purchaser’s security | ||||||||
upon acceptance is | Not applicable | |||||||||
reduced by (subclause | ||||||||||
3.4) |
Page 3 of 8
14 |
Purchaser supplied | Document | No. of copies | |||||||||||
documents (subclause | 1 | Contract | 1 | |||||||||||
6.2) | 2 | All other documents | 1 |
15 | Supplier-supplied documents (subclause 6.3) | Refer to Contract Sections 5 & 6 if nothing stated 3 copies |
||||||||||||
16 | Time for Purchaser’s direction about documents (subclause 6.3(c)) | 14 days | ||||||||||||
17 | Subcontract work requiring approval (subclause 7.2) | All and any except that the Supplier may, without further approval, sub-contract works up to AUD10,000 value. | ||||||||||||
18 | Legislative requirements, those excepted (subclause 10.1) | Nil | ||||||||||||
19 | Reference date (clause 1, subclause 10.2(b)) | 29th February, 2008 | ||||||||||||
20 | Insurance cover for the Equipment to be placed (subclause 13.1) | If nothing stated, then before the Supplier commences performance of the Contract | ||||||||||||
21 | Public and Product liability insurance, amount per occurrence shall be not less than (subclause 13.2) | Yes | ||||||||||||
a | ) | Is public liability | ||||||||||||
insurance required | ||||||||||||||
b | ) | If yes to (a), level | AUD10,000,000 | |||||||||||
of cover required | If nothing stated, then $10,000,000 | |||||||||||||
c | ) | Period for which | ||||||||||||
public liablility | If nothing stated, for the duration of the contract | |||||||||||||
cover is required | Yes | |||||||||||||
d | ) | Is product liability | ||||||||||||
insurance required | ||||||||||||||
AUD10,000,000 | ||||||||||||||
e | ) | If yes to (d), level | ||||||||||||
of cover required | If nothing stated, then $10,000,000 | |||||||||||||
f | ) | Period for which | For the duration of the Contract and thereafter for six years | |||||||||||
product liability | If nothing stated, for six years | |||||||||||||
insurance is | ||||||||||||||
required | ||||||||||||||
22 | Qualifying cause of delay, causes of delay for which EOTs will not | Any event |
Page 4 of 8
be granted (page 3, subparagraph (b)(iii) of clause 1 and subclause 17.2) | ||||||||||||||
23 | Liquidated damages (subclause 17.5) | For every week or part thereof adjusted on a pro-rata basis for which any part of the Equipment is not delivered on or before the Date for Delivery, 0.5% of contract price, capped at 5% of the Contract price | ||||||||||||
24 | Delay damages | |||||||||||||
a | ) | other | Principal caused Delay | |||||||||||
compensable | ||||||||||||||
causes (page 1, | ||||||||||||||
clause 1 and | ||||||||||||||
subclause 17.6) | ||||||||||||||
b | ) | rate (subclause | AUD per day | |||||||||||
17.6) | ||||||||||||||
25 | Date for completion of acceptance testing (subclauses 18.1 and 21.1) | 365 days after delivery to
site of all components if nothing stated, 28 days commencing on delivery |
||||||||||||
26 | Party responsible for unloading the Equipment (subclauses 19.1) | Purchaser | ||||||||||||
27 | When risk in the Equipment passes (subclauses 20.1) | Upon delivery as stated in Appendix C of these contract documents | ||||||||||||
28 | Time at which ownership of the Equipment passes to the Purchaser (subclause 20.2) | Upon the date of payment of the contract price | ||||||||||||
29 | Period for Purchaser’s notice that Equipment is acceptable or rejected (subclause 21.1) | 21 days from acceptance testing if nothing stated, 7 days |
||||||||||||
30 | Period for Purchaser’s notice, accepting or rejecting Supplier’s proposal (subclause 21.4) | 14 days rif nothing stated, 7 days |
||||||||||||
31 | Defects liability period (clause 22) | 52 weeks from acceptance or 104 weeks from final delivery, whichever is the earlier. | ||||||||||||
32 | Invoice (subclause 24.1) | |||||||||||||
a | ) | Time | for invoices | day of each month | ||||||||||
OR |
Page 5 of 8
b) | Milestones for the | Refer to Section 2, Appendix A. | ||||||
rendering of invoices | ||||||||
33
|
Period for payment (subclause 24.1) | 21 days | ||||||
If nothing stated, 14 days | ||||||||
34
|
Equipment for which prepayment may be |
Refer to Section 2, Appendix A. | ||||||
claimed | ||||||||
(subclause 24.2) | ||||||||
35
|
Interest rate on overdue payments (subclause 24.5) | The current bank overdraft rate from time to time charged on overdrafts over AUD $100,000 by the Commonwealth Bank of Australia | ||||||
If nothing stated, 18% per annum | ||||||||
36
|
Arbitration | |||||||
(subclause 28.3) | ||||||||
a) | Person to nominate an | |||||||
arbitrator | ||||||||
If no-one stated, then where the place stated in Item 9 is: | ||||||||
i) in New Zealand, the President of the Institution of Professional Engineers New Zealand; or |
||||||||
ii) elsewhere, the President of the Institute of Arbitrators & mediators Australia |
||||||||
b) | Rules for arbitration | |||||||
If nothing stated,
i) rules 5-18 of the Rules of The Institute of Arbitrators & Mediators Australia for the conduct of Commercial Arbitration’s; or |
||||||||
ii) if one or more of the parties are national of or habitually resident in, incorporated in, or where the central management, and control is
exercised in, different countries as between the parties, then the UNCITRAL Arbitration Rules shall apply and the appointing authority shall be the person provided in Item 36(c) |
||||||||
c) | Appointing Authority | |||||||
under UNCITRAL Arbitration Rules |
If nothing stated, the President of the Institute of Arbitrators & Mediators | |||||||
37
|
The Supplier’s liability is limited as follows (clause 29) | |||||||
The respective limits apply to the sum of the respective claims and not to each claim. | ||||||||
a) | For claims in respect of or arising out of death or personal injury: | Unlimited | ||||||
b) | For loss of rents, income (other than arising out of death or personal injury) | AUD$ If no amount specified, then $1.00 |
Page 6 of 8
and the opportunity to | ||||||||||
earn profits and indirect | ||||||||||
and consequential loss | ||||||||||
c | ) | For all other claims | of the Contract Sum | |||||||
whatsoever | ||||||||||
38 |
The Purchaser’s liability | of the Contract Sum | ||||||||
is limited as follows | ||||||||||
(clause 29) |
Page 7 of 8
Annexure to the
Joint Australian/New Zealand Standard
General Conditions of contract for the supply of equipment without
installation AS/NZS 4911:2003.
Page 8 of 8
Project
MOPU-1001-0A M-019SP Ball Mill Specification
G P O Xxx 000
XXXXXXXX XXX 0000 Date: 08/05/08
REV. | DATE | BY | CHK | APPROVAL | DESCRIPTION | |||||
A
|
30/11/9 | PH | FLL | JHL/TWT | Issue for Bid and Approval | |||||
B
|
21/2/95 | PH | FLL | JHL/TWT | LMC comments incorporated — Reissue for Bid | |||||
0
|
28/6/95 | GLO | PH | FLL/TWT | Issue for Purchase | |||||
1
|
8/5/08 | AD | BN | Issue for Purchase MOPU Xxxxx |
SAG MILL
TABLE OF CONTENTS
1.0
|
SCOPE | 1 | ||||
1.1 Review of Footing Design | 2 | |||||
2.0
|
WORK EXCLUDED | 2 | ||||
3.0
|
CODES AND STANDARDS | 3 | ||||
4.0
|
OPERATING AND DESIGN CONDITIONS | 3 | ||||
4.1 General | 3 | |||||
4.2 Performance | 4 | |||||
4.3 Performance Warranty | 4 | |||||
4.4 General Features | 5 | |||||
5.0
|
INSPECTION AND TESTING | 5 | ||||
5.1 Inspection and Testing | 5 | |||||
6.0
|
PAINTING AND PROTECTIVE COATINGS | 5 | ||||
7.0
|
ACCEPTANCE | 5 | ||||
8.0
|
SHIPMENT | 6 | ||||
9.0
|
DOCUMENTATION | 6 | ||||
9.1 Supplier | 6 |
1.0 | SCOPE | |
The Supplier shall furnish all necessary materials, labor, and services for the design, fabrication, testing, and delivery of one semi-autogenous grinding (SAG) mill in accordance with this specification and attachments thereto. |
Item | Qty | Equip. Xx. | Xxxxxxxxxxx | |||||
0
|
0 | 0000-XX0000 | Xxxx-xxxxxxxxxx wet grinding mill, to be driven by a variable speed 32 pole 5500 kW GE synchronous motor (item 17 – to be supplied by LGL), internal shell diameter 8530mm, effective grinding chamber length 4110mm, grate discharge, capable of rotation in either direction, complete with shell, SG iron heads and demountable trunnions, support bearings, base plates, sole plates designed for reverse motor rotation and to suit inching drive, ring gear, pinion, gear guards, safety guards, all integral pipework, trunnion liners and pinion bearings. Feed end trunnion bearing to be 2450mm diameter x 800mm wide. Discharge and trunnion bearing to be 2850mm diameter x 750mm wide. | |||||
2
|
1 | Feed chute assembly, generally as shown on Dwg 26001008, retractable, mounted on rail type wheels with auxiliary hydraulically operated side shift rail wheels suitable for actuation by Purchaser’s portable Enerpac unit, sheet metal shrouds to protect hydraulic cylinders from mud splash to be provided. To be fitted with a hold down device to ensure that feed chute cannot move while mill is turning. | ||||||
3
|
1 | Trommel Assembly, 3100 diameter by 4945 parallel length not inclusive of the conical transition price between the trommel and the trunnion. Panels to be 10 mm by 30 mm slot opening flat snap-in polyurethane, minimum open area 40%. All wear areas to be substantially rubber lined; layout to be generally as shown on vendor drawing 40001047 | ||||||
5
|
1 | Pinion bearings lubrication system to be separate from the trunnion lubrication system. Filters to be 10um paper element of oversize capacity. Rexroth drawings to be approved by the Purchaser prior to commencement of manufacturer. | ||||||
6
|
1 | Trunnion bearing lubrication/lift system to be identical (save for gear type flow dividers capacity) to the Ball Mill system. The spherical seat lift pumps are to be located at the Trunnion housings during mill erection, but the lubrication module and oil reservoir is to be designed to facilitate relocation of these pumps after the mill is commissioned. Lubrication system is to incorporate cooling and low pressure filtration to 20 micron by paper element filters prior to entry to the high pressure pump suction compartment of the oil reservoir, generally as indicated on Rexroth/ANI drawing No 00000000 . Standby pumps and filters to be included. All filters and pumps to be arranged to facilitate changeout on the run. Drip trays shall be sufficiently sloped and arranged to permit gravity drainage into collection containers. Rexroth lubrication system drawings must be approved by the Purchaser prior to commencement of manufacture. | ||||||
7
|
1 | Forged and fabricated girth gear with “T” section construction, designed to AGMA 321.05 code, surface finish Q10. Refer data sheets for full |
Page 1 of 6
Item | Qty | Equip. No. | Description | |||||
technical details. | ||||||||
8
|
1 | Pinion, forged, gas carburised, designed to AGMA 321.05 code, Quality Q12. Refer data sheets for full details. | ||||||
9
|
1 Set | Trunnion seals, double lip/labyrinth type, as shown on drawing X10129M as Alternate 1. | ||||||
11
|
1 Lot | Rubber mill liner backing, 6mm thick, shop installed prior to shipment. | ||||||
12
|
1 | Clutch, Xxxxx Airflex, dual 60 VC 1600. Pinion half driving flange to be assembled to pinion shaft prior to pinion shipment from gear cutters. Motor half driving flange to be forwarded to motor manufacturers for matching to motor shaft. | ||||||
13
|
1 Lot | Inching device, Rexroth hydraulics with gearbox of 158:1 ratio, Xxxx key interlocks, control panel, safety guards, designed to suit both SAG and Ball Xxxxx. Sole plates for SAG and Ball Xxxxx to be designed to accept the inching device. | ||||||
14
|
1 Lot | Gear spray system, air operated, to suit Xxxxx recommended or equivalent gear lubricant drawn from 200 litre drums. Gear spray nozzles to be mounted on a swingaway hinged panel on the gear guard with flexible hose connections to the distributor block. Timer cycle to be adjustable. To be supplied complete with controls, control panel and alarms. | ||||||
15
|
1 Lot | Mill load measuring system, utilising dual load cells mounted below feed end trunnion housing, complete with all required circuitry. | ||||||
20
|
1 Lot | Fixtures or lifting Lugs for erection and maintenance. | ||||||
21
|
1 Lot | Shop painting of mill components to LGL specifications. | ||||||
24
|
Lot | Manuals, drawing and data | ||||||
1.1 | Review of Footing Design | ||
Footings to support the SAG Mill in its operational mode will be designed and documented by LGL, based on the loading data provided by the Supplier. | |||
The footings will be proportioned to accommodate all mounting and clearance criteria required by the Supplier, and also to limit amplitudes and frequencies of vibration of the combined Mill and foundation system to acceptable levels. |
2.0 | WORK EXCLUDED |
• | Main Mill Motor | ||
• | Mill Liners | ||
• | Mill Jacking cradle |
Page 2 of 6
• | Material unloading and storage at job site | ||
• | Foundations, anchor bolts, and embedded steel | ||
• | Erection labor and materials | ||
• | Remote controls and starters for auxiliary motors | ||
• | Electrical wiring and conduit external to mill or auxiliary systems | ||
• | Interconnecting piping, excluding flexible hose and special fittings, external to mill or auxiliary systems | ||
• | Ball charge | ||
• | Chute work ahead of the mill retractable feed chute | ||
• | Discharge chute (excluding items integral with the mill) | ||
• | Supports for stationary components associated with the oversize return system. | ||
• | Mill liner handler | ||
• | Lubricants other than initial lubricants required for assembly and testing | ||
• | Structural steel supports, walkways, stairs, and platforms |
3.0 | CODES AND STANDARDS |
SAA Standards Association of Australia | |||
PNG Papua New Guinea Codes and Regulations | |||
AGMA American Gear Suppliers Association | |||
ANSI American National Standards Institute | |||
ASME American Society of Mechanical Engineers | |||
AWS American Welding Society | |||
ASTM American Society of Testing and Materials | |||
Work under this specification shall be performed in accordance with the above referenced codes and standards. In instances where national codes do not exist, materials and workmanship shall follow the prevailing manufacturing industry standards for semi-autogenous grinding xxxxx. |
4.0 | OPERATING AND DESIGN CONDITIONS |
4.1 | General |
The equipment will be installed outdoors and shall be designed to operate 24 hours
per day, 7 days per week, 365 days per year. The Supplier shall identify in his
proposal all special requirements for outdoor operation in a tropical climate. |
|||
The grinding system will consist of one SAG mill followed by one Ball mill. The SAG mill will operate in closed circuit with an integral trommel system. Trommel oversize will discharge to the pebble crusher feed conveyor. Trommel undersize will report by gravity to a Ball mill cyclone feed |
Page 3 of 6
sump. The Ball mill will operate in closed circuit with a cluster of cyclone classifiers. Provision will be made for a portion of cyclone underflow to be recycled to the SAG mill feed if required. | |||
The ultimate capacity of the grinding system is 600 dry tph metric, which is the new feed rate to the SAG mill. This design capacity includes a 92% mechanical availability allowance. | |||
The detail design and construction requirements for the SAG mill components and gearing are specified in Appendix B and Appendix C. |
4.2 | Performance |
The SAG mill receives primary crusher discharge as follows: |
Ore specific gravity |
2.78 | |||
Ore dry bulk density, t/m3 |
1.4 | |||
Ore feed rate, dry t/h |
600 | |||
Feed size, 80% passing, mm |
150 | |||
Feed size, maximum, mm |
400 | |||
Product size, 80% passing, microns
(trommel undersize) |
1,200 | |||
Slurry density mill discharge, % solids |
65 |
The mill is estimated to be capable of drawing the 5500 kW at the pinion at 75% of
critical speed with a 12 to 15% or greater ball charge and a total charge of 28%. |
|||
The mill should be able to operate at the design conditions (10% ball charge, 28% total charge) in the speed range of 50% to 75% of critical speed over the full wear life of the liners. For the 75% to 85% speed range the mill should be able to operate at maximum power but possibly with reduced ball charge. |
4.3 | Performance Warranty |
The SAG Mill is mechanically and structurally capable of drawing 5,500 kW. | |||
Process Performance: | |||
The Supplier warrants the following: | |||
That the 28’ x 14.5’ SAG mill will draw at least 5,200 kW as measured at the motor shaft with: |
- | Ball charge in the range of 12% to 15% at a total charge of ³ 28% | ||
- | Pulp density in the range 65 to 75% w/w | ||
- | F80 less than or equal to 175 mm | ||
- | Mill speed in the range 73 to 77% |
And provided that the following conditions are met: |
• | That the milling circuit is operated by experienced personnel | ||
• | That all auxiliary equipment is selected, installed and operated to suit the circuit requirements. |
Page 4 of 6
• | That the milling circuit is fed an ore with a specific gravity ≥ 2.7 |
4.4 | General Features | ||
The equipment shall be the Supplier’s standard design and of heavy-duty construction suitable for the operating conditions specified. | |||
See Appendix B, Mill Components, and Appendix C, Mill Gearing, for a more detailed description of design and construction requirements for the mill. | |||
The mill pinion shall be direct coupled with an air operated clutch to a variable speed, 11,000 volt, 5500 kW, synchronous motor. The drive will be located at the feed end of the mill, on the left hand side when viewed from the feed end. |
5.0 | INSPECTION AND TESTING |
5.1 | Inspection and Testing | ||
The Supplier will be responsible for the testing and inspection of all materials and work in accordance with this specification and all applicable codes, laws and regulations. | |||
The Purchaser’s appointed representative shall appoint a duly authorized inspection authority to witness all “Hold”, witness and surveillance points, fully inspect and certify the equipment at, but not limited to, the Supplier’s works. | |||
The Purchaser’s representatives shall have all reasonable access to the work whether it is in preparation or in progress. The Supplier shall provide facilities for such access and for inspection. | |||
Inspection of the equipment by the Purchaser’s representative is required at the following stages of fabrication: |
• | Material before start of fabrication | ||
• | At inspection points nominated in the Inspection and Test Plan |
Unless otherwise specified, the Supplier shall ensure that all equipment is thoroughly cleaned prior to painting and shipping. |
6.0 | PAINTING AND PROTECTIVE COATINGS |
Upon completion of manufacture, the Supplier shall ensure that all equipment is thoroughly cleaned prior to painting and shipping. | |||
All external exposed carbon steel surfaces shall be sandblasted and painted in accordance with FLSM STD-SP01, with colour to be advised. |
7.0 | ACCEPTANCE |
The Purchaser’s inspectors or delegates shall have the authority to require repairs or alterations if in their opinion materials or workmanship do not meet the required specification. | |||
Any omission or failure on the part of the Purchaser’s inspector or delegate to disapprove or reject any work or |
Page 5 of 6
materials shall not be construed as an acceptance of any defective work or materials. | |||
The SAG Mill shall not be delivered by the Supplier until approval has been received from the Purchaser. |
8.0 | SHIPMENT |
Bolts, nuts, and other small parts shall be boxed for shipment. | |||
Gaskets furnished by the Supplier shall be suitably boxed and marked for field installation. | |||
The SAG Mill and various assemblies shall be loaded and shipped in such a manner as to ensure delivery without damage. | |||
See procurement document for marking and packaging requirements. |
9.0 | DOCUMENTATION |
9.1 | Supplier | ||
Information to be submitted by the Supplier to Purchaser or Purchaser’s representative after award of contract shall include, but not be limited to: |
• | All drawings, welding procedures and other documents for Purchaser’s approval
prior to fabrication. Purchaser’s review will be of general design and
controlling dimensions only and will not relieve the Supplier of
responsibility for design and accuracy of details or dimensions. |
||
• | Copies of all correspondence to and from government authorities in reference to the equipment. | ||
• | Procedures for: |
- | Qualification and certification of welders | ||
- | Welding | ||
- | Welding inspection | ||
- | Inspection and testing |
• | Records of welding procedure qualification, welder qualification, inspections and tests. | ||
• | Copies of bills of materials. |
Page 6 of 6
G P O Xxx 000
XXXXXXXX XXX 0000 Date: 8/5/08
REV. | DATE | BY | CHK | APPROVAL | DESCRIPTION | |||||
A
|
1DEC94 | PH | FLL | TWT | ISSUE FOR BID AND APPROVAL | |||||
B
|
16FEB95 | PH | FLL | TWT | ||||||
0
|
20JUN95 | GLO | PH | ISSUE FOR PURCHASE | ||||||
1
|
8MAY08 | AD | BN | ISSUE FOR PURCHASE MOPU XXXXX |
SECTION | PAGE | |||||
1.0 |
SCOPE | 1 | ||||
1.2 |
Review of Footing Design | 3 | ||||
2.0 |
WORK EXCLUDED | 3 | ||||
3.0 |
CODES AND STANDARDS | 4 | ||||
4.0 |
OPERATING AND DESIGN CONDITIONS | 4 | ||||
4.1 |
General | 4 | ||||
4.2 |
Performance | 4 | ||||
4.3 |
Performance Warranty | 5 | ||||
4.4 |
General Features | 5 | ||||
5.0 |
INSPECTION AND TESTING | 5 | ||||
5.1 |
Inspection and Testing | 5 | ||||
5.2 |
Cleaning | 5 | ||||
6.0 |
PAINTING AND PROTECTIVE COATINGS | 5 | ||||
7.0 |
ACCEPTANCE | 6 | ||||
8.0 |
SHIPMENT | 6 | ||||
9.0 |
DOCUMENTATION | 6 | ||||
9.1 |
Supplier | 6 |
1.0 | SCOPE |
1.1 | The Supplier shall furnish all necessary materials, labor and services for the design, fabrication, testing and delivery of one ball mill in accordance with this specification and attachments thereto. |
Item | Qty. | Equip. No. | Description | |||||
1
|
1 | 1326-GM2002 | Ball Mill, wet overflow type, to be driven by a fixed speed 32 pole 4800 kW GE synchronous motor (motor supplied by LGL), inside diameter of shell 5490mm, effective grinding chamber length 9750mm, complete with shell, SG iron heads with integral trunnions, trunnion bearings, baseplates, sole plate with provision made for inching drive attachment, ring gear, pinion and pinion bearings, gear guards fitted with heating devices and appropriate cleanout doors, all integral pipework and trunnion liners. Feed and discharge bearings to be 2450mm diameter by 800mm wide. | |||||
2
|
1 | Feed chute assembly, to incorporate trunnion liner removal facilities and interlocks to prevent mill rotation while chute is attached to the liner while the liner is still attached to the mill; mounted on four rail type wheels with four auxiliary side shift rail wheels which may be lowered hydraulically using the Purchaser’s portable Enerpac pump unit. Sheet metal shrouds to be fitted over the hydraulic cylinders to protect against mud splash, etc. To be provided with a locking device to ensure that carriage cannot move while mill is turning. | ||||||
3
|
1 | Trommel assembly, 2400mm (nom) diameter by 3000mm (nom) parallel length, not inclusive of the conical transition piece between the trommel and the trunnion. Panels to be 6mm square opening snap-in flat rigid polyurethane. Trommel to include a scats discharge system (mechanism to be determined). All steel surfaces subject to abrasive wear to be substantially rubber lined. | ||||||
4
|
Lot | Discharge Trunnion liners to be Skega type with stud fixing. Transition piece liners between trunnion and trommel to be Skega rubber segments with T-Bolt fixing with the nuts accessible from outside the mill. Rubber spirals in trommel and trunnion to be “knock-in” type. | ||||||
5
|
1 | Pinion bearings lubrication system to be separate from the trunnion lubrication system. Filters to be 20µm paper element of oversize capacity. Rexroth drawings to be approved by the Purchaser prior to commencement of manufacture. |
Page 1 of 6
Item | Qty. | Equip. No. | Description | |||||
6
|
1 | Trunnion bearings lubrication/lift system to be identical (save for the gear type rotary flow dividers capacity) to the SAG mill system. The spherical seat lift pumps are to be located at the trunnion housings during mill erection, but the lubrication module and oil reservoir is to be designed to facilitate relocation of these pumps after the mill is commissioned. The lubrication system is to incorporate cooling and low pressure filtration to 20µm by paper element filters prior to entry into the high pressure pump suction compartment of the oil reservoir. Standby pumps and filters are included. Drip trays to be sufficiently sloped and arranged to permit gravity drainage into collection containers. All Rexroth drawings must be approved by the Purchaser prior to commencement of manufacture. | ||||||
7
|
1 | Forge and fabricated “T” Section Girth gear, designed to AGMA 321.05 code, surface finish Q10. Refer data sheets for full technical details. | ||||||
8
|
1 | Pinion, forged, gas carburised, shaft extension to suit connection of inching drive, Xxxx key interlocks, etc, designed to AGMA 321.05 code, surface finish Q12. Refer data sheets for full details. | ||||||
9
|
1 set | Trunnion seals, double lip/labyrinth type,. | ||||||
11
|
1 lot | Mill Rubber Lining, 6mm thick, shop installed prior to shipment. | ||||||
12
|
1 | Clutch, Xxxxx Airflex, dual 60 VC 1600. Pinion half driving flange to be fitted to matched to pinion shaft prior to pinion shipment from gear cutters. Motor half driving flange to be forwarded to motor manufacturers for matching to motor shaft. | ||||||
13
|
1 | Pinion shaft and sole plate to be designed to accept Inching device. | ||||||
14
|
1 lot | Gear spray system, air operated, to suit Xxxxx recommended or equivilant gear lubricant drawn from 200 litre drums. Gear spray nozzles to be mounted on a swingaway hinged panel on the gear guard, with flexible hose connections to the distributor block. Timer cycle to be adjustable. To be supplied with all controls, control panel and alarms. | ||||||
18
|
1 Lot | Fixtures or Lifting Lugs required for erection and maintenance | ||||||
19
|
1 lot | Shop painting of mill components to LGL Specifications. | ||||||
22
|
Lot | Manuals, drawings and data. |
Page 2 of 6
1.2 | Review of Footing Design |
2.0 | WORK EXCLUDED |
Page 3 of 6
3.0 | CODES AND STANDARDS |
SAA | — | Standards Association of Australia | ||
PNG | — | Papua New Guinea Codes and Regulations | ||
AGMA | — | American Gear Manufacturers Association | ||
ANSI | — | American National Standards Institute | ||
ASME | — | American Society of Mechanical Engineers | ||
ASTM | — | American Society for Testing and Materials | ||
AWS | — | American Welding Society |
4.0 | OPERATING AND DESIGN CONDITIONS |
4.1 | General |
Ore specific gravity (avg) | 2.78 | |||
Circuit feed rate | 600 t/h (dry) | |||
Circuit feed size | 80% passing 1200 microns | |||
Circuit product size | 80% passing 130 microns | |||
Bond Ball Mill Work Index | 15.3 (metric ton basis) | |||
Slurry ph | 4.5 to 8 | |||
Slurry density % solids | 65 | |||
NOTE: 1 t = 1000 kg |
4.2 | Performance |
4.3 | Performance Warranty |
- | Ball Charge in the range 32 to 35% | ||
- | Pulp Density in the range 65 to 75% w/w |
Page 4 of 6
- | Seasoned equilibrium ball charge with a top size ³ 60mm |
- | That the milling circuit is operated by experienced personnel | ||
- | That all auxiliary equipment is selected, installed and operated to suit the circuit requirements. | ||
- | That the milling circuit is fed an ore with a specific gravity ³ 2.7 |
4.4 | General Features |
5.0 | INSPECTION AND TESTING |
5.1 | Inspection and Testing |
• | Material before start of fabrication | ||
• | At inspection points nominated in the Inspection and Test Plan |
5.2 | Cleaning |
6.0 | PAINTING AND PROTECTIVE COATINGS |
Page 5 of 6
7.0 | ACCEPTANCE |
8.0 | SHIPMENT |
9.0 | DOCUMENTATION |
9.1 | Supplier |
• | All drawings, design calculations, welding procedures and other documents for Purchaser’s approval prior to fabrication. Purchaser’s review will be of general design and controlling dimensions only and will not relieve the Supplier of responsibility for design and accuracy of details or dimensions. | ||
• | Copies of all correspondence to and from government authorities in reference to the equipment. | ||
• | Procedures for: |
_ | Qualification and certification of welders | ||
_ | Welding | ||
_ | Welding inspection | ||
_ | Inspection and testing |
• | Records of welding procedure qualification, welder qualification, inspections and tests. | ||
• | Copies of bills of materials |
Page 6 of 6
Project
MOPU-1001-0A M-019ANI Ball Mill Technical Sheet
TECHNICAL REFERENCE
ITEM | UNITS | |
General |
||
Mill Type: |
||
Diameter Inside Shell |
mm | |
Shell Length, Flange to Flange |
mm | |
Grinding Chamber Length |
mm | |
Volume Inside Liners |
m3 | |
Mill Operating Speed |
rpm | |
Percent of Criticial speed (new liners): |
||
Power Required with New liners at Design Ore & Media Charge |
||
Head Outside Diameter |
mm | |
Feed end Trunnion Min. I.D. with Liners |
mm | |
Discharge End Trunnion I.D. with Liners |
mm | |
Mill Drive |
||
Recommended
Motor Rating, kW/RPM, Service Factor |
kW/rpm | |
Drive Arrangement — Gear Position |
||
Loaded mill WR2 |
kgm2 | |
Design Data |
||
Finite Element Stress Analysis Method |
||
Stress Analysis Method Developed by Whom? |
||
Independent Review of Stress Analysis Method by Whom? |
||
Extent Field Verification of Stress Analysis Method |
||
Design Total Charge, % Mill Volume |
% | |
Design Ball Charge, % Mill Volume |
5 | |
Mill Design Life Expectancy |
Yrs | |
Shell Design |
||
No. of Shell Sections |
||
Shell |
Page 1 of 13
TECHNICAL REFERENCE
ITEM | UNITS | |
Material (ASTM No.) |
||
Design Stress |
MPa | |
Max Thickness |
mm | |
Location of Max. Thickness |
||
Min. Thickness |
mm | |
Location of Min. Thickness |
||
Shell Length, Flange to Flange |
mm | |
Shell Weight |
kg | |
Circumferential Flanges |
||
Material (ASTM No.) |
||
Design Stress |
MPa | |
Thickness |
mm | |
Outside Diameter |
mm | |
Bolt Circle Diameter |
mm | |
Quantity and Size of Fasteners Per Head |
mm | |
Axial Flanges |
||
Material (ASTM No.) |
||
Design Stress |
MPa | |
Thickness |
mm | |
Head and Trunnion Design |
||
Heads |
||
Type |
||
Material (ASTM No.) |
||
Design Stress |
MPa | |
Fabrication Method |
||
Angle |
degrees | |
No. of Pieces/Assembly Method |
||
Thickness: (max/Min) |
||
at Trunnion/Head Interface |
mm |
Page 2 of 13
TECHNICAL REFERENCE
ITEM | UNITS | |
at Shell/head Interface |
mm | |
Outside diameter |
mm | |
Bolt Circle Diameter |
mm | |
Flange Thickness |
mm | |
Quantity and Size of Fasteners Head/Trunnion |
mm | |
Overall Length |
mm | |
Weight each |
kg | |
Trunnions |
||
Type |
||
Material (ASTM No.) |
||
Design Stress |
MPa | |
Fabrication Method |
||
Thickness (Max/Min) |
||
at Knuckle Radius |
mm | |
at Shell/head Interface |
||
at Bearing Surface |
mm | |
Flange O.D. |
mm | |
Flange Bolt Fasteners |
||
Quantity and Size of Fasteners |
||
Overall Length |
mm | |
Weight |
kg | |
Mill Support Bearing Assemblies |
||
Type and Location |
Journal |
||
Diameter |
mm | |
Length |
mm | |
Projected Area |
m2 | |
Thrust Face Area |
Pressure with Max. Load |
||
Feed End |
kPa | |
Discharge end |
kPa | |
Thrust |
kPa |
Page 3 of 13
TECHNICAL REFERENCE
ITEM | UNITS | |
Self-Aligning Method |
||
Thermally Stress Relived? |
||
Type of Seals |
||
Bearing Inserts |
||
Type: Tilting Pad/Sleeve/Other (Specify) |
||
Mounted on Riding Ring or Trunnion |
||
Material |
||
Thickness |
mm | |
Pad Length/Width/Thickness |
mm | |
No. Per Bearing |
||
Contact Angle w/Journal |
degrees | |
Bearing Weight each |
kg | |
Means of Holding Bearing Aligned on Baseplates |
||
Temperature Detectors |
||
Type |
||
No. Per Bearing |
||
Alarm Temperature |
oC | |
Shutdown Temperatue |
oC | |
Mill Support Bearing Lube System |
||
Supplier |
||
Type |
||
No. of Systems/Mill |
||
Pumps: High Pressure pockets/ HP thrust and flood/Low
Pressure conditioning/ HPSpherical Seats |
||
Type |
||
Rating |
||
Flow rate |
l/s | |
Pressure |
kPa |
Page 4 of 13
TECHNICAL REFERENCE
ITEM | UNITS | |
Motor Power |
kW | |
No. per Lube System |
||
Operating/Standby |
||
Excess Capacity |
||
High Pressure |
% | |
Low Pressure |
% | |
Thrust |
||
Heat Exchanger |
||
Type |
||
Cooling |
l/s /kPa | |
No. per Lube System |
||
Oil Filter |
||
Type |
||
Size |
Microns | |
No. per Lube System |
||
Operating/Standby |
||
Oil Heaters |
||
Type |
||
Rating |
kW | |
No. per Lube System |
||
Operating/Standby |
kg | |
Lube system Weight, empty/filled |
kg | |
Pinion Bearing Lube System |
||
Supplier |
||
No. of Systems per Mill |
||
Pumps |
||
Type |
||
Flow rate |
l/s |
Page 5 of 13
TECHNICAL REFERENCE
ITEM | UNITS | |
Pressure |
kPa | |
Motor Power |
kW | |
No. per Lube System |
||
Operating/Standby |
||
Heat Exchanger |
||
Type |
||
Cooling Water Req’d |
l/s / kPa | |
Oil Filter |
oC | |
Type |
||
Size |
Microns | |
No. per Lube System |
||
Operating/Standby |
||
Oil Heater |
||
Type |
||
Rating |
kW | |
No. per Lube System |
||
Operating/Standby |
||
Weight, empty/filled |
kg | |
Feed Spout |
||
Type |
||
Material |
||
Thickness |
mm | |
Liner Material/Thickness |
mm | |
Opening Dimensions |
mm | |
Seal Type |
||
Weight |
kg | |
Trommel |
||
Type |
||
Material |
||
Thickness |
mm | |
Outside Diameter x Length |
mm |
Page 6 of 13
TECHNICAL REFERENCE
ITEM | UNITS | |
Opening Size |
mm | |
Diameter Inside Spiral |
mm | |
Weight |
kg | |
Ring and Pinion Gear Lube System |
||
Type |
||
Lubricant |
||
Air Requirements: (Free air) 15 min Cycles |
l/s / kPa | |
Weight |
kg | |
Air Clutch |
||
Supplier |
||
Type |
||
Model |
||
Torque |
||
Operating at 690 kPa |
Nm | |
Maximum at 860 kPa |
Nm | |
Service factor |
||
Air Requirement: (Free Air) per engagement |
l/s / kPa | |
Locking Device |
||
Weight Each |
kg | |
Liners |
||
Shell |
||
Type |
||
Material |
||
Liners (cont’d) |
||
Thickness, min/max |
mm | |
Liner Bolt Type, size |
mm | |
Backing Material/Thickness |
mm | |
Weight |
kg | |
Feed Head |
||
Type |
||
Material |
||
Thickness |
mm |
Page 7 of 13
TECHNICAL REFERENCE
ITEM | UNITS | |
Liner Bolt Type, size |
mm | |
Backing Material/Thickness |
mm | |
Weight |
kg | |
Discharge Head |
||
Type |
||
Material |
||
Thickness |
mm | |
Slot size |
mm | |
Open Area |
||
Weight |
kg | |
Feed Trunnion Liner |
||
Type |
||
Material |
||
Thickness |
mm | |
Diameter |
mm | |
Seal |
||
Weight |
kg | |
Discharge Trunnion Liner |
||
Type |
||
Material |
||
Thickness |
mm | |
Discharge Trunnion Liner (cond’t) |
||
Diameter |
mm | |
Seal |
||
Weight |
kg | |
Jacking System |
||
Xxxx Size |
Tonne | |
Quantity |
||
Hydraulic Power Package |
||
Motor Rating |
kW | |
Motor Speed |
rpm |
Page 8 of 13
TECHNICAL REFERENCE
ITEM | UNITS | |
Cradles, describe |
||
Gear Set |
||
Normal diametral pitch |
||
Normal pressure angle |
degrees | |
Helix angle |
degrees | |
Transverse pressure angle |
degrees | |
Maximum allowable misalignment |
||
Axial runout |
mm | |
Radial runout |
mm | |
Efficiency |
% | |
Ring Gear |
||
Supplier |
||
Fabrication Supplier |
||
Material |
||
Type/No. of teeth |
||
Hardness |
||
Hardening method |
||
Tooth cutting process |
||
Design life expectancy |
Yrs | |
Tooth form |
||
Tip relief |
||
Face width |
mm | |
Outside diameter |
mm | |
Pitch diameter |
mm | |
Root diameter |
mm | |
Speed |
rpm | |
Durability service factor |
||
Strength service factor |
||
No.of sections |
||
Weight, each section |
||
Weight, total |
kg |
Page 9 of 13
TECHNICAL REFERENCE
ITEM | UNITS | |
Pinion
|
||
Supplier |
||
Forger |
||
Material |
||
Type/No. of Teeth |
||
Hardness |
||
Hardening method |
||
Tooth cutting process |
||
Design Life expectancy |
Yrs | |
Tooth form |
||
Tip relief |
||
Face width |
mm | |
Outside diameter |
mm | |
Pitch diameter |
mm | |
Root diameter |
mm | |
Speed |
rpm | |
Durability service factor |
||
Strength service factor |
||
No. of sections |
||
Weight |
kg | |
Pinion Shaft Bearings |
||
Type |
||
Supplier |
||
Size |
||
B-10 Life |
hrs | |
Seal Type |
||
Lubrication |
Quality Level |
|||
Overall |
|||
Pitch |
|||
Profile |
|||
Runout |
|||
Lead |
Page 10 of 13
TECHNICAL REFERENCE
ITEM | UNITS | |
Instruments. Describe how quality levels are checked and
instruments used. |
||
Weights and Sizes (for Gear & Pinion only) |
||
Shipping |
||
Total shipping wt., |
kg | |
Total shipping volume |
m3 | |
Largest piece (identify) |
||
Size of Largest piece |
m | |
Heaviest piece (identify) |
||
Weight of heaviest piece |
kg | |
Total number of shipping pieces |
||
Installed unit weights |
||
Ring gear |
kg | |
Pinion and shaft |
kg | |
Heaviest piece for erection |
||
DE Trunnion |
kg | |
Pinion and shaft |
kg | |
Inching Drive |
||
Type |
||
Supplier |
||
Speed |
rpm | |
Mill inching speed |
rpm | |
Motor rating |
kW/ rpm | |
Gear Reducer |
||
Supplier |
||
Model No. |
||
Ratio |
||
Service factor |
||
Gear Reducer (cont’d) |
Page 11 of 13
TECHNICAL REFERENCE
ITEM | UNITS | |
Bearing type B-10 Life |
hrs | |
Seal Type |
||
Lubrication |
||
Couplings model/torque rating |
||
High speed |
rpm | |
Low speed
|
||
Xxxx key interlocks |
||
Installed operating weight |
kg | |
Outdoor Installation |
||
Weights and Sizes Shipping (excluding gears) |
||
Total Shipping Weight |
||
Total Shipping Volume |
||
Largest Piece (identify) |
||
Size of Largest Piece |
m | |
Heaviest Piece (identify) |
||
Weight of Heaviest Piece |
kg | |
Total No. of Shipping Packages |
||
Installed Weight (excluding gears) |
||
Mill without Liner |
kg | |
Mill with Liners |
kg | |
Mill Total c/w Oper. Max Load 37% B.C. = |
kg |
Page 12 of 13
TECHNICAL REFERENCE
ITEM | UNITS | |
Heaviest Piece (excluding gear) |
||
Erection |
||
Identify Component |
||
Weight |
kg | |
Maintenance |
||
Identify Component |
||
Weight |
kg | |
Painting and Finish |
||
Surface Preparation |
||
Prime Coat |
||
Material |
||
Min. Thickness |
mils | |
Loads Acting on Footings |
||
Feed trunnion, live load |
kN | |
Feed trunnion, dead load |
kN | |
Discharge trunnion, live load |
kN | |
Discharge trunnion, dead load |
kN |
Page 13 of 13
TECHNICAL REFERENCE
ITEM | UNITS | |
General |
||
Mill Type: |
||
Diameter Inside Shell |
mm | |
Shell Length, Flange to Flange |
mm | |
Grinding Chamber Length |
mm | |
Volume Inside Liners |
m3 | |
Mill Operating Speed |
rpm | |
Percent of Criticial speed (new liners): |
% | |
Power Required with New liners at Design Ore & Media
Charge |
kW | |
Head Outside Diameter |
mm | |
Feed end Trunnion Min. I.D. with Liners |
mm | |
Discharge End Trunnion I.D. with Liners |
mm | |
Mill Drive |
||
Recommended Motor Rating, kW/RPM, Service Factor |
kW/rpm | |
Drive Arrangement — Gear Position |
||
Loaded mill WR2 |
kgm2 | |
Design Data |
||
Finite Element Stress Analysis Method |
||
Stress Analysis Method Developed by Whom? |
||
Independent Review of Stress Analysis Method by
Whom? |
||
Extent Field Verification of Stress Analysis Method |
||
Design Total Charge, % Mill Volume |
% | |
Design Ball Charge, % Mill Volume |
% | |
Mill Design Life Expectancy |
Yrs | |
Shell Design |
||
No. of Shell Sections |
||
Shell |
||
Material (ASTM No.) |
||
Design Stress |
MPa |
Page 1 of 13
TECHNICAL REFERENCE
ITEM | UNITS | |
Max Thickness |
mm | |
Location of Max. Thickness |
||
Min. Thickness |
mm | |
Location of Min. Thickness |
||
Shell Length, Flange to Flange |
mm | |
Shell Weight (total) |
kg | |
Circumferential Flanges
Material (ASTM No.) |
||
Design Stress |
MPa | |
Thickness |
mm | |
Outside Diameter |
mm | |
Bolt Circle Diameter |
mm | |
Quantity and Size of Fasteners |
mm | |
Axial Flanges |
||
Material (ASTM No.) |
||
Design Stress |
kPa | |
Thickness |
mm | |
Head and Trunnion Design |
||
Heads |
||
Type |
||
Material (ASTM No.) |
||
Design Stress |
MPa | |
Fabrication Method |
||
Angle |
degrees | |
No. of Pieces/Assembly Method |
||
Thickness: (max/Min) |
||
at Trunnion/Head Interface |
mm | |
at Shell/head Interface |
mm | |
Outside diameter |
mm | |
Bolt Circle Diameter |
mm | |
Flange Thickness |
mm |
Page 2 of 13
TECHNICAL REFERENCE
ITEM | UNITS | |
Quantity and Size of Fasteners Head/Trunnion |
||
Overall Length |
mm | |
Weight |
kg | |
Trunnions |
||
Type |
||
Material (ASTM No.) |
||
Trunnions (cont’d) |
||
Design Stress |
Mpa | |
Fabrication Method |
||
Thickness (Max/Min) |
||
at Knuckle Radius |
mm | |
at Shell/head Interface |
||
at Bearing Surface |
mm | |
Flange O.D. |
mm | |
Flange Bolt Fasteners |
||
Quantity and Size of Fasteners |
||
Overall Length |
mm | |
Weight |
kg | |
Mill Support Bearing Assemblies |
||
Type and Location |
||
Journal |
||
Diameter |
mm | |
Length |
mm | |
Projected Area |
m2 | |
Thrust Face Area |
||
Pressure with Max. Load |
||
Feed End |
kPa | |
Discharge end |
kPa | |
Thrust |
||
Self-Aligning Method |
||
Thermally Stress Relieved? |
Page 3 of 13
TECHNICAL REFERENCE
ITEM | UNITS | |
Type of Seals |
||
Bearing Inserts |
||
Type: Tilting Pad/Sleeve/Other (Specify) |
||
Mounted on Riding Ring or Trunnion |
||
Material |
||
Thickness |
mm | |
Pad Length/Width/Thickness |
mm | |
No. Per Bearing |
||
Contact Angle w/Journal |
degrees | |
Bearing Weight each |
kg | |
Means of Holding Bearing Aligned on Baseplates |
||
Temperature Detectors |
||
Type |
||
No. Per Bearing |
||
Alarm Temperature |
°C | |
Shutdown Temperature |
°C | |
Mill Support Bearing Lube System |
||
Supplier |
||
Type |
||
No. of Systems/Mill |
||
Pumps: High Pressure pockets/ HP thrust and flood/Low
Pressure conditioning/ HPSpherical Seats |
||
Type |
||
Rating |
||
Flow rate |
l/s | |
Pressure |
kPa | |
Motor Power |
kW | |
No. per Lube System |
||
Operating/Standby |
||
Excess Capacity |
||
High Pressure |
% | |
Low Pressure |
% |
Page 4 of 13
TECHNICAL REFERENCE
ITEM | UNITS | |
Thrust |
||
Heat Exchanger |
||
Type |
||
Cooling |
l/s /kPa | |
No. per Lube System |
||
Oil Filter |
||
Type |
||
Size |
Microns | |
No. per Lube System |
||
Operating/Standby |
||
Oil Heaters |
||
Type |
||
Rating |
kW | |
No. per Lube System |
||
Operating/Standby |
kg | |
Lube system Weight, empty/filled |
kg | |
Pinion Bearing Lube System |
||
Supplier |
||
No. of Systems per Mill |
||
Pumps |
||
Type |
||
Flow rate |
l/s | |
Pressure |
kPa | |
Motor Power |
kW | |
No. per Lube System |
||
Operating/Standby |
||
Heat Exchanger |
||
Type |
Page 5 of 13
TECHNICAL REFERENCE
ITEM | UNITS | |
Cooling Water Req’d |
l/s / kPa | |
Oil Filter |
°C | |
Type |
||
Size |
Microns | |
No. per Lube System |
||
Operating/Standby |
||
Oil Heater |
||
Type |
||
Rating |
kW | |
No. per Lube System |
||
Operating/Standby |
||
Weight, empty/filled |
kg | |
Feed Spout |
||
Type |
||
Material |
||
Thickness |
mm | |
Liner Material/Thickness |
mm | |
Opening Dimensions |
mm | |
Seal Type |
||
Weight |
||
Trommel |
||
Type |
||
Material |
||
Thickness |
mm | |
Outside Diameter x Length |
mm | |
Opening Size |
mm | |
Diameter Inside Spiral |
mm | |
Weight |
kg | |
Ring and Pinion Gear Lube System |
||
Type |
||
Lubricant |
Page 6 of 13
TECHNICAL REFERENCE
ITEM | UNITS | |
Air Requirements: (Free air) 15 min Cycles |
l/s / kPa | |
Ring and Pinion Gear Lube System (cont’d) |
||
Weight |
kg | |
Air Clutch |
||
Supplier |
||
Type |
||
Model |
||
Torque |
||
Operating |
Nm | |
Maximum |
Nm | |
Service factor |
||
Air Requirement: (Free Air) |
l/s / kPa | |
Locking Device |
||
Weight Each |
kg | |
Liners |
||
Shell |
||
Type |
||
Material |
||
Thickness, min/max |
mm | |
Liner Bolt Type, size |
mm | |
Backing Material/Thickness |
mm | |
Weight |
kg | |
Heads |
||
Type |
||
Material |
||
Thickness |
mm | |
Liner Bolt Type, size |
mm | |
Backing Material/Thickness |
mm | |
Weight |
kg | |
Liners |
||
Shell |
Page 7 of 13
TECHNICAL REFERENCE
ITEM | UNITS | |
Type |
||
Material |
||
Thickness, min/max |
mm | |
Liner Bolt Type, size |
mm | |
Backing Material/thickness |
mm | |
Weight |
kg | |
Heads |
||
Type |
||
Material |
||
Thickness |
mm | |
Liner Bolt Type, size |
mm | |
Backing Material/thickness |
mm | |
Weight |
kg | |
Feed Trunnion Liner |
||
Type |
||
Material |
||
Thickness |
mm | |
Diameter |
mm | |
Seal |
||
Weight |
kg | |
Discharge Trunnion Liner |
||
Type |
||
Material |
||
Thickness |
mm | |
Diameter |
mm | |
Seal |
||
Weight |
kg | |
Jacking System |
||
Xxxx Size |
||
Quantity |
||
Hydraulic Power Package |
||
Motor Rating |
kW |
Page 8 of 13
TECHNICAL REFERENCE
ITEM | UNITS | |
Motor Speed |
rpm | |
Cradles, describe |
||
Gear Set |
||
Normal diametral pitch |
||
Normal pressure angle |
degrees | |
Helix angle |
degrees | |
Transverse pressure angle |
degrees | |
Maximum allowable misalignment |
||
Axial runout |
mm | |
Radial runout |
mm | |
Efficiency |
% | |
Ring Gear |
||
Supplier |
||
Casting Supplier |
||
Material |
||
Type/No. of teeth |
||
Hardness |
||
Hardening method |
||
Tooth cutting process |
||
Design life expectancy |
||
Tooth form |
||
Tip relief
Face width |
mm | |
Outside diameter |
mm | |
Pitch diameter |
mm | |
Root diameter |
mm | |
Speed |
rpm | |
Durability service factor |
||
Strength service factor |
||
No.of sections |
||
Weight, each section |
kg |
Page 9 of 13
TECHNICAL REFERENCE
ITEM | UNITS | |
Weight, total |
kg | |
Pinion |
||
Supplier |
||
Forger |
||
Material |
||
Type/No. of Teeth |
||
Hardness |
||
Hardening method |
||
Tooth cutting process |
||
Design Life expectancy |
||
Tooth form |
||
Tip relief |
||
Face width |
mm | |
Outside diameter |
mm | |
Pitch diameter |
mm | |
Root diameter |
mm | |
Speed |
rpm | |
Durability service factor |
||
Strength service factor |
||
No. of sections |
||
Weight |
||
Pinion Shaft Bearings |
||
Type |
||
Supplier |
||
Size |
||
B-10 Life |
hrs | |
Seal Type |
||
Lubrication |
||
Quality Level |
||
Overall |
||
Pitch |
||
Profile |
Page 10 of 13
TECHNICAL REFERENCE
ITEM | UNITS | |
Runout |
||
Lead |
||
Instruments. Describe how quality levels are checked and
instruments used. |
||
Weights and Sizes (for Gear & Pinion only) |
||
Shipping |
||
Total shipping wt., |
kg | |
Total shipping volume |
m3 | |
Largest piece (identify) |
||
Size of Largest piece |
m | |
Heaviest piece (identify) |
||
Weight of heaviest piece |
kg | |
Total number of shipping pieces |
||
Installed unit weights |
||
Ring gear |
kg | |
Pinion and shaft |
kg | |
Heaviest piece for erection |
||
Ring gear |
kg | |
Pinion and shaft |
kg | |
Inching Drive |
||
Type
|
||
Supplier |
||
Speed |
rpm | |
Mill inching speed |
rpm | |
Motor rating |
kw/rpm | |
Gear Reducer |
||
Supplier |
||
Model No. |
||
Ratio |
||
Service factor |
||
Bearing type B-10 Life |
Page 11 of 13
TECHNICAL REFERENCE
ITEM | UNITS | |
Seal Type |
||
Lubrication |
||
Couplings model/torque rating |
||
High speed |
||
Low speed |
||
Xxxx key interlocks |
||
Installed operating weight |
||
Outdoor Installation |
||
Weights and Sizes Shipping (excluding gears) |
||
Total Shipping Weight |
||
Total Shipping Volume |
||
Largest Piece (identify) |
||
Size of Largest Piece |
m | |
Heaviest Piece (identify) |
||
Weight of Heaviest Piece |
kg | |
Total No. of Shipping Packages |
||
Weights and Sizes Shipping (excluding gears) |
||
Installed Weight (excluding gears) |
||
Mill without Liner |
kg | |
Mill with Liners |
kg | |
Mill Total c/w Oper. Max Load 37% B.C. |
kg | |
Heaviest Piece (excluding gear) |
||
Erection |
||
Identify Component |
||
Weight |
kg | |
Maintenance |
||
Identify Component |
||
Weight |
kg | |
Painting and Finish |
Page 12 of 13
TECHNICAL REFERENCE
ITEM | UNITS | |
Surface Preparation |
||
Primer Coat |
||
Material |
||
Min. Thickness |
mils | |
Finish Coat |
||
Material |
||
Min. Thickness |
mm |
Page 13 of 13