Exhibit 10.25
----------------------------------------------------------------------------------------------------------------------------------
1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 1
----------------------------------------------------------------------------------------------------------------------------------
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4.REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (if applicable)
P00001 10/01/97
----------------------------------------------------------------------------------------------------------------------------------
6. ISSUED BY CODE W15QKN03 7. ADMINISTERED BY (if other than Item 6) CODE W15QKN03
------------- ----------------
U.S. Army TACOM-ARDEC U.S. Army TACOM-ARDEC
AMSTA-AR-PC-A, B. 10 AMSTA-AR-PC-A, B. 10
Picatinny Xxxxxxx, XX 00000-0000 Picatinny Xxxxxxx, XX 00000-0000
----------------------------------------------------------------------------------------------------------------------------------
8. NAME AND ADDRESS OF CONTRACTOR
(No.,street, country, State and ZIP code) /X/ 9A. AMENDMENT OF SOLICITATION NO.
-------------------------------------------------------------------------------
Implant Sciences Corporation ---------------------------------------
000 Xxxxxxx Xxxx, #0 0X. DATED (SEE ITEM 11)
Xxxxxxxxx, XX 00000 ----------------------------------------------------
10A. MODIFICATION OF CONTRACT/ORDER NO.
/X/ DAAE30-97-2-0100
--------------------------------------
10B. DATED (SEE ITEM 13)
09/30/97
-------------------------------------------------------------------------------
CODE OATR5 FACILITY CODE
-------------------------------------------------------------------------------
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
-------------------------------------------------------------------------------
/ / The above numbered solicitation is amended as set forth in Item 14.
The hour and date for receipt / /is extended / / is not extended.
Offers
Offers must acknowledge receipt of this amendment prior to the hour and date
specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, ________ copies of the amendment; (b) By
acknowledging receipt of this amendment on each copy of the offer submitted; or
(c) By reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS
PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If
by virtue of this amendment you desire to change an offer already submitted,
such change may be made by telegram or letter, provided each telegram or letter
makes reference to the solicitation and this amendment, and is received prior to
the opening hour and date specified.
-------------------------------------------------------------------------------
12. Accounting and Appropriation Data (If required)
-------------------------------------------------------------------------------
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS, IT MODIFIES THE
CONTRACTOR/ORDER NO. AS DESCRIBED IN ITEM 14.
-------------------------------------------------------------------------------
/X/ A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority)
THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
ORDER NO. IN ITEM 10A.
------------------------------------------------------------------------------
/X/ B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE
ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation
date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR
43.103(b).
------------------------------------------------------------------------------
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
------------------------------------------------------------------------------
D. OTHER (Specify type of modification and authority)
------------------------------------------------------------------------------
E. IMPORTANT: Contractor /x/ is not. / / is required to sign this
document and return copies to the issuing office.
-------------------------------------------------------------------------------
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings,
including solicitation/contract subject matter where feasible.)
The purpose of this modification is to change the Agreement Number shown on
the face of the Agreement. The number is hereby changed from:
DAAE30-98-2-0100 to DAAE30-97-2-0100.
All other terms and conditions remain unchanged.
Except as provided herein, all terms and conditions of the document
referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in
full force and effect.
------------------------------------------------------------------------------
15A. NAME AND TITLE OF SIGNER (Type or print)
------------------------------------------------------------------------------
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Xxxx Xxxxxxxxxx
------------------------------------------------------------------------------
1
2
-----------------------------------------------------------------------------------------------------------------------------------
15B. CONTRACTOR/OFFEROR 15c. DATE 16B. XXXXXX XXXXXX XX XXXXXXX 00X. DATE SIGNED
SIGNED
BY /s/ illegible signature 10 Oct 97
---------------------------------------- -----------------------------------
(Signature of person authorized to sign) (Signature of Contracting Officer)
----------------------------------------------------------------------------------------------------------------------------------
2
3
COOPERATIVE AGREEMENT BETWEEN
THE UNITED STATES OF AMERICA
U.S. ARMY TANK-AUTOMOTIVE AND ARMAMENTS COMMAND
ARMAMENT RESEARCH, DEVELOPMENT AND ENGINEERING CENTER
(TACOM-ARDEC)
PICATINNY XXXXXXX, XX 00000-0000
AND
IMPLANT SCIENCES CORPORATION
000 XXXXXXX XXXX, #0
XXXXXXXXX, XX 00000-0000
TITLE OF PROJECT: Environmentally Friendly Alternative to Chrome Plating
Agreement Number: DAAE30 98-2-0100
Authority: 10 U.S.C. 2358
Total Amount of Funding: [Redacted text]
Total Amount of Government Funding: [Redacted text]
Accounting and Appropriations Data:
97 7 0400 1301 7 XX XXXX 76100.00000 25B1 PK 0007L DTS 9 028017
This Agreement is entered into between the United States of America, hereinafter
called the "Government", represented by the U.S. Army TACOM-ARDEC, "Funding
Agency" on behalf of the Defense Advanced Research Projects Agency, "DARPA", and
Implant Sciences Corporation for the development of Environmentally Friendly
Alternatives To Chrome Plating pursuant to and under U.S. Federal Law.
For Implant Sciences Corp. For the United States of America
TACOM-ARDEC
/s/ X.X. Xxxxxx 9/30/97 /s/Xxxx Xxxxxxxxxx 9/30/97
------------------------- ---------------------------------
Signature Date Signature
X.X.Xxxxxx Xxxx Xxxxxxxxxx, Grants Officer
------------------------- -------------------------------
Type Name and Title Typed Name and Title
3
4
TABLE OF CONTENTS
Articles Page No.
-------- --------
PART I SCOPE OF AGREEMENT
Article 1 Scope 4
PART II ADMINISTRATIVE INFORMATION
Article 2 Definitions 4
Article 3 Administrative Requirements 5
Article 4 Administrative Responsibilities 6
Article 5 Period of Performance 6
PART III FINANCIAL MATTERS
Article 6 Obligations 7
Article 7 Payment 7
Article 8 Program Income 8
Article 9 Close-out Adjustments 8
PART IV PRIOR APPROVALS
Article 10 Modifications 8
Article 11 Revision to Financial Plans 9
PART V INTELLECTUAL PROPERTY RIGHTS
Article 12 Inventions 9
Article 13 Data Rights 10
PART VI TECHNICAL AND FINANCIAL REPORTS
Article 14 Annual and Final Technical Reports 10
Article 15 Informal Technical Reports 13
Article 16 Scientific Reports 13
Article 17 Reporting Financial Information 13
PART VII DISTRIBUTING PROJECT RESULTS
Article 18 Distributing Project Results 13
PART VII MISCELLANEOUS PERFORMANCE ISSUES
Article 19 Using Technical Information Resources 14
Article 20 Disputes 14
Article 21 Access to Information 15
Article 22 Site Visit 15
Article 23 Limitation of Liability 15
4
5
PART IX SUSPENSION AND TERMINATION
------- --------------------------
Article 24 Suspension and Termination 16
PART X PROPERTY
------ --------
Article 25 Title to Nonexpendable Personal Property 17
PART XI CERTIFICATIONS
------- --------------
Article 26 Certifications 17
PART XII OTHER ARTICLES
-------- --------------
Article 27 Military Recruiting on Campus 18
ATTACHMENTS
Attachment 1 Statement of Work 19
Attachment 2 Schedule of Payments and Payable Milestones 22
Attachment 3
Detailed Schedule of Payments and Payable Milestones 23
PART I - SCOPE OF THE AGREEMENT
ARTICLE 1- SCOPE
1. The Recipient shall perform a coordinated research and development program
for the development of environmentally friendly alternatives to chrome plating.
The research shall be carried out in accordance with the Statement Of Work (SOW)
incorporated in this Agreement as Attachment 1. The Recipient shall submit or
otherwise provide all documentation required by Part VI.
2. The Recipient shall be paid for each Payable Goal accomplished in accordance
with the Schedule and Detailed Schedule of Payable Milestones as set forth in
Attachments 2 and 3 and the procedures in Part III. Both of these schedules may
be revised or updated in accordance with Parts IV and VI.
3. The Government and the Recipient estimate that the Statement of Work of this
Agreement can only be accomplished with the Recipient's aggregate resource
contribution of [Redacted text] from the effective date of this Agreement
through twenty-four (24) months thereafter. The Recipient intends and, by
entering into this Agreement, undertakes to cause to be provided these funds.
Recipient contributions will be provided as detailed in the Schedule of Payable
Milestones, as set forth in Attachments 2 and 3 and Part III. If the Funding
Agency or Recipient are unable to provide the respective total contributions,
the other Party may reduce its project funding by the same percentage.
5
6
4. The Government will have continuous involvement with the Recipient. The
Government will also obtain access to research results and certain rights in
data and patents pursuant to Part V. The Funding Agency and the Recipient are
bound to each other by a duty of good faith and reasonable research effort in
achieving the goals of the Recipient.
5. This Agreement is a cooperative agreement pursuant to 10 U.S.C. 2358. The
Parties agree that the principal purpose of this Agreement is for the Government
to support and stimulate the Recipient to provide a reasonable research effort
and not for the acquisition of property or services for the direct benefit or
use of the Government. The Federal Acquisition Regulations (FAR) and Department
of Defense Federal Acquisition Regulations (DFAR) apply only as specifically
referenced herein. This Agreement is not a procurement contract or grant
agreement for purposes of FAR Subpart 31.205-18, an such other Parties' IR&D
costs incurred in performance under this Agreement are not construed to be
sponsored by, or required in performance of this Agreement. This Agreement is
not intended to be, nor shall it be construed as, by implication or otherwise, a
partnership, a corporation or other business organization.
PART II - ADMINISTRATIVE INFORMATION
ARTICLE 2- DEFINITIONS
1. The term "Agreement" as used herein is defined as the articles in this
Cooperative Agreement number DAAE30-97-2-0100, and it attachments.
2. The term "Recipient" as used herein is defined as Implant Sciences
Corporation.
3. The term "Parties" as used herein is defined as the Recipient and the
Government, jointly.
4. The term "performance year" as used herein shall refer to each consecutive
twelve month period from the effective date of this agreement throughout the
term of the agreement.
ARTICLE 3 - ADMINISTRATIVE REQUIREMENTS
1. This Agreement will be administered in accordance with, and Recipients shall
comply with the requirements of, the following, which are incorporated herein by
reference:
* 32 CFR 34
* OMB Circular A-110 (19 Nov 93), "Grants and Agreements with
Institutions of Higher Education, Hospitals, and Other
Nonprofit Organizations", as revised
* OMB Circular A-122 (08 May 97), "Cost Principles for Nonprofit
Organizations", as revised
6
7
* OMB Circular A-21 (26 Apr 96), "Cost Principles for
Educational Institutions"
* OMB Circular A-133 (24 Jun 97), "Audits of Institutions of
Higher Education and Other Nonprofit Institutions"
* OMB Circular A-88 (27 Nov 79), "Indirect Cost Rates, Audit and
Audit Follow-Up at Educational Institutions"
* Interim Guidance draft of DoD 3210.6-R, the DoD Grant and
Agreement Regulations (DODGARs) (4 Feb 94)
The regulations can be obtained from:
Office of Management and Budget
EOP Publications Office
Telephone: (000) 000-0000
or the following web sites:
xxxx://xxx.xx.xxx.xxx/xxx0.xxxx (OMB Circulars)
xxxx://xxx.xxx.xxx/xxx/xxx/xxxxxxxx.xxx (OMB Circulars and CFR)
2. The following shall be the order of precedence, in descending order, in the
event of a conflict:
a. The governing directives listed in paragraph 1 above;
b. The articles in this Agreement;
c. The attachments to this Agreement.
ARTICLE 4 - ADMINISTRATIVE RESPONSIBILITIES
Unless otherwise provided in this Agreement, approvals permitted or required to
be made by the Government may be made only by the Funding Agency Grants Officer.
Administrative and contractual matters under this Agreement shall be referred to
the following representatives of the Parties:
TACOM-ARDEC
Grants Officer/: Xxxx Xxxxxxxxxx Telephone: (000) 000-0000
Administrator TACOM-ARDEC Fax: (000) 000-0000
XXXXX-XX-XX-X, Xxxx. 00
Picatinny Arsenal, NJ 07806-5000
Grants Specialist: Xxxxxxx X. Xxxxxxxxxx Telephone: (000) 000-0000
7
8
TACOM-ARDEC Fax: (000) 000-0000
XXXXX-XX-XX-X, Xxxx. 00
Picatinny Arsenal, NJ 07806-5000
Recipient:
Contract Manager: Xxxxx Xxxx Telephone: (000) 000-0000
Fax: (000) 000-0000
Technical matters under this Agreement shall be referred to the following
representatives:
TACOM-ARDEC:
Program Engineer: Xxx Xxxxxxxx Telephone: (000) 000-0000
TACOM-ARDEC Fax: (000) 000-0000
AMSTA-AR-WEA, Xxxx. 000
Picatinny Arsenal, NJ 07806-5000
Recipient:
Principal Investigator: Xx. Xxxxxxx Xxxxxx Telephone: (000) 000-0000
The Parties may change the individuals named in this Article by written
notification to the other Party. Changes shall be made to this Agreement by
formal modification by the Grants Officer pursuant to Article 12.
ARTICLE 5 - PERIOD OF PERFORMANCE
The Recipient program commences upon the date of the last signature hereon and
continues for a period of twenty-four (24) months. If all funds are expended
prior to the twenty-four (24) month duration, the Parties have no obligation to
continue performance and may elect to cease development at that point.
Provisions of this Agreement, which by their express terms or by necessary
implication, apply for periods of time other than specified herein, shall be
given effect, notwithstanding this Article.
PART ILL - FINANCIAL MATTERS
ARTICLE 6- OBLIGATION
1. The Government's obligation to make payment to the Recipient is limited to
only those funds allotted to this Agreement or by modification to the Agreement.
The Funding Agency may incrementally fund this Agreement.
2. If modification becomes necessary in performance of this Agreement, pursuant
to Part IV, the Grants Officer and Recipient shall execute a revised Schedule,
and Detailed Schedule, of Payable
8
9
Milestones consistent with the current Program Plan and will notify the
Recipient in writing of the Funding Agency's changed level of obligation.
3. The Government's share for full performance of this award is [Redacted text].
At this time, [Redacted text] is provided for funding of this Agreement. The
remainder of the Government's share will be provided at a later date. The
Government's share for full performance will be paid in accordance with the
Schedule, and Detailed Schedule, of Payable Milestones as set forth in
Attachments 2 and 3 and the procedures in Part III. These schedules may be
revised or updated in accordance with Parts IV and VI.
4. To minimize interruption of effort due to lack of funds, the Recipient shall
notify the Grants Officer in writing whenever the amount of funds expended under
this award when added to anticipated costs in the next sixty (60) days will
exceed 75% of the amount allotted by the Government plus the Recipient's
corresponding share (if this is a cost-sharing Agreement). If, after
notification, additional funds are not allotted, the Parties agree this
Agreement will be terminated. The Recipient is not obligated to continue
performance or otherwise incur costs in excess of (i) the amount then allotted
to the Agreement by the Government, or (ii) if this is a cost-sharing agreement,
the amount allotted by the Government to the Agreement plus the Recipient's
corresponding share, until the Grants Officer notifies the Recipient in writing
that the amount allotted by the Government has been increased and specifies and
increased amount, which shall then constitute the total amount allotted by the
Government to this Agreement. When and to the extent that the Recipient incurs
before the increase that are in excess of (i) the amount previously allotted by
the Government or (ii) if this is a cost-sharing agreement, the amount
previously allotted by the Government to the Agreement plus the Recipient's
corresponding share, shall be allowable to the same extent as if incurred
afterward, unless the Grants Officer issues a termination or other notice and
directs that the increase is solely to cover termination or other specified
expenses.
ARTICLE 7- PAYMENT
1. In addition to any other financial reports provided or required, the
Recipient shall notify the Grants Administrator immediately if any contribution
from the Recipient is not made as required.
2. The Recipient shall document the accomplishments of each Payable Milestone by
submitting the Payable Milestones Report required by Part VI. The Recipient
shall submit an original and two (2) copies of all invoices to the Grants
Administrator for payment approval. After written verification of the
accomplishment of the Payable Milestone by the Funding Agency Program Engineer
and approval by the Grants Administrator, the invoices will be forwarded to the
payment office within thirty (30) calendar days of receipt of the invoices at
the Funding Agency. Payments will be made by the Funding Agency within thirty
(30) days of the Funding Agency's transmittal. Payment approval for the final
Payable Milestone will be made after reconciliation of the Funding Agency's
funding with actual Recipient contributions. Subject to change only
9
10
through written Agreement modification, payment shall be made to the address of
the Recipient as set forth below.
3. Name and Address of Payee: Implant Sciences Corporation, Attn: Xx. Xxxxx
Xxxx, 000 Xxxxxxx Xxxx, #0, Xxxxxxxxx, XX 00000-0000.
4. Cost-reimbursable milestone payments shall be made no more frequently then
quarterly in the amounts set forth in Attachment 2, "Detailed Schedule of
Payable Milestones", provided the Funding Agency Program Manager has verified
the accomplishment of the Payable Milestones. It is recognized that the
quarterly accounting of current expenditures reported in the "Quarterly Business
Status Report" submitted in accordance with Part VI is not necessarily intended
or required to match the Payable Milestones until submission of the Final
Report. However, Payable Milestones may be revised during the course of the
program to reflect current and revised projected expenditures.
5. Limitation of Funds: In no case shall the Government's financial obligation
exceed the amount obligated under this Agreement.
6. The Funding Agency acknowledges and agrees that the applicable values of
previously developed technology or intellectual property, approved as in-kind
contributions, are acceptable and that no further justification for those value,
or application of such technology, shall be required.
ARTICLE 8- PROGRAM INCOME
No program income will be generated during the project period.
ARTICLE 9- CLOSE-OUT ADJUSTMENTS
The Government may make a downward adjustment to the Government funding amount
after completion of the effort under the Agreement, when appropriate in
accordance with OMB Circular A-110.
PART IV - PRIOR APPROVALS
ARTICLE 10 - MODIFICATIONS
1. At any time during the term of the Agreement, research progress or results
may indicate that a change in the Statement of Work and/or Payable Milestones,
would be beneficial to program objectives. Recommendations for modifications,
including justifications to support any changes to the Statement of Work and or
the Payable Milestones, will be documented in writing and submitted by the
Recipient to the Funding Agency Program Manager, with a copy to the Grants
Officer. This documentation letter will detail the technical, chronological and
financial impact of the proposed modification to the research program. The
Recipient shall approve an Agreement modification. The Government is not
obligated to pay for additional or revised Payable
10
11
Milestones until the Payable Milestones Schedules (Attachments 2 and 3) are
formally revised by the Funding Agency Grants Administrator and made part of
this Agreement.
2. The Funding Agency Program Engineer shall be responsible for the review and
verification of any recommendations to revise or otherwise modify the Agreement
Statement of Work, Schedule of Payments or Payable Milestones, or other proposed
changes to the terms and conditions of this Agreement.
3. The Grants Officer may unilaterally make minor or administrative
modifications to this Agreement (e.g. changes in the paying office or
appropriation data, changes to Government personnel identified in the Agreement,
etc.).
ARTICLE 11 - REVISION TO FINANCIAL PLANS
1. The financial plan, or approved budget, is the financial expression of the
effort to be performed under this Agreement as approved during the award
process. This Agreement and its terms and conditions reflect the approved
financial plan. Some change to the plan require prior approval, as described
below.
2. Recipients are authorized to:
a. Incur preaward costs up to 90 days at their own risk.
b. Carry forward unobligated balances to subsequent funding periods
(with the exception of the final funding period) without prior
Government approval.
3. All other "prior approvals" required by the applicable cost principles and
OMB Circular A- 110 are waived, except actions of the following. All other
"prior approvals" are noted in Article 10 above.
a. Change the scope or objective of a project
b. Change key personnel - The Recipient shall request prior approval
from the Grants Officer if the Principal Investigator can not or will
not devote substantially the same amount of time to the project as was
proposed or if he or she will not be able to otherwise perform as
originally proposed.
c. Require additional funding
4. The Recipient will be notified of approval/nonapproval by the Grants Officer,
in writing, within thirty (30) days of receipt of the request.
PART V - INTELLECTUAL PROPERTY RIGHTS
ARTICLE 12 - INVENTIONS
11
12
1. The clause entitled "Rights to Inventions Made by Nonprofit Organizations and
Small Business Firms" (37 CFR 401) is hereby incorporated by reference and the
clauses in paragraph 401.14 are modified as follows: replace the word
"contractor" with "Recipient"; replace the words "agency", "Federal Agency" and
"funding Federal Agency" with "government"; replace the word "contract" with
"Agreement"; delete paragraphs (g)(2), (g)(3) and the words "to be performed by
a small business firm or domestic nonprofit organization" from paragraph (g)(1).
2. The Recipient shall file Invention (Patent) Reports as of the close of the
performance year and at the end of the term for this Agreement. Annual reports
are due sixty (60) calendar days after the end of each year of performance and
final reports are due sixty (60) calendar days after the expiration of the final
performance period. The Recipient shall use DD Form 882, Report of Inventions
and Subcontracts, to file an inventions report. Negative reports are also
required. The Recipient shall submit the original and one copy to the Grants
Officer, one copy to the Grants Administration Office, if different from the
Grants Officer, and one copy to the Program Engineer.
3. Final payment can not be made nor can the Agreement be closed out until the
Recipient delivers to the Government all disclosures of subject inventions
required by this Agreement, an acceptable final report pursuant to Article 14
entitled "Annual and Final Technical Reports", and all confirmatory instruments.
ARTICLE 13 - DATA RIGHTS
1. All rights and title to data and technical data, as defined in 48 CFR 27.401,
generated under this Agreement shall vest in the Recipient.
2. The Recipient hereby grants to the U.S. Government a non-exclusive,
non-transferable, royalty-free, fully paid-up license to use, duplicate, or
disclose for governmental purposes any data, technology and inventions, whether
patented or not, made or developed under this Agreement.
3. The Recipient reserves the right to protect by copyright original works
developed under this Agreement. All such copyrights will be in the name of the
Recipient. The Recipient hereby grants the U.S. Government a non-exclusive,
non-transferable, royalty-free, fully paid-up license to reproduce, prepare
derivative works, distribute copies to the public, and perform publicly and
display publicly, for governmental purposes, any copyrighted materials developed
under this Agreement, and to authorize other to do so.
4. The Recipient is responsible for affixing appropriate markings indicating the
rights of the Government on all data and technical data deliver under the
Agreement. The Government shall be deemed to have unlimited rights in all data
and technical data delivered without markings.
PART VI - TECHNICAL AND FINANCIAL REPORTS
12
13
ARTICLE 14 - ANNUAL AND FINAL TECHNICAL REPORTS
1. The Recipient shall submit to or otherwise provide to the Funding Agency, the
reports described in Attachment II and such other technical reports as may be
mutually agreed between the Recipient and the Funding Agency. With the approval
of the Funding Agency Program Engineer, reprints of published articles may be
distributed as technical reports. All reports shall be marked in accordance with
the article entitled "Distributing Project Results". This includes but is not
limited to the following.
* reports presented at scientific and technical meetings, conferences,
workshops or other information exchange meetings;
* publications in scientific and technical journals or proceedings of
information exchange meetings;
* news releases and news letters; and
* articles in trade publications.
2. Payable Milestone Report
The Recipient will provide the Funding Agency Program Engineer with two (2)
copies of documentation describing the extent of accomplishments of Payable
Milestones as required by Article 7 entitled Payment.
3. Quarterly Business Status Report
a. As stated in Attachment 3, Detailed Schedule of Payable Milestones,
the Recipient shall provide a quarterly report. Two (2) copies will be
submitted: one (1) copy to the Funding Agency Program Engineer and one (1) copy
to the Grants Officer. The report will have two major sections:
1) Technical Status Report: Will detail the Recipient's technical
progress to date and report on all problems and resolutions,
technical issues and major developments during the reporting
period.
2) Business Status Report: Will provide quarterly accounting of
current expenditures, including the status of the Recipient's
contributions. Any major deviations shall be explained along
with discussions of the adjustment actions proposed.
4. Annual Technical Report
a. Annual reports are required for efforts of more than one year. This
report will provide a concise and factual discussion of the significant
accomplishments and progress during the year covered by the report. Each of the
topics described below shall be addressed for the effort being performed:
13
14
(1) A comparison of actual accomplishments with the goals and
objectives established for the period, the findings of the
investigator, or both.
(2) Reasons why established goals were not met, if appropriate.
(3) Other pertinent information including, when appropriate,
analysis and explanation of cost overruns.
b. In addition, for research awards, each of the following topics (4)
through (7) shall be addressed as appropriate to the research effort being
performed:
(4) A cumulative chronological list of written publications in
technical journals. Include those in press as well as
manuscripts in preparation and planned for later submission.
Indicate likely journals, authors and titles.
(5) A list of professional personnel associated with the research
effort. List any advanced degrees awarded, including dates,
recipient, type of degree, and those titles.
(6) Interactions (Related Activities):
(a) Papers presented at meetings, conferences, seminars, etc.
(b) Consultative and advisory functions to other laboratories
and agencies, especially the Army and other DoD
laboratories on research supported under the Agreement.
Provide factual information about the subject matter,
institutions, dates and the names of individuals involved.
(7) New discoveries, inventions, or patent disclosures and
specific applications stemming from the research effort.
5. Final Technical Report
a. A Final Technical Report is due at the completion of the Agreement.
This report will provide a comprehensive, cumulative, and substantive summary of
the progress and significant accomplishments achieved during the total period of
the effort covered by the Agreement. Each of the topics described above shall be
addressed as appropriate for the effort performed. Publications may be bound and
attached as appendices.
b. When the results of a research effort have not previously been
reported in scientific or technical publications, the Final Technical Report
must provide sufficient detailed discussions of findings and accomplishments
obtained in pursuit of the planned research objectives.
6. Submittal
14
15
a. The Recipient shall submit annual and final technical reports in the
original and two (2) copies to the Project Engineer within ninety (90) calendar
days after completion of the period covered by the report. Provide a copy of the
transmittal letter to the Grants Officer.
7. Format
a. Cover and Title Page - Standard Form (SF) 298, Report Documentation
Page, shall be used. Item 13 of the form should contain a 100 to 200 word
abstract summarizing technical progress during the reporting period. Style
should be third person singular using past tense. Jargon, special symbols,
notations, subscripts, mathematical symbols or foreign alphabet letters are not
permitted. The pages should be prepared for acquisition and distribution by the
Defense Technical Information Center (DTIC). All pages should be of good quality
for copying purposes.
b. The report shall be prepared in accordance with American National
Standards Institute (ANSI) document Z39.18-1987, "Scientific and Technical
Reports: Organization, Preparation, and Production", which may be obtained from
American National Standards Institute Incorporated
0000 Xxxxxxxx
Xxx Xxxx, XX 00000
ARTICLE 15 - INFORMAL TECHNICAL REPORTS
This report shall be prepared only if requested by the Government Project
Engineer. It shall be submitted in letter format and is usually not longer then
three (3) pages in length. Its primary purpose is to inform the Project Engineer
about significant events, accomplishments, and anticipated problems that may
affect the conduct of the planned effort. It should summarize the progress of
the effort being performed, new discoveries, inventions or patent disclosures,
anticipated changes in commitments of key personnel and in the planned approach;
acquisition or fabrication of major or special research equipment; and the
titles of manuscripts planned for publication. Send the Project Engineer one (1)
copy signed by the Principal Investigator or Recipient's Project Manager within
fifteen (15) calendar days after the request.
ARTICLE 16 - SCIENTIFIC REPORTS
For research agreements, this report shall be used for rapidly disseminating
highly significant research results or for scientific reports that are too long
or that contain useful compilations of data, tables and computations not
normally accepted by technical journals. It is not appropriate for a student's
thesis. Before preparing a Scientific Report, obtain written permission from the
Project Engineer who will then furnish detailed instructions for formatting,
reproducing and distributing the report. Send the government Project Engineer
two (2) copies. On its cover, a scientific report shall prominently display the
following disclaimer: "The views and conclusions contained in this document are
those of the authors and should not be interpreted as necessarily representing
the official policies or endorsements, either expressed or implied, of the Army
or the U.S. Government."
15
16
ARTICLE 17 - REPORTING FINANCIAL INFORMATION
The Recipient shall submit the Financial Status Report (SF269 or 269A) on a cash
basis within thirty (30) calendar days following the end of each quarter, and
within ninety (90) calendar days following the completion of the Agreement.
Submit the original and one (1) copy to the Grants Administration Office and one
(1) copy to the Grants Officer, if different from the Grants Administration
Office.
PART VII - DISTRIBUTING PROJECT RESULTS
ARTICLE 18 - DISTRIBUTING PROJECT RESULTS
1. Publications - The Recipient is encouraged to publish results of the project,
unless classified, in appropriate journals. One (1) copy of each article planned
for publication will be submitted to the Project Engineer simultaneously with
its submission for publication. A copy of the transmittal letter should be
provided to the Grants Officer. Two (2) copies of all publications resulting
from the project shall be forwarded to the Project Engineer as they become
available.
2. Acknowledgment of Sponsorship - The Recipient is responsible for assuring
that an acknowledgment of Government support will appear in any publication of
any material based on or developed under this project, in the following terms:
"Effort sponsored by U.S. Army Tank-Automotive and Armaments Command
Armament Research, Development and Engineering Center, TACOM-ARDEC,
Picatinny Arsenal, under cooperative agreement number DAAE30-97-2-0100.
The U.S. Government is authorized to reproduce and distribute reprints
for Governmental purposes notwithstanding any copyright notation
thereon."
3. Disclaimer - The Recipient is responsible for assuring that every publication
of material based on or developed under this project contains the following
disclaimer:
"The views and conclusions contained herein are those of the authors and
should not be interpreted as necessarily representing the official
policies or endorsements, either expressed or implied, of U.S. Army
Tank-Automotive and Armaments Command Armament Research, Development and
Engineering Center, TACOM-ARDEC, Picatinny Arsenal, or the U.S.
Government."
4. Photographs - The Recipient may photograph the progress or results of this
project, including phenomena discovered, special equipment used, or special
laboratory techniques designed. Copies of such photographs, suitable for
reproduction, should be made available to the U.S. Army TankAutomotive and
Armaments Command Armament Research, Development and Engineering Center,
TACOM-ARDEC, Picatinny Arsenal as part of the project/scientific documentation.
These photographs may be used later for other Government publications.
16
17
5. Marking and Distribution Requirements - Xxxx all data delivered in accordance
with MIL-STD-1806 with the following statement: "Distribution Statement A.
Approved for public release; distribution is unlimited."
PART VIII - MISCELLANEOUS PERFORMANCE ISSUES
ARTICLE 19 - USING TECHNICAL INFORMATION RESOURCES
To the extent practical, the Recipient will use the technical information
resources of the Defense Technical Information Center (DTIC) and other
Government or private facilities to investigate recent and on-going research and
avoid needless duplication of scientific and engineering effort.
ARTICLE 20 - DISPUTES
1. Parties shall communicate with one another in good faith and in a timely and
cooperative manner when raising issues under this Article.
2. Any disagreement, claim or dispute between the Funding Agency and the
Recipient concerning questions of fact or law arising from or in connection with
this Agreement, and, whether or not involving an alleged breach of this
Agreement, may be raised only under this Article.
3. Whenever disputes, disagreements, misunderstandings or claims arise, the
Parties shall attempt to resolve the issues(s) involved by discussion and mutual
agreement as soon as is practicable. If agreement can not be reached, the Grants
Officer will issue a final decision in writing to the Recipient. The final
decision will permit the Recipient to appeal the decision within thirty (30)
days after receipt of such notifications. Appeals will be resolved by the
Associate for Contracting, Acquisition Center, TACOM-ARDEC. A decision will be
final and not subject to further administrative appeal.
ARTICLE 21 - ACCESS TO INFORMATION
The Recipient agrees to permit any person or persons designated by the
Government access during normal business hours to such books, records, accounts
and other sources of information and facilities as is reasonably necessary to
ascertain compliance with the provisions of the Agreement.
ARTICLE 22 - SITE VISIT
The Government, through authorized representatives, has the right during normal
business hours, to make site visits to review project accomplishments and to
provide such technical assistance, as required. If any site visit is made by the
Government on premises of the Recipient, the Recipient shall provide all
reasonable facilities and assistance for the safety and convenience of the
Government representatives in the performance of their duties. All site visits
and evaluations shall be performed in such a manner as will not unduly interfere
with or delay the work.
17
18
ARTICLE 23 - LIMITATION OF LIABILITY
1. The Recipient agrees to indemnity and hold harmless and defend the
Government, its employees and agents, against liability or loss for any claim,
including the cost of litigation, made by an employee or agent of the Recipient,
or persons claiming through them, for death, injury, loss or damage to person or
property arising in connection with the Agreement, except to the extent that
such death, injury, loss or damage arises solely from the negligence or willful
misconduct of government employees.
2. The government shall not be liable to the Recipient whether directly or by
way of contribution or indemnity, for any claim made by any person or other
entity for personal injury or death, or for property damage or loss, arising in
any way from this Agreement, including, but not limited to, the later use, sale
or other disposition of research and technical developments, whether by
resulting products or otherwise, whether made or developed under this Agreement,
or whether contributed by either party, pursuant to this Agreement, except as
provided under the Federal Tort Claims Act (28 U.S.C. 2671 et seq.) or other
Federal law where sovereign immunity has been waived. The Recipient shall
indemnify the Government against all such claims or proceedings and shall hold
the Government harmless for any resulting liabilities and lawsuits provided the
Recipient is reasonably notified of such clams and proceedings.
PART IX - SUSPENSION AND TERMINATION
ARTICLE 24 - SUSPENSION AND TERMINATION
1. This Agreement may be terminated, in whole or in part, by the party listed
upon written notification to the other party:
a. The Grants Officer, as set forth in Articles 6 and 7, should
insufficient funds be available to accomplish the goals or intent of the
Agreement, or other convenience to the Government.
b. By either party based on a reasonable determination that the project
will not produce beneficial results commensurate with the expenditure of
resources.
c. The Grants Officer, with the consent of the Recipient, in which case
the parties shall agree upon the termination conditions, including the effective
date and, in the case of partial termination, the portion to be terminated.
d. The Recipient, upon sending to the Grants Officer written
notification, setting forth the reasons for such termination, the effective date
and, in the case of partial termination, the portion to be terminated. The
Recipient must provide such notice at least thirty (30) calendar days prior to
the effective date of the termination. If the Grants Officer determines, in the
case of partial termination, that the reduced or modified portion of the
Agreement will not accomplish
18
19
the purposes for which the award was made, the Grants Officer may terminate the
award in its entirety.
2. If a Recipient materially fails to comply with the provisions of this
Agreement, the Grants Officer may take one or more of the following actions as
appropriate.
a. Temporarily withhold payments pending correction of the deficiency by
the Recipient,
b. Disallow all or part of the cost of the activity or action not in
compliance,
c. Wholly or partly suspend or terminate the current Agreement,
d. Withhold further awards for the project or program,
e. Take any other legally available remedies.
3. The Government and the Recipient will negotiate in good faith and equitable
reimbursement for work performed toward accomplishment of program goals. The
Government will allow full credit to the Recipient for the Government share of
the obligations properly incurred by the Recipient prior to termination. Costs
incurred by the Recipient during a suspension or after termination of an award
are not allowable unless the Grants Officer expressly authorizes them in either
the notices of suspension, termination or subsequently. Other Recipient costs
incurred during a suspension or after termination which are necessary and not
reasonable avoidable are allowable if:
a. The costs result from obligations which were properly incurred by
the recipient before the effective date of the suspension or termination, are
not in anticipation of it, and in the case of a termination, are noncancellable;
and
b. The costs would be allowable if the award were not suspended or the
award expired normally at the end of the funding period in which the termination
takes effect.
4. If this Agreement is terminated after the Recipient has received Government
funding, the closeout procedures in OMB Circular A-110, apply.
5. Notwithstanding the above, for security or safety reasons or in the case of a
serious breach that could lead to irreparable damage, the Grants Officer may
order immediate suspension of work, in whole or in part.
PART X - PROPERTY
19
20
ARTICLE 25 - TITLE TO NONEXPENDABLE PERSONAL PROPERTY
Property standards under this Agreement are dependent upon the business
structure of the Recipient. Recipients and Subrecipients who qualify as
Institutions of Higher Education or Other Non-Profit Organizations operate under
the standards in OMB Circular A-110. Those same standards apply to commercial
organizations with the following exceptions.
1. The Recipient must obtain the prior approval of the Grants Officer
before making any such purchases of real property or nonexpendable tangible
personal property with federal funds under this award.
2. Title to all real property and equipment purchased by the Recipient
with federal funds under this Agreement shall vest in the Government, unless
statute authorizes otherwise.
3. The Recipient must obtain the prior approval of the Grants Officer
before they can continue to use equipment after funding ceases for the project
under which the equipment was purchased. Use of equipment on other federally
funded projects requires a formal change of accountability for the equipment to
a currently funded, federal award.
PART XI - CERTIFICATIONS
ARTICLE 26 - CERTIFICATIONS
By signing this Agreement or accepting funds under the Agreement, the Recipient
provides the:
1. Certification at Xxxxxxxx X, 00 XXX Part 25 regarding Drug-Free Workplace
Requirements. The place of performance as specified in the technical proposal
shall constitute the Recipient's designation of the site for the performance of
work done in connection with this Agreement.
2. Certification at Appendix A, 32 CFR Part 25 regarding Debarment, Suspension
and Other Responsibility Matters - Primary Covered Transactions.
3. Certification at Appendix A, 32 CFR Part 28 regarding Lobbying, if the amount
of the cooperative agreement exceeds $100,000.
4. Assurance at 32 CFR Part 56.9(b) regarding Nondiscrimination on the Basis of
Handicap in Programs and Activities Assisted or Conducted by the Department of
Defense
5. Assurance at 32 CFR Part 195.6 regarding Nondiscrimination in Federally
Assisted Programs of the Department of Defense - Effectuation of Title IV of the
Civil Rights Act of 1964.
6. If the cooperative agreement exceeds $ 1 00,000, the certification at 42
U.S.C. 1857, as amended, and 33 U.S.C. 125 1, as amended regarding the Clean Air
and Water Act of 1970 and the Federal Water Pollution Control Act, respectively.
Also, the Recipient shall be in
20
21
compliance with Executive Order No. 11738 and the related regulations of the
Environmental Protection Agency as stated in 40 CFR, Part 15.
PART XII - OTHER ARTICLES
ARTICLE 27 - MILITARY RECRUITING ON CAMPUS
If the Recipient is an Institute of Higher Education, this Article is
applicable.
As a condition for receipt of funds available to the Department of Defense (DoD)
under this award, the Recipient agrees that it is not an institution that has a
policy of denying, and that it is not an institution that effectively prevents,
the Secretary of Defense from obtaining for military purposes: (1) entry to
campuses or access to students on campuses or (2) access to directory
information pertaining to students. If the Recipient is determined, using
procedures established by the Secretary of Defense to implement section 558 of
Public Law 103-337 (1994), to be such an institution during the period of
performance of this Agreement, and therefore to be in breach of this clause, the
Government will cease all payments of DoD funds under this Agreement and all
other DoD grants and cooperative agreements, and it may suspend or terminate
such grants and cooperative agreements unilaterally for material failure to
comply with the terms and conditions of award.
21
22
ATTACHMENT 1
STATEMENT OF WORK
1. Description of Scope of Work (SOW)
There are six major tasks: Design, fabrication, and testing of the spotless arc
plasma gun; Coating process development; Evaluation of coatings; Design
fabrication, and testing of the demonstration process system; Demonstration
coating of partner-supplied industrial parts; and Economic analysis and Final
Project Report.
2. Technical Task Description
The intent of this project is to maintain chrome plating as an accepted
commercial technique through development of an environmentally friendly spotless
cathodic arc chromium coating system which eliminates the generation of
hexavalent chrome associated with the electroplating process.
2.1 Task I - Design, Fabrication, and Testing of the Spotless Arc Plasma Gun
This task will assemble equipment needed for prototype demonstration of the
coating process. The proposed design is to incorporate three innovations to
existing cathodic arc technology, thereby overcoming particulate generation
problems associated with existing technology and also improve electrical
efficiency by at least a two-fold factor. The innovations which are to be
incorporated into the design of the equipment include a hot sublimating cathode,
independently controlled electron emission for stabilization and shaped magnetic
field guidance.
2.2 Task 2 - Coating Process Development
This task will focus on investigating key parameters which affect coating
deposition. Key parameters to be determined include:
1. Delivered ion flux versus neutral flux as a function of gun parameters.
2. Coating growth rate.
3. Coating stress versus ion flux and bias voltage.
Computer data acquisition will be accomplished with signal channels for arc
voltage, arc current, current probe bias, gas flow, vacuum, and cathode
temperature.
Ancillary diagnostic instruments will be employed to measure current density and
to give thickness readings and instantaneous deposition rate.
22
23
Chrome test coatings will be produced for a wide range of operating parameters.
The introduction of nitrogen gas will also be evaluated to demonstrate that a
hard chrome nitride coating can also be produced employing this technology.
2.3 Task 3 - Evaluation of Coatings
This task will evaluate the chromium test coatings produced during Task 2.
Characterization will consist of the following analyses:
1. Microparticle and morphology by optical microscopy and scanning electron
microscopy.
2. Coating thickness and growth rate versus location using silicon witness
plates and thin masks. Thickness measured with Tencor profilometer. Combining
thickness and weight gain determines density and thus porosity.
3. Coating composition by Auger electron spectroscopy. This identifies
contamination from background gases and wall sputtering.
4. Coating stress using flexible thin quartz membrane technique.
5. Coating adhesion using scratch test technique compared to electroplated
coating. An ISC-300 diamond scratch tester will be used.
6. Weighing of Faraday cup to determine neutral atom content when total
collected current is compared to quartz crystal data.
7. Hardness of coating using LECO microhardness tester. This is indirectly
related to porosity. Hardness should at least equal electroplate.
8. Surface friction and wear profile against an A1203 pin compared to
electroplated coating. This is intended to highlight surface differences if they
exist. An ISC-200 pin-on-disk tribometer will be used.
9. Coating RMS roughness compared to plated coating using Tencor
profilometer.
2.4 Task 4 - Design, Fabrication and Testing of the Demonstration Process System
The development of the demonstration process system will permit coating of
larger workpieces than the prototype system of Task 1 could handle. The chamber
will be 3 feet in diameter and 3 feet deep. The system will incorporate a fixed
plasma gun position with a workpiece table that will have rotational and
translation movement capabilities. The vacuum chamber will contain a cryopanel
and cryopump to remove residual water vapor from the system. Diagnostic
equipment and test coupons will be able to be placed in the chamber.
23
24
2.5 Task 5 - Demonstration Coating of Partner-Supplied Industrial Parts
Corpus Christi Army Depot (CCAD) in Texas, which is a large Army rework
facility, has a special interest in helicopter parts and uses large quantities
of chrome plating yearly. CCAD will provide sample components for evaluation and
comparison to chrome electroplating. CCAD is planning on evaluating the coating
using (1) chrome hardness readings, (2) adhesion test, (3) surface finish, and
(4) ability to grind after application of the spotless arc coating. Parts that
are chrome electroplated with CCAD's standard process will be compared as
reference standards. Piston and valve stems will be emphasized.
Xxxxx Corporation, an industrial electroplater, will supply diesel engine
workpieces, mainly valve components, for testing. Eaton will also perform
testing and comparisons with their reference standards.
2.6 Task 6 - Economic Analysis and Final Report
ISC will produce an economic analysis of the costs and commercial feasibility
based on the measured throughput of the system. Data will be scaled, based on
commercial system geometries. The analysis will consider the costs of
installation, labor, materials, and maintenance. Also included will be
amortization of capital costs, projected future cost reductions and process
improvements, and any possible environmental costs. These data will be compared
to estimates of present day electrolytic chrome plating costs to determine the
competitiveness of the process. A mini-business plan will be produced that
describes how the developed process will be scaled up for commercialization. The
plan will consider the targeted market, make use of the cost information from
the economic analysis, and provide plans for licensing, construction, or other
means of increasing capacity to service the intended market.
The economic analysis will include the following factors:
1. Cost of installation
2. Throughput
3. Labor cost analysis
4. Environmental costs
5. Effect of scaleup
6. Continuing materials and maintenance costs
7. Projected process improvements and cost reductions
8. Comparison to conventional chrome plating
9. Amortization of equipment
The Final Report will provide a description of all work performed, test data,
analyses of these results, and the resulting conclusions, correlations and
comparisons. In addition, the economic
24
25
and business analyses will be included. These will include conclusions on
commercial feasibility, projected costs, and the plan to commercialize the
coating service.
25
26
ATTACHMENT 2
SCHEDULE OF PAYMENTS AND PAYABLE MILESTONES
DATE MILESTONE GOV'T AMOUNT MATCH AMOUNT
----------------------------------------------------------------------------------------
6/98 Design, fabrication, and testing of the [Redacted table]
spotless arc plasma gun
1/99 Coating Process Development [Redacted table]
1/99 Design, fabrication, and testing of the [Redacted table]
process demonstration system
3/99 Evaluation of coatings [Redacted table]
5/99 Demonstration coating of [Redacted table]
partner-supplied industrial parts
9/99 Economic Analysis and Final Report [Redacted table]
26
27
ATTACHMENT 3
DETAILED SCHEDULE OF PAYMENTS AND PAYABLE MILESTONES
DATE MILESTONE GOV'T AMOUNT MATCH AMOUNT
-----------------------------------------------------------------------------------------------------------
12/22/97 First Progress/Status Report [Redacted text] [Redacted text]
03/31/98 Second Progress/Status Report [Redacted text] [Redacted text]
6/30/98 Design, fabrication, and testing of the [Redacted text] [Redacted text]
spotless arc plasma gun
6/30/98 Third Progress/Status Report [Redacted text] [Redacted text]
9/30/98 Fourth Progress/Status Report [Redacted text] [Redacted text]
12/18/98 Fifth Progress/Status Report [Redacted text] [Redacted text]
1/30/99 Coating Process Development [Redacted text] [Redacted text]
1/30/99 Design, fabrication, and testing of the [Redacted text] [Redacted text]
process demonstration system
3/31/99 Evaluation of coatings [Redacted text] [Redacted text]
3/31/99 Sixth Progress/Status Report [Redacted text] [Redacted text]
5/31/99 Demonstration coating of [Redacted text] [Redacted text]
partner-supplied industrial parts
6/30/99 Seventh Progress/Status Report [Redacted text] [Redacted text]
9/30/99 Economic Analysis and Final Report [Redacted text] [Redacted text]
27