EXHIBIT 10.45
CONFIDENTIAL TREATMENT REQUESTED
FIRST AMENDMENT TO MASTER FACILITIES AGREEMENT
AND ASSIGNMENT AND ASSUMPTION
This Amendment to the Master Facilities Agreement (the "Facilities
Agreement") between Fiber Technologies Operating Company, LLC and Choice One
Communications Inc. dated May 31, 2000 is entered into as of the _________ day
of December, 2001 between FIBER TECHNOLOGIES CONSTRUCTION COMPANY, L.L.C. F/K/A/
FIBER TECHNOLOGIES OPERATING COMPANY, LLC ("FTCC"), a Delaware limited liability
company having its principal place of business at 000 Xxxxxx Xxxxx Xxxx,
Xxxxxxxxx, Xxx Xxxx 00000, FIBER TECHNOLOGIES NETWORKS, L.L.C. ("FTN"), a New
York limited liability company having its principal place of business at 000
Xxxxxx Xxxxx Xxxx, Xxxxxxxxx, Xxx Xxxx 00000 and CHOICE ONE COMMUNICATIONS INC.
("CHOICE"), a Delaware corporation having its principal place of business at 000
Xxxxxxxx Xxxxxx, Xxxxx 000, Xxxxxxxxx, Xxx Xxxx 00000 (hereinafter, each
individually, "Party," and collectively, the "Parties").
RECITALS
WHEREAS, the Parties entered into the Facilities Agreement dated May
31, 2000, which Facilities Agreement governs the rights and obligations of the
Parties; and
WHEREAS, it is in the mutual interest of the Parties to amend the
Facilities Agreement to replace certain of the original Exhibits with Revised
Exhibits; and
WHEREAS, FTCC desires to assign all of its rights and obligations under the
Facilities Agreement to FTN; and
WHEREAS, FTN desires to assume all of the rights and obligations of FTCC under
the Facilities Agreement; and
WHEREAS, consent of CHOICE is required for such assignment pursuant to
paragraph 21 of the Facilities Agreement;
WHEREAS, both Parties agreed on November 30, 2000 to make modifications
to their understanding of the initial Master Facilities Agreement in the
attached document including changes and updates to Exhibit A, A-1 and D. These
understandings are hereby confirmed.
NOW, THEREFORE, in consideration of the foregoing and other good and
valuable consideration, the receipt of which is hereby acknowledged, the parties
hereto agree as follows:
1. Amendment.
A. Exhibit A, as attached to the Facilities Agreement, shall be deleted
and removed from the Facilities Agreement and shall be replaced with
Revised Exhibit A in the form attached hereto. All references in the
Facilities Agreement to Exhibit A shall hereafter be deemed to refer to
Revised Exhibit A.
B. Exhibit A-1, as attached to the Facilities Agreement, shall be deleted
and removed from the Facilities Agreement and shall be replaced with
Revised Exhibit A-1 in the form attached hereto. All references in the
Facilities Agreement to Exhibit A-1 shall hereafter be deemed to refer
to Revised Exhibit A-1. It is noted that Exhibit A-1 is for the
purposes of depicting the basic network design including the COs that
the network connects to, the distances between such COs, and whether
Grantor provides single or diverse entrance into each CO, and the
method of such. Grantor will provide other means of depicting the
specifics regarding building entry.
C. Exhibit C, as attached to the Facilities Agreement, shall be deleted
and removed from the Facilities Agreement and shall be replaced with
Revised Exhibit C in the form attached hereto. All references in the
Facilities Agreement to Exhibit C shall hereafter be deemed to refer to
Revised Exhibit C.
D. Exhibit D, as attached to the Facilities Agreement, shall be deleted
and removed from the Facilities Agreement and shall be replaced with
Revised Exhibit D in the form attached hereto. All references in the
Facilities Agreement to Exhibit D shall hereafter be deemed to refer to
Revised Exhibit D.
E. Exhibit E, as attached to the Facilities Agreement, shall be deleted
and removed from the Facilities Agreement and shall be replaced with
Revised Exhibit E in the form attached hereto. All references in the
Facilities Agreement to Exhibit E shall hereafter be deemed to refer to
Revised Exhibit E.
F. Exhibit F, as attached to the Facilities Agreement, shall be deleted
and removed from the Facilities Agreement and shall be replaced with
Revised Exhibit F in the form attached hereto. All references in the
Facilities Agreement to Exhibit F shall hereafter be deemed to refer to
Revised Exhibit F.
G. Exhibit G, as attached to the Facilities Agreement, shall be deleted
and removed from the Facilities Agreement and shall be replaced with
Revised Exhibit G in the form attached hereto. All references in the
Facilities Agreement to Exhibit G shall hereafter be deemed to refer to
Revised Exhibit G.
H. Outstanding Issues. Parties will mutually agree at a later date: a)
Columbus City Route, based on H. b) Within 30 days of the execution of
this Amendment, Grantor and Grantee will have agreed in writing, by
means of signature on each map in Revised Exhibit A, the final design
specifications for each City Route.
2. Discount for Changes. Grantor agrees to provide dual/diverse/single
entrance as depicted in Exhibit A-1 by color coding. At time of
delivery, if any COs are delivered in a less diverse method than
represented in Exhibit A-1, Grantor will provide a 20% discount to the
use charge for affected segments until such time as those segments can
be augmented to match the parameters of Exhibit A-1. Grantee has right
to accept such deviances without discount to affected segments.
3. Definition for Dual Entrance. Parties agree to the following definition
of Dual Entrance. Grantor will use commercially reasonable efforts to
provide dual entrance into all contracted central offices connected to
the individual City Routes. Dual entrance will be accomplished through
diverse entrance paths into the central office or diverse entrance into
manhole zero depending on availability. If diverse entrance into the
central office and manhole zero are both unavailable, then diverse
entrance into manhole zero minus 1 or 2 is acceptable as long as the
manholes are in close proximity to the central office. Close proximity
is agreed to be considered within 150 feet. No single path, aerial road
crossings to the central office will be acceptable.
Central Office
Entry Description
Entry depicted with following colors on Network Design Maps
[MAP]
4. Subsequent Network Design Changes. In the event that any changes are
made to the Network designs as depicted and agreed to in the attached
Exhibit A-1, both parties must mutually agree and sign off on the
changes. If the change results in a necessity to utilize a collapsed
ring, FTN will provide Choice One the fibers to do so at no charge
until FTN eliminates the collapsed ring. In addition, FTN will
compensate Choice One with a $10,000 penalty per incident.
5. Assignment and Assumption. FTCC hereby assigns and transfers all of its
rights, title, interest and obligations under the Facilities Agreement
to FTN and FTN hereby accepts such assignment and assumes all
obligations of FTCC and is hereby bound by all of the terms and
conditions of the Facilities Agreement.
6. Consent of Choice. As part of the Amendment herein, Choice hereby
consents and agrees to the assignment and assumption as set forth in
Paragraph 3 above.
7. Restatement. Paragraphs 22 and 27 through 33 of the Facilities
Agreement are incorporated and restated by reference herein and shall
apply both to this Amendment and to the Facilities Agreement.
8. Design Maps.
[REMAINDER OF PAGE INTENTIONALLY LEFT BLANK]
Portions of this agreement have been omitted and filed separately with the
Commission pursuant to an application for confidential treatment under Rule
24b-2.
IN WITNESS WHEREOF the parties have executed this First Amendment to
the Facilities Agreement as of ____________, 2001.
FIBER TECHNOLOGIES
CONSTRUCTION COMPANY L.L.C. f/k/a FIBER
TECHNOLOGIES OPERATING COMPANY, LLC
By: FIBERTECH NETWORKS,
LLC
By: /s/ Xxxxx Xxxxxxx
---------------------------------------
Xxxxx Xxxxxxx, Chief Operating Officer
FIBER TECHNOLOGIES NETWORKS, L.L.C.
By: FIBERTECH NETWORKS,
LLC
By: /s/ Xxxxx Xxxxxxx
---------------------------------------
Xxxxx Xxxxxxx, Chief Operating Officer
CHOICE ONE COMMUNICATIONS INC.
By: /s/ Xxxxx X. Xxxxxx
---------------------------------------
Xxxxx X. Xxxxxx
President and CEO
Amendment One
EXHIBIT "A"
[Confidential Treatment sought for this Schedule]
Amendment One
EXHIBIT "A-1"
[Confidential Treatment sought for this Schedule]
AMENDMENT ONE
EXHIBIT "C"
[Confidential Treatment sought for this Schedule]
Amendment One
EXHIBIT "D"
PROPOSED SCHEDULE FOR INSTALLATION
[Confidential Treatment sought for this Schedule]
Amendment One
REVISED EXHIBIT "E"
USE CHARGE
[Confidential Treatment sought for this Schedule]
AMENDMENT ONE
EXHIBIT "F"
FIBER SPLICING, TESTING AND ACCEPTANCE STANDARDS
1. FIBER CABLE REEL ACCEPTANCE TESTING
Fiber Technologies shall be responsible for on-reel verification prior to
placement. Fiber Technologies may elect to test each fiber on every reel with an
OTDR in one direction at 1310 and 1550nm to determine the continuity of the
fiber cable. Tester shall immediately notify Fiber Technologies in writing of
any damaged or non-conforming fibers.
2. BONDING AND GROUNDING
Fiber Technologies shall perform bonding and grounding of call cables requiring
it. All bonding and grounding shall be performed in accordance with the splice
case manufacturer's standard practice and installation manuals.
All bonds shall be clean and free of debris and sealed within the splice
closure.
Grounding and ground rod placement is to be done as per design.
Fiber Technologies is to be responsible for supplying all grounding material
such as ground rods, ground lugs and ground wire.
3. INITIAL CONSTRUCTION TESTING
During initial construction, Fiber Technologies shall use an optical time domain
reflectometer (OTDR) or LID System (Light Injection/Detection) to test splices
and shall use an OTDR and a 1-km launch reel to test pigtail connectors. Such
initial construction tests shall be uni-directional and performed at 1310 and
1550nm.
4. SPLICING AND TERMINATIONS
Fibers shall be spliced with one to one correspondence. All splicing shall be
done in accordance with Fiber Technologies specifications and manufacturer's
recommendations.
All fibers are to be fusion spliced and organized, placed and secured in the
splice closure equipment provided by Fiber Technologies.
5. END-TO-END TESTING
After tester has provided end-to-end connectivity on the fibers, continuity
tests will be done to verify that no fibers have been transposed or crossed in
any of the splice points. Loss measurements will be recorded using a laser
source and a power meter at 1310 and 1550nm. OTDR traces will be taken at 1310
and 1550nm and splice loss measurements will be recorded. Fiber Technologies
will save each OTDR trace to diskette and provide to customer for evaluation. In
addition, Fiber Technologies is to provide power meter test data to customer in
hard copy on supplied forms.
It is imperative to verify that all fibers have one to one continuity on the new
cable. This will be done at the fiber level, not just the pigtail level. For
each pigtail, visual inspection will be used to verify fiber color and buffer
color. Once the fiber color and the buffer color have been recorded, power
meters will be attached. Then at the far end, visual inspection should be used
to verify the fiber color and the buffer tube
color of the fiber receiving the signal. Then power level readings should be
taken in the opposite direction. The power measurements should be made at 1310
and 1550nm unless otherwise specified.
The test results for the bi-directional OTDR testing are as follows:
5.1 The objective for each splice is a loss of .10 dB utilizing OTDR and
GN Nettest reporting software. If after five (5) splice attempts,
splicer is not able to produce a loss value of .10 dB or less, splicer
will notify the Fiber Technologies on-site Project Manager and perform
an additional (3) attempts, which will be documented by the Project
Manager. If after the (3) attempts, the splicer cannot obtain the .10
dB loss value, then the splice will be marked as Out of Spec (OOS) and
initialed by the Fiber Technologies Project Manager on the data sheet.
On the attached data sheets, all cable information will be filled in by splicer
and verified by a Fiber Technologies representative. These two forms are to
contain the following information:
5.2 The End-to-End Attenuation Loss Power Meter Test Form will be used to
verify continuity from end to end. In addition, the power level
readings taken with a laser source and power meter must be recorded
for every fiber on this sheet. In the column marked fiber, the fiber
color must be recorded. In the buffer column, the buffer tube or
ribbon color must be recorded.
OTDR testing to be conducted at 1310 and 1550nm unless specified.
All fibers inclusive to any span will be OTDR tested using the same
range/resolution and pulse width settings to insure consistency in the test
results.
Use of 3:00 minute averaging, a minimum for each span.
NOTE: If Fiber Technologies determines that a 3:00 minute sample period is too
long and Fiber Technologies can obtain a "good" trace representation of the
fiber being tested then a reduced sampling period will be applied.
Traces will be stored electronically on a 3.5" floppy diskette storage media.
Customer's traces will be supplied to customer.
The trace file format and file labeling will be designated by Fiber Technologies
prior to any testing.
Fiber Technologies shall provide customer with copies of all OTDR shots on the
customer's fibers within 30 days of completed construction.
6. POST CONSTRUCTION TESTING
After performing permanent re-splicing (in conjunction with repair of a cable
cut, replacement of a segment of cable, or other work after initial installation
and splicing of the cable), the test procedures set forth in the End-to-End
Testing section, shall apply to the relevant fiber and cable segments. The
provisions in the OTDR Equipment and Settings section and the Acceptance Test
Deliverables that are relevant to such testing shall also apply. Fiber
Technologies may, after completing construction of its System, adopt any
alternative methods of testing that are generally accepted in the industry and
that provide sufficient data to fulfill the objectives of the tests set forth in
this exhibit.
7. OTDR EQUIPMENT AND SEETINGS
Fiber Technologies shall use OTDR equipment and settings that are, in its
reasonable opinion, suitable for performing accurate measurements of the fiber
installed. Such equipment and settings shall include, without limitation, the
equipment and settings described below.
Fiber Technologies has approved the following OTDRs and settings for acceptance
testing: the Laser Precision TDx000 series and CMA4000 models and compatible
models.
Fiber Technologies has approved the following settings for various OTDR tests:
Index of refraction settings:
1310 nm 1550nm
------- ------
Lucent Truwave 1.4738 1.4732
Corning SMF-28 1.4675 1.4681
Corning SMF-LS 1.4710 1.4700
Corning LEAF 1.4700 1.4690
Sumitomo fiber 1.4670 1.4670
Lucent Allwave 1.4660 1.4670
Test of pigtail connector and its associated splice:
TDx000 Series CMA4000
------------- -------
4km Range 4km range
30 ns Pulse 50 nm Pulse
1 m Resolution 1 m Resolution
Medium Averaging Medium Averaging
End-to-End Segment OTDR Testing:
TDx000 Series CMA4000
------------- -------
64 km Range 100 km Range
500 ns Pulse 250 ns Pulse
4 m Resolution 4 m Resolution
Medium Averaging Medium Averaging
NOTE: If the end points are more than 64 kilometers apart, Fiber Technologies
currently uses a TD3000 set at 128 km range setting and performs bi-directional
testing only at 1310 and 1550nm.
8. ACCEPTANCE TEST DELIVERABLES
Fiber Technologies shall provide data sheets or computer media containing the
following information for the relevant fibers and cable segments.
- Verification of end-to-end fiber continuity with power level readings
for each fiber taken with a light source and power meter. Figure "A"
attached.
- Verification of loss at each splice point to be below 0.3 dB as well
as the final bi-directional OTDR test data, with distances utilizing
GN Nettest software reports. Figure "B" attached.
- Visual OTDR test results reported using either PC-3000 software or GN
Nettest software. Figure "C" attached.
9. SPLICING AT ACTIVE LOCATIONS
If splicing at active locations is required, special care and precautions are
required. Close supervision and monitoring of this work is necessary and the
provisions of these specs will be adhered to.
Fiber Technologies will identify all work locations where active fibers are
present and identify which fibers within the able are active. Additionally, all
work within a cable containing active fibers will be performed within a specific
maintenance window.
Fiber Technologies will coordinate the time frames for the maintenance windows.
Fiber Technologies will work closely with the customer to schedule the
maintenance windows and notify customer of any possible changes in the schedule.
Customers will receive a minimum (2) day notification prior to any work on
active fibers.
Additionally, all Fiber Technologies splicing crews will be required to have on
hand at time of splicing enough materials to make temporary and permanent
repairs to active fibers damaged during the course of work.
In the event that active fibers are damaged during the course of work, Fiber
Technologies splicing crews shall work as directed by Fiber Technologies Project
Manager. Immediately take whatever steps are necessary to re-establish service
on the active fibers and repair the damaged fibers. Submit a written report to
Fiber Technologies Project Manager detailing the events leading up to the
damage, the corrective actions taken and what steps will be implemented by
subcontractor to prevent damage during future work.
10. RESTORATION
Upon notification of a possible damaged fiber, Fiber Technologies will dispatch
technicians to site to locate damage. This process shall take no more than two
(2) hours. The technicians shall quickly assess the information provided by the
local contact. A visual inspection of the fiber to determine to what extent the
fiber may be structurally damaged.
If no damage is apparent visually, the technician will proceed to the nearest
location that allows him to perform an OTDR test. The technician will then
calculate where the damaged fiber is located along the run and again visually
inspect that length of cable.
All permanent restorations will be made at off peak use time of the fiber plant
with coordination of all companies leasing fibers in that particular span. Fiber
Technologies Project Manager will supervise all restoration efforts to ensure
timeliness and quality of repair.
11. DELIVERY AND ACCEPTANCE BY LICENSEE
For each Route Segment, Grantor shall deliver to Licensee written notice of
network completion to all Demarcation points in such Route Segment ("Delivery").
Grantor and Licensee will work together to coordinate end to end testing. If end
to end testing is not complete within fifteen (15) days after Delivery
notification, Grantor will provide test results for Grantor's fibers along same
Route Segment from Demarcation Point to Demarcation Point ("Generic Test
Results") within fifteen (15) days along such route. Licensee shall have fifteen
(15) days after receipt of test results (either end to end or generic) to
confirm test results provided by the Grantor ("Acceptance Period"). Unless
Licensee sends written notice of its objection to the test results of the
Grantor within the Acceptance Period, which sets forth the manner in which the
Cable has failed to comply with the Cable Parameters or the standards set forth
herein, Licensee shall be deemed to have accepted the Route Segment and Grantor
may initiate invoicing for the Route Segment from the date of Acceptance. If
Licensee sends a notice of the non-acceptance, Grantor shall take necessary
action to restore or repair the Cable to the required acceptance standard and
shall deliver to Licensee written test results thereof. Upon such delivery the
Acceptance Period shall recommence. Licensee shall accept all Licensee Fibers,
which conform to the Cable Parameters set forth in Exhibit "B" and the standards
set forth in this Exhibit "D".
AMENDMENT ONE
EXHIBIT "G"
LIST OF CHOICE ONE REGIONAL SWITCH CENTERS
CONFIDENTIAL AND PROPRIETARY
[Confidential Treatment sought for this Schedule]