Foreign Trade Agreement Agreement #: PE_071005 Date: 2007-10-11
Agreement
#: PE_071005
Date:
2007-10-11
Signing
Location: Shanghai
Party
A:
Isofoton
Address:
Parque Xxxxxxxxxxx xx Xxxxxxxxx Xxxxxx Xxxxx, 00
00000-Xxxxxx
Tel:
x00
000 000 000
Fax:
x00
000 000 000
Party
B:
Perfectenergy (Shanghai) Co., Ltd.
Address:
#479 Youdong road, Minhang District, Xxxxxxxxx Xxxxxxx,
Xxx
000000
Xxxxxxxx,
Xxxxx
Tel:
x00
00 00000000
Fax:
x00
00 00000000
Party
A
and B agree to execute the agreement according to the following
terms:
Partial
Processing Material (Provided by Isofoton)
Finished
Product Diagram
Export
Finished Product (Provided by Perfectenergy (Shanghai) Co. Ltd.)
1.
|
Product
Specification: ISF-190/16
|
According
to the Isofoton design, Isofoton shall provide 156mmX156mm monocrystalline
cell
film, connecting cable box (including cables) and product labels. Perfectenergy
shall process, laminate and seal layers, install cable connecting box and
frame,
and packages into finished product.
2.
|
Quantity
and Shipment Date:
|
Shipment Date | Quantity |
Nov. 13, 2007 | 5,000 |
Nov. 27, 2007 | 3,800 |
3.
|
Processing
Cost: $ 0.73 USD /Watt CIF Malaga
|
Finished
Product Power: 190 Watt (Composed of 54 cell films)
Finished
Product Price: $ 138.70 USD (= $0.73 USD/W * 190W)
Total
Price: $ 1,220,560.00 USD
4.
|
Payment
Method: 100% irrevocable L/C 30 days from October 28th,
2007.
|
5.
|
Warranty:
5 years. Diminishing power is not included in the
warranty.
|
6.
|
Production
Wastage : 1% ( not including possible breakage upon
arrival)
|
Cell
films that are delivered to Party B’s warehouse shall be inspected by Party B.
If there is breakage in unopened package, the package shall be shipped back
to
Party A. Party A shall retain ownership right to cell films that have not
be
processed.
7.
|
Technology
Standard
|
·
|
Designed
by Isofoton
|
·
|
Quality
inspection draft
|
·
|
Quality
report of each finished product
|
·
|
Index
number requested by Isofoton
|
·
|
Sample
provided by Isofoton
|
8.
|
Consumable
Material
|
Raw
materials to be provided by Party B include tempered glass, EVA and TPT,
etc.
Details of raw material specification are listed on the material consuming
record.
9.
|
Quality
|
According
to Party A’s request, the finished product shall have the following standard:
IEC 61215, TUV safety class II. Technical file shall be provided with the
product per Party A’s request.
10.
|
Import/export
trading company information of Party
B:
|
Company
Name: Shanghai Yongjiu Import Export Trade Co., Ltd.
Address:
#832 Xxxxx Xxxx, 0xx
xxxxx,
Xxxxxxxx 000000, Xxxxx
Tel:
x00
00 00000000
Bank:
Standard Chartered Bank, Shanghai branch
Bank
address: #161 Lujiazhui Xxxx Xxxx, Xxxxxx, Xxxxxxxx 000000, Xxxxx
Account
#: 8029260143
Banking
Code: SCBL CNSX SHA
All
shipment to Party A shall be provided by Party B’s import/export trading
company.
11.
|
Packaging
|
Packaging
shall be done according to ocean transportation requirement. The product
shall
be packaged in a 40 inch container on a pallet. The container shall be
moisture-proof, antirust, anticorrosive and shockproof.
12.
|
Port
of Shipment:
|
Shanghai,
China
13.
|
Destination:
|
Malaga,
Spain
14.
|
Insurance
will be provided by Party B.
|
15.
|
Transportation
will be provided by Party B.
|
16.
|
Quality/Quantity
Dispute
|
When
the
buyer makes a claim for damages, the claim must be made within 30 days after
the
product’s arrival at the destination port if the claim is quality related. The
claim must be made within 15 days after the product’s arrival at the destination
port if the claim is quantity related. The seller shall not responsible for
any
product damage claim made against insurance company, shipping carrier, other
transportation company or postal services.
Differences
on quantity/charges are allowed if it falls within ±
5%. This
can be adjusted by shipping additional products at a later date or by reducing
the export charges.
17.
|
Force
Majeure
|
If
the
agreement can not be carried out or can not be carried out in a timely manner
due to an unpredictable, unavoidable and unpreventable event, the party that
suffers from such force majeure event may elect not to fulfill its contractual
obligation or not to extend the term of the agreement. The other party has
no
right to demand damage compensation. Force majeure events include natural
disasters such as earthquake, tsunami, typhoon, snow storm, fire, drought,
flooding, etc., and man-made events such as war, strike and government
order.
When
such
event happens, the party that suffers from the event must inform the other
party
within 3 days of occurrence. If the event continues for more than 7 days,
both
parties shall discuss how to fulfill the affected shipment or stop the shipment.
Within 4 weeks of the event, if both parties can not reach an agreement through
discussion, any party has the right to terminate the agreement, and each
party
shall bear its own loss. This shall not preclude the possibility of further
demand for damage compensation.
18.
|
Arbitration
|
In
the
course of carrying out this agreement, any dispute shall be resolved through
friendly negotiation of the parties. If the dispute can not be resolved through
negotiation, they can submit the dispute to China International Economic
and
Trade Arbitration Commission (CIETAC). CIETAC’s decision regarding the dispute
shall be final and binding on both parties. The losing party shall be
responsible for the cost of arbitration.
19.
|
Agreement
text and wording
|
Each
shipment includes the following document:
·
|
Original
Receipt/Invoice with signature and
stamp
|
·
|
Packing
list
|
·
|
Product
testing data that has been sent out via e-mail in excel file format
before
shipment.
|
·
|
Xxxx
of Lading (B/L)
|
Party A: | Party B: Perfectenergy (Shanghai) Co., Ltd | ||
(Company Seal) | (Company Seal) | ||