AGREEMENT Between ARGENTEX MINING CORPORATION And CONNORS ARGENTINA S.A. for: DIAMOND CORE DRILLING (Surface) at: PINGUINO, SANTA CRUZ, PROVINCE, ARGENTINA January 19, 2005
Exhibit 10.1
AGREEMENT Between
ARGENTEX MINING CORPORATION
And
XXXXXXX ARGENTINA S.A. for:
DIAMOND CORE DRILLING
(Surface)
at:
PINGUINO,
SANTA XXXX, PROVINCE,
ARGENTINA
January 19, 2005
MEMORANDUM OF AGREEMENT made this 20th
day of December, 2004.
BETWEEN: | Argentex Mining Corporation., (hereinafter referred to as the “COMPANY”) |
AND: | XXXXXXX ARGENTINA S.A., (hereinafter referred to as the “CONTRACTOR”) |
The CONTRACTOR agrees to perform certain diamond drilling and related services on the lands of the COMPANY situated near Xxxx Xxxxxx, Xxxxx Xxxx Xxxxxxxx, Xxxxxxxxx and known as the Pinquino project on the following terms and conditions.
SPECIFICATIONS:
The CONTRACTOR agrees to sink by piping or to bore by diamond drilling three thousand (3,000) linear meters in approximately fifteen (15) holes with a maximum length of three hundred (300) linear meters at angles from minus 90 to minus 45. Average hole length will be approximately two hundred (200) meters.
The COMPANY guarantees to the CONTRACTOR a minimum meterage of two thousand (2,000) linear meters.
It is agreed that the core from the holes shall be approximately 61.00 and/or 47.60 millimeters in diameter known as HQ-3 and NQ, respectively, in the trade, and that said core shall be kept in boxes provided by the CONTRACTOR.
COMMENCEMENT AND EXECUTION OF WORK:
Mobilization of the equipment shall commence approximately late January, 2005, or at a mutually agreeable date.
Drilling shall commence immediately thereafter, or at a mutually agreeable date.
The COMPANY agrees to provide thirty (30) days notice prior to Mobilization.
2
PRICES:
A) | Mobilization |
The CONTRACTOR will marshal the crew and all required equipment to the site of the first hole and made ready to drill for a lump sum of $5000.00. Should the CONTRACTOR encounter delays during the mobilization due to access problems on the property it shall be agreed that such delays will be chargeable at “FIELD COST” rates. Transportation costs of the drill crew from home domicile to the drill area will be for the CONTRACTOR’s account. Mobile equipment required for off-loading the drill equipment at the staging area and required for the transport of the drill equipment for the duration of the drilling will be provided by the CONTRACTOR at no cost to the COMPANY. |
|
B) | Demobilization Time spent tearing down the drilling equipment and moving from the completion of drilling on the last hole to the CONTRACTOR’s warehouse will be charged as a lump sum of $5000.00. Should the CONTRACTOR encounter delays during the demobilization due to access problems on the property it shall be agreed that such delays will be chargeable at “FIELD COST” rates. Mobile equipment required for loading the drill equipment at the staging area will be provided by the CONTRACTOR at no cost to the COMPANY. |
C) | Drilling in Bedrock For coring in bedrock at angles from minus 90 to minus 45 degrees. |
Core size | NQ | HQ-3 | ||||
Depth interval | ||||||
0 to 150 m. | $ | 66.20 | $ | 68.20 | ||
150 to 300 m. | $ | 68.30 | $ | 70.30 |
D) | Penetration of Overburden and Setting Casing - Price per Meter For piping and/or drilling in overburden at angles from minus 90 to minus 45 degrees. |
Casing Size | NW | HW | ||||
Depth interval | ||||||
0 to 10 m. | $ | 77.30 | $ | 79.70 |
3
If the depth of overburden exceeds ten (10) meters, then the price for penetrating overburden will be at “FIELD COST” rates or the meterage rate, at the CONTRACTOR’s option for that portion of the overburden in excess of ten (10) meters . Where overburden is being drilled at meterage rates, setting casing, the cost of casing shoes and normal wear and tear on casing will be for the CONTRACTOR’s account. Where overburden is being drilled at “FIELD COST” rates, placing and pulling casing and the cost of casing shoes will be charged to the COMPANY. |
|
E) | Drilling Fluids and Additives Drilling prices include the cost of drilling mud, drilling fluid additives used in the course of normal drilling. Lost circulation and hole stabilization products and other materials such as, but not limited to heavy mixes of bentonite gel, Quik-Seal, rod grease and other materials required for maintaining or improving return circulation, conditioning the hole or safeguarding the in-hole tools shall be chargeable at the “FIELD COST” rates. |
F) | Diamond Tool Costs The cost of diamond bits and reaming shells consumed during the course of normal drilling will be for the CONTRACTOR’s account. |
G) | Cementing, Reaming, Hole Conditioning It is agreed that if a hole requires advancing or reaming of casing, wedging, conditioning, reaming of drill rods, drilling or reaming of cave, hole size reducing, or other such measures in order for drilling to proceed, the COMPANY will pay for such activities at “FIELD COST” rates. Casing, drill rods, down-hole tools, or other materials left in the hole at the request of the COMPANY, lost in the hole, or damaged upon recovery will be charged at “FIELD COST” rates. In cases where holes are cemented, the time spent preparing cement and placing cement, waiting for cement to properly xxxxxx, and drilling out the cement will be chargeable at “FIELD COST” rates. |
4
H) | Field Cost Any reference to “FIELD COST” in this Agreement shall be interpreted as follows: i) Man-hourly rates All labour provided by the CONTRACTOR while operating at “FIELD COST” will be at an all-inclusive rate of $30.00 per man hour. A full-time supervisor’s labour shall not be chargeable unless he is performing “FIELD COST” functions. The labour of extra crew above the regular three (3) man drill crew will not be chargeable unless they are performing “FIELD COST” functions. ii) Drill rig hourly rate Drill rig time when operating at “FIELD COST” will be charged at the rate of $90.00 per rig-hour including fuel, rig lubricants, and three (3) man crew. iii) Extra Equipment: The CONTRACTOR agrees to provide extra equipment as follows: a) a front end loader @ $40.00 per hour including operator iv) Materials Consumed and Services Provided When drilling is proceeding at “FIELD COST” rates, all materials, supplies or services provided by the CONTRACTOR shall be chargeable at the CONTRACTOR’s cost plus transportation, sales taxes, and a nominal 15% for accounting and overhead. Drilling tools or drill steel lost in the hole or damaged beyond further use as a result of ground conditions will be chargeable to the COMPANY at the CONTRACTOR’s cost with no markup applied |
I) | Moves It is agreed that the COMPANY will pay at “FIELD COST” rates for all moving between holes in excess of four (4) rig-hours per move. Moving time after the expiry of said rig-hours shall be chargeable at “FIELD COST” rates, for both crew and equipment time. |
5
Notwithstanding any free time allowed on any move, if the CONTRACTOR is required to move back onto a previously drilled hole for any reason, the COMPANY will pay at “FIELD COST” rates for all moving time to and cleaning out the old hole. All moving time from a hole where there has been less than fifty (50) meters of core drilling in that hole will be charged at “FIELD COST” rates. Moving shall be interpreted to include (but not limited to) tearing down, dismantling machinery, moving equipment, installing water lines, securing timber, transportation, site preparation, time spent waiting for daylight and setting up. Drilling of anchors when required will be chargeable at “FIELD COST” rates as a separate item. |
|
J) | Drill Sites and Set-Ups The COMPANY will provide drill sites, construct drill pads or platforms at no cost to the CONTRACTOR. |
K) | Walking or Traveling Time The COMPANY agrees to pay for all walking and/or travelling time from the accommodation location to the drill area and return in excess of two (2) hours per man per day at the rate of $30.00 per man-hour. |
L) | Water Supply The CONTRACTOR agrees to supply and install water lines and pumps from an adequate source provided by the COMPANY . If a water truck or trucks are required, the CONTRACTOR shall provide suitable units to haul water from a COMPANY-supplied source to the drill site and shall be chargeable at a rate of $ 220.00 per day per truck including operators. Delays due to source of supply problems from a COMPANY-supplied source will be chargeable at “FIELD COST” rates. The COMPANY shall pay for any water that must be purchased. |
M) | Delays It is agreed that at the same time as the COMPANY notifies the CONTRACTOR to cease drilling on a hole, the COMPANY shall inform the CONTRACTOR of the site of the next hole to be drilled. Should the COMPANY fail to locate sites or for any cause for which it is responsible for the delay of the operation of the drill, the COMPANY agrees to pay the CONTRACTOR at the “Standby Rate” for the period that the operation of the drill has been delayed by such failure. |
6
It is agreed that when the operation, moving, mobilization
or demobilization of the drill rig or ancillary equipment is delayed because
of weather, terrain difficulties or for other reasons beyond the control
of the CONTRACTOR , such delays shall be chargeable to the COMPANY to
a maximum of eight (8) hours per shift. |
|
Time spent repairing or maintaining the CONTRACTOR’s
equipment shall not be chargeable to the COMPANY. |
|
N) | Standby |
Standby time is defined as that time during which
the CONTRACTOR has been delayed in performing the work, due to the fault
of the COMPANY. |
|
In the event CONTRACTOR is delayed in performing
any of its obligations under this Contract due to Act of God, CONTRACTOR
shall promptly give notice to that effect to the COMPANY, so that the
latter be informed of the extension of the term hereof, and no charge
for Standby time shall be chargeable to the COMPANY. |
|
The Standby Rate will be $90.00 per rig hour.
(three man crew and drill equipment) |
|
Any third party rentals or services provided by
the CONTRACTOR for the benefit of the COMPANY shall be chargeable during
standby periods. |
|
O) | Testing and Logging |
Hole Surveying |
|
The CONTRACTOR may supply equipment (depending upon
availability) for the purposes of dip and/or azimuth testing in the holes.
The following charges will apply according to the table: |
Sperry Sun | Tropari | Acid Test | |||||||
Rental per Month | $ | 2,500.00 | $ | 600.00 | n/c | ||||
Cost per test | |||||||||
Depth interval | |||||||||
0 to 150 m. | $ | 70.00 | $ | 70.00 | $ | 65.00 | |||
150 to 300 m. | $ | 80.00 | $ | 80.00 | $ | 75.00 |
No charge will be made for illegible tests.
7
Geophysical Logging |
|
Geophysical hole logging equipment will be provided
by the COMPANY. When the drill rig is required to stand by on a hole for
the purposes of running geophysical logs, the time spent shall be chargeable
at “FIELD COST” rates. |
|
P) | Core Boxes |
The CONTRACTOR will supply wooden core boxes at
no cost to the COMPANY. |
|
The CONTRACTOR will supply sufficient boxes and
lids for three thousand (3,000) meters of core drilling upon the initial
mobilization. Unless otherwise directed, the CONTRACTOR will supply one
(1) lid for every box. Additional core boxes and lids required for an
extension of drilling meterage will have freight costs added from the
closest point of supply. |
|
Q) | Board and Lodging |
The COMPANY will provide a kitchen, xxxx and cookery,
washroom facilities and a camp genset for the drill crew and the CONTRACTOR’s
subcontractors at no cost to the CONTRACTOR for periods of mobilization,
drilling and demobilization while based on the property. |
|
The COMPANY shall provide sleeping quarters at no
cost to the CONTRACTOR. Beds and linens will be provided by the CONTRACTOR
at no cost to the COMPANY. |
|
R) | Handling of Drill Cuttings and Fluids
|
If the CONTRACTOR is required to haul, pump, or
otherwise dispose of used drill fluids or cuttings at an approved disposal
site, time and materials consumed in such activities will be chargeable
at “FIELD COST” rates. |
|
If sumps for disposal of cuttings are required,
the COMPANY shall construct these at no cost to the CONTRACTOR. |
|
In the event that it is not feasible to construct
sumps, the CONTRACTOR shall take all reasonable precautions to prevent
run-off or spillage of drill cuttings or used drill fluids into any water
course. |
|
S) | Hole Abandonment and Completion |
The CONTRACTOR agrees to cement off, plug or otherwise
seal off completed holes as directed by the COMPANY and shall perform
such work at “FIELD COST” rates. |
8
Piezometers or other instrumentation
that is required to be placed into a completed hole shall be provided
by the COMPANY at no cost to the CONTRACTOR. Time spent by the CONTRACTOR
to install such instrumentation shall be chargeable at “FIELD COST”
rates. |
||
T) | COMPANY to Provide |
|
Access |
||
1) |
drill sites and access suitable for 4 X 4 pickups
and wheeled skid mounted drill rigs |
|
2) |
access to water source |
|
3) |
rubber tired backhoe for the construction on recirculation
sumps |
|
4) |
all fuel normally consumed by the CONTRACTOR’S
equipment |
|
Permitting |
||
1) |
all necessary land use, water use, camp, and work
permits |
|
Geological Control |
||
1) |
instructions on dip and azimuth and confirmation
of same prior to collaring the hole |
|
2) |
instructions on hole completion depth |
|
Unless otherwise specified herein, the
COMPANY agrees to provide the above listed items in this Article (V) at
no cost to the CONTRACTOR. |
||
U) | CONTRACTOR to Provide
|
|
Drill rigs |
||
1) |
one wheeled skid mounted 25HH drill rig (or equivalent)
|
|
Drill Rods and Casing
|
||
1) |
HQ and NQrods in sufficient quantity to reach depths
contemplated (300 meters) |
|
2) |
HW and NW casing in sufficient quantities to reach
bedrock (10 meters) |
|
3) |
HQ-3 core barrels |
|
4) |
rod sloops as required |
|
5) |
one front end loader for drill rig moves |
|
Water Supply |
||
1) |
500 meters of waterline |
9
2) |
supply pumps |
|
3) |
coil stove(s) for water line, if required |
|
4) |
water storage tanks |
|
5) |
water trucks if required |
|
Mud Mixing Equipment
|
||
1) |
one mud mixing tank and mixers |
|
2) |
one mud tank |
|
Diamond Tools
|
||
All necessary diamond products
including bits, reamer shells, casing shoes and tricones. |
||
Other Equipment
|
||
All necessary hand tools
and spares deemed necessary for the work |
||
Mobile Equipment
|
||
1) |
4 X 4 pickups as required for crew travel and rig
servicing |
|
2) |
||
Communications
|
||
1) |
satellite phone, rig-to-camp and hand-held radios
as required |
|
V) | Crewing.
|
|
The CONTRACTOR will provide
personnel to carry the work out on a twelve (12) hour, two (2) shift basis,
seven (7) days per week. |
||
Each drilling shift will
be operated by one driller and one helper and one fifth man. The work
will be supervised by a runner xxxxxxx. |
||
The CONTRACTOR may provide
extra personnel for non-drilling activities such as site clearing, expediting,
waterline maintenance, or loader operating and drill rig support. |
||
The total number of CONTRACTOR
personnel and that of his subcontractors is estimated at nine (9) persons
for the scope of the program as follows: |
||
Two drillers Two helpers One “fifth” men |
10
Four water truck drivers |
|
The CONTRACTOR may at any time or from time to time
change the crews in accordance with field breaks, duty tours, statutory
requirements, or other circumstances requiring a crew movement. |
|
W) | First Aid and Survival |
Each drill will be supplied with a complete First
Aid kit which complies with the regulations of the Province having jurisdiction.
|
|
Where the conditions require, the CONTRACTOR will
provide survival kits, emergency shelters and food supplies at each drill
site. |
|
The COMPANY agrees to provide medivac services in
the event of emergency at no cost to the CONTRACTOR where medical services
are not readily available or where the distances to hospitals or clinics
preclude prompt medical care. |
|
AA) | Removal of Drill Rig Wastes |
The CONTRACTOR shall collect and dispose of all
drill rig wastes such as oily rags, lubricant containers and oily soils,
etc. Where provincial regulations dictate that such wastes be disposed
of in an approved waste disposal site, any disposal fees chargeable shall
be reimbursed to the CONTRACTOR by the COMPANY. |
|
AB) | VAT |
Prices stated do not include VAT. This tax will
be charged where applicable, and shown as a separate item on all invoices.
|
|
AC) | Payments |
Invoices will be rendered twice monthly, covering
half-monthly periods, and will be due and payable upon receipt. Unless
otherwise indicated, all prices are in US dollars. Interest
charges of 18% per annum will commence 21 days after the due date. |
|
The CONTRACTOR shall submit a Factura to the COMPANY
for each approved invoice which shall be quoted in US dollars. Such facturas
shall be payable by the COMPANY within 15 days of receipt. Payments may
be made in Canada or Miami by mutual agreement. The CONTRACTOR warrants
that all applicable Argentine taxes owed by the CONTRACTOR arising from
the work will be paid, regardless of where payment of invoices is made.
|
|
If the COMPANY should dispute any item on an invoice,
this shall not constitute cause to withhold payment for undisputed items. |
11
The CONTRACTOR shall prepare and submit to the COMPANY’s
representative daily drilling reports showing the progress of the work.
Such daily drilling reports shall form the basis for invoicing; such reports
shall be subject to correction of errors or omissions by head office personnel
to ensure invoices are prepared in accordance with this Agreement. |
|
AD) | The COMPANY agrees, upon signing this Agreement
and prior to the commencement of the work, to provide assurances satisfactory
to the CONTRACTOR that the COMPANY has sufficient financial resources
to pay all invoices rendered in accordance with the Agreement. Such assurances
may include the deposit of monies to be held by the CONTRACTOR and applied
to the final invoice, establishment of trust accounts, or other such financial
assurances agreed to by both parties. |
GENERAL | |
a) | The CONTRACTOR shall pipe and drill on the site selected
by the COMPANY’S representative and will deliver at the drill site
only to such persons as the COMPANY may designate all cores and samples
taken from the holes drilled. |
b) | The CONTRACTOR agrees that all information and data
relating to the work obtained or collected by or coming to the attention
of the CONTRACTOR, its officers, employees, agents or subcontractors shall
be for the exclusive use and benefit of the COMPANY. The CONTRACTOR agrees
that it shall not, and it shall use its reasonable best efforts to ensure
that its employees, agents or subcontractors do not, divulge to anyone
other than the COMPANY or its duly authorized representatives any information
or data concerning the progress or results of the work, except as directed
in writing by the COMPANY. |
c) | The CONTRACTOR’S drilling crews will follow
good drilling practices and shall use due care and diligence as shall
enable them to recover such a percentage of core as the nature of the
ground and the drilling tools being employed shall. All cores shall be
become the possession of the COMPANY at the drill site. If the COMPANY
requests that the core be moved by CONTRACTOR personnel or in CONTRACTOR’S
vehicles, loss or damage of the core shall be at the COMPANY’S risk.
|
d) | The CONTRACTOR shall be responsible for, and will
pay promptly all costs and charges incurred by itself for labour, machinery,
tools, and supplies used in completing the work herein so that no lien
or other such charges relative to the CONTRACTOR may be registered against
the COMPANY or the property. The CONTRACTOR shall be responsible for the
payment of assessments for Workers’ Compensation, Holiday Pay, Health
and Medical premiums, Pension, Unemployment Insurance, Sales Tax, or other
such applicable charges relative to its own labour and supplies purchased.
|
12
e) | The CONTRACTOR shall at all times enforce strict
discipline and maintain good order among its employees and shall not retain
on the project any person unfit for the work assigned to him. Any employee
who is objectionable or unsatisfactory to the COMPANY shall be removed
from the project and replaced forthwith by an employee acceptable to the
COMPANY. |
f) | The CONTRACTOR shall keep the camp and drill sites
free from accumulation of waste and rubbish, and at the completion of
the work shall leave the camp and drill sites in a clean condition acceptable
to the COMPANY. |
g) | The Contractor does not guarantee the direction
of the hole beyond the collar. |
h) | Upon completion of the work herein contracted to
be performed the CONTRACTOR shall have the right to remove within a reasonable
period of time all temporary buildings and other fixtures including trade
fixtures, machinery, equipment and appliances placed upon such lands by
the CONTRACTOR. |
i) | It is agreed that should cavities, caving materials,
underground mine workings, loose materials, excessive water or gases,
or tight hole conditions are encountered at a depth which would prevent
successful drilling or render further drilling uneconomic in terms of
the contract, the CONTRACTOR does not guarantee to drill or sink a hole
to any specified depth, but will drill or sink as far as is practical
under existing overburden and rock conditions and the COMPANY shall pay
for every foot or meter sunk or drilled. |
However, should the COMPANY request that further
work be carried out in the hole beyond this point, then the CONTRACTOR
shall continue work in the hole, but such work will proceed under “FIELD
COST” rates with the COMPANY assuming all risk for in-hole tools
and materials until normal coring conditions can be regained. |
|
j) | The CONTRACTOR agrees to carry the following insurance
coverage at its sole expense: |
- | Comprehensive General Liability | equivalent of $Cdn1,000,000.00 | |
- | Automobile Insurance, Liability for bodily injury and property damage |
equivalent of $Cdn1,000,000.00 |
k) | All costs resulting from the enforcement of government
regulations or legislation concerning land use or pollution control measures
which may apply to the work will be borne by the COMPANY. The COMPANY
will indemnify and hold the CONTRACTOR harmless for any and all liability,
claims, damages and expenses which may arise from events or activities
in connection of the work which are |
13
beyond the reasonable control of the CONTRACTOR,
including but not limited to pollution of ground water, streams, lakes,
or surrounding land by discharge of drilling fluids, drill cuttings, and
wastes, except to the extent that such claims, liability, damages and
expenses result from or are attributable to the negligent acts or omissions
of the CONTRACTOR or its employees. |
|
l) | This Agreement shall be governed by and interpreted
in accordance with the laws of Argentina. |
m) | Neither the CONTRACTOR nor the COMPANY shall be
held responsible for any delays in carrying out the obligations of this
Agreement resulting from Acts of God, strikes, fires, riots, casualties,
inability to obtain labour or materials or other causes beyond the reasonable
control of the CONTRACTOR or the COMPANY. |
n) | Social benefits payable to employees in force at
the time of signing of this Agreement are included in the quoted prices.
All cost increases due to legislated benefit increases which arise after
signing of this Agreement will be chargeable to the COMPANY, or shall
be cause for renegotiation of rates herein. |
o) | Delays due to source of supply problems where the
CONTRACTOR is not required to supply the materials or services required
under this Agreement will not be chargeable to the COMPANY. |
p) | This Agreement will not be binding upon the COMPANY
until approved in writing by an authorized officer thereof. |
q) | This proposal is open for acceptance until January
15th, 2005. The CONTRACTOR has the option to withdraw this proposal or
modify its contents after this date. |
14
Signed and Delivered
in the presence of:
ARGENTEX MINING CORPORATION | |||||
per: | /s/ XXX XXXXX | ||||
Witness | |||||
Title: | VP Exploration | ||||
Date: | January 19, 2005 | ||||
XXXXXXX ARGENTINA S.A. | |||||
per: | /s/ XXXXX XXXXXX | ||||
Witness | |||||
for Xxxxxx Xxxxxxxx | |||||
Title: | Legal Representative | ||||
Date: | January 18, 2005 |
15