Chengbang Interior Decoration Co., LTD Contractor’s Agreement
Exhibit 10.6
Chengbang Interior Decoration Co., LTD
Contractor’s Agreement
Contractors:
Consigner:
UAN
Cultural
& Creative
Co.,
LTD.
Taiwan
Branch
Office
(Hereinafter
the
“Party
A”)
Assignee:
Chengbang
Interior
Decoration
Co.,
LTD.
(Hereinafter
the “Party
B”)
Party A and Party B stipulate construction contract with agreement from both parties. The provisions of the contract are as follows:
1. | Construction location: B1 and 0xx Xxxxx, Xx.00, Xxxxxxx Xx., Xxxx dist., Tainan City 701, Taiwan (R.O.C.) |
2. | Construction scope: |
Party B needs to follow the designed drawing, construction instruction, and attached construction quote. Party B can start working only after Party A signs the contract.
3. | Application procedures: |
Party B will follow any required procedures and obtain necessary permits related to this construction project, but Party A is responsible for all of the associated costs.
4. | Construction period: |
Jan. 26, 2012 – Feb. 17, 2012. If there is any unpredictable natural accident or other unconquerable forces which Party B is not responsible for the cause and the completion of the construction was delayed because of those accidents, Party A and Party B would extend project period based on mutual agreement.
5. | Construction total cost: NT$3,000,000 (tax included). |
6. | Payment: After final acceptance of construction, Party A needs pay Party B 100% of the construction payment which is NT$3,000,000. |
Note: (1) If Party A fails to make payment during the above time period, Party B could follow term b of
Agreement 10th to call off this project. And the stoppage days shouldn’t be counted as construction days. Party A cannot have any disagreement.
(2) After signing the contract, if Party A wants to breach the contract, Party A needs pay Party B designing cost which equals to 10% of the construction cost.
7. | Expanding and lessening projects: |
a. | This construction scope could be expanded or lessened with both parties’ agreement. If the type of expanded or lessened construction is listed in the attachment, cost for the work should be added to the quote or deducted from the quote. If the type of work is not one of the listed works in the attachment, the cost needs to be decided by both parties. It needs to be signed by Party A before Party B start working on it. The contract for the expanded or lessened construction work needs to be attached to this contract. |
b. | The cost of expanded construction work needs to be paid in 3 days after the contract signed. |
8. | Construction safety: |
During the construction period, Party B needs to confirm the safety of the construction site. Party B is responsible for any accidents of losing lives, body parts, or belongings happening in the construction site. Party A is not responsible for that.
9. | Construction acceptance: |
After all construction work is done, Party B needs to notify Party A to check the completed construction. Party A needs to do so in 5 days after the notice. If Party A doesn’t come to accept the work within 10 days after notice, the construction work would be automatically considered as accepted by Party A.
10. | Penalties: |
a. | Overdue fine: If the construction is not completed within construction period as planned, Party B needs to pay back Party A daily cost which is 1/1000 of the total construction cost. This penalty will be deducted by Party A from the total cost. Party B should have no disagreement about the penalties. |
b. | If Party A doesn’t make payment as agreed, Party B can call off the project until Party A makes payment. The days of stoppage should not be counted in the construction period; therefore the completion date should be postponed. If contract is breached after Party B received payment from Party A, Party B could ask Party A for indemnification if there is still damage after the payment compensates the work already finished and the equipment already purchased. |
11. | Warrantee period: |
Three months after the official construction acceptance. If there is any damage resulted from construction work and inferior material within 3 months starting from the day of official construction acceptance, Party B is responsible for reparation. The damage caused by unconquerable forces is not included in this.
12. | This Contract is in duplicate. Party A and Party B each have one copy. |
13. | This construction cost includes 5% business tax. |
14. | The attachment of this contract is considered as part of the contract and should be already attached to this contract possessed by both parties. |
15. | Remitting bank: |
a. | Chinatrust Bank – Northern Taoyuan branch |
b. | Account name: Chengbang Interior Decoration Co., LTD. Account No.: |
Contractor:
Party A: UAN Cultural & Creative Co., LTD. Taiwan Branch Office
Business registration number: 00000000
Phone: 00-0000000
Address: 8F., Xx. 000, Xxxxxx 0xx Xx., Xxxxx Xxxxxxxx, Xxxxxxx Xxxxxx 000, Xxxxxx (R.O.C.) Email address:
Contractor:
Party B: Chengbang Interior Decoration Co., LTD. Person in charge: Xxxxxxxx Xxxxx
Business registration number: 00000000
Phone: 00-0000-0000
Fax: 00-0000-0000
Address: 10F., Xx. 000-0, Xxxxxxx Xx., Xxxxxx Xxxxxxxx, Xxxxxx xxxxxx, Xxxxxx (R.O.C.) Email address: xxxxxxxxxxx@xxxxx.xxx.xx
Year 101 of Republic of China, January 10th. (Jan. 10, 2012)
Chengbang Interior Decoration Co., LTD.
Phone: 00-0000-0000 Fax: 00-0000-0000
Address: 10F., Xx. 000-0, Xxxxxxx Xx., Xxxxxx Xxxxxxxx, Xxxxxx county
Customer:
UAN Cultural
& Creative
Co.,
LTD.
Construction
name:
Tainan gallery
Construction address: B1 and 0xx Xxxxx, Xx.00, Xxxxxxx Xx., Xxxx dist., Tainan City 701, Taiwan (R.O.C.)
Date: 2012/1/10 pages: 4
Quote | |||||||||
scope | Item | Project name | quantity | Unit price | Total cost | note | |||
1st F., No. 58 | |||||||||
1 | Demolishment work | Landlord is responsible for it | |||||||
2 | Gallery Sign work | ||||||||
a. |
Outside power configuration including time switch configuration |
piece | 1 | 12000 | 12000 | ||||
b. | Vertical sign changing panel | piece | 1 | 15000 | 15000 | ||||
c. | Horizontal sign | piece | 1 | 28000 | 28000 | ||||
d. | Foam characters | piece | 1 | 10000 | 10000 | ||||
e. |
Company LED colorful logo on B1F front desk |
piece | 1 | 20000 | 20000 | ||||
f. | Big picture on pillar | piece | 1 | 9000 | 9000 | ||||
g. |
Pictures on 1F and B1F glass wall |
piece | 1 | 6000 | 6000 | ||||
3 | Hydropower work | piece | 1 | 60000 | 60000 | ||||
Original lights alignment | |||||||||
wire work on ceiling | |||||||||
Sewage system | |||||||||
Newly added plug | |||||||||
Projector and plug configuration for e-screen (not including phone and internet configuration) |
|||||||||
4 | Lighting work(including installation) |
||||||||
a. | 2m track light | piece | 18 | 500 | 9000 | ||||
b. | Track light | set | 54 | 450 | 24300 | ||||
c. | Ceiling light | set | 2 | 800 | 1600 | ||||
d. | T5 light brass | piece | 26 | 1050 | 27300 | ||||
e. | Bathroom ceiling light | set | 4 | 800 | 3200 | ||||
f. | Wire | piece | 1 | 3000 | 3000 | ||||
5 | Wood work | ||||||||
Reception area |
a. | Reception front desk | foot | 31 | 3000 | 93000 | |||
b. | Counter side reparation | piece | 1 | 9000 | 9000 | ||||
Business discussion area |
a. | Wall modeling | foot | 86 | 700 | 60200 | |||
Stage area | a. | Elevating stage | piece | 1 | 8000 | 8000 | |||
b. | Ceiling & e-screen | piece | 1 | 15000 | 15000 | ||||
VIP area wall | a. | Sliding door modeling | piece | 12 | 7000 | 84000 | |||
Hall way to 2F |
a. | compartment | piece | 1 | 12000 | 12000 | |||
6 | Carpet work | ||||||||
a. | Stage carpet | piece | 1 | 7800 | 7800 | ||||
b. | VIP area(1) | piece | 1 | 17000 | 17000 | ||
c. | VIP area(2) | piece | 1 | 17000 | 17000 | ||
d. | VIP area(3) | piece | 1 | 17000 | 17000 | ||
e. | VIP area(3) | piece | 1 | 17000 | 17000 | ||
7 | Painting work | ||||||
x. | Xxxxxxx painting | piece | 1 | 9000 | 9000 | ||
b. | Spraying painting on ceiling | piece | 1 | 38000 | 38000 | ||
8 | Curtain/wallpaper work | ||||||
Curtain work | |||||||
If | a. | Entrance area | piece | 1 | 21000 | 21000 | |
b. | Stage area | piece | 1 | 16000 | 16000 | ||
Movable line curtain | |||||||
a. | VIP area | piece | 520 | 150 | 78000 | ||
Wallpaper work | |||||||
If | a. | Wallpaper | ping* | 26 | 1000 | 26000 | |
9 | Glass work | ||||||
If | a. | Bar area | piece | 1 | 20000 | 20000 | |
b. | Wall mirror | piece | 1 | 45000 | 45000 | ||
c. | Ceiling mirror | set | 30 | 500 | 15000 | ||
10 | Furniture work | ||||||
a. | L-shape sofa | piece | 4 | 38000 | 152000 |
Manmade PVC leather | |
b. | Auxiliary chair | piece | 8 | 1800 | 14400 |
Manmade PVC leather | |
c. | Big coffee table | set | 4 | 9500 | 38000 | ||
d. | Bar stool | piece | 8 | 4200 | 33600 | ||
e. | Podium | piece | 1 | 12000 | 12000 | ||
11 | Wood floor work | ||||||
a. |
Business discussion area & hallway |
ping | 42 | 3000 | 126000 |
Including loss | |
12 | Bathroom work | ||||||
a. | Bathroom sink | set | 1 | 3500 | 3500 | ||
b. | Shower faucet | set | 1 | 1500 | 1500 | ||
c. | Paper towel holder | set | 1 | 1000 | 1000 | ||
d. | Shelves | set | 1 | 700 | 700 | ||
13 | Air conditioner work | piece | |||||
14 | Aluminum window work | piece | |||||
15 | Cleanup work | piece | 1 | 22000 | 22000 |
Including trash dump | |
16 | Marble work | piece | |||||
17 | Sound system | ||||||
a. | Speaker & microphone | piece | 1 | 60000 | 60000 |
8 pair of speakers | |
Wireless microphone main unit & 2 pair of microphones |
|||||||
b. | Projector | piece | 1 | 23000 | 23000 | ||
c. | Automatic e-screen | piece | 1 | 12000 | 12000 | ||
d. |
Drop hanger & wire & installation cost |
piece | 1 | 4000 | 4000 | ||
18 | Automatic door work | ||||||
a. |
Change pushing door to automatic door |
piece | 1 | 5000 | 5000 |
No. 58 basement construction project | ||||||||
one | Demolish work | |||||||
Two | Cement work | |||||||
Three | Water & electricity work | piece | 1 | 120000 | 120000 | |||
B1F | 1 | Remove old cables | ||||||
2 | Cables for new lights | |||||||
3 | Cables for new receptacles | |||||||
4 | Power for new lights | |||||||
5 | Power for new air conditioner | |||||||
6 | Power for new blowers | |||||||
7 | Power for new automatic rolling shutter door | |||||||
8 | Power for new automatic door | |||||||
Not including telephone and network setup | ||||||||
Four | Light fixtures (including installation) | |||||||
B1F | 1 | T5 light brass | piece | 52 | 1050 | 54600 | ||
2 | 2m track light | piece | 12 | 500 | 6000 | |||
3 | Track light | set | 7 | 450 | 3150 | |||
Five | Wood work | |||||||
1F | 1 | Closure plate for the side of stair | piece | 1 | 15000 | 15000 | ||
B1F | 1 | Stair tread plate | piece | 1 | 18000 | 18000 | ||
2 | Platform for stair | piece | 1 | 3000 | 3000 | |||
3 | Both side closure panels for automatic door | piece | 1 | 9000 | 9000 | |||
4 | Wall closure plate | foot | 100 | 500 | 50000 | |||
5 | Vent pipes | foot | 200 | 200 | 40000 | |||
6 | Plates for electricity room | foot | 16 | 500 | 8000 | |||
7 | Door for electricity room | piece | 1 | 7000 | 7000 | |||
Office | 1 | Cubicle window frame | piece | 1 | 12000 | 12000 | ||
2 | Door and frame | piece | 4 | 8000 | 32000 | |||
Bathroom | 1 | Ceiling | piece | 1 | 9000 | 9000 | ||
2 | Door and frame | piece | 2 | 8000 | 16000 | |||
Others | 1 | Track for painting hanging | foot | 165 | 50 | 8250 | ||
2 | hardware | unit | 50 | 55 | 2750 | |||
Six | light-weighted steel project | |||||||
B1f | 1 | B1F light-weight steel ceiling | ping | 82 | 840 | 68880 |
9mm drywall | |
B1F light-weight steel ceiling | Ping | 38 | 550 | 20900 |
Use 1f old materials | |||
Labor for 1F light-weight steel ceiling repair | piece | 1 | 3000 | 3000 | ||||
B1f | 1 | Double-side cubicle | ping | 38 | 2100 | 79800 |
1 hr burning resistance | |
15mm drywall | ||||||||
Seven | Painting | |||||||
B1f | 1 | Walls and stair painting | piece | 1 | 28000 | 28000 | ||
Eight | Blinds and wallpapers | |||||||
Blinds | ||||||||
B1f | 1 | Office blinds | piece | 100 | 75 | 7500 | ||
B1f | Wallpaper & line curtain | |||||||
1 | Wallpaper behind the reception desk | Ping | 5 | 1000 | 5000 | |||
2 | Office | ping | 60 | 1000 | 60000 | |||
3 | Vent pipes | ping | 6 | 1000 | 6000 | |||
4 | Wallpaper for VP (1)’s office | ping | 20 | 700 | 14000 | |||
5 | Wallpaper for VP (2)’s office | ping | 20 | 700 | 14000 | |||
6 | Wallpaper for general manager’s office | ping | 30 | 700 | 21000 | |||
7 | Wallpaper for storage room | ping | 15 | 700 | 10500 | |||
8 | Pantry line curtain | piece | 1 | 12000 | 12000 | |||
Nine | Glassware work | |||||||
B1f | 1 | Automatic glass door | piece | 1 | 14000 | 14000 | ||
2 | Manual glass door | piece | 1 | 6000 | 6000 | |||
3 | Supervisor cube and door glasses | piece | 1 | 38000 | 38000 | |||
4 | BIF glasses | piece | 1 | 20000 | 20000 | |||
5 | Glasses for bathrooms | piece | 1 | 13670 | 13670 | |||
Ten | Furniture | |||||||
Eleven | Floor work | |||||||
1 | Stair vinyl floor | piece | 1 | 5000 | 5000 | Including edge | ||
2 | Office vinyl floor | ping | 134 | 1200 | 160800 | Including extra | ||
Twelve | Bathroom | |||||||
1 | Changing toilets | piece | 1 | 5000 | 5000 | |||
2 | Changing sink (including faucet) | piece | 2 | 15000 | 30000 | |||
Thirteen | Air conditioner | |||||||
1 | Hitachi AC unit | piece | 1 | 129000 | 129000 | RCU-106A | ||
2 | Hitachi ice-water blower | piece | 7 | 9100 | 63700 | RF-1207 | ||
3 | Hitachi ice-water blower | piece | 2 | 6100 | 12200 | RF-807 | ||
4 | Electronic thermostat | unit | 9 | 1800 | 16200 | |||
5 | 2,3 way valves | unit | 9 | 1500 | 13500 | |||
6 | PVC pipes for blower s and main unit | unit | 11 | 6000 | 66000 | |||
7 | hardware | pice | 1 | 20000 | 20000 | |||
8 | Pipes for blowers | unit | 9 | 6000 | 54000 | |||
9 |
Heat Preservation Project 9 pieces of units plus main pipes |
piece | 1 | 45000 | 45000 | |||
10 | Main unit Earthquake proof | piece | 1 | 7500 | 7500 | |||
11 | labor | piece | 1 | 60000 | 60000 | |||
12 | labor for demolishing and disposing old unit | piece | 1 | 10000 | 10000 | |||
13 | Power for main unit | piece | 1 | 10000 | 10000 | |||
14 | Blower test and maintenance | piece | 1 | 12000 | 12000 | |||
15 | Blower vents | piece | 1 | 12000 | 12000 | |||
Fourteen | Aluminum window work | |||||||
Fifteen | Cleanup work | piece | 1 | 35000 | 35000 |
Including trash cleaning up | ||
Total cost of the construction project is NT$3,000,000(tax included) |
*Ping = 3.3 m2