ASTRA ENERGY INC.
EXHIBIT 10.14
ASTRA ENERGY INC.
0000 Xxxxxx Xxxxxx, Xxxxx 000
Xxx Xxxxx, XX 00000
Supply and Installation Contract for
Green Hygienics Holdings Inc.
at Sol Valley Xxxxx0000 Xxxxx Xxxxxxx Xxxx
Xxxxxxx XX 00000 XXX
This contract covers the detailed design, engineering, material supply and installation of a 110 KW ground- mount photovoltaic system.
Design:
The 110 KW system includes the following:
| · | 450 polycrystalline solar modules mounted on a ground mount system. |
| · | Wind loading shall meet the requirements of local codes. |
| · | Panel warranty is for 25 years. |
| · | Designed to the highest wind proof standards and conforming to all IEC and NESC regulations. |
Scope of Work:
Detailed engineering including:
| · | Layout |
| · | Design/ Drawings of Civil Works |
| · | Equipment Electrical specifications |
| · | Electrical layout drawings |
Panel supply
Construction related permits
Construction and Installation
Power connection.
Supervision of Commissioning.
Manual of operating and maintenance instructions
Contract Price:
Complete system installed price is USD $220,000.
Terms: $25,000 payment upon acceptance of this contract. Balance on completion.
Equipment Warranty:
The period of guarantee for equipment from vendors, which shall be twenty-five years (25) from shipment, with the exception of inverters which is 5 years. This is subject to the goods having been treated with reasonable care. Our guarantee does not extend to any consequential loss, which may arise from any defects.
Accepted this 12th day of January 2022
____________________________
Green Hygienics Holdings Inc.
Authorized Signatory