The Light Railway Project in the Haifa Metropolitan Area, between Haifa and NazarethTender for Selecting the Project Designer • October 16th, 2018
Contract Type FiledOctober 16th, 2018Annex “A” Definitions Annex “B” Reference Design Documents Annex “C” Advisors to the Company Annex “D(1)” Threshold Requirements for the Lead Design Firm Annex “D(2)” Threshold Requirements for the Local Design Firm Annex “D(3)” Threshold Requirements for the Chief Designer Annex “D(4)” Threshold Requirements for the Deputy Chief Designer Annex “D(5)” Threshold Requirements for the Operations and Maintenance Expert Annex “D(6)” Threshold Requirements for the Systems Engineer Annex “D(7)” Threshold Requirements for the Rolling Stock Engineer Annex “D(8)” Threshold Requirements for the Track Designer Annex “E” The Quality Proposal Annex “F” Mandatory Industrial Cooperation