SHORT-FORM AGREEMENT FOR PROFESSIONAL SERVICESShort-Form Agreement • March 8th, 2023
Contract Type FiledMarch 8th, 2023VTM Engineering, PLC will perform an annual evaluation of the integrity of the landfill’s final cover system including vegetative cover, the drainage systems, surface water runoff, and the gas ventilation system. The inspection shall be performed in the spring after snowmelt. The work shall include a final report. A draft of the report shall be submitted to the Town for review. A final report shall be submitted by June 15th, 2023.
SHORT-FORM AGREEMENT FOR PROFESSIONAL SERVICESShort-Form Agreement • April 6th, 2022
Contract Type FiledApril 6th, 2022VTM Engineering, PLC will perform an annual evaluation of the integrity of the landfill’s final cover system including vegetative cover, the drainage systems, surface water runoff, and the gas ventilation system. The inspection shall be performed in the spring after snowmelt. The work shall include a final report. A draft of the report shall be submitted to the Town for review. A final report shall be submitted by June 15th, 2022.
SHORT-FORM AGREEMENT FOR PROFESSIONAL SERVICESShort-Form Agreement • April 6th, 2022
Contract Type FiledApril 6th, 2022VTM Engineering PLC will perform an annual inspection as described in the Indirect Discharge Permit #ID-9-0208-1. The annual inspection will take place during the month of April 2022.