Common Contracts

1 similar null contracts

Local CHP Plants between the Natural Gas and Electricity Systems
May 6th, 2005
  • Filed
    May 6th, 2005

This paper deals with the CHP as intermediary between the natural gas system and the electricity system. In particular, the relationship between the peak hour characteristics of the electricity and gas systems will be investigated. The point is here that the two systems will tend to have peak demand during the same hours. This is the typical situation, since load is high during the same hours of the day and of the year. Moreover, the random variations in the load will be correlated between the systems, because both demands in part depend on the climate.

AutoNDA by SimpleDocs
Time is Money Join Law Insider Premium to draft better contracts faster.