FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, DC 20426
Interconnection Service Agreement • December 27th, 2023

This action does not constitute approval of any service, rate, charge, classification, or any rule, regulation, contract, or practice affecting such rate or service provided for in the filed document(s); nor shall such action be deemed as recognition of any claimed contractual right or obligation affecting or relating to such service or rate; and such action is without prejudice to any findings or orders which have been or may hereafter be made by the Commission in any proceeding now pending or hereafter instituted by or against the applicant(s).

AutoNDA by SimpleDocs
FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, DC 20426
Interconnection Service Agreement • September 6th, 2022

On September 7, 2022, PJM Interconnection, L.L.C. (PJM) filed an amended Interconnection Service Agreement (Amended ISA) among PJM, ENGIE Solidago Solar LLC (ENGIE), and Delmarva Power & Light Company (Delmarva).1 PJM states that the Amended ISA replaces an existing ISA among PJM, New Castle Solar LLC (New Castle), and Delmarva, designated as Original Service Agreement No. 5535, which was previously accepted by the Commission (Prior ISA).2 PJM also states that the Amended ISA reflects the assignment by New Castle of all of its rights and duties under the Prior ISA to ENGIE and ENGIE’s acceptance of such assignment, as effectuated by an executed Consent to Assignment Agreement and Agreement to Amend among PJM, ENGIE, New Castle, and Delmarva. PJM requests that the agreement be accepted effective November 19, 2019.

FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, DC 20426
Interconnection Service Agreement • August 3rd, 2022

On August 3, 2022, PJM Interconnection, L.L.C. (PJM) filed an amended Interconnection Service Agreement (Amended ISA) among PJM, Sol Madison Solar, LLC (Interconnection Customer), and Virginia Electric and Power Company (Interconnected Transmission Owner), designated as Service Agreement No. 5548.1 PJM states that the Amended ISA modifies the existing ISA among the parties, which was previously accepted by the Commission, to revise certain milestone dates, as effectuated by the Agreement to Amend executed by the parties. PJM requests that the effective date of the Amended ISA remain the same as the effective date of the original ISA, i.e., December 16, 2019.

FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, DC 20426
Interconnection Service Agreement • June 17th, 2022

On June 17, 2022, PJM Interconnection, L.L.C. (PJM) filed an amended Interconnection Service Agreement (ISA) among PJM, Bluegrass Solar, LLC (Interconnection Customer), and Delmarva Power & Light Company (Interconnected Transmission Owner), designated as Service Agreement No. 5359 (Amended ISA).1 PJM states that it is filing the Amended ISA to update the Interconnection Customer’s contact information and the name of the customer facility, as effectuated by the Agreement to Amend executed by the parties. PJM requests that the effective date of the Amended ISA remain the same as the effective date of the original ISA, i.e., April 9, 2019.

FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, DC 20426
Interconnection Service Agreement • September 10th, 2021

On September 10, 2021, you filed, on behalf of PJM Interconnection, L.L.C. (PJM), an executed Interconnection Service Agreement (ISA) among PJM, Aurora Generation, LLC and Commonwealth Edison Company, designated as First Revised Service Agreement No. 5756.1 You state that the ISA supersedes the Original Service Agreement No. 5756, which was filed with and accepted by the Commission in Docket No. ER20-2928-000.2 PJM requests that the ISA be accepted effective August 11, 2021.

Document Accession #: 20210521-3000 Filed Date: 05/21/2021
Interconnection Service Agreement • June 30th, 2021

On March 25, 2021, PJM Interconnection, L.L.C. (PJM) filed an amended Interconnection Service Agreement, designated as Service Agreement No. 5212, and an amended Interconnection Construction Service Agreement, designated as Service Agreement No. 5213, among PJM and Virginia Electric and Power Company (VEPCO) (Amended Service Agreements).1 PJM states that the Amended Service Agreements modify Original Service Agreement Nos. 5212 and 5213 respectively, that were previously accepted by the Commission in Docket No. ER19-79-000,2 to reflect the assignment of all rights and responsibilities under the Amended Service Agreements from Otter Creek Solar LLC to VEPCO. PJM requests that the Amended Service Agreements be accepted effective September 10, 2018.

Document Accession #: 20210521-3000 Filed Date: 05/21/2021
Interconnection Service Agreement • June 30th, 2021

On March 25, 2021, PJM Interconnection, L.L.C. (PJM) filed an amended Interconnection Service Agreement, designated as Service Agreement No. 5212, and an amended Interconnection Construction Service Agreement, designated as Service Agreement No. 5213, among PJM and Virginia Electric and Power Company (VEPCO) (Amended Service Agreements).1 PJM states that the Amended Service Agreements modify Original Service Agreement Nos. 5212 and 5213 respectively, that were previously accepted by the Commission in Docket No. ER19-79-000,2 to reflect the assignment of all rights and responsibilities under the Amended Service Agreements from Otter Creek Solar LLC to VEPCO. PJM requests that the Amended Service Agreements be accepted effective September 10, 2018.

Document Accession #: 20210428-3055 Filed Date: 04/28/2021‌‌
Interconnection Service Agreement • June 16th, 2021

Reference: Amended Interconnection Service Agreement No. 5291 and Amended Interconnection Construction Service Agreement No. 5312

Document Accession #: 20210428-3055 Filed Date: 04/28/2021‌‌
Interconnection Service Agreement • June 16th, 2021

Reference: Amended Interconnection Service Agreement No. 5291 and Amended Interconnection Construction Service Agreement No. 5312

David S. Berman, Esq. Wright & Talisman, P.C. 1200 G Street, NW, Suite 600 Washington, DC 20005-3898 Reference: Amended Interconnection Service Agreement No. 5692
Interconnection Service Agreement • March 25th, 2021

On December 22, 2020, as amended on March 25, 2021,1 on behalf of PJM Interconnection, L.L.C. (PJM), you filed an amended Interconnection Service Agreement among PJM, Blossburg Power, LLC, and Mid-Atlantic Interstate Transmission, LLC, designated as Original Service Agreement No. 5692.2 You state that the amendments correct errors in the original agreement that was previously accepted by the Commission in Docket No. ER20-2520-000.3 You request that the revisions be accepted effective June 30, 2020.

Document Accession #: 20210419-3019 Filed Date: 04/19/2021‌‌
Interconnection Service Agreement • February 19th, 2021

Reference: Amended Interconnection Service Agreement and Amended Interconnection Construction Service Agreement

FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, DC 20426
Interconnection Service Agreement • February 17th, 2021
Document Accession #: 20210409-3025 Filed Date: 04/09/2021‌‌
Interconnection Service Agreement • February 11th, 2021

On February 11, 2021, PJM Interconnection, L.L.C. (PJM) submitted a revised Interconnection Service Agreement (ISA), and original Interconnection Construction Service Agreement (ICSA) both among PJM, Marcus Hook Energy, L.P., and PECO Energy Company (collectively, the Marcus Hooks Agreements).1 You state that PJM is submitting the Marcus Hooks Agreements filing because they contain provisions that do not conform to the ISA Form or ICSA in the Tariff, Attachment P.

Document Accession #: 20210409-3025 Filed Date: 04/09/2021‌‌
Interconnection Service Agreement • February 11th, 2021

On February 11, 2021, PJM Interconnection, L.L.C. (PJM) submitted a revised Interconnection Service Agreement (ISA), and original Interconnection Construction Service Agreement (ICSA) both among PJM, Marcus Hook Energy, L.P., and PECO Energy Company (collectively, the Marcus Hooks Agreements).1 You state that PJM is submitting the Marcus Hooks Agreements filing because they contain provisions that do not conform to the ISA Form or ICSA in the Tariff, Attachment P.

Document Accession #: 20210331-3043 Filed Date: 03/31/2021‌‌
Interconnection Service Agreement • February 1st, 2021

On February 1, 2021, you filed, on behalf of PJM Interconnection, L.L.C. (PJM), an executed Interconnection Service Agreement (ISA) among PJM, Cricket Solar LLC, and Virginia Electric and Power Company, designated as Original Service Agreement No. 5680.1 You state that the ISA includes terms and conditions that do not conform to the applicable form of ISA set forth in Attachment O of the PJM Open Access Transmission Tariff. You also state that the ISA includes an additional non-conforming provision that was not included in the existing ISA which was previously accepted for filing in Docket No. ER20-2381-000.2 You explain that, due to an administrative oversight, the existing ISA did not use the version of ISA Form, Appendix 1, in effect at the time of the filing in Docket No. ER20-2381-000. You state that, in Docket No.

Document Accession #: 20210331-3043 Filed Date: 03/31/2021‌‌
Interconnection Service Agreement • February 1st, 2021

On February 1, 2021, you filed, on behalf of PJM Interconnection, L.L.C. (PJM), an executed Interconnection Service Agreement (ISA) among PJM, Cricket Solar LLC, and Virginia Electric and Power Company, designated as Original Service Agreement No. 5680.1 You state that the ISA includes terms and conditions that do not conform to the applicable form of ISA set forth in Attachment O of the PJM Open Access Transmission Tariff. You also state that the ISA includes an additional non-conforming provision that was not included in the existing ISA which was previously accepted for filing in Docket No. ER20-2381-000.2 You explain that, due to an administrative oversight, the existing ISA did not use the version of ISA Form, Appendix 1, in effect at the time of the filing in Docket No. ER20-2381-000. You state that, in Docket No.

FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, DC 20426
Interconnection Service Agreement • January 20th, 2021

Reference: Amended Interconnection Service Agreement and Amended Interconnection Construction Service Agreement

FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, DC 20426
Interconnection Service Agreement • January 12th, 2021
This ISA has been superceded.
Interconnection Service Agreement • January 4th, 2021

On September 21, 2020, you filed, on behalf of PJM Interconnection, L.L.C. (PJM), an executed Interconnection Service Agreement (ISA) among PJM, Aurora Generation, LLC (Aurora), and Commonwealth Edison Company (ComEd) (Aurora ISA), designated as Service Agreement No. 5756.1 You state that the Aurora ISA reflects an increase in the Aurora Generation Customer Facility’s Maximum Facility Output and Capacity Interconnection Rights, and that it supersedes Rate Schedule FERC No. 62 between Commonwealth Edison Company and Reliant Energy Aurora LP, which was accepted by the Commission in Docket No. ER00-3670-000.2 You also state that PJM is submitting the Aurora ISA for filing because it contains terms and conditions that do not conform to the form of ISA set forth in Attachment O of the PJM Open Access Transmission Tariff.

David S. Berman, Esq. Wright & Talisman, P.C. 1200 G Street, NW, Suite 600 Washington, DC 20005 Reference: Amended Interconnection Service Agreement
Interconnection Service Agreement • December 28th, 2020

On December 28, 2020, PJM Interconnection, L.L.C. (PJM) filed an amended Interconnection Service Agreement among PJM, Gilbert Power, LLC, and Jersey Central Power & Light Company, designated as Original Service Agreement No. 5622.1 PJM states that the amendments correct errors in the original agreement that was previously accepted by the Commission in Docket No. ER20-1532-000.2 PJM requests that the amendments be accepted effective March 10, 2020.

Document Accession #: 20210212-3038 Filed Date: 02/12/2021‌‌
Interconnection Service Agreement • December 16th, 2020

On December 16, 2020, PJM Interconnection, L.L.C. (PJM) filed an amended Interconnection Service Agreement among PJM, Hamilton Power, LLC, and Mid- Atlantic Interstate Transmission, LLC, designated as Original Service Agreement No. 5691.1 PJM states that the amendments correct errors in the original agreement that was previously accepted by the Commission in Docket No. ER20-2533-000.2 PJM requested that the amendments be accepted effective June 30, 2020.

Document Accession #: 20201207-3038 Filed Date: 12/07/2020‌‌
Interconnection Service Agreement • October 14th, 2020

On October 14, 2020, PJM Interconnection, L.L.C. (PJM) filed an executed Interconnection Service Agreement (ISA) among PJM, Chambersburg Energy, LLC, and West Penn Power Company, designated as Service Agreement No. 5794 (Chambersburg ISA).1 PJM states that it is submitting the Chambersburg ISA for filing because it contains terms and conditions that do not conform to the form of ISA set forth in Attachment O of the PJM Open Access Transmission Tariff.

AutoNDA by SimpleDocs
Document Accession #: 20201117-3085 Filed Date: 11/17/2020‌‌
Interconnection Service Agreement • September 28th, 2020

On September 28, 2020, PJM Interconnection, L.L.C. (PJM) filed an executed Interconnection Service Agreement (ISA) among PJM, Virginia Electric and Power Company (Interconnection Customer), and Virginia Electric and Power Company (Interconnected Transmission Owner) (VEPCO ISA), designated as Service Agreement No. 5763.1 You state that the VEPCO ISA supersedes the Interim Interconnection Service Agreement among the same parties, designated as Original Service Agreement No. 5587, effective January 22, 2020, and reported in PJM’s Electric Quarterly Report. You further state that PJM is submitting the ISA for filing because it contains provisions that do not conform to the form of ISA set forth in Attachment O of the PJM Open Access Transmission Tariff.

Document Accession #: 20201113-3042 Filed Date: 11/13/2020‌‌
Interconnection Service Agreement • September 23rd, 2020

On September 23, 2020, PJM Interconnection, L.L.C. (PJM) filed an executed Interconnection Service Agreement (ISA) among PJM, Wolf Run Energy LLC (Wolf Run), and Mid-Atlantic Interstate Transmission (MAIT) (collectively, the Parties) (Wolf Run ISA).1 PJM states that the Wolf Run ISA supersedes the existing ISA among the Parties, designated as Service Agreement No. 5067, which was accepted by the Commission in Docket No. ER18-1554-000. PJM further states that it is submitting the Wolf Run ISA for filing because it contains provisions that do not conform to the form of ISA set forth in Attachment O of the PJM Open Access Transmission Tariff.

PJM Interconnection, L.L.C. 2750 Monroe Blvd. Audubon, PA 19403-2497 Reference: Second Revised Interconnection Service Agreement No. 3041
Interconnection Service Agreement • September 10th, 2020

On September 10, 2020, PJM Interconnection, L.L.C. (PJM) filed an executed Interconnection Service Agreement (ISA) among PJM, Virginia Electric and Power Company (VEPCO) as the interconnection customer, and VEPCO as the interconnected transmission owner, designated as Second Revised Service Agreement No. 3041.1 PJM explains that it is filing the revised ISA because it contains a schedule of charges that does not conform to the form of ISA set forth in Attachment O of the PJM Open Access Transmission Tariff.

ISA superseded by AF1-051
Interconnection Service Agreement • September 9th, 2020

On July 13, 2020, you filed, on behalf of PJM Interconnection, L.L.C. (PJM), an executed Interconnection Service Agreement (ISA) among PJM, Gavin Power, LLC (Gavin), and Ohio Power Company (Ohio Power), designated as Third Revised Service Agreement No. 3753 (Gavin ISA).1 You state that the Gavin ISA supersedes the ISA among PJM, Gavin and Ohio Power designated as Second Revised Service Agreement No. 3753, which was previously accepted by the Commission.2 You further state that PJM is submitting the Gavin ISA for filing because it contains provisions that do not conform to the form of ISA set forth in Attachment O of the PJM Open Access Transmission Tariff.

PJM Interconnection, L.L.C. 2750 Monroe Blvd. Audubon, PA 19403-2497 Reference: Original Interconnection Service Agreement No. 5679
Interconnection Service Agreement • September 9th, 2020

On July 20, 2020, as supplemented on July 23, 2020, PJM Interconnection, L.L.C. (PJM) filed an executed Interconnection Service Agreement (ISA) among PJM, Niles Power, LLC (Niles Power), and American Transmission Systems, Incorporated.1 PJM states that the Niles Power ISA, which supersedes Original Service Agreement No. 2809, is associated with the interconnection to the PJM transmission system of 26.1 MW at the Niles A CT Customer Facility in Niles, Ohio. PJM further states that it is filing the Niles Power ISA because it contains terms and conditions that do not conform to the form of ISA set forth in Attachment O of the PJM Open Access Transmission Tariff.

Document Accession #: 20201022-3000 Filed Date: 10/22/2020‌‌
Interconnection Service Agreement • August 25th, 2020

Reference: Original Interconnection Service Agreement No. 5728 and Notice of Cancellation of Wholesale Market Participant Agreement No. 3318

Document Accession #: 20200930-3066 Filed Date: 09/30/2020‌‌
Interconnection Service Agreement • August 12th, 2020

On August 12, 2020, you filed, on behalf of PJM Interconnection, L.L.C. (PJM), an executed Interconnection Service Agreement (ISA) among PJM, Energy Developments Watervliet, LLC (EDW), and Indiana Michigan Power Company, designated as Service Agreement No. 5725 (EDW ISA).1 You state that the EDW ISA supersedes Service Agreement No. 3265, which was accepted by the Commission in Docket No. ER12-1454-000 and is thereby cancelled. You further state that PJM is submitting the EDW ISA for filing because it contains terms and conditions that do not conform to the form of ISA set forth in Attachment O of the PJM Open Access Transmission Tariff.

Kathleen E. Schnorf, Esq. Wright & Talisman, P.C. 1200 G Street, NW, Suite 600 Washington, DC 20005-3898 Reference: Interconnection Service Agreement, Service Agreement No. 5682
Interconnection Service Agreement • August 5th, 2020

On July 13, 2020, as amended on August 5, 2020, PJM Interconnection, L.L.C. (PJM) filed an executed Interconnection Service Agreement (ISA) among PJM, New Castle Power, LLC (New Castle), and American Transmission Systems, Incorporated (ATSI), designated as Service Agreement No. 5682 (New Castle ISA).1 PJM states that the New Castle ISA facilitates the interconnection of the New Castle Customer Facility located in West Pittsburgh, Pennsylvania to the PJM transmission system. PJM also states that the New Castle ISA contains terms and conditions that do not conform to the form of ISA set forth in Attachment O of the PJM Open Access Transmission Tariff (OATT), and contains Schedule E, Schedule of Charges. Nonconforming terms and conditions pertain to interim Capacity Interconnection Rights. The New Castle ISA supersedes ATSI’s Service Agreement No. 2810 filed under the PJM OATT as part of ATSI’s integration into PJM.2

Kathleen E. Schnorf, Esq. Wright & Talisman, P.C. 1200 G Street, NW, Suite 600 Washington, DC 20005-3898 Reference: First Revised Service Agreement No. 4547
Interconnection Service Agreement • July 30th, 2020

executed Interconnection Service Agreement (ISA) by and among PJM, Shawville Power, LLC (Heritage) (Shawville), and Mid-Atlantic Interstate Transmission, LLC (MAIT), designated as First Revised Service Agreement No. 4547 (Shawville ISA).1 PJM states that the Shawville ISA facilitates the interconnection of the Shawville Generating Station facility located in Shawville, Pennsylvania to the PJM transmission system. PJM also states that the Shawville ISA contains terms and conditions that do not conform to the form of ISA set forth in Attachment O of the PJM Open Access Transmission Tariff, and contains Schedule E, Schedule of Charges. Nonconforming terms and conditions pertain to interim Capacity Interconnection Rights and Schedule J being Reserved. The Shawville ISA supersedes Original Service Agreement No. 4547, which was a conforming service agreement among the parties effective September 20, 2016, reported in PJM’s Electric Quarterly Reports.

Alejandro Bautista, Esq. PJM Interconnection, L.L.C. 2750 Monroe Blvd. Audubon, PA 19403-2497 Reference: Revised Service Agreement No. 2637
Interconnection Service Agreement • July 30th, 2020

On July 30, 2020, PJM Interconnection, L.L.C. (PJM) filed an executed Interconnection Service Agreement (ISA) by and among PJM, Warren Generation, LLC (Warren Generation), and Mid-Atlantic Interstate Transmission, LLC (MAIT), designated as Revised Service Agreement No. 2637 (Warren Generation ISA).1 PJM states that the Warren Generation ISA facilitates the interconnection of the Warren Generating Station located in Warren, Pennsylvania to the PJM transmission system.

Washington, DC 20005-3898 Reference: Original Service Agreement No. 5687
Interconnection Service Agreement • July 23rd, 2020

On July 23, 2020, you filed, on behalf of PJM Interconnection, L.L.C. (PJM), an executed Interconnection Service Agreement (ISA) among PJM, Orrtanna Power, LLC and Mid-Atlantic Interstate Transmission, LLC, designated as Original Service Agreement No. 5687.1 You state that PJM is submitting the ISA for filing because it contains (i) terms and conditions that do not conform to the form of ISA set forth in Attachment O of the PJM Open Access Transmission Tariff and (ii) a Schedule of Charges.

David S. Berman, Esq. Wright & Talisman, P.C. 1200 G Street, NW, Suite 600 Washington, DC 20005-3898 Reference: Amended Service Agreement No. 5619
Interconnection Service Agreement • July 7th, 2020

On July 8, 2020, you filed, on behalf of PJM Interconnection, L.L.C. (PJM), an amended Interconnection Service Agreement (ISA) among PJM, Alton Post Office Solar, LLC (Alton), and Virginia Electric and Power Company (the Parties).1 You state that the Amended ISA modifies the existing ISA between the Parties that was accepted by the Commission,2 to correct an error, as effectuated by the Agreement to Amend executed by the Parties.

FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, DC 20426
Interconnection Service Agreement • June 29th, 2020

On June 29, 2020, PJM Interconnection, L.L.C. (PJM) filed an amended Interconnection Service Agreement between PJM, Toms River Merchant Solar LLC, and Jersey Central Power & Light Company.1 PJM states that it is revising the agreement to reflect changes in certain equipment and the Network Upgrade Charges set forth in the Interconnection Service Agreement.