Common Contracts

1 similar Annual Rate Contract contracts

Annual Rate Contract for underground work for laying 11KV XLPE cable under Harij SDn, Division Office Patan UGVCL SCHEDULE:B FOR LAYING OF UNDERGROUND CABLE NETWORK Sr.No. Description Unit Quantity Rateper Unit in Rs. TotalAmount in Rs. 1 Laying...
Annual Rate Contract • February 29th, 2020

with the Pole including cost of nuts & bolts. 5 Supply and Installation of clamps made from 50*6 mm GI flat (Minimum weight of flat 1.8 Kg per Set) for fitting for 160 mm GI/HDPE Pipe above groundwith the Pole including cost of nuts & bolts. SET 10 150 1500 6 Laying of various sizes of 11 KV XLPE insulated Aluminium armoured Cable in Cable Tray/ Trench over/below the ground level excluding CableTray/Trench. MTR 125 150 18750 7 Laying of HDPE Pipe confirming to IS 4984:1955 (Amendment no. 2) having 160 mm Diameter and minimum 5 mm Thickness at a minimum Depth of 1200 mm below the road surface by Push through method, drilling the road with HDD machine/manually without breaking the road surface and laying of any size of HT XLPE insulated Aluminum armoured Cable through the duct as per the instruction of EIC and specifications excluding cost of HDPE Pipe. Only Cable will be supplied byUGVCL. (For 240 & 300 mm2 XLPE cable) MTR 125 800 100000 8 Supply of HDPE Pipe h

AutoNDA by SimpleDocs
Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!