DOC 56 VND 01 Rev. 4July 15th, 2022
FiledJuly 15th, 2022time (TT) of each shift of operation of the Equipment, less all the downtimes not attributable to the Equipment (DT), including but not limited to, the profile changeover time, the color change time and all general downtimes (stops for lunch and similar breaks, stops due to failure to maintain the Equipment in accordance with the Seller’s instructions, lack of proper raw materials or materials not complying the test specification like sand, cement, water, oil, paint, lack of skilled workers supplied by the Buyer, lack of energy) APT= TT-DT.
DOC 56 VND 01 Rev. 4December 22nd, 2020
FiledDecember 22nd, 2020time (TT) of each shift of operation of the Equipment, less all the downtimes not attributable to the Equipment (DT), including but not limited to, the profile changeover time, the color change time and all general downtimes (stops for lunch and similar breaks, stops due to failure to maintain the Equipment in accordance with the Seller’s instructions, lack of proper raw materials or materials not complying the test specification like sand, cement, water, oil, paint, lack of skilled workers supplied by the Buyer, lack of energy) APT= TT-DT.
DOC 56 VND 01 Rev. 3March 2nd, 2020
FiledMarch 2nd, 2020time (TT) of each shift of operation of the Equipment, less all the downtimes not attributable to the Equipment (DT), including but not limited to, the profile changeover time, the color change time and all general downtimes (stops for lunch and similar breaks, stops due to failure to maintain the Equipment in accordance with the Seller’s instructions, lack of proper raw materials or materials not complying the test specification like sand, cement, water, oil, paint, lack of skilled workers supplied by the Buyer, lack of energy) APT= TT-DT.