Common Contracts

1 similar null contracts

PPAP Package for:
July 8th, 2019
  • Filed
    July 8th, 2019

Design Verification Plan and Report page 4 of 13 System: CPSC 18.01.07 Connectors Ford part number (s): 6W8T-14474-BA6W8T-14474-PA Model Year and Program: Ford Design Engineer: Temperature Class T4 T1, T2, T3, T4 T5 Supplier: TE Connectivity Ford Design Engineer Approval Vibration Class V4 V1, V2,V3, V4, V5 Reason for Validation: Tool Transfer Part Level: PV - product on Plan: Report: Sealing Class S1, S2,S2.5, S3 Test Name/Source Acceptance Criteria Test Results Design Level Tested Sample Size Timing Required Tested Sched. Actual Remarks USCAR-2, 5.3.4.3.8 C-6. Visual Inspection - SAE/USCAR-2 5.1.8 Todocument the physical appearance of test samples. The connectors assemblies must not show , with the aid of 10X magnification, any evidence of deterioration, cracks, deformities, etc., that could affect their functionality or distort their appearance. Connector locking mechanism must function without breaking Pass/ Fail DV / PV 10 D

AutoNDA by SimpleDocs
Time is Money Join Law Insider Premium to draft better contracts faster.