Common Contracts

1 similar null contracts

Appendix A Miller and Walker Creeks Basin Plan Development Interlocal Agreement and Amendment
February 27th, 2006
  • Filed
    February 27th, 2006

This report included both the Miller and Walker basins. The report recognized that uncontrolled stormwater runoff and the introduction of large amounts of fine sediments to the stream were harming it. The report suggested that detention of stormwater and implementation of erosion control measures were critical to recovery of the basin. Interestingly, two other proposals favored at the time, as cited in the report, were creating a storm sewer system and turning the stream into a concrete channel to accommodate the uncontrolled stormwater runoff. Creation of a concrete channel involved enlarging the existing 72-inch culvert pipe that conveys Miller Creek under 1st Avenue South and building a fifty- to 65-foot wide channel in Miller Creek all the way to the mouth. The channel was to carry stormwater from Sea-Tac Airport, SR 509, and other development in the basin. The King County proposal was the subject of a lawsuit brought by a resident in the area.

AutoNDA by SimpleDocs
Time is Money Join Law Insider Premium to draft better contracts faster.