AGREEMENTProject Agreement • January 17th, 2014 • Texas
Contract Type FiledJanuary 17th, 2014 JurisdictionThe Engineer will conduct a Master Water Distribution Plan for the campus. The Master Plan will include creating a model of the existing system and identify areas of the system which need immediate attention, areas of the system which are oversized and make recommendations for water main sizes to adequately serve the college. Based on these findings, and coordinating with the Owner, develop phased construction documents for the replacement of the water mains to eliminate and/or reduce dead ends and zones, and reduce and/or eliminate the need for flushing. As funding permits and at the discretion of the Owner, the Engineer will be retained to provide construction administration services, including bidding, contract administration, and as-built documentation for each construction phase.