Common Contracts

1 similar Design-Build Agreement contracts

AGREEMENT FOR DESIGN-BUILD INITIAL SERVICES
Design-Build Agreement • July 20th, 2017

The San Carlos Pump Station (SCPS) is owned and operated by the City of Tampa (City) Wastewater Department and is located at 4406 San Carlos Street. It was placed into service in 1981. Several of the station’s components are original and have reached the end of their useful life. The station currently uses three pumps. Pump 1 is driven by a two speed induction motor rated 1000/1500 horsepower (hp), with an eddy current clutch for speed control. Pump 3 is driven by a single speed synchronous motor rated 1500 hp, with an eddy current clutch for speed control. The motors for Pump 1 and Pump 3 are medium voltage— 4160 Volts. Pump 2 is a variable speed pump rated at 13,400 gallons per minute (gpm) (250 hp). This pump motor is rated 480 Volts and is controlled by a variable frequency drive. The station discharges through a 48-inch force main that connects directly to the Howard F. Curren Advanced Wastewater Treatment Plant (HFC AWTP).

AutoNDA by SimpleDocs
Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!