COMMUNITY DEVELOPMENTBuilding Permit Application • May 11th, 2021
Contract Type FiledMay 11th, 2021Building Permit Checklist Required at Submittal ofApplication Required Signatures andNotary Stamp Office UseOnly Owners Signature on all Required Forms Signature Building Permit Application Form (in this packet) Signature Proof of Ownership (this could be the most current tax statement or property information sheet) FEMA Floodplain Information (see question 2 below) Signature Agreement for Electrical Meter (in this packet) Signature Site Plan Showing: north indicator, lot shape and dimensions, ALL structures (existing and proposed), setbacks to center of road or back of curb, setbacks from all other property lines, street(s) or other structures, easements, right-of-ways, canals, ditches, drainages, driveways, wells, septic systems, FEMA floodplain. (seeattached example page 4) The site plan can be drawn by the property owner. Water and/or Sewer Availability Letter (When Applicable)(This is a letter from the water district in which the structure will be loca
COMMUNITY DEVELOPMENTBuilding Permit Application • March 23rd, 2016
Contract Type FiledMarch 23rd, 2016Building Permit Checklist Required at Submittal ofApplication Required Signatures andNotary Stamp Office UseOnly Owners Signature on all Required Forms Signature Building Permit Application Form (in this packet) Signature Proof of Ownership (this could be the most current tax statement or property information sheet) Owner Builder Certificate (when owner will be their own contractor) Notary Stamped FEMA Floodplain Information (see question 2 below) Signature Agreement for Electrical Meter (in this packet) Signature Site Plan Showing: north indicator, lot shape and dimensions, ALL structures (existing and proposed), setbacks to center of road or back of curb, setbacks from all other property lines, street(s) or other structures, easements, right-of-ways, canals, ditches, drainages, driveways, wells, septic systems, FEMA floodplain. (seeattached example page 4) The site plan can be drawn by the property owner. Water and/or Sewer Availability Letter (When A