Grant Agreement: 644047Grant Agreement • October 30th, 2015
Contract Type FiledOctober 30th, 2015This deliverable contains the technical design documentation of the INTO- CPS platform at the end of the first year of the project. This is focussed around the Co-simulation Orchestration Engine (COE) and the integration of a number of existing simulation tools making use of the Functional Mockup Interface (FMI). However, the INTO-CPS tool chain contains a lot of other features as well. These range from requirements and graphical overviews of CPS elements in different views using SysML down to realisation of CPSs. Full traceability from the initial requirements as well as configuration man- agement for all the different artefacts. Additional features enable Design Space Exploration (DSE), Test Automation (TA) and Model Checking (MC).