Large General Service Electric Service β Primary Meter & Utility Owned TransformerJune 7th, 2021
FiledJune 7th, 2021hereunder will normally be delivered through one meter for a combined power and lighting load. However, where the Utility has specified separate single-phase metering for lighting and a separate polyphase metering for power at a single location, then the kilowatt-hours and demand for billing purposes will be taken as the sum of the two kilowatt-hour readings and two demand readings separately determined.