New Agreement Start-upNew Agreement • January 15th, 2019
Contract Type FiledJanuary 15th, 2019There are several regions of the geometry used in the Geant4 simulation where volumes representing service and support structures are missing. The efforts carried out as part of this working package include the implementation of these volumes. Moreover, volumes representing structures which undergo modifications during the detector upgrade will be changed correspondingly. The main objective is to establish a smooth work flow from design engineers up to the ATLAS simulation team. The design geometry will be extracted from the engineering database and implemented into CATIA by adding absent drawings. Subsequently the derived 3D model will be simplified while paying special attention to preserving the initial volume and weight. A transfer into XML will be performed. This result is sent to the simulation team for an eventual incorporation into the simulation geometry. During the process the unique simulation loop developed by the Georgian team in cooperation with the ATLAS simulation team