NEC3/NEC4 Professional Service ContractProfessional Services • March 12th, 2021
Contract Type FiledMarch 12th, 2021No Description 1 OXIDIZER and ducting to suite the PILOT plant equipment, including design, manufacturing, delivery, commissioning and training. The oxidizer will stand 6 meters high including legs and chimney extension. A working volume of 2m 3 is provided for and at 1100°c this will ensure a minimum of 2 seconds residence time for the gasses. The outside diameter of the oxidizer will be 1300mm. Included is the installation of a 50kw heater bank to ensure combustion of the highly calorific off gasses from the pyrolysis process. This process will be completed and controlled by the addition ofcombustion air, ensuring complete oxidation of the PAH’s and VOC’s. The oxidizer willcome complete with’ducting linking the unit to the Pilot plant pyroliser, a control panel and a VSD controlled combustion air fan.
NEC3/NEC4 Professional Service ContractProfessional Services • March 12th, 2021
Contract Type FiledMarch 12th, 2021No Description 1 OXIDIZER and ducting to suite the PILOT plant equipment, including design, manufacturing, delivery, commissioning and training. The oxidizer will stand 6 meters high including legs and chimney extension. A working volume of 2m 3 is provided for and at 1100°c this will ensure a minimum of 2 seconds residence time for the gasses. The outside diameter of the oxidizer will be 1300mm. Included is the installation of a 50kw heater bank to ensure combustion of the highly calorific off gasses from the pyrolysis process. This process will be completed and controlled by the addition ofcombustion air, ensuring complete oxidation of the PAH’s and VOC’s. The oxidizer willcome complete with’ducting linking the unit to the Pilot plant pyroliser, a control panel and a VSD controlled combustion air fan.
NEC3/NEC4 Professional Service ContractProfessional Services • March 12th, 2021
Contract Type FiledMarch 12th, 2021No Description 1 OXIDIZER and ductingto suitethe PILOT plant equipment, including design, manufacturing, delivery, commissioning andtraining. Theoxidizer will stand 6 meters high including legs and chimney extension. A working volume of 2m3 is provided for and at 1100°c this will ensure a minimum of 2 seconds residence time for the gasses. The outside diameter ofthe oxidizer will be 1300mm. Included is the installation ofa 50kw heater bank to ensure combustion ofthe highly calorific off gasses from the pyrolysis process. This process will be completed and controlled by the addition ofcombustion air, ensuringcomplete oxidation ofthe PAH's andVOC's. Theoxidizerwillcome complete with'ducting linking the unit to the Pilot plant pyroliser, a control panel and a VSD controlled combustion air fan.