Common Contracts

2 similar null contracts

Contract
June 15th, 2005
  • Filed
    June 15th, 2005
AutoNDA by SimpleDocs
Agreement No. CE 80/2001(DS) Drainage Improvement in Tsuen Wan and Kwai Chung – Tsuen Wan Drainage Tunnel
June 15th, 2005
  • Filed
    June 15th, 2005

EIARef. Recommended Mitigation Measures Who to implement the measure ? Location of the measure When to implement the measure ? What requirements or standards for the measure to achieve ? Air Quality 3.6.1 Specific As mentioned in Section 3.5, exceedances of 1-hour and 24-hour average TSP guidelinelevels have been predicted at most of the ASRs. Hence, mitigation measures are considered necessary in order to suppress the potential dust impact. DSD’s Contractor Construction Work Sites During Construction Air Pollution Control (Construction Dust) Regulation The dust suppression measures set out in the Air Pollution Control (Construction Dust) Regulation, in fact, are more extensive. Therefore, it is expected that with watering the construction site every four times daily together with strict implementation of dust suppression measures as stipulated in the Air Pollution Control (Construction Dust)Regulation, the dust level is expected to be reduced by over 75%. General To further ensure com

Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!