EQUIPMENT TYPEJanuary 27th, 2022
FiledJanuary 27th, 2022Not all inclusive; for additional clarification refer to the agreement (SF-1449 section D). Yes No 1 Equipment VIN/serial # matches resource order (Schedule of Items) D.6.3.1 2 Check-in process completed D.6.5.3 3 Agreement: One complete copy D.8 4 Self-contained: Unit arrived fully operable within 2 hours of arrival at the incident, unless otherwise negotiated. D.1 5 Minimum 20’ length x 7’ wide: Excluding tongue, minimum 20’ of unit is intended to include all of the space as usable space by the Government. Self-propelled units acceptable. D.2.1.1 6 Air Conditioning Unit(s): Self-contained, climate-controlled unit to maintain 70-75° F temperature in unit. D.2.1.1 7 Heating System: Sufficient to provide heating commensurate with the internal dimensions, no free-standing heaters (heating system to maintain 70-75° F temperature in the unit). D.2.1.1 8 AC power source (generator): Adequate to provide sufficient power for all onboard systems. D.2.1.1 9 A