Common Contracts

1 similar null contracts

High Load Factor
August 9th, 2016
  • Filed
    August 9th, 2016

hereunder will normally be delivered through one meter for a combined power and lighting load. However, where the Utility has specified separate single-phase metering for lighting and a separate polyphase metering for power at a single location, then the kilowatt-hours and demand for billing purposes will be taken as the sum of the two kilowatt-hour readings and two demand readings separately determined.

AutoNDA by SimpleDocs
Time is Money Join Law Insider Premium to draft better contracts faster.