Common Contracts

1 similar null contracts

Draft agreement between Autorità per l’energia elettrica e il gas and Commission de regulation de l’electricité on transfer capacity allocation over the grid interconnecting Italy and France for the year 2002
May 16th, 2002
  • Filed
    May 16th, 2002

The present document contains the general outlines adopted by the Autorità per l’energia elettrica e il gas (herefater AEEG) and the Commission de Regulation de l’Electricité (hereafter CRE) with respect to terms and conditions for allocating the transfer capacity over the interconnected grid between Italy, France and, with reference to a technically-coupled portion of the interconnection, Switzerland for the year 2002. Same conditions will be applied by AEEG, to a possible extent, to the transfer capacity allocation over the interconnected grid between Italy, Austria and Slovenia for the year 2002.

AutoNDA by SimpleDocs
Time is Money Join Law Insider Premium to draft better contracts faster.