Common Contracts

1 similar Agreement contracts

AGREEMENT BETWEEN
Agreement • December 26th, 2022 • New Hampshire

between the City of Berlin, New Hampshire ("CLIENT") and Wright-Pierce ("ENGINEER"). CLIENT intends to replace one of the existing 100 HP multi-stage centrifugal Hoffman blowers with a new 50 HP positive displacement (PD) blower to reduce the minimum air flow rate to the existing activated sludge system. The engineering services would entail preliminary design, final design, bidding and construction administration services for a design-bid-build project for the aeration blower replacement.

AutoNDA by SimpleDocs
Time is Money Join Law Insider Premium to draft better contracts faster.