AGREEMENT BETWEEN OWNER AND DESIGN BUILDERTown of Taos • December 2nd, 2020 • New Mexico
Contract Type FiledDecember 2nd, 2020 JurisdictionDesign and construction of the following: Two solar photovoltaic (PV) systems at the Town’s wastewater treatment plant (WWTP): 1) a 1 megawatt (MW) AC PV system that will sell energy to the electric utility, Kit Carson Electric Cooperative (KCEC), under a Power Purchase Agreement (PPA); and 2) a 62.5 kW AC net metered PV project, which will further offset the WWTP electric utility costs at the WWTP. The Town of Taos’ WWTP is located at 182 Los Cordovas Dr, Ranchos De Taos, NM 87557.