Common Contracts

1 similar Settlement Agreement contracts

Settlement Agreement
Settlement Agreement • July 3rd, 2013

Inflow concentrations of total phosphorus to the ENP through Taylor Slough and the Coastal Basins are compared to the 11 ppb limit at the end of each water year using data from both the old (S175, S332, S18C) and new (S174, S332D, S18C) combinations of structures (Figure 10). The bars in Figure 10 represent the flow- weighted mean total phosphorus concentrations from S332, S175 and S18C for water years 1989 through 2002. The diamond point values for water years 1999 through 2005 represent the new combination of structures. S175, located on the Levee 31W borrow canal, is closed under IOP. It was opened briefly on August 26 and 27, 2005 for the flood protection of the area after Hurricane Katrina (total flow: 2,066 acre-feet; TP concentration: 6 ppb; TP load: 15 kg). However, flow through S175 is not considered an input to the ENP but a flow within it.

AutoNDA by SimpleDocs
Draft better contracts in just 5 minutes Get the weekly Law Insider newsletter packed with expert videos, webinars, ebooks, and more!