Before Commissioners: Neil Chatterjee, Chairman;Network Integration Transmission Service Agreement • October 26th, 2018
Contract Type FiledOctober 26th, 2018
ORDER ACCEPTING AGREEMENTNetwork Integration Transmission Service Agreement • May 1st, 2020
Contract Type FiledMay 1st, 2020On March 2, 2020, Southwest Power Pool, Inc. (SPP) filed, pursuant to section 205 of the Federal Power Act (FPA)1 and section 35.13 of the Commission’s regulations:2 (1) a revised, unexecuted Network Integration Transmission Service
FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D.C. 20426 July 8, 2014Network Integration Transmission Service Agreement • July 8th, 2014
Contract Type FiledJuly 8th, 2014
Before Commissioners: Neil Chatterjee, Chairman;Network Integration Transmission Service Agreement • October 28th, 2019
Contract Type FiledOctober 28th, 2019On August 29, 2019, Southwest Power Pool, Inc. (SPP) filed, pursuant to section 205 of the Federal Power Act (FPA)1 and section 35.13 of the Commission’s regulations:2 (1) an unexecuted Network Integration Transmission Service Agreement (NITSA) between SPP as transmission provider and American Electric Power Service Corporation (AEP), as agent for Public Service Company of Oklahoma (PSO) and Southwestern Electric Power Company (SWEPCO), as network customer; and (2) an executed Network Operating Agreement among SPP as transmission provider, AEP, as agent for PSO and SWEPCO, as both network customer and host transmission owner,
FEDERAL ENERGY REGULATORY COMMISSIONNetwork Integration Transmission Service Agreement • February 18th, 2020
Contract Type FiledFebruary 18th, 2020On December 20, 2019, Southwest Power Pool, Inc. (SPP) filed, pursuant to section 205 of the Federal Power Act (FPA)1 and section 35.13 of the Commission’s regulations:2 (1) a revised, unexecuted Network Integration Transmission Service Agreement (NITSA) between SPP as transmission provider and Western Farmers Electric Cooperative (Western Farmers) as network customer; and (2) an executed Network Operating Agreement among SPP as transmission provider, Western Farmers as network customer, and Western Farmers, Oklahoma Gas and Electric Company, and American Electric Power Service Corporation (AEP) as host transmission owners (together, the Western Farmers Agreement).3 In this order, we accept the Western Farmers Agreement, effective December 1, 2019, as requested.
FEDERAL ENERGY REGULATORY COMMISSIONNetwork Integration Transmission Service Agreement • October 18th, 2019
Contract Type FiledOctober 18th, 2019On August 19, 2019, Southwest Power Pool, Inc. (SPP) filed, pursuant to section 205 of the Federal Power Act (FPA)1 and section 35.13 of the Commission’s regulations:2 (1) a revised executed Network Integration Transmission Service
FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, DC 20426Network Integration Transmission Service Agreement • March 23rd, 2022
Contract Type FiledMarch 23rd, 2022The filing was publicly noticed, with interventions and protests due on or before February 17, 2022. Pursuant to Rule 214 of the Commission’s regulations (18 C.F.R. §
FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, DC 20426Network Integration Transmission Service Agreement • August 12th, 2022
Contract Type FiledAugust 12th, 2022The filing was publicly noticed, with interventions and protests due on or before July 21, 2022. Pursuant to Rule 214 of the Commission’s regulations (18 C.F.R. §
FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D.C. 20426Network Integration Transmission Service Agreement • January 10th, 2017
Contract Type FiledJanuary 10th, 2017Notice of the filing was published in the Federal Register with interventions and protests due on or before December 8, 2016. Under 18 C.F.R § 385.210, interventions are timely if made within the time prescribed by the Secretary. Under 18 C.F.R. § 385.214, the filing of a timely motion to intervene makes the movant a party to the proceeding, if no answer in opposition is filed within fifteen days. The filing of a timely notice of intervention makes a State Commission a party to the proceeding. No adverse comments were filed.
FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D.C. 20426Network Integration Transmission Service Agreement • July 1st, 2010
Contract Type FiledJuly 1st, 2010On May 25, 2010, Southwest Power Pool, Inc. (SPP) submitted for filing an executed Network Integration Transmission Service Agreement between SPP as Transmission Provider and City of Mulvane, Kansas (Mulvane) as Network Customer and an executed Network Operating Agreement between SPP as Transmission Provider, Mulvane as Network Customer and Westar Energy as Host Transmission Owner. 1 Pursuant to authority delegated to the Director, Division of Electric Power Regulation - Central, under 18 C.F.R. § 375.307, your submittal in the above referenced docket is accepted for filing, effective May 1, 2010, as requested.
FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, DC 20426Network Integration Transmission Service Agreement • August 20th, 2021
Contract Type FiledAugust 20th, 2021On June 25, 2021, Southwest Power Pool, Inc. (SPP) submitted an executed network integration transmission service agreement between SPP as transmission provider and Nemaha-Marshall Electric Cooperative (NMEC) as network customer; and an executed network operating agreement among SPP as transmission provider, NMEC as network customer and Evergy Kansas Central, Inc. (Evergy) as host transmission owner.1 Pursuant to authority delegated to the Director, Division of Electric Power Regulation – Central, under 18 C.F.R. § 375.307, your submittal is accepted for filing, effective September 1, 2021, as requested.
FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D.C. 20426Network Integration Transmission Service Agreement • December 19th, 2012
Contract Type FiledDecember 19th, 2012This action does not constitute approval of any service, rate, charge, classification, or any rule, regulation, contract, or practice affecting such rate or service provided for in the filed documents; nor shall such action be deemed as recognition of any claimed contractual right or obligation affecting or relating to such service or rate; and such action is without prejudice to any findings or orders which have been or may hereafter be made by the Commission in any proceeding now pending or hereafter instituted by or against any of the applicant(s).
FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D.C. 20426Network Integration Transmission Service Agreement • December 23rd, 2014
Contract Type FiledDecember 23rd, 2014On October 29, 2014, Southwest Power Pool, Inc. (SPP) filed an executed Service Agreement for Network Integration Transmission Service (NITSA) between SPP as Transmission Provider and Nemaha-Marshall Electric Cooperative (Nemaha-Marshall) as Network Customer; and an executed Network Operating Agreement (NOA) between SPP as Transmission Provider, Nemaha- Marshall as Network Customer, and Westar Energy, Inc. as Host Transmission Owner (together, Agreement). SPP requests waiver of the Commission's 60-day notice requirement to permit an August 1, 2014 effective date for changes to the Agreement including updated wholesale distribution service charges. Pursuant to authority delegated to the Director, Division of Electric Power Regulation – Central, under 18 C.F.R. § 375.307, the Agreement in the above referenced docket is accepted for filing sixty days from the date of filing, effective December 29, 2014.1 Waiver of the Commission’s 60-day prior notice requirement (18 C.F.R. § 35.11) for th
FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D.C. 20426Network Integration Transmission Service Agreement • March 26th, 2013
Contract Type FiledMarch 26th, 2013On January 30, 2013, you submitted for filing on behalf of Southwest Power Pool, Inc. (SPP): (1) an executed network integration transmission service agreement (NITSA) between SPP as transmission provider and Western Farmers Electric Cooperative (WFEC) as network customer; and (2) an executed network operating agreement (NOA) between SPP as transmission provider and WFEC as network customer and American Electric Power as host transmission owner; and (3) an executed NOA between SPP as transmission provider, WFEC as both network customer and host transmission owner, and Oklahoma Gas and Electric Company as host transmission owner.1 Pursuant to authority delegated to the Director, Division of Electric Power Regulation – Central under 18 C.F.R. § 375.307, your submittal in the above referenced docket is accepted for filing to become effective January 1, 2013.
FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, DC 20426 September 23, 2016Network Integration Transmission Service Agreement • September 23rd, 2016
Contract Type FiledSeptember 23rd, 2016
FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D.C. 20426Network Integration Transmission Service Agreement • June 24th, 2011
Contract Type FiledJune 24th, 2011On May 3, 2011, you submitted, on behalf of Southwest Power Pool, Inc. (SPP), an executed Network Integration Transmission Service Agreement between SPP as transmission provider and The Board of Public Utilities, Springfield, Missouri (City Utilities) as network customer and an executed Network Operating Agreement between SPP as transmission provider and City Utilities as both network customer and host transmission owner, collectively designated as Sixth Revised Service Agreement No.
FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, DC 20426Network Integration Transmission Service Agreement • March 11th, 2021
Contract Type FiledMarch 11th, 2021On December 2, 2020, as amended on January 13, 2021, Southwest Power Pool, Inc. (SPP) submitted an executed network integration transmission service agreement between SPP as transmission provider and Evergy Kansas Central, Inc. (Evergy KS) as network customer; and an executed network operating agreement among SPP as transmission provider and Evergy KS as both network customer and host transmission owner (together, Agreement).1 SPP requests that the Agreement become effective September 1, 2020.
FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, DC 20426Network Integration Transmission Service Agreement • March 6th, 2020
Contract Type FiledMarch 6th, 2020This action does not constitute approval of any service, rate, charge, classification, or any rule, regulation, contract, or practice affecting such rate or service provided for in the filed document(s); nor shall such action be deemed as recognition of any claimed
FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, DC 20426Network Integration Transmission Service Agreement • December 9th, 2008
Contract Type FiledDecember 9th, 2008This action does not constitute approval of any service, rate, charge, classification, or any rule, regulation, contract, or practice affecting such rate or service provided for in the filed documents; nor shall such action be deemed as recognition of any claimed contractual right or obligation affecting or relating to such service or rate; and such action is without prejudice to any findings or orders which have been or may hereafter be made by the Commission in any proceeding now pending or hereafter instituted by or against any of the applicant(s).
FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D.C. 20426Network Integration Transmission Service Agreement • January 15th, 2015
Contract Type FiledJanuary 15th, 2015On October 10, 2014, as amended on November 18, 2014, Southwest Power Pool, Inc. (SPP) filed an executed Service Agreement for Network Integration Transmission Service (NITSA) between SPP as Transmission Provider and Kaw Valley Electric Cooperative, Inc. (Kaw Valley) as Network Customer; and an executed Network Operating Agreement (NOA) between SPP as Transmission Provider, Kaw Valley as Network Customer and Westar Energy, Inc. as Host Transmission Owner (Third Revised Kaw Valley NOA). SPP requests waiver of the Commission’s 60-day notice requirement to permit an August 1, 2014 effective date for changes to the Agreement including updated wholesale distribution service charges. Pursuant to authority delegated to the Director, Division of Electric Power Regulation – Central, under 18 C.F.R. § 375.307, the Agreement in the above referenced docket is accepted for filing sixty days from the date of filing, effective December 10, 2014.1 Waiver of the Commission’s 60-day prior notice require
FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, DC 20426Network Integration Transmission Service Agreement • September 24th, 2018
Contract Type FiledSeptember 24th, 2018On July 31, 2018, Southwest Power Pool, Inc. (SPP) submitted an unexecuted network integration transmission service agreement between SPP as transmission provider and People’s Electric Cooperative (PEC) as network customer; an executed network operating agreement among SPP as transmission provider, PEC as network customer, and Oklahoma Gas and Electric Company and Western Farmers Electric Cooperative as host transmission owners; and an unexecuted NOA among SPP as transmission provider, PEC as network customer, and Southwestern Power Administration as host transmission owner.1 Pursuant to authority delegated to the Director, Division of Electric Power Regulation – Central, under 18 C.F.R. § 375.307, your submittal is accepted for filing, effective July 1, 2018, as requested.
FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, DC 20426Network Integration Transmission Service Agreement • August 20th, 2021
Contract Type FiledAugust 20th, 2021This action does not constitute approval of any service, rate, charge, classification, or any rule, regulation, contract, or practice affecting such rate or service provided for in the filed document(s); nor shall such action be deemed as recognition of any claimed
FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, DC 20426Network Integration Transmission Service Agreement • August 20th, 2021
Contract Type FiledAugust 20th, 2021This action does not constitute approval of any service, rate, charge, classification, or any rule, regulation, contract, or practice affecting such rate or service provided for in the filed documents; nor shall such action be deemed as recognition of any claimed contractual right or obligation affecting or relating to such service or rate; and such action
FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D.C. 20426Network Integration Transmission Service Agreement • May 23rd, 2018
Contract Type FiledMay 23rd, 2018On March 29, 2018, Southwest Power Pool, Inc. (SPP) filed an executed network integration transmission service agreement between SPP as transmission provider and Kansas Municipal Energy Agency (KMEA) as network customer; and an executed network operating agreement among SPP as transmission provider, KMEA as network customer, and Sunflower Electric Power Corporation as host transmission owner.1 Pursuant to authority delegated to the Director, Division of Electric Power Regulation – Central, under 18 C.F.R. § 375.307, your submittal in the above referenced docket is accepted for filing, effective March 1, 2018, as requested.
FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D.C. 20426Network Integration Transmission Service Agreement • August 19th, 2010
Contract Type FiledAugust 19th, 2010This action does not constitute approval of any service, rate, charge, classification, or any rule, regulation, contract, or practice affecting such rate or service provided for in
FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D.C. 20426Network Integration Transmission Service Agreement • March 12th, 2020
Contract Type FiledMarch 12th, 2020On January 29, 2020, Southwest Power Pool, Inc. (SPP) filed an executed Service Agreement for Network Integration Transmission Service between SPP as Transmission Provider and Western Area Power Administration – UGP (WAPA) as Network Customer; and an executed Network Operating Agreement among SPP as Transmission Provider, WAPA as Network Customer and Basin Electric Power Cooperative, Central Power Electric Cooperative, Inc., Corn Belt Power Cooperative, East River Electric Power Cooperative, Inc., Missouri River Energy Services, Northwest Iowa Power Cooperative, NorthWestern Corporation and WAPA as Host Transmission Owners. Pursuant to authority delegated to the Director, Division of Electric Power Regulation – Central, under 18 C.F.R. § 375.307, your submittal in the above referenced docket is accepted for filing, effective January 1, 2020, as requested.1
FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D.C. 20426Network Integration Transmission Service Agreement • May 22nd, 2017
Contract Type FiledMay 22nd, 2017On March 31, 2017, Southwest Power Pool, Inc. (SPP) filed an executed Network Integration Transmission Service Agreement (Agreement)1 between SPP as Transmission Provider and Kansas Municipal Energy Agency (KMEA) as Network Customer; and an executed Network Operating Agreement (NOA) among SPP as Transmission Provider, KMEA as Network Customer, and Kansas City and Light Company (KCPL) as Host Transmission Owner. Pursuant to authority delegated to the Director, Division of Electric Power Regulation – Central, under 18 C.F.R. § 375.307, your submittal in the above referenced docket is accepted for filing, effective March 1, 2017, as requested.
FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, DC 20426Network Integration Transmission Service Agreement • April 6th, 2021
Contract Type FiledApril 6th, 2021Pursuant to the authority delegated to the Director, Division of Electric Power Regulation – Central, under 18 C.F.R. § 375.307, the submittal is accepted for filing, effective August 1, 2020, as requested.2
FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, DC 20426Network Integration Transmission Service Agreement • February 18th, 2014
Contract Type FiledFebruary 18th, 2014On December 23, 2013, Southwest Power Pool, Inc. (SPP) filed an executed Network Integration Transmission Service Agreement between SPP as transmission provider and Kansas Electric Power Cooperative, Inc. (KEPCO) as network customer, and a Network Operating Agreement among SPP as transmission provider, KEPCO as network customer, and Mid-Kansas Electric Company, LLC (Mid-Kansas) as host transmission owner.1 Pursuant to authority delegated to the Director, Division of Electric Power Regulation – Central, under 18 C.F.R. § 375.307, the filing in the above- referenced docket is accepted effective December 1, 2013, as requested.
FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, DC 20426Network Integration Transmission Service Agreement • June 10th, 2021
Contract Type FiledJune 10th, 2021Pursuant to authority delegated to the Director, Division of Electric Power Regulation – Central, under 18 C.F.R. § 375.307, the submittal in the above-referenced proceeding is accepted for filing, effective April 1, 2021, as requested.2
FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, DC 20426Network Integration Transmission Service Agreement • May 20th, 2020
Contract Type FiledMay 20th, 2020This action does not constitute approval of any service, rate, charge, classification, or any rule, regulation, contract, or practice affecting such rate or service provided for in the filed document(s); nor shall such action be deemed as recognition of any claimed
FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D.C. 20426Network Integration Transmission Service Agreement • March 8th, 2010
Contract Type FiledMarch 8th, 2010Reference: Network Integration Transmission Service Agreement and Network Operating Agreement with the Board of Public Utilities, Springfield
FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D.C. 20426Network Integration Transmission Service Agreement • December 3rd, 2018
Contract Type FiledDecember 3rd, 2018This action does not constitute approval of any service, rate, charge, classification, or any rule, regulation, contract, or practice affecting such rate or
FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D.C. 20426Network Integration Transmission Service Agreement • January 11th, 2012
Contract Type FiledJanuary 11th, 2012On November 18, 2011, you submitted on behalf of Southwest Power Pool, Inc. (SPP) a nonconforming, executed Network Integration Transmission Service Agreement between SPP as Transmission Provider and American Electric Power Service Corporation (AEP), as agent for Public Service Company of Oklahoma (PSO) and Southwestern Electric Power Company (SWEPCO), as Network Customer. In addition, you submitted an executed Network Operating Agreement among SPP as Transmission Provider, AEP, as agent for PSO and SWEPCO, as Network Customer, and AEP, as agent for PSO, SWEPCO, and AEP Texas North Company, as Host Transmission Owner.1 Pursuant to authority delegated to the Director, Division of Electric Power Regulation – Central, under 18 C.F.R. § 375.307, the submittals in the above referenced docket are accepted for filing effective November 1, 2011, as requested.
FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, DC 20426Network Integration Transmission Service Agreement • August 20th, 2021
Contract Type FiledAugust 20th, 2021This action does not constitute approval of any service, rate, charge, classification, or any rule, regulation, contract, or practice affecting such rate or service provided for in the filed documents; nor shall such action be deemed as recognition of any claimed