30% Design Submittal definition

30% Design Submittal has the meaning set out in Section C.1.3.16 of this Schedule 18;
30% Design Submittal has the meaning as set out in Schedule 18 – Technical Requirements;
30% Design Submittal means the Design Submittal that exists at the time this Agreement is executed, which included conceptual design of the alignment, station, and park-and-ride facilities.

Examples of 30% Design Submittal in a sentence

  • Proposed changes to Area Codes, if applicable, shall be submitted to the City for review prior to submission of the 30% Design Submittal.

  • Submittal Remarks 30% Design Submittal PDF and AutoCAD copies of the drawings and specifications at the 30% completion stage.

  • Address internal QA/QC comments on the 30% Design Submittal and submit the Final 30% Design Submittal to the city for review.

  • Perform Quality Assurance/Quality Control (QA/QC), design intent, and constructability reviews on the 30% Design Submittal.

  • The project will include: • Two Public Meetings • Traffic Study to determine lane configuration • 30% Design Submittal • 60% Design Submittal • 100% Design Submittal • Cost Estimating/Bid Tabulation • Construction Specifications Transportation Design shall utilize context classification design standards with the following design parameters: • Olive Road is functionally classified as a major collector road.

  • Prepare a complete 30% Design Submittal as described in Section 2 Deliverables and Schedule.

  • The 30% Design Submittal will be prepared based upon the following assumptions: • Progress level design advancements will be prepared in accordance with the configuration agreed upon in Task 400 Concept Design Update Workshop.

  • The 60% Design Submittal will be prepared based upon the following assumptions: • Progress level design advancements will be prepared in accordance with the configuration presented in the 30% Design Submittal and incorporation of comments received during the 30% review period.

  • The scope of this work shall include: o Prepare 30% Design Submittal based on previously completed 30% Design Drawings for State Street P3 project o Prepare 60% Design Submittal in collaboration with OWNER and selected GSC Provider and based on 30% Design Drawings previously completed as part of State Street P3 project and WL CSO 30% Design Drawings completed by Wessler.

  • Conduct and facilitate a technical workshop with the City staff to solicit focused City inputs about comments and decisions on 30% Design Submittal.