Active Turbine definition

Active Turbine means, in relation to a Billing Period, an offshore wind turbine which exports electricity at any time during that Billing Period;

Examples of Active Turbine in a sentence

  • The hours and/or equivalent hours of ExcludedTime shall be subtracted from Active Turbine Hours.

  • Active Turbine Hours (ACTH) can be divided into 2 sections, Available and Unavailable.

  • Kevin J.; and Kypuros, Javier A.: “Toward A Fast-response Active Turbine Tip Clearance Control”, ISABE2003-1102, 16th International Symposium on Air-breathing Engines, August 31- September 1, 2003.

  • Early in the Wind DRI process of the concept of RUTH, several months of discussion centered on whether RUTH should be Active Turbine hours or a Forced event.

  • The detailed seasonal ornithological survey was carried out as part of the Strategic and Cumulative Environmental and Social Assessment Active Turbine Management Program (ATMP) for Wind Power Projects in the Gulf of Suez targeting the overall development area including the project site.

  • Besides, RCREEE will be responsible for conducting the Active Turbine Management Program (ATMP) which consists of the Bird Monitoring Program (BMP), the Shutdown On-Demand Program (SOD Program), and the Fatality Monitoring Program (FMP) throughout the operation phase.▪ Engineering, Procurement, and Construction (EPC) Contractors: responsible for the development of the Project on a turnkey basis.

  • S., Steinetz, B., Oswald, J., ““Test Rig for Active Turbine Blade Tip Clearance Control Concepts: An Update,”” NASA CP-214383, 2006.

  • The Operations Phase will require implementation of the Active Turbine Management Programme, and its requirements shall be incorporated in to the Operational Phase ESMS.

  • When considering factors, only Active Turbine Hours (ACTH) are considered.

  • There are times, for various reasons, it is necessary to remove turbines from the Active Turbine pool.

Related to Active Turbine

  • Wind Turbine means a mechanical/electrical system that converts the kinetic energy of blowing wind into mechanical or electric power.

  • Bulk gasoline terminal means a gasoline storage facility which receives gasoline from its supply source primarily by pipeline, ship, or barge, and delivers gasoline to bulk gasoline plants or to commercial or retail accounts primarily by tank truck; and has an average daily throughput of more than 76,000 liters (20,000 gallons) of gasoline.

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.

  • Supply Period means the period commencing on the Supply Period Start Date and terminating on the Termination Date.

  • Pump spray means a packaging system in which the product ingredients within the container are not under pressure and in which the product is expelled only while a pumping action is applied to a button, trigger or other actuator.

  • Combustion turbine means an enclosed fossil or other fuel-fired device that is comprised of a compressor, a combustor, and a turbine, and in which the flue gas resulting from the combustion of fuel in the combustor passes through the turbine, rotating the turbine.

  • Supply Pipe means any part of a service pipe which a water undertaker could not be, or have been required to lay under section 46 of the Water Industry Act 1991; and

  • Power plant means a facility for the generation of

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Plasma arc incinerator means any enclosed device using a high intensity electrical discharge or arc as a source of heat followed by an afterburner using controlled flame combustion and which is not listed as an industrial furnace.

  • INTER-CONNECTION POINT/ DELIVERY/ METERING POINT means a single point at 220kV or above, where the power from the Project(s) is injected into the identified ISTS Substation (including the dedicated transmission line connecting the Projects with the substation system) as specified in the RfS document. Metering shall be done at this interconnection point where the power is injected into. For interconnection with grid and metering, the WPDs shall abide by the relevant CERC/ SERC Regulations, Grid Code and Central Electricity Authority (Installation and Operation of Meters) Regulations, 2006 as amended and revised from time to time.

  • Submerged fill pipe means any fill pipe the discharge opening of which is entirely submerged when the liquid level is six inches above the bottom of the tank, or when applied to a tank which is loaded from the side, shall mean any fill pipe the discharge opening of which is entirely submerged when the liquid level is eighteen inches above the bottom of the tank.

  • Operational Acceptance Tests means the tests specified in the Technical Requirements and Agreed Project Plan to be carried out to ascertain whether the System, or a specified Sub system, is able to attain the functional and performance requirements specified in the Technical Requirements and Agreed Project Plan, in accordance with the provisions of GCC Clause 27.2 (Operational Acceptance Test).

  • wind turbine generator or “WTG” means a structure comprising a tower, rotor with three blades connected at the hub, nacelle and ancillary electrical and other equipment which may include J-tube(s), transition piece, access and rest platforms, access ladders, boat access systems, corrosion protection systems, fenders and maintenance equipment, helicopter landing facilities and other associated equipment, fixed to a foundation;

  • chemical tanker means a ship constructed or adapted and used for the carriage in bulk of any liquid product listed in chapter 17 of the International Bulk Chemical Code;

  • Interconnection Study means any of the studies defined in the CAISO Tariff or, if applicable, any distribution provider’s tariff that reflect the methodology and costs to interconnect the Project to the Participating Transmission Owner’s electric grid.

  • Planned Financed Generation Capacity Resource means a Planned Generation Capacity Resource that, prior to August 7, 2015, has an effective Interconnection Service Agreement and has submitted to the Office of the Interconnection the appropriate certification attesting achievement of Financial Close.

  • Net metering period means the 12-month period following the date of final interconnection of the

  • Commissioning Period has the meaning set forth in Attachment T.

  • Tight-fitting facepiece means a respiratory inlet covering that forms a complete seal with the face.

  • project completion period means the period of sixty (60) months commencing from and expiring on for the construction and obtaining of Temporary Occupation Permit or Permits for the whole of the Development as provided in clause 3.3;

  • Generation Interconnection Customer means an entity that submits an Interconnection Request to interconnect a new generation facility or to increase the capacity of an existing generation facility interconnected with the Transmission System in the PJM Region.

  • Ethanol blended gasoline means the same as defined in section 214A.1.

  • Delivery Point means the point(s) of connection(s) at which energy is delivered into the Grid System i.e. the Interconnection Point.

  • Double check valve assembly means an assembly composed of two single, independently acting, check valves including tightly closing shutoff valves located at each end of the assembly and suitable connections for testing the water tightness of each check valve.

  • Fixed wing turbine powered aircraft means an aircraft that: