Application Unit Size definition

Application Unit Size means such number of Units or whole multiples thereof as specified in the Prospectus as the minimum holding or any number of Units above the minimum holding from time to time determined by the Manager, approved by the Trustee and notified to Participating Dealers.
Application Unit Size means, in respect of Listed Class of Units, such number of Units as specified in the Prospectus as the minimum holding or any number of Units above the minimum holding from time to time determined by the Manager, approved by the Trustee and notified to Participating Dealers.
Application Unit Size means, in respect of the Listed Class of Units, such number of Units or whole multiples thereof as specified in this Prospectus or such other number of Units from time to time determined by the Manager, approved by the Trustee and notified to the Participating Dealers.

Related to Application Unit Size

  • Application Unit means such number of Units or whole multiples thereof as specified in this Prospectus or such other whole multiple of Units determined by the Manager, approved by the Trustee and notified to the Participating Dealers.

  • Application area means the area where the coating is applied by spraying, dipping, or flow coating techniques.

  • Application Programming Interface or “API” means the application programming interface materials and related documentation containing all data and information to allow skilled Software developers to create Software interfaces that interface or interact with other specified Software.

  • Initial application means the Application first provided to MFA on or before an Application Deadline to request an allocation of Tax Credits.

  • Application Date or "APP" means the date CLEC provides Qwest an application for service containing required information as set forth in this Agreement.

  • Application Period means the months beginning with the month in which the application is considered to be filed, through and including the month in which an eligibility determination is made.

  • Project Implementation Unit or “PIU” means the unit referred to in Section I.A.1 of Schedule 2 to this Agreement.

  • Local public procurement unit means any political subdivision or unit thereof which expends public funds for the procurement of supplies, services, or construction.

  • Maximum Offering Size has the meaning set forth in Section 2(d);

  • Generation Unit means a facility that converts a fuel or an energy resource into electrical energy.

  • Application packet means the information, documents, and fees required by the Department for the:

  • Application Package means the forms, schedules, checklists, exhibits, computer disks and instructions thereto obtained from the Agency, which shall be completed and submitted to the Agency in accordance with all regulations in order to apply for the HTC Program.

  • Planning Application means the application for [outline/full] planning permission dated [ ] bearing the Council’s reference number [ ];

  • L/C Application means an application and agreement for the issuance or amendment of a Letter of Credit in the form from time to time in use by the L/C Issuer.

  • Excess Cash Flow Application Date as defined in Section 2.12(c).

  • Completed application means an application that satisfies all of the information and other requirements of the Tariff, including any required deposit.

  • Minimum Transaction Size means the minimum value of subsequent subscriptions,

  • Clinical Privileges or “PRIVILEGES” means the authorization granted by the Board to render specific patient care services, for which the Medical Staff Leaders and Board have developed eligibility and other credentialing criteria and focused and ongoing professional practice evaluation standards.

  • Available Transfer Capability or “ATC” shall mean a measure of the transfer capability remaining in the physical transmission network for further commercial activity over and above already committed uses.

  • Registrant Fax Ext 4321 Registrant Email: XXXXX@XXXXXXX.XXX Admin ID: 5372809-ERL Admin Name: EXAMPLE REGISTRANT ADMINISTRATIVE Admin Organization: EXAMPLE REGISTRANT ORGANIZATION Admin Street: 000 XXXXXXX XXXXXX Xxxxx Xxxx: ANYTOWN Admin State/Province: AP Admin Postal Code: A1A1A1 Admin Country: EX Admin Phone: +1.0000000000 Admin Phone Ext: 1234 Admin Fax: +1.5555551213 Admin Fax Ext: Admin Email: XXXXX@XXXXXXX.XXX Tech ID: 5372811-ERL Tech Name: EXAMPLE REGISTRAR TECHNICAL Tech Organization: EXAMPLE REGISTRAR LLC Tech Street: 000 XXXXXXX XXXXXX Xxxx Xxxx: ANYTOWN Tech State/Province: AP Tech Postal Code: A1A1A1 Tech Country: EX Tech Phone: +1.1235551234 Tech Phone Ext: 1234 Tech Fax: +1.5555551213 Tech Fax Ext: 93 Tech Email: XXXXX@XXXXXXX.XXX Name Server: NS01.EXAMPLEREGISTRAR.TLD Name Server: NS02.EXAMPLEREGISTRAR.TLD DNSSEC: signedDelegation DNSSEC: unsigned >>> Last update of WHOIS database: 2009-05-29T20:15:00Z <<< Query format: whois “registrar Example Registrar, Inc.” Response format: Registrar Name: Example Registrar, Inc. Street: 0000 Xxxxxxxxx Xxx City: Marina del Rey State/Province: CA Postal Code: 90292 Country: US Phone Number: +1.0000000000 Fax Number: +1.3105551213 Email: xxxxxxxxx@xxxxxxx.xxx WHOIS Server: whois.example-registrar.tld Referral URL: xxxx://xxx.xxxxxxx-xxxxxxxxx.xxx Admin Contact: Xxx Registrar Phone Number: +1.3105551213 Fax Number: +1.3105551213 Email: xxxxxxxxxxxx@xxxxxxx-xxxxxxxxx.xxx Admin Contact: Xxxx Registrar Phone Number: +1.3105551214 Fax Number: +1.3105551213 Email: xxxxxxxxxxxxx@xxxxxxx-xxxxxxxxx.xxx Technical Contact: Xxxx Geek Phone Number: +1.3105551215 Fax Number: +1.3105551216 Email: xxxxxxxx@xxxxxxx-xxxxxxxxx.xxx >>> Last update of WHOIS database: 2009-05-29T20:15:00Z <<< Query format: whois “NS1.EXAMPLE.TLD”, whois “nameserver (nameserver name)”, or whois “nameserver (IP Address)” Server Name: NS1.EXAMPLE.TLD IP Address: 192.0.2.123 IP Address: 2001:0DB8::1 Registrar: Example Registrar, Inc. WHOIS Server: whois.example-registrar.tld Referral URL: xxxx://xxx.xxxxxxx-xxxxxxxxx.xxx >>> Last update of WHOIS database: 2009-05-29T20:15:00Z <<< The format of the following data fields: domain status, individual and organizational names, xxxxxxx, xxxxxx, xxxx, xxxxx/xxxxxxxx, postal code, country, telephone and fax numbers (the extension will be provided as a separate field as shown above), email addresses, date and times should conform to the mappings specified in EPP RFCs 5730-5734 so that the display of this information (or values return in WHOIS responses) can be uniformly processed and understood. In order to be compatible with ICANN’s common interface for WHOIS (InterNIC), WHOIS output shall be in the format outline above.

  • Creation Application means an application by a Participating Dealer for the creation and issue of Units in an Application Unit size (or whole multiples thereof) in accordance with the Operating Guidelines and the Trust Deed.

  • Mobile Application means a specialized software program downloaded onto a wireless communication device.

  • Cogeneration unit means a unit that has equipment used to produce electric energy and forms of useful thermal energy (such as heat or steam) for industrial, commercial, heating or cooling purposes, through the sequential use of energy.

  • Limited Demand Resource Reliability Target for the PJM Region or an LDA, shall mean the maximum amount of Limited Demand Resources determined by PJM to be consistent with the maintenance of reliability, stated in Unforced Capacity that shall be used to calculate the Minimum Extended Summer Demand Resource Requirement for Delivery Years through May 31, 2017 and the Limited Resource Constraint for the 2017/2018 and 2018/2019 Delivery Years for the PJM Region or such LDA. As more fully set forth in the PJM Manuals, PJM calculates the Limited Demand Resource Reliability Target by first: i) testing the effects of the ten- interruption requirement by comparing possible loads on peak days under a range of weather conditions (from the daily load forecast distributions for the Delivery Year in question) against possible generation capacity on such days under a range of conditions (using the cumulative capacity distributions employed in the Installed Reserve Margin study for the PJM Region and in the Capacity Emergency Transfer Objective study for the relevant LDAs for such Delivery Year) and, by varying the assumed amounts of DR that is committed and displaces committed generation, determines the DR penetration level at which there is a ninety percent probability that DR will not be called (based on the applicable operating reserve margin for the PJM Region and for the relevant LDAs) more than ten times over those peak days; ii) testing the six-hour duration requirement by calculating the MW difference between the highest hourly unrestricted peak load and seventh highest hourly unrestricted peak load on certain high peak load days (e.g., the annual peak, loads above the weather normalized peak, or days where load management was called) in recent years, then dividing those loads by the forecast peak for those years and averaging the result; and (iii) (for the 2016/2017 and 2017/2018 Delivery Years) testing the effects of the six-hour duration requirement by comparing possible hourly loads on peak days under a range of weather conditions (from the daily load forecast distributions for the Delivery Year in question) against possible generation capacity on such days under a range of conditions (using a Monte Carlo model of hourly capacity levels that is consistent with the capacity model employed in the Installed Reserve Margin study for the PJM Region and in the Capacity Emergency Transfer Objective study for the relevant LDAs for such Delivery Year) and, by varying the assumed amounts of DR that is committed and displaces committed generation, determines the DR penetration level at which there is a ninety percent probability that DR will not be called (based on the applicable operating reserve margin for the PJM Region and for the relevant LDAs) for more than six hours over any one or more of the tested peak days. Second, PJM adopts the lowest result from these three tests as the Limited Demand Resource Reliability Target. The Limited Demand Resource Reliability Target shall be expressed as a percentage of the forecasted peak load of the PJM Region or such LDA and is converted to Unforced Capacity by multiplying [the reliability target percentage] times [the Forecast Pool Requirement] times [the DR Factor] times [the forecasted peak load of the PJM Region or such LDA, reduced by the amount of load served under the FRR Alternative].

  • Project Application means the federal Section 5311 operating assistance project application submitted by the Municipal Corporation to, and as approved by the Commissioner for the Project described in Appendix C of this Agreement, including all project supporting information submitted therewith;

  • Nominated Demand Resource Value means the amount of load reduction that a Demand Resource commits to provide either through direct load control, firm service level or guaranteed load drop programs. For existing Demand Resources, the maximum Nominated Demand Resource Value is limited, in accordance with the PJM Manuals, to the value appropriate for the method by which the load reduction would be accomplished, at the time the Base Residual Auction or Incremental Auction is being conducted.