Examples of Base Indices in a sentence
However, existing Base Indices shall not be changed under this Subsection.
How- ever, existing Base Indices shall not be changed under this Subsection.
However, existing Base Indices shall not be changed under this Subsection. Redetermined rates, or differences for rates subject to B3.2, and Required Deposits shall be considered es- tablished under B3.1 for timber Scaled subsequent to the contract revision. B3.32 Rate Redetermination after Cata- strophic Damage.
Xo,Yo,Zo represent the Base Indices X1, Y1, Z1 represent the Determinative Indices.
However, existing Base Indices shall not be changed under this Subsection.Upon agreement under I.3.2, redetermined rates and Required Deposits shall be considered established underD.1 for timber Scaled subsequent to Catastrophic Damage.At time of such appraisal, Specified Road construction cost shall include the estimated cost of any construction work listed in the Schedule of Items performed and abandoned.D.3.3 Rate Redetermination for Market Change.
However, existing Base Indices shall not be changed under this Subsection.Redetermined rates, or differences for rates subject to D.2, and Required Deposits shall be considered estab- lished under D.1 for timber Scaled subsequent to the contract revision.
However, existing Base Indices shall not be changed under this Subsection.Redetermined rates shall be considered established under D.1 for timber Scaled subsequent to the delay or inter- ruption.D.3.4 Emergency Rate Redetermination.
Base Indices: HCC0 = USD…PMT, SCC0 = USD…PMT and E0 = 1 USD is Rs…..
If rates established by a scheduled rate redetermination result in lower than Current Contract Rates de- termined from Bid Rates and Base Indices stated in AT4, such lower rates shall become effective only af- ter at least 2/ has been paid for and Released for Cutting.
Rates Per Unit of Measure Species (a) Product (b) Unit of Measure (c) Estimated Quantity (d) Base Rate (e) Advertised Rate (f) Offer Rate (g) Additional Deposits for Slash Disposal (h) Base Indices (i) Mandatory Timber Cutting Units Ponderosa Pine and Other Sawtimber CCF 13,882.00 $5.00 $26.76 $0.00 N/A Ponderosa Pine 9"-11.9" DBH Sawtimber CCF 4,360.00 $3.00 $25.12 $0.00 N/A Only the Fixed Rate Applies.