Baseload Dual Scheme Facility definition

Baseload Dual Scheme Facility means a Facility that is stated to be a Baseload Dual Scheme Facility in the CfD Agreement;

Related to Baseload Dual Scheme Facility

  • Qualifying Facility means an electric energy generating facility that complies with the qualifying facility definition established by PURPA and any FERC rules as amended from time to time (18 Code of Federal Regulations Part 292, Section 292.203 et seq.) implementing PURPA and, to the extent required to obtain or maintain Qualifying Facility status, is self-certified as a Qualifying Facility or is certified as a Qualified Facility by the FERC.

  • Existing Facility means a facility in existence on any given date, newly constructed or altered.

  • ro-ro passenger ship means a passenger ship with ro-ro spaces or special category spaces as defined in regulation II-2/3.

  • facial image means digital images of the face;

  • Existing tank system or “existing component” means a tank system or component that is used for the storage or treatment of hazardous waste and that is in operation, or for which installation has commenced on or prior to July 14, 1986. Installation will be considered to have commenced if the owner or operator has obtained all Federal, State, and local approvals or permits necessary to begin physical construction of the site or installation of the tank system and if either (1) a continuous on-site physical construction or installation program has begun, or (2) the owner or operator has entered into contractual obligations — which cannot be canceled or modified without substantial loss — for physical construction of the site or installation of the tank system to be completed within a reasonable time.

  • Optional Extended Local Calling Scope Arrangement Traffic is traffic that under an optional Extended Local Calling Scope Arrangement chosen by the Customer terminates outside of the Customer’s basic exchange serving area.

  • As-built drawings, as used in this clause, means drawings submitted by the Contractor or subcontractor at any tier to show the construction of a particular structure or work as actually completed under the contract. “As-built drawings” shall be synonymous with “Record