Built up Area (BUA) definition
Built up Area (BUA) means the total constructed covered area of all the floors within the building envelope up to the extent of external walls excluding the projections. The area under shafts (Plumbing, HVAC, Fire, Electrical etc.), cut outs in floor, atrium, escalator cut outs & Lift wells, smoke extractions
Built up Area (BUA) means the gross permissible built up area of a Township.
Built up Area (BUA) means the total constructed covered area of all the floors within the building envelope up to the extent of external walls excluding the projections. The area under shafts (Plumbing, HVAC, Fire, Electrical etc.), Cut outs in floor, atrium, escalator cut outs & Lift wells, smoke extractions shafts, open & covered terraces, terrace fan rooms, Underground & Overhead water tanks, STP, Cooling towers shall not be counted in Built up Area. However, these spaces are also required to be maintained/serviced by the Service Provider without any additional cost. All service areas including the built-up areas given in this RFP document are indicative only. No claim of any additional cost on
More Definitions of Built up Area (BUA)
Built up Area (BUA) means the total constructed covered area of all the floors within the building envelope up to the extent of external walls excluding the projections, Grand steps, Sunken court, area below the Grand steps at Basement-1 and Light well. The area under shafts (Plumbing, HVAC, Fire, Electrical etc.), Cut outs in floor, atrium, escalator cut outs & lift wells, smoke extractions shafts, open & covered terraces, terrace fan rooms, Underground & Overhead water tanks, STP, Cooling towers shall not be counted in Built up Area. However, these spaces are also required to be maintained/serviced by the Service Provider without any additional cost. All service areas including the built up areas given in this RFP document are indicative only and the same shall be assessed by the Bidders as per the list of drawings given in this RFP. This list of drawings is not exhaustive and the same shall be updated and provided to the successful bidder progressively after issue of Notice to Proceed. No claim of any additional cost on account of increase in the built up / serviceable areas shall be admissible.