Central Control Room definition
Examples of Central Control Room in a sentence
Transmitters / Switches) and other hardwares like Solenoid valves, Pneumatically operated Diaphragm Valves / Control Valves, Proximity Switches, Air Filter Regulators etc are provided for centralized operation of the plant from Central Control Room (CCR) / Local Panel Room (LPR).
It is understood by and between the parties that, in lieu of the clothing allowance, Central Control Room Operators and Detention Center Technicians will be provided with 4 polo shirts annually.
Maintenance of EPBAX is excluded from the scope of present tender Public Address System has been provided to establish one-way communication between Local Panel Rooms (LPR), Central Control Room (CCR) and field.
Human Factors Engineering (HFE) requirements are limited to the criteria set forth in the “Plant Design and Layout Criteria” referenced in Appendix B, with the exception of the ergonomics study to be performed on the Central Control Room (CCR) referenced in Section 4.10.2 of this Appendix A.
The company is committed to review the roles and responsibilities of the Central Control Room Operator.
Once the belt is full, the TPT BTS Supervisor arranges with the Central Control Room Operator and Tippler Supervisor to empty the belt; CV110 - ore spillage underneath the tail to the head section of the belt is removed by the general workers using spades, scrapers and wheelbarrows and placed onto CV110 belt.
On‐shift bargaining unit employees can be present when bargaining unit work is demonstrated at the Central Control Room or in the process units.
Main operational control will be out of the Central Control Room (CCR).
Once the ore spillage is in the tippler bin, the TPT BTS Supervisor arranges with the Central Control Room Operator and Tippler Supervisor to empty tippler bins; CV109 - ore spillage underneath the tail to the head section of the belt is removed by the general workers using spades, scrapers and wheelbarrows and dumped at the transfer chute onto CV110 belt.
Once the ore spillage is in the pan feeders and/or conveyor belt, the TPT BTS Supervisor arranges with the Central Control Room Operator and Tippler Supervisor to run the conveyor route so as to transfer the ore spillage from the tippler conveyor to the dump site.