Class A Construction Cost Estimate definition

Class A Construction Cost Estimate means an estimate of the Construction Cost in both elemental cost analysis format as well as trade divisional format based on completed construction drawings and specifications prepared prior to calling competitive tenders;
Class A Construction Cost Estimate means an estimate of the costs of construction for the Project based on the completed Project Design, which shall be presented in elemental format and include labour and material costs, allowance for all costs resulting from the Project Schedule, all actual associated costs, including cash allowances, contingencies, allowances for design, escalation, market conditions and anticipated amendment amounts as applicable;

Examples of Class A Construction Cost Estimate in a sentence

  • Class A Construction Cost Estimate is the final estimate before the bid or proposal call.

  • Class A Construction Cost Estimate shall be presented in elemental format and include labour and material costs, allowance for all costs resulting from the Project schedule, all actual associated costs, including cash allowances, contingencies, allowances for design, escalation, market conditions and anticipated amendment amounts as applicable.

  • The Class A Construction Cost Estimate is an estimate of the Construction Cost based on the completed Contract Documents.

  • Final reconciliation payments shall be adjusted based on Class A Construction Cost Estimate; and.3* An amount based on the time-based rates for personnel employed by the Construction Manager as described in Schedule B to the Agreement and engaged in performing the Services to the level of effort agreed prior to the commencement of the Services.

Related to Class A Construction Cost Estimate

  • Estimated Construction Cost or “ECC” means the amount calculated by Contractor for the total cost of all elements of the Work based on this Agreement available at the time(s) that the ECC is prepared. The ECC shall be based on current market rates with reasonable allowance for overhead, profit and price escalation and shall include and consider, without limitation, all alternates and contingencies, designed and specified by A/E and the cost of labor and materials necessary for installation of Owner furnished equipment. The ECC shall include all the cost elements included in the AACC, as defined above, and shall represent Contractor’s best current estimate of the Guaranteed Maximum Price it will propose for the Project based on the information then available. The ECC shall not include Contractor’s Pre-Construction Phase Fee, A/E’s Fees, the cost of the land and rights-of-way, or any other costs that are the direct responsibility of Owner.

  • Direct Construction Cost means the sum of the amounts that the Construction Manager actually and necessarily incurs for General Conditions Costs, Cost of the Work and Construction Manager’s Contingency during the Construction Phase as allowed by this Agreement. Direct Construction Cost does not include Pre-Construction Phase Fees or Construction Phase Fees.

  • Construction Cost means and includes the cost of the entire construction of the Project, including all supervision, materials, supplies, labor, tools, equipment, transportation and/or other facilities furnished, used or consumed, without deduction on account of penalties, liquidated damages or other amounts withheld from payment to the contractor or contractors, but such cost shall not include the Consulting Engineer/Architect's fee, or other payments to the Consulting Engineer/Architect and shall not include cost of land or Rights-of-Way and Easement acquisition.

  • Construction Costs means land costs, all costs paid to construct and complete the Improvements, as specified on Exhibit "B" attached hereto and made a part hereof.

  • Cost Estimate means the detailed projected expenditure, including material costs and overhead, equipment costs and overhead, labor costs and overhead, and all taxes associated with each major material and service component, required for a line extension. It shall also separately identify any incremental costs associated with providing premium services. The Company may, for the purpose of standardization, establish standard construction cost estimates, for basic or premium service plans, which shall not exceed, in any event, the average cost of constructing such line extensions in the area involved, in which case the term “cost estimate” as used in this section will be understood to mean the standard estimate thus established.

  • Erection, construction, remodeling, repairing means all types of work done on a particular building or work at the site thereof in the construction or development of the project, including without limitation, erecting, construction, remodeling, repairing, altering, painting, and decorating, the transporting of materials and supplies to or from the building or work done by the employees of the Contractor, Subcontractor, or Agent thereof, and the manufacturing or furnishing of

  • AMPS Basic Maintenance Amount, as of any Valuation Date, means the dollar amount equal to (i) the sum of (A) the product of the number of shares of AMPS and Other AMPS Outstanding on such Valuation Date multiplied by the sum of (a) $25,000 and (b) any applicable redemption premium attributable to the designation of a Premium Call Period; (B) the aggregate amount of cash dividends (whether or not earned or declared) that will have accumulated for each share of AMPS and Other AMPS Outstanding, in each case, to (but not including) the end of the current Dividend Period that follows such Valuation Date in the event the then current Dividend Period will end within 49 calendar days of such Valuation Date or

  • Maintenance Costs means parts and materials, sublet and labour costs of a qualified licensed mechanic for the maintenance of the Revenue Service Vehicles, but shall not include costs associated with interior and exterior transit advertising signs and non-mechanical servicing of Revenue Service Vehicles such as fuelling, clearing fareboxes, cleaning and painting wheel rims, vehicle washing and other work performed by a serviceman; and,

  • Operating Cost means the costs associated with operating a multifamily development once the project is placed in service.

  • Project Expenses means usual and customary operating and financial costs. The term does not include extraordinary capital expenses, development fees and other non-operating expenses.

  • Operating Costs means the incremental expenses incurred by the Recipient on account of Project implementation, management, and monitoring, including for office space rental, utilities, and supplies, bank charges, communications, vehicle operation, maintenance, and insurance, building and equipment maintenance, advertising expenses, travel and supervision, salaries of contractual and temporary staff, but excluding salaries, fees, honoraria, and bonuses of members of the Recipient’s civil service.

  • Total Contract Price/Project Cost/TCO means the price payable to Service Provider over the entire period of Contract for the full and proper performance of its contractual obligations.

  • Total Contract Price/Project Cost/TCO means the price payable to Service Provider over the entire period of Contract for the full and proper performance of its contractual obligations.

  • New construction means, for the purposes of determining insurance rates, structures for which the "start of construction" commenced on or after the effective date of an initial FIRM or after December 31, 1974, whichever is later, and includes any subsequent improvements to such structures. For floodplain management purposes, "new construction" means structures for which the "start of construction" commenced on or after the effective date of the floodplain management regulations adopted by a community and includes any subsequent improvements to such structures.

  • Estimated Project Cost means Benchmark cost of MNRE which is Rs 8.00 Crore/MWp as per MNRE letter no. 03/20/2014-15/GCRT/11.12.14 at the time of Bid Due date.

  • Project Costs means the costs of the construction, acquisition or equipping of the Project, as further described in the Project Budget, and such other costs as may be approved in writing by the Department, provided such costs are permitted by the Act.

  • Project Cost means the price payable to Service Provider over the entire period of Agreement (i.e. Rs. <in words>) for the full and proper performance of its contractual obligations.

  • Construction Fee means a fee or other remuneration for acting as general contractor and/or construction manager to construct improvements, supervise and coordinate projects or provide major repairs or rehabilitations on a Property.

  • Construction project means the same as that term is defined in Section 38-1a-102.

  • The Contract Price/Project Cost means the price payable to the Vendor under the Contract for the full and proper performance of its contractual obligations.

  • Acquisition Cost means the cost to acquire a tangible capital asset including the purchase price of the asset and costs necessary to prepare the asset for use. Costs necessary to prepare the asset for use include the cost of placing the asset in location and bringing the asset to a condition necessary for normal or expected use.

  • Original Project Cost means the capital expenditure incurred by the Generating Company or the Transmission Licensee, as the case may be, within the original scope of the project up to the cut-off date as admitted by the Commission;

  • Building construction means any physical activity on the site involved in the erection of a structure, cladding, external finish, formwork, fixture, fitting of service installation and the unloading of plant, machinery, materials or the like.

  • Construction Budget means the fully-budgeted costs for the acquisition and construction of a given parcel of real property (including, without limitation, the cost of acquiring such parcel of real property, reserves for construction interest and operating deficits, tenant improvements, leasing commissions, and infrastructure costs) as reasonably determined by the Parent in good faith.

  • Eligible Project Costs means such portion of the Project costs disbursed and loaned from the OPWC to the Recipient for the sole and express purpose of acquiring, constructing, reconstructing, expanding, improving, engineering and equipping the Project, other direct expenses, and related financing costs thereto.

  • Sub-project means a specific development project to be carried out by a Beneficiary utilizing the proceeds of a Sub-loan;