Longstop Date means 20 September 2020;
Commissioning Period has the meaning set forth in Attachment T.
Commissioning Date means that date when construction of the contemplated Project is complete, and the Maintenance Term commences;
Commissioning test means tests applied to a distributed generation facility by the applicant after construction is completed to verify that the facility does not create adverse system impacts and performs to the submitted specifications. At a minimum, the scope of the commissioning tests performed shall include the commissioning test specified in Institute of Electrical and Electronics Engineers, Inc. (IEEE) Standard 1547 Section 5.4 "Commissioning tests".
Project Completion Date means the date on which the Completion Certificate is issued;
Construction Completion Date means the Completion Date of the Construction as specified in the Statutory Declaration of Completion for the Project;
Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:
Completion Date means the date of completion of the Services by the Service Provider as certified by the Procuring Entity
Scheduled Commissioning Date or “SCD” of the Project shall mean [Insert Date];
Commissioning means the process for determining the need for and for obtaining the supply of healthcare and related services by the Trust within available resources.
Target Completion Date has the meaning given such term in Section 3.3(b).
Firm Transmission Feasibility Study means a study conducted by the Transmission Provider in accordance with Tariff, Part II, section 19.3 and Tariff, Part III, section 32.3.
Scheduled Completion Date shall be the date set forth in Clause 10.3;
Final Completion Date means the date on which Final Completion occurs.
project completion period means the period of sixty (60) months commencing from and expiring on for the construction and obtaining of Temporary Occupation Permit or Permits for the whole of the Development as provided in clause 3.3;
The Completion Date means the date of completion of the Works as certified by the Employer’s Representative.
Project Completion means the date, as determined by the Division after consultation with the Recipient, that operation of the Project is initiated or is capable of being initiated, whichever comes first.
Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.
Final Completion means the date determined and certified by A/E and Owner on which the Work is fully and satisfactorily complete in accordance with the Contract.
Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.
Outside Completion Date shall have the meaning assigned to such term in Section 6.3(d).
Decommissioning Plan means the document containing detailed information on the proposed decommissioning and covering the following: the selected decommissioning strategy; the schedule, type and sequence of decommissioning activities; the waste management strategy applied, including clearance; the proposed end state; the storage and disposal of the waste from decommissioning; the timeframe for decommissioning; the cost estimates for the completion of decommissioning; and the objectives, expected results, milestones, target dates, as well as the corresponding key performance indicators, including, as appropriate, earned value based indicators. The plan is prepared by the nuclear facility license holder and is reflected in the multiannual work programmes of the Programme;
Construction Completion means physical construction of a cleanup action component is complete.
Mechanical Completion means that (a) all components and systems of the Project have been properly constructed, installed and functionally tested according to EPC Contract requirements in a safe and prudent manner that does not void any equipment or system warranties or violate any permits, approvals or Laws; (b) the Project is ready for testing and commissioning, as applicable; (c) Seller has provided written acceptance to the EPC Contractor of mechanical completion as that term is specifically defined in the EPC Contract.
Substantial Completion Date means the date on which Substantial Completion occurs.
Framework Commencement Date means [insert date dd/mm/yyyy];