Commissioning Phase definition

Commissioning Phase means the period between MMMM YYYY and MMMM YYYY as per Annex III and Annex IV
Commissioning Phase means the period between MMMM YYYY and MMMM YYYY as per Xxxxx XXX and Xxxxx XX
Commissioning Phase a. As outlined in Section 01660.

Examples of Commissioning Phase in a sentence

  • Commissioning targets at creating a better understanding of design intent, setting performance goals ahead, and ensure the performance of the system through verification tests at the Acceptance Commissioning Phase (ASHRAE, 1996) [1].

  • HDD/Micro Trenching/ Open Trench which ever methodology is applicable in road crossing, national highway crossing, etc.The scope of work in Pre – Implementation & Implementation phase comprises of following, but not limited to: Commissioning Phase: The scope of work shall comprise survey, supply of fiber including all the accessories, live line installation and commissioning of underground optical fiber cable .The fiber has to be terminated at the points provided by APSFL.

  • The Facility Project is being implemented in two distinct phases, namely,• Phase 1 – Planning and Procurement Phase• Phase 2 – Design/Construction and Commissioning Phase.

  • Comprehensive Phase monitoring was conducted after the Commissioning Phase and start-up of plant operations was completed during February, 1985.

  • The Commissioning Phase alone does NOT provide personal protection; it must be used in conjunction with a Risk Assessment and a Control Plan that details the process that is to be undertaken.

  • The IP is in this respect a “handbook” of scientific validation activities that are distinct from those contracted by ESA and EUM Mission management directly (e.g. via the Satellite Project Commissioning Phase activities and the Mission Performance Centre in Phase E-2).Independent validation is a critical aspect that provides credibility to a mission.

  • Contractor shall remedy any breach of the Warranties set forth in this Section 2.20(a) occurring during the period commencing on the date of completion of the Commissioning Phase and ending on the date that is one (1) year after the date of completion of the Commissioning Phase (the “Warranty Period”).

  • The Principal Investigator will provide a detailed report of all his/her Commissioning Phase findings at the Preliminary Validation Results Review.

  • BACKGROUND: At its February 2012 meeting, the Commission approved Resolution CMIA-A-1112-024, allocating$40,000,000 in CMIA Construction Capital and $7,000,000 in Construction Support for the Route 46 Corridor Improvements (Whitley 2A) Project (PPNO 0226G).

  • C5 are the yearly cash outflows as illustrated below - C0 is the Net Value of CAPEX (A) as per Section – 13.2.2 of Vol –1 for Supply, Installation, Testing and Commissioning Phase - C1 is defined as: (Cost of Operations and Maintenance Services for the 1st year after “Go-Live”) as per Section– 13.2.3 of Vol – 1.


More Definitions of Commissioning Phase

Commissioning Phase. 21 days prior to Substantial Completion . Installation of Initial FF&E: 14 days prior to Substantial Completion . Completion of Punch List : Within 45 days following Substantial Completion EXHIBIT G CONTRACTOR'S CONSENT AND AGREEMENT ---------------------------------- The undersigned ("Contractor") acknowledges the assignment by ________ __________________________________________ ("Owner"), to _______________________ ("Lender"), as additional security for the obligations of Owner under a Construction Loan Agreement ("Loan Agreement") between Owner (as Borrower) and Lender (as Lender), dated __________________ of Owner's rights (but not Owner's obligations) under the Construction Contract and any future modifications of the Construction Contractor change orders ("Contract") between Owner and the Contractor pertaining to the project contemplated by the Loan Agreement, such project to be located upon certain real property described on Exhibit "A" ----------- attached hereto and made a part hereto (the "Property"). Contractor hereby consents to such assignment and represents and warrants to and agrees with Lender as follows:

Related to Commissioning Phase

  • Commissioning means the process for determining the need for and for obtaining the supply of healthcare and related services by the Trust within available resources.

  • Commissioning Period has the meaning set forth in Attachment T.

  • Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.

  • Project Commissioning means the Project will be considered as commissioned if all equipment as per rated project capacity has been installed and energy has flown into grid, in line with the Commissioning procedures defined in the RfS/PPA.

  • Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:

  • Commissioning test means tests applied to a distributed generation facility by the applicant after construction is completed to verify that the facility does not create adverse system impacts and performs to the submitted specifications. At a minimum, the scope of the commissioning tests performed shall include the commissioning test specified in Institute of Electrical and Electronics Engineers, Inc. (IEEE) Standard 1547 Section 5.4 "Commissioning tests".

  • Commissioning Date means that date when construction of the contemplated Project is complete, and the Maintenance Term commences;

  • Development Phase means the period before a vehicle type is type approved.

  • Phase 1 means the phase of the ATP comprised of: (1) improvements to the State Street Substation; (2) construction of the Proposed Line; (3) the rebuilding of NYSEG’s existing Lines 971 and 000 xxxxx xx Xxxxxxxx Xxxx xx the NYSEG ROW to allow for construction of the Proposed Line as intended; (4) improvements to the Elbridge Substation to accept the Proposed Line; and (5) National Grid’s conveyance to NYSEG of the NYSEG Acquired ROW and such other land interests as contemplated by the Purchase and Sale Agreement.

  • Decommissioning Plan means the document containing detailed information on the proposed decommissioning and covering the following: the selected decommissioning strategy; the schedule, type and sequence of decommissioning activities; the waste management strategy applied, including clearance; the proposed end state; the storage and disposal of the waste from decommissioning; the timeframe for decommissioning; the cost estimates for the completion of decommissioning; and the objectives, expected results, milestones, target dates, as well as the corresponding key performance indicators, including, as appropriate, earned value based indicators. The plan is prepared by the nuclear facility license holder and is reflected in the multiannual work programmes of the Programme;

  • Construction Phase means that Phase of the Project which shall commence after the Authority provides the Trade Contractor with written Notice to Proceed with the Construction Phase.

  • Pre-commissioning means the testing, checking, and any other required activity that may be specified in the Technical Requirements that are to be carried out by the Supplier in preparation for Commissioning of the System as provided in GCC Clause 26 (Installation).

  • Design-build team means an entity that consists of:

  • Project Completion means the date, as determined by the Division after consultation with the Recipient, that operation of the Project is initiated or is capable of being initiated, whichever comes first.

  • Design Phase means the period during which the Transporter shall prepare a draft project proposal for publication in accordance with section 4.3;

  • Phase 2 means the phase of the ATP comprised of: (1) improvements to the State Street Substation to receive Rebuilt Line 972; (2) the rebuilding of NYSEG’s existing Line 972 not performed in Phase 1; (3) construction of Relocated Line 15; (4) the construction of Bused Line 5; (5) improvements to the Elbridge Substation to receive Relocated Line 15; and (6) improvements to the Elbridge Substation to receive Bused Line 5.

  • Project Work means the work required to complete the Project.

  • Project Water means water made available for delivery to the contractors by project conservation facilities and the transportation facilities included in the System.

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.

  • Study Completion means the database for the Study has been locked and all Essential Documents have been provided to the Sponsor, including a copy of the letter from the Reviewing HREC acknowledging receipt of the final report and/or closure letter from the Principal Investigator.

  • Development Work means any work carried out in relation to the physical construction of a mine;

  • project completion period means the period of sixty (60) months commencing from and expiring on for the construction and obtaining of Temporary Occupation Permit or Permits for the whole of the Development as provided in clause 3.3;

  • Interconnection Studies means the Interconnection Feasibility Study, the System Impact Study, and the Facilities Study described in Tariff, Part IV and Tariff, Part VI.

  • generating plant means the generating facility described in Schedule 1 as amended from time to time;

  • Project Plan means the document to be developed by the Contractor and approved by WTL, based on the requirements of the Contract and the Preliminary Project Plan included in the Contractor’s bid. For the sake of clarity, the Agreed and Finalised Project Plan” refers to the version of the Project Plan submitted by the contractor after receiving the letter of Award and the same approved by WTL. The project plan may be changed/ modified during the course of the project. Should the Project Plan conflict with the provisions of the Contract in any way, the relevant provisions of the Contract, including any amendments, shall prevail.