Commissioning Phase definition

Commissioning Phase means the period between MMMM YYYY and MMMM YYYY as per Annex III and Annex IV
Commissioning Phase a. As outlined in Section 01660.
Commissioning Phase means the period between MMMM YYYY and MMMM YYYY as per Xxxxx XXX and Xxxxx XX

Examples of Commissioning Phase in a sentence

  • After the one-year maintenance period, the landscape maintenance and monitoring shall be carried out by the Contractor.4 MONITORING RESULTS 4.1 AIR QUALITY 4.1.1 Commissioning Phase Monitoring Monitoring results of air quality parameters from stack emissions of the centralised air pollution control system, the ammonia stripping plant and the cogeneration units will be provided once available to show compliance with the monitoring requirements stated in the EM&A Manual (Rev.

  • The Commissioning Phase alone does NOT provide personal protection; it must be used in conjunction with a Risk Assessment and a Control Plan that details the process that is to be undertaken.

  • HDD/Micro Trenching/ Open Trench which ever methodology is applicable in road crossing, national highway crossing, etc.The scope of work in Pre – Implementation & Implementation phase comprises of following, but not limited to: Commissioning Phase: The scope of work shall comprise survey, supply of fiber including all the accessories, live line installation and commissioning of underground optical fiber cable .The fiber has to be terminated at the points provided by APSFL.

  • The Facility Project is being implemented in two distinct phases, namely,• Phase 1 – Planning and Procurement Phase• Phase 2 – Design/Construction and Commissioning Phase.

  • Assistance during Commissioning Phase and Process Start-Up Phase.

  • A1.07 Commissioning Phase - This phase is not applicable (not included in this Task Order).

  • Facilitate all inspections required by the representatives of the executing or implementing agency, or any third party engaged by the executing or implementing agency.(v) During Commissioning Phase.

  • The Contractor shall execute the Works in three phases, the Design Phase, the Manufacturing/Supply Phase and construction i.e.; the Installation, Testing & Commissioning Phase.

  • Commissioning targets at creating a better understanding of design intent, setting performance goals ahead, and ensure the performance of the system through verification tests at the Acceptance Commissioning Phase (ASHRAE, 1996) [1].

  • TermDefinitionCommissioning Phase Testing / ControlIs not limited to commissioning, but may also include testing, fault finding, bridging, calibrating and tracking.Control PlanA document that establishes the standards, controls and guidelines that apply to a workgroup when undertaking tasks in a Commissioning Phase.


More Definitions of Commissioning Phase

Commissioning Phase. 21 days prior to Substantial Completion . Installation of Initial FF&E: 14 days prior to Substantial Completion . Completion of Punch List : Within 45 days following Substantial Completion EXHIBIT G CONTRACTOR'S CONSENT AND AGREEMENT ---------------------------------- The undersigned ("Contractor") acknowledges the assignment by ________ __________________________________________ ("Owner"), to _______________________ ("Lender"), as additional security for the obligations of Owner under a Construction Loan Agreement ("Loan Agreement") between Owner (as Borrower) and Lender (as Lender), dated __________________ of Owner's rights (but not Owner's obligations) under the Construction Contract and any future modifications of the Construction Contractor change orders ("Contract") between Owner and the Contractor pertaining to the project contemplated by the Loan Agreement, such project to be located upon certain real property described on Exhibit "A" ----------- attached hereto and made a part hereto (the "Property"). Contractor hereby consents to such assignment and represents and warrants to and agrees with Lender as follows:

Related to Commissioning Phase

  • Commissioning means the process for determining the need for and for obtaining the supply of healthcare and related services by the Trust within available resources.

  • Commissioning Period means, with respect to each Subproject, the period commencing upon the first delivery of Feed Gas to the Subproject in accordance with Sections 4.8 and 11.1 of the Agreement continuing through achievement of RFSU, commissioning, Start Up, Performance Testing and achievement of Substantial Completion for such Subproject.

  • Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.

  • Commissioning Tests means all of the procedures and tests which, in accordance with the Reasonable and Prudent Standard, and in compliance with industry guidelines, practices and standards, are:

  • Commissioning test means tests applied to the Generating Facility, after completion of the construction of the Generating Facility, in order to verify that the Generating Facility may be released for Operation.

  • Commissioning Date means that date when construction of the contemplated Project is complete, and the Maintenance Term commences;

  • Development Phase means the period before a vehicle type is type approved.

  • Phase 1 means the first implementation phase of this section, beginning June 1, 2018 and ending May 31, 2022.

  • Decommissioning Plan means the document containing detailed information on the proposed decommissioning and covering the following: the selected decommissioning strategy; the schedule, type and sequence of decommissioning activities; the waste management strategy applied, including clearance; the proposed end state; the storage and disposal of the waste from decommissioning; the timeframe for decommissioning; the cost estimates for the completion of decommissioning; and the objectives, expected results, milestones, target dates, as well as the corresponding key performance indicators, including, as appropriate, earned value based indicators. The plan is prepared by the nuclear facility license holder and is reflected in the multiannual work programmes of the Programme;

  • Construction Phase means that Phase of the Project which shall commence after the Authority provides the Trade Contractor with written Notice to Proceed with the Construction Phase.

  • Pre-commissioning means the testing, checking, and any other required activity that may be specified in the Technical Requirements that are to be carried out by the Supplier in preparation for Commissioning of the System as provided in GCC Clause 26 (Installation).

  • Design-build team means an entity that consists of:

  • Project Completion means completion of the Redevelopment in accordance with this Agreement to the state where the whole of the Morley Shopping Centre, as so redeveloped, is capable of occupation for its intended purpose;

  • Design Phase means the period during which the Transporter shall prepare a draft project proposal for publication in accordance with section 4.3;

  • Phase 2 means the second implementation phase of this section, beginning June 1, 2022 and continuing thereafter.

  • Project Work means the work required to complete the Project.

  • Project Water means water made available for delivery to the contractors by project conservation facilities and the transportation facilities included in the System.

  • Interconnection Feasibility Study means either a Generation Interconnection Feasibility Study or Transmission Interconnection Feasibility Study.

  • Generation Interconnection Feasibility Study means a study conducted by the Transmission Provider (in coordination with the affected Transmission Owner(s)) in accordance with Tariff, Part IV, section 36.2.

  • Study Completion means the database for the Study has been locked and all Essential Documents have been provided to the Sponsor, including a copy of the letter from the Reviewing HREC acknowledging receipt of the final report and/or closure letter from the Principal Investigator.

  • Development Work means the conduct of preclinical and clinical trials, the compilation of the regulatory dossier concerning Licensed Products and the conduct of other work necessary or useful for obtaining Regulatory Approval of Licensed Products.

  • project completion period means the period of sixty (60) months commencing from and expiring on for the construction and obtaining of Temporary Occupation Permit or Permits for the whole of the Development as provided in clause 3.3;

  • Interconnection Studies means the Interconnection Feasibility Study, the System Impact Study, and the Facilities Study described in Tariff, Part IV and Tariff, Part VI. Interface Pricing Point:

  • generating plant means the generating facility described in Schedule 1 as amended from time to time;

  • Project Plan means the document to be developed by the Contractor and approved by Webel Technology Ltd., based on the requirements of the Contract and the Preliminary Project Plan included in the Contractor’s bid. For the sake of clarity, the Agreed and Finalized Project Plan” refers to the version of the Project Plan submitted by the contractor after receiving the letter of Award and the same approved by Webel Technology Ltd. The project plan may be changed/ modified during the course of the project. Should the Project Plan conflict with the provisions of the Contract in any way, the relevant provisions of the Contract, including any amendments, shall prevail.

  • municipal spatial development framework means a municipal spatial development framework adopted by the Municipality in terms of Chapter 5 of the Municipal Systems Act;